CONSTRUCTION OF DRUG STORES

GENERAL HOSPITAL - KALUTARA


ENGINEER'S ESTIMATE

BILL NO.03 - SUPER STRUCTURE

RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
Rs. Cts. Rs. Cts.

3B- CONCRETE WORK

Unless otherwise stated all concrete shall be Note


of grade as per Specifications/Drawings.

Rates for concrete shall include for Note


construction joints, expansion joints or
contraction joints as necessary.

Concrete will be measured as the net Note


area/volume, as shown on the drawings.

Rate for concrete shall include for :


supply, handling at site, depositing, Note
compacting, vibrating, curing and making
good after removal of formwork.

preparation of surfaces, roughening/chipping Note


to the approval of the Engineer.

Reinforcement and Formwork paid separately Note


unless specified in the Item.

All concrete shall be so cast as to receive fair Note


face finish on it's exposed faces suitable to
receive paint/sealer directly.

All major structural concrete works ( Slabs, Note


beams, columns etc) shall be 'Ready mix'
concrete of relevant grade and other minor
concrete works ( lintels, worktops, floor
Concretes etc) shall be machine mixing
concrete of relevant mix ratios.

Rate shall include for necessary tests Note


including cube tests as per the BS 1881 and
SCA/4/1.

16
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
Rs. Cts. Rs. Cts.
Rate for formwork shall include for all Note
necessary boarding, supports, erecting,
framing, cutting angles, cleaning, apply
approved foam oil, wetting before placing
concrete, removal etc.

Formwork is measured as the net contact Note


surface measurement between formwork and
concrete.

Film coated Plywood or other equivalent Note


quality approved type of shuttering to
produced to have fair faced concrete finish.
Mould oil should be applied to formwork
surfaces before using.

Rate for form work shall include for all Note


necessary measures to provide fair face finish.
(Concrete faces should be finished such a
way to finish only with cement base putty. If
not additional work involved to level the
surface should be born by the Contractor)

All reinforcement shall be as per relevant Note


British Standards having minimum
characteristic strength of 460 N/mm2 for
ribbed tor steel and 250 N/mm2 for mild steel
and complied the relevant drawing specs.

Rate shall include for necessary tests as per Note


BS4449 and SLS 375.

All reinforcement shall be free from mill scale, Note


dirt, oil, paint, grease or loose rust before
fixing in position and shall be brushed with a
stiff wire brush as directed.

Rate for reinforcement shall include for Note


supplying, cleaning, cutting, bending,
fabricating, binding, placing in position,
binding wires, ties, supporting bars, spaces,
chairs, wastage etc.

Grade 25 (20) cement concrete for column


shafts.

3B-1 Second floor to third floor level 5.61 m3

3B-2 Third floor to Roof terrace floor level 5.61 m3

17
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
Rs. Cts. Rs. Cts.
3B-3 Roof terrace to water tank level 1.89 m3

Grade 25 (20) cement concrete for floor


slab.

3B-7 Third Foor 41.4 m3

3B-8 Roof Terrace Floor 41.8 m3

3B-9 Water Tank level 5.31 m3

Grade 25 (20) cement concrete for beams.

3B-14 Third Floor 28.9 m3

3B-15 Roof Terrace Floor 28.0 m3

3B-15 Water Tank Level 5.1 m3

Grade 25 (20) cement concrete for


Staircase including steps, waist, beams
and landing.

3B-21 First floor to Second floor level m3

3B-22 Second Floor to Third Floor level m3

3B-23 Third Floor to Roof Terrace Floor level m3

Grade 25 (20) cement concrete for


sunshades.

3B-26 Second Floor m3

3B-27 Third Floor m3

3B-28 Roof Terrace Floor m3

FORMWORK

Form work for sides of column shaft

3B-65 Second Floor to Third Floor level 66 m2

3B-66 Third Floor to Roof Terrace level 66 m2

3B-67 Roof terrace to water tank level 24.5 m2

18
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
Rs. Cts. Rs. Cts.

