JABATAN KERJA RAYA MALAYSIA
SENARAI KUANTITI
Kami seperti nama syarikat di bawah mengesahkan tawaran harga yang tersenarai di dalam senarai
kuantiti ini adalah sama sepertimana di dalam Borang Tender yang dihasilkan di dalam sistem dan
sebarang percanggahan akan menyebabkan tawaran kami ditolak.
Senarai kuantiti ini dikeluarkan oleh BAHAGIAN KESIHATAN. Sebarang pertanyaan boleh berhubung dengan pegawai yang menyediakan tender dan maklumat pegawai
untuk dihubungi boleh didapati di laman iklan.
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
0.00
SENARAI KUANTITI
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
RINGKASAN TENDER
B2 PILE CAPS
H PROVISIONAL SUMS
Sila pilih: -
Sila pilih muka surat
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
1.0 GENERAL
1.1 The Works contained in the Contract shall include the provision of all labour,
materials, constructional plant, temporary or permanent works as required in the
Contract.
1.2 The Bill of Quantities shall be read in conjunction with the Conditions of Contract, the
Specification and the Drawings in the Contract Documents.
1.3 The items as set out in the Bill of Quantities shall apply to the whole of the Works
contained in the Contract and the Contractor shall allow for compliance with the
same and for any cost incurred in connection therewith.
1.4 Headings are not comprehensive and do not necessarily reflect or modify the
meaning of the items in the B.Q. The exact nature and extent of the work to be
carried out shall be ascertained by reference to the Contract as a whole, in particular
the Conditions of Contract, the Specification and the Drawings. It shall be read
together with the relevant “Method of Payment”.
1.5 The amounts inserted by the Contractor for such items shall be deemed to apply to
the whole of the Works carried out under this Contract.
1.6 Each item shall be individually priced. Bulk pricing for sections, trades, groups or
pages of items shall not be allowed and no subsequent claims for loss or expense
and/or profit shall be entertained for failure to comply with this clause.
1.7 The rates and prices inserted in the Bill of Quantities shall include cost of the works
described, all risks, liabilities and obligations set forth or implied in the Contract
Document and shall be deemed to include the following, unless expressly stated
otherwise:
b) the supply of materials, goods, equipment and storage thereof including delivery
to site and all costs in connection therewith;
c) taking delivery of materials, goods and equipment necessary for the Works and
including those supplied by others, loading and unloading, storage and all costs
in connection therewith;
d) the usage of plants and machineries and all costs in connection therewith;
e) the fixing, erecting and installing or placing in position of materials, goods and
equipment including around obstruction, tolerances, penetration, working
space, over-breaks etc. and all costs in connection therewith;
f) the provision of all temporary works and all costs in connection therewith unless
JKR E-Tender | SD210723
ITEM DESCRIPTION
f) the provision of all temporary works and all costs in connection therewith unless
separately provided for in the Bill of Quantities;
(g) the phasing requirements of the Works including the effect on the programming
of the Works of all traffic and drainage diversions, special structural
requirements, earthwork restrictions, alterations to services and street lighting
(executed under the Contract or in conjunction with it) and all other
requirements of the Contract and all costs in connection therewith;
(h) all cost of testing to show proof of compliance with the Specification on
materials and workmanship inclusive of samples of materials and submission
of tests results. Should the frequency of testing and sampling not specified,
then it shall be in accordance with the relevant Malaysian/British Standards and
Codes of Practice. Where there is no such relevant Standards and Codes of
Practice for reference, it shall then be as instructed by the S.O.;
(i) all royalties and dues which the Contractor may be required to pay;
(j) wastage;
1.8 Where any priced item in the B.Q. but has not been executed on site by the
Contractor, the cost of such priced item shall accordingly be deducted from the
Contract Sum.
1.9 All items priced shall be deemed to include compliance with the provisions of the
contract, statutes, regulation, by-laws or any order or directive issued by public
authority or public service company and other related legislation currently in force.
1.10 Notwithstanding the above clauses, the S.O. reserves the right to request from the
Contractor the detailed breakdown of the pricing for items or rates in the B.Q. for his
perusal. The detailed breakdown pricing may be used as a basis for the
administration of the Contract
2.0 MEASUREMENT
2.1 Quantities in the Bills of Quantities are measured in accordance with the Malaysian
Standard Method of Measurement of Building Works (2nd Edition Metric 2000).
Where departure have been made from the standards mentioned, the method
adopted in the Bills shall be adhered to for the purposes of sscertaining the value of
all variations and measurements.
3.1 Where any item is left unpriced, it shall be deemed that the cost of such item has
A/1
been allowed for elsewhere within this document. No subsequent claims arising out
of expense and/or loss incurred against such unpriced item shall be entertained.
A/2
BILL NO. A - KERJA-KERJA AWALAN (PRELIMINARIES)
KLINIK KESIHATAN (JENIS 3) DENGAN KUARTERS
SELISING,PASIR
ITEM PUTEH,KELANTAN (GANTIAN) DESCRIPTION
15/5/2024 - 9:21 AM
4.1 Attendance and facilities for Nominated Sub-contractors and nominated suppliers
shall include:
(a) in the case of works or services executed : for allowing the use of existing
working space, access, temporary roads, erected scaffolding, sanitary, welfare
and other facilities existing on Site and the provision of protection, water,
electricity for lighting and clearing away rubbish and debris arising from the
work;
(b) in the case of goods, materials or services supplied: for taking delivery,
unloading, storing, protection and returning crates, cartons and packing
materials,
5.1 The rates and prices shall, unless otherwise stated, include for the costs of
compliance with any restrictions imposed on the programming of the Works by the
Government and Local Authorities and other relevant authorities dealing with phasing
sequence of operations, method of construction, safety and health and liaison and
access.
