Completed

Will be completed before


24th, May

FLB 8 15 Glasses will be installed before 24th, May


FLB 9 14 Glasses will be installed before 24th, May
FLB 11 15 Glasses will be installed before 24th, May
FLB 13 34 Glasses will be installed before 24th, May
FLB 14 26 Glasses will be installed before 24th, May
KEY PLAN

KEY TILE

U1 U2 V1 V2 W1 W1a
62 63 67 68 71 72
T3 T4 U3 U4 V3 V4 W2 W2a
T3 T4 64 65 69 70 73 74
D1 D2 E1 E2 F1 F2 W3 W3a
D1 D2 66 15 18 19 75 76
D3 D4 E3 E4 F3 F4 W4 W4a
D3 D4 16 17 20 21 77 78
J1 J2 K1 K2 Y1 Y2 W5 W5a
J1 22 24 25 83 84 79 80
J3 J4 K3 K4 Y3 Y4 W6 W6a
J3 23 26 87 85 86 81 82
M2 N1 N2 N1a N2a
M2 91 92 88 89
M4 N3 N4 N3a
M4 93 94 90
P2

EWS101-B127 EWS101-B124 EWS101-B124 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B121 28


P4
30

GENERAL NOTES :
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
EWS101-B127 EWS101-B124 EWS101-B124 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B121 2.
3.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE.
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL
RELEVANT KEY PLANS, SPECIFICATIONS, REPORTS, SCHEDULES,
APPROVED MATERIALS AND ANY OTHER SHOP DRAWINGS.
5. ANY DISCREPANCY IN THE DRAWING SHALL BE BROUGHT TO THE
EWS101-B127 EWS101-B124 EWS101-B124 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B121 NOTICE OF DESIGN OFFICE PRIOR TO EXECUTION OF THE WORK.
6. ALL DIMENSIONS SHALL BE CHECKED ON SITE AND VERIFIED PRIOR
TO EXECUTION OF THE WORK.

EWS101-B126 EWS101-B123 EWS101-B123 EWS101-B02 EWS101-B02 EWS101-B02 EWS101-B02 EWS101-B02 EWS101-B120 LEGENDS:

EWS101-B125 EWS101-B122 EWS101-B122 EWS101-B100 EWS101-B100 EWS101-B100 EWS101-B100 EWS101-B100 EWS101-B119 COORDINATION TABLE
DESIGN DEPT. NAME SIGN DATE

Will be Completed before IFC DRAWING REFERENCE


NO DWG. NO DRAWING TITLE REV.

24th, May

Completed SHOP DRAWING REFERENCE


NO DWG. NO DRAWING TITLE REV.

BIM MODEL REFERENCE


MODEL NO DRAWING TITLE REV.

0 1 2 3 4 5 10
GRAPHIC SCALE 1:100
ALL DIMENSION IN MILLIMETER
LEVEL ± 0.00 = 0.00 QNHD

REV DATE DESCRIPTION OF REVISION BY REVIEWED APPROVED

DATE SIGNATURE

DESIGNED BY:

DRAWN BY:

EWS101-B133 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B130 CHECKED BY:

EMPLOYER

EWS101-B133 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B130

EWS101-B133 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B03 EWS101-B130 PROJECT MANAGER

EWS101-B132 EWS101-B02 EWS101-B02 EWS101-B02 EWS101-B02 EWS101-B02 EWS101-B129 DESIGN CONSULTANT

EWS101-B131 EWS101-B100 EWS101-B100 EWS101-B100 EWS101-B100 EWS101-B100 EWS101-B128


MAIN CONTRACTOR

SUB-CONTRACTOR
ShenYang YuanDa Aluminium Industry Engineering Co.,Ltd
TEL:0086-024-25273225 FAX:0086-024-25273055
Http:www.yuandacn.com
Yuanda China Holdings
NO.20,13th street ,Shenyang E
China

PROJECT

GOVERNMENT OF THE STATE OF QATAR


Hamad International Airport
EXPANSION PROJECT
DRAWING TITLE

A7110 Concourse D & E Works

技术说明:1.玻璃合框加工细目见:GJ202240-H347~H348/H430 ;
EWS101 玻璃安装编号图
铝散件加工细目见:GJ202240-H261/H263; 泡沫棒美纹纸见提料:GJ202240-T444/T449; 层间铝背衬板安装图见:GJ202240-BH147
标准件提料见:GJ202240-T437/T439; 密封胶提料见:GJ202240-T298/T299; 层间防火系统提料见:GJ202240-T354/T355; PROJECT No. DATE SCALE AT A0 REVISION
防水膜见提料:GJ202240-T300/T301; 保温岩棉提料见:GJ202240-T155/T156; ME-00065 1:400 00
铝箔胶带提料单GJ202240-T297; PP垫提料见:GJ202240-T442/T447; DRAWING No.

GJ202240-BH230
Completed

Will be completed before 24th, May


Completed

Completed