Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A

16.00
4.00 4.00 4.00 4.00
10.15 10.15

2.00 1.50
0.50 3.00 0.50 2.00

0.30

0.30
0.75

2.50
4.00

1.50

4.00
2.50
1.20

3.00
CR

1.50
4.50 3.00 3.00 4.50
POWER
HOUSE NGL

0.75
1.20
4.00 4.00 12.00

3.00

SOLAR PANEL, PUMP SOLAR PANEL, PUMP


4.50 4.50 HOUSE&RESERVOIR HOUSE&RESERVOIR
2.50
LEFT SIDE ELEVATION RIGHT SIDE ELEVATION
SCALE 1:100m SCALE 1:100m
4.00
COR. G.I SHEET

GENERAL NOTES:
4.00 4.00 4.00
1.50 ALL DIMENSIONS ARE IN CENTIMETER
UNLESS OTHERWISE SPECIFIED.
ALL CONCRETE SHALL BE 3000 psi

2.50
1.50
UNLESS OTHERWISE SPECIFIED.
G

4.00
2.00 175
A CLEARANCE OF REINFORCING STEEL
BARS TO THE NEAREST SURFACE OF

3.00
WIRING CR
2.25 THE CONCRETE SHALL BE 5 cm. FOR
SETUP
GROUND FLOOR PLAN FOUNDATIONS AND WARPED SURFACES,

1.50
7 cm. FOR CONCRETE EXPOSED TO
SCALE 1:100m FFL WATER, AND 4 cm. FOR OTHERS.
NGL
LAPPING OF BARS SHALL BE 24 D FOR
2'' Ø Steel Pipe S40 INTER-LINKED HOT DIP ZINC GALVANIZE, WIDTH:150cm HOLE SIZE:5cmx5cm, WIRE Ø: GALVANIZED DEFORMED BARS AND 48 D FOR PLAIN

0.10
3.3mm ZINC GAL. COATING THK.: 80-90 g/sq.m LENGTH/METER: 9METERS BARBED WIRE BARS, SPLICE SHALL BE STAGGERED.
WEIGHT/ROLL: 38kg.
ALL EXPOSED EDGES OF CONCRETE
SHALL BE ROUNDED OR CHAMFERED.
ALL BARS NOT OTHERWISE SPECIFIED
SHALL BE 10 mm. Ø SP. 30 cm. O.C.-B.W.

1.50
OR 12 mm. Ø SP. 45 cm. O.C.-B.W.
ALL ELEVATIONS ARE IN METERS.

2.70
SHOULD THE END OF THE CANAL BE A
SOLAR PANEL, PUMP STRUCTURE, PROVIDE 0.80 m. CUT-OFF WALL.

1.20
HOUSE&RESERVOIR
4" THK. CONCRETE
HOLLOW BLOCKS W/ PLAIN SECTION @ ''A-A''
CONCRETE FINISH
SCALE 1:100m

FENCE FRONT ELEVATION


SCALE 1:100m

2.50
INTER-LINKED HOT DIP ZINC GALVANIZE, WIDTH:150cm HOLE SIZE:5cmx5cm, WIRE Ø: GALVANIZED
2'' Ø Steel Pipe S40

1.50
3.3mm ZINC GAL. COATING THK.: 80-90 g/sq.m LENGTH/METER: 9METERS BARBED WIRE

4.00
WEIGHT/ROLL: 38kg.

3.00
1.50
1.50

2.70
1.20

SOLAR PANEL, PUMP


HOUSE&RESERVOIR
4" THK. CONCRETE

FENCE REAR ELEVATION HOLLOW BLOCKS W/ PLAIN


CONCRETE FINISH REAR ELEVATION
SCALE 1:100m
SCALE 1:100m

INTER-LINKED HOT DIP ZINC GALVANIZE, WIDTH:150cm HOLE SIZE:5cmx5cm, WIRE Ø:


3.3mm ZINC GAL. COATING THK.: 80-90 g/sq.m LENGTH/METER: 9METERS
2'' Ø Steel Pipe S40 GALVANIZED WEIGHT/ROLL: 38kg. 2'' Ø Steel Pipe S40 GALVANIZED
BARBED WIRE BARBED WIRE

2.50
1.50

4.00
1.50

3.00
2.70

1.50
1.20

4" THK. CONCRETE 4" THK. CONCRETE


HOLLOW BLOCKS W/ PLAIN
CONCRETE FINISH
HOLLOW BLOCKS W/ PLAIN
CONCRETE FINISH
SOLAR PANEL, PUMP
FENCE LEFT SIDE ELEVATION FENCE RIGHT SIDE ELEVATION HOUSE&RESERVOIR
SCALE 1:100m SCALE 1:100m
FRONT ELEVATION
SCALE 1:100m

PRC NO.: VALIDITY: PROJECT TITLE: DESIGNED AND DRAFTED BY: RECOMMENDED BY: RECOMMENDING APPROVAL: SHEET CONTENT: SHEET No.:

FLOOR PLAN
PROPOSED POWER HOUSE W/ FENCE OF SAN
CHECKED BY: REVIEWED BY: APPROVED BY:
ELEVATIONS A-2
PTR NO.: DATE : (TYPICAL PLAN) SECTIONS
GENERAL NOTES
PLACE: TIN:

C:\Users\ASUS\Desktop\2023 IPCR DESIGN PLANS AND CHECK PLANS AND INSP


2 OF 2

You might also like