Form work for soffit of slab

3B-71 Third Floor 274.3 m2

3B-72 Roof Terrace Floor 274.3 m2

3B-73 Water Tank Level 34.9 m2

Form work for sides and soffit of beams

3B-77 Third Floor 190 m2

3B-78 Roof Terrace Floor 182 m2

3B-79 Water Tank Level 35 m2

Form work for Staircase including soffit of


sloping flight, steps, waist, beams and
landing.

3B-84 First floor to Second Floor level m2

3B-85 Third Floor to Roof Floor level m2

Form work for soffit of Sunshades.

3B-89 Second Floor m2

3B-90 Third Floor m2

3B-91 Roof Floor Floor m2

REINFORCEMENT

Tor steel reinforcement for column shaft.

3B-99 Second Floor to Third Floor level 4,000 kg

3B-100Third Floor to Roof Terrace Floor level 5,200 kg

Tor steel reinforcement for slab

3B-105Third Floor 6,000 kg

3B-106Roof Terrace Floor 6,000 kg

Tor steel reinforcement for beams.


19
RATE AMOUNT
ITEM DESCRIPTION QTY UNIT
Rs. Cts. Rs. Cts.

3B-111Third Floor 7,350 kg

3B-112Roof Terrace Floor 7,350 kg

Tor steel reinforcement for Staircase


including steps, waist, beams and landing.

3B-118First Floor to Third Floor level 300 kg

3B-119Third Floor to Roof Terrace level 300 kg

Tor steel reinforcement for Sunshades.

3B-123Second Floor 80 kg

3B-124Third Floor 80 kg

3B-125Roof Terrace Floor 40 kg

Mild steel reinforcement

3B-134Third Floor 200 kg

3B-135Roof Terrace Floor 200 kg

Sub Total for Miscellaneous Carried to Sub Summary of


- 5,315,805.00
Superstructure

20
height
size 2nd to 3rd 3rd to roof roof to water tank
inch x inch column ht ft m3 ht ft ht ft
12 18 c1 8.5 0.361 8.5 0.361 7.5 0.319

12 18 c2 8.5 0.361 8.5 0.361 7.5 0.319


12 18 c3 8.5 0.361 8.5 0.361
12 18 c4 8.5 0.361 8.5 0.361
12 18 c10 8.5 0.361 8.5 0.361
12 18 c11 8.5 0.361 8.5 0.361

12 18 c9 8.5 0.361 8.5 0.361


12 18 c12 8.5 0.361 8.5 0.361
12 18 c14 8 0.340 8 0.340
12 18 c15 8 0.340 8 0.340 7 0.297
12 18 c18 8 0.340 8 0.340

12 21 c17 8 0.396 8 0.396

9 12 c5 8.5 0.181 8.5 0.181 7.5 0.159


9 12 c7 8.5 0.181 8.5 0.181 7.5 0.159

99 c6 8.5 0.135 8.5 0.135 7.5 0.119


99 c8 8.5 0.135 8.5 0.135 7.5 0.119

12 12 c13 8 0.227 8 0.227


12 12 c19 8 0.227 8 0.227 7 0.198

12 12 c16 8 0.227 8 0.227 7 0.198


5.615585 5.615585 1.88838
m3 m3 m3

Formwork height Formwork


size 2nd to 3rd 3rd to roof roof to water tank
inch x inch column ht ft m2 ht ft m2 ht ft m2
12 18 c1 8.5 3.948 8.5 3.948 7.5 3.484

12 18 c2 8.5 3.948 8.5 3.948 7.5 3.484


12 18 c3 8.5 3.948 8.5 3.948
12 18 c4 8.5 3.948 8.5 3.948
12 18 c10 8.5 3.948 8.5 3.948
12 18 c11 8.5 3.948 8.5 3.948

