Responsibilities:
1. Plan work activity based on client priority of completion.
2. Monitor work progress of erection work as per the work planned.
3. Report work progress on daily basis and consult with client on any amendment/issues.
Fig. 1 : Erection of cable tray on steel structure Fig. 2 : Modification of grating for pipe entrance
Page 2 of 5
SITE WORK : PETRONAS RAPID PACKAGE 4
Industry : Oil and Gas Fabrication
Client : Petronas
Consultant : Petrofac
Contractor : Muhibbah Steel Industries
Location : Port Klang, Selangor
Duration : June 2016 – December 2016
Responsibilities:
1. Plan packaging and delivery activity based on erection of site/client request.
2. Coordinate process flow from material fabrication up to delivery of package.
3. Handling RFI, Client Approval and prepare Material Delivery Order (DO)
Responsibilities:
1. Prepare Work Method Statement and JHA prior commencement of work
2. Plan work progress daily at site monitor work progress of per the planned work.
3. Report work progress on daily basis and consult with client on any amendment/issues.
Fig. 5 : Heavy lifting of 25-ton bridge Fig. 6 : Laydown area to place steel structures
Page 4 of 5
DESIGN WORK : OPTIMIZING DIB NOZZLE GEOMETRY
Objective : Optimize Dry Ice Blasting (DIB) Nozzle Geometry using CFD analysis
Location : Universiti Tun Hussein Onn Malaysia (UTHM)
Duration : September 2017– October 2019
Research Title : Geometry Optimization of Dry Ice Blasting Nozzle for the Noise Reduction
using Experimental Validation.
Research Summary : This study focuses on maximizing particle velocity and minimizing acoustic noise
emission from a nozzle. UTHM has patented the explicit and novelty approach of this work
under commercialization for an industrial cleaning system.
Fig. 7 : Measuring sound power level as per ISO 3746 Fig. 8 : Simulation of optimum nozzle geometry