12 18 c9 8.5 3.948 8.5 3.948


12 18 c12 8.5 3.948 8.5 3.948
12 18 c14 8 3.716 8 3.716
12 18 c15 8 3.716 8 3.716 7 3.252
12 18 c18 8 3.716 8 3.716

12 21 c17 8 4.088 8 4.088


9 12 c5 8.5 2.764 8.5 2.764 7.5 2.439
9 12 c7 8.5 2.764 8.5 2.764 7.5 2.439

99 c6 8.5 2.369 8.5 2.369 7.5 2.090


99 c8 8.5 2.369 8.5 2.369 7.5 2.090

12 12 c13 8 2.973 8 2.973


12 12 c19 8 2.973 8 2.973 7 2.601

12 12 c16 8 2.973 8 2.973 7 2.601


66.00761 66.00761 24.47995
m2 m2 m2
Slab 3rd floor roof water tank
ft2 tk inch volume m3 tk inch volume m3 ft2 tk inch volume m3
221.11 6 3.13 6 3.13
107.256 6 1.52 6 1.52
107.854 6 1.53 6 1.53
101.184 6 1.43 6 1.43 30.06 6 0.43
45.7 6 0.65 6 0.65 18.56 6 0.26
250.332 6 3.54 6 3.54 13.67 6 0.19
163.973 6 2.32 6 2.32 17.84 6 0.25
119.479 5 1.41 6 1.69 47.277 6 0.67
37.638 5 0.44 6 0.53 16.667 6 0.24
50.627 6 0.72 6 0.72
364.34 6 5.16 6 5.16
346.6 6 4.91 6 4.91
62.656 6 0.89 6 0.89 40.603 6 0.57
29.8 5 0.35 6 0.42 122.3 6 1.73
303.34 6 4.29 6 4.29 68.32 6 0.97
389.76 6 5.52 6 5.52
70.833 6 1.00 6 1.00
71.458 6 1.01 6 1.01
91.667 6 1.30 6 1.30
16.667 6 0.24 6 0.24
41.36 41.80 5.31
m3 m3 m3

Formwork
Slab 3rd floor =roof roof water tank
ft2 m2 ft2 m2
221.11 20.5
107.256 10.0
107.854 10.0
101.184 9.4 30.06 2.8
45.7 4.2 18.56 1.7
250.332 23.3 13.67 1.3
163.973 15.2 17.84 1.7
119.479 11.1 47.277 4.4
37.638 3.5 16.667 1.5
50.627 4.7
364.34 33.8
346.6 32.2
62.656 5.8 40.603 3.8
29.8 2.8 122.3 11.4
303.34 28.2 68.32 6.3
389.76 36.2
70.833 6.6
71.458 6.6
91.667 8.5
16.667 1.5
2952.27 274.28 274.28 34.87
ft2 m2 m2 m2
beam 3rd floor roof
volume m3 dx h length length
inch x inch ft ft inch x
3B6 12 24 51.75 2.930794 51.75 2.930794 WB1
3B5 18 24 47.75 4.056388 47.75 4.056388 WB2
3B4 12 18 43.25 1.837055 43.25 1.837055 WB3
3B3 12 18 45.25 1.922006 45.25 1.922006 WB4
3B2 9 15 8.25 0.219013 8.25 0.219013 WB5
3B1 12 18 49 2.081288 49 2.081288
0 0 WB6
3B7 &8 12 18 74.75 3.175026 74.75 3.175026 WB7
3B9 9 21 21.25 0.789775 21.25 0.789775 WB8
9 21 5 0.185829 5 0.185829 WB9
0 0 WB10
3B10 12 18 5 0.212376 5 0.212376
12 18 21.25 0.902599 21.25 0.902599
12 18 18.75 0.796411 18.75 0.796411
12 18 15.5 0.658367 15.5 0.658367
0 0
3B11 18 24 14 1.189308 14 1.189308
0 0
3B12 12 18 15.5 0.658367 15.5 0.658367
12 18 14 0.594654 14 0.594654
0 0
3B13 18 24 15.5 1.316733 15.5 1.316733
18 24 14 1.189308 14 1.189308
0 0
3B14 12 18 5 0.212376 5 0.212376
12 18 21.25 0.902599 21.25 0.902599
12 18 19 0.80703 19 0.80703
12 18 16 0.679604 16 0.679604
12 18 15.5 0.658367 15.5 0.658367
0
Edge beam 96 38.75 0.411479
96 44.75 0.475192
28.86 27.98

Formwork
beam 3rd floor roof
dx h length beam bottom sides length
inch x inch ft m2 m2 ft
3B6 12 24 51.75 4.807732 14.4232 51.75 14.4232
side 6 51.75 0 2.403866 2.403866

3B5 18 24 47.75 6.65418 13.30836 47.75 13.30836


3B4 12 18 43.25 4.018056 8.036113 43.25 8.036113
3B3 12 18 45.25 4.203863 8.407725 45.25 8.407725
3B2 9 15 8.25 0.574838 1.149675 8.25 1.149675
3B1 12 18 49 4.552249 9.104498 49 9.104498
0 0
3B7 &8 12 18 74.75 6.944502 13.889 74.75 13.889
side 6 74.75 0 3.472251 3.472251

3B9 9 21 21.25 1.480642 4.935474 21.25 4.935474


9 21 5 0.348386 1.161288 5 1.161288
0 0
3B10 12 18 5 0.464515 0.92903 5 0.92903
12 18 21.25 1.97419 3.948379 21.25 3.948379
12 18 18.75 1.741932 3.483864 18.75 3.483864
12 18 15.5 1.439997 2.879994 15.5 2.879994
0 0
3B11 18 24 14 1.950964 3.901928 14 3.901928
0 0
3B12 12 18 15.5 1.439997 2.879994 15.5 2.879994
12 18 14 1.300643 2.601285 14 2.601285
0 0
3B13 18 24 15.5 2.159996 4.319991 15.5 4.319991
18 24 14 1.950964 3.901928 14 3.901928
0 0
3B14 12 18 5 0.464515 0.92903 5 0.92903
12 18 21.25 1.97419 3.948379 21.25 3.948379
12 18 19 1.765158 3.530316 19 3.530316
12 18 16 1.486449 2.972897 16 2.972897
12 18 15.5 1.439997 2.879994 15.5 2.879994
0 0
Edge beam 9 12 38.75 0 3.599993
9 12 44.75 0 4.157411

Voids 6 54 2.508382 2.508382


6 25.5 1.184514 1.184514
6 26.5 1.230965 1.230965

55.14 134.85 127.09


m2 m2 m2

189.99 182.23
water tank
dx h length
inch x inch ft
12 12 9.75 0.276089
12 12 7.25 0.205297
12 12 6 0.169901
12 15 23.75 0.840656
12 15 23.25 0.822958
0
12 12 11.5 0.325644
12 18 12 0.509703
12 18 15.75 0.668986
12 18 19.25 0.817649
12 18 11.25 0.477847

5.11

water tank
dx h length beam bottom sides
inch x inch ft m2 m2
WB1 12 12 9.75 0.905805 0.905805
WB2 12 12 7.25 0.673547 0.673547
WB3 12 12 6
WB4 12 15 23.75 2.206447 3.309671
WB5 12 15 23.25 2.159996 3.239994
0 0
WB6 12 12 11.5 1.068385 1.068385
WB7 12 18 12 1.114836 2.229673
WB8 12 18 15.75 1.463223 2.926446
WB9 12 18 19.25 1.788384 3.576767
WB10 12 18 11.25 1.045159 2.090318

sides 6 56 2.601285

12.43 22.62
m2 m2

35.05