6.1 The rates and prices shall include for a testing laboratory or an accredited laboratory
approved by SIRIM, equipment and staff for carrying out the tests, tests and the
effects on the progress of the Works for the carrying out of all trials, sampling and
tests whether specified in the Contract Document or otherwise in order to ensure
compliance with the requirements of the Specification except where separately
itemised in the Bill of Quantities.
7.1 The Contractor shall include in his rates and prices for taking measures to services
and mains and other equipment and machineries during the progress of the Works.
The Contractor shall inform the S.O. of all arrangements with all Statutory and Public
Utility Authorities.
8.1 The rates shall include any costs arising from and in connection with the execution of
work under water wherever required unless otherwise stated.
A/3
BILL NO. A - KERJA-KERJA AWALAN (PRELIMINARIES)
ITEM DESCRIPTION
KLINIK KESIHATAN (JENIS 3) DENGAN KUARTERS
9.0
SELISING,PASIR PHRASEOLOGY
PUTEH,KELANTAN (GANTIAN)
15/5/2024 - 9:21 AM
9.1 Differences in the method of billing and in phraseology used in various parts of the
Bill of Quantities and/or Schedule of Rates shall not be a basis of any claim for an
ITEM DESCRIPTION
9.0
JKR E-Tender | SD210723
PHRASEOLOGY
9.1 Differences in the method of billing and in phraseology used in various parts of the
Bill of Quantities and/or Schedule of Rates shall not be a basis of any claim for an
increase in the rates and prices.
10.1 All provisional sums included in the Bill of Quantities are intended to be approximate
indications only of the amounts to be expended in respect of the work described and
may be omitted entirely or substantially varied without entitling the Contractor to any
claim for compensation. No part of the Contractor’s overhead, expenses or profit
should be included in these sums when the bill is priced unless items for profit and
attendance are specifically allowed for.
11.1 Pricing of the Contract shall be in Malaysian Ringgit to two decimal place. Payment to
the Contractor under the Contract shall be in Malaysian Ringgit.
12.1 Work in connection with the temporary diversion and relocation of existing overhead
and underground services, whether detailed in the Contract or not shall be covered
by the appropriate Lump Sum Items in Bill No. 1 : Preliminaries and General
Conditions unless separately measured in other parts of the Bill of Quantities.
13.0 ABBREVIATIONS
13.1 The following abbreviations or symbols are generally used in the Contract Document
and shall be read as follows:
a) mm : milimetre
b) m : metre
c) m2 : square metre
d) m3 : cubic metre
e) kg : kilogramme
f) tonne : metric ton
g) No. : Number
h) L.S. : Lump Sum
i) P.C. Sum : Prime Cost Sum
j) P.S. : Provisional Sum
k) RM : Ringgit Malaysia
A/4
BILL NO. A - KERJA-KERJA AWALAN (PRELIMINARIES)
ITEM DESCRIPTION
A) Preliminaries Works
D) External Works
G) Provisional Sum
The site for the proposed Works is located at Lot 2574 & 2100 Mukim Selising as
shown on drawing no. JKR/CA/09/123/D22/060/PT/01.
The Contractor shall comply with the List of Building Information Modelling (BIM)
Deliverables as specified in APPENDIX A/8 for the following works:
A/5
Project Signboard
Construction Plan
D The Contractor shall submit to the S.O. for his approval the
following as specified :
a) Programme of Works
For the purpose of submission, updating and revision of the work
programme as the case maybe, the Contractor shall prepare project
construction simulation by integrating baseline programme of works
with the 3D BIM model provided. This will enable the verification of
the said work programme. This process shall be maintained
throughout the duration of the contract and shall be updated
whenever necessary or as instructed by the S.O. The submission
shall be made in video (.wmv / .avi / .mp4) and native file format
(.nwf and. nwd).
b) Method statements
c) Contractor's organisation chart
d) Schedules
To Collection :
G The Contractor shall locate the actual position and provide support
and full protection of existing services and mains during the
progress of the Works. The Contractor shall inform the S.O. of all
arrangements with the various authorities.
To Collection :
Progress Photographs
To Collection :
H The Contractor shall ensure that the above appointed personnel has
working experience in using BIM tools or shall at least attended any BIM
courses conducted by CIDB/Professional Boards or any recognized
BIM application vendor/supplier/system provider.
J The M&E Coordinator and shall refer and employ the latest BIM models
during coordination works to resolve discrepancies and to resolve
design issues that may arise before and during the commencement
of works on site.
To Collection :
A The Contractor shall clear and clean the Works including existing
roads, drains bounding the Site of any debris, earth, et cetera, and
making good all damages upon completion as specified.
Form of Contract
B The Contractor shall refer to the Standard Form of Contract for
further information. The Contractor may price here for all the
expenses involved in complying with the terms of these Clauses,
otherwise such expenses are deemed to be included elsewhere.
Clause No. 13
C Performance Bond
For due observance and performance of this contract, the
Contractor shall have to provide:
D Performance Bond in the form of an approved Bank or Insurance
Guarantee equal to five percent (5%) of the contract sum to be
deposited with the Government as a condition precedent to the
commencement of any work under this contract.
Clause No.15
E Insurance Against Personal Injuries And Damage To Property
Clause No. 16
F Indemnities to Government in Respect of Claim by Workmen
Clause No. 17
G Employees' Social Security Act, 1969.
Clause No. 18
H Insurance of Works.
Clause No.22
J Design, Sub-clause No. 22.2 - Design Guarantee Bond
Clause No. 35
L Materials, Goods And Workmanship - Opening up of work for
inspection or testing of materials or goods
To Collection :
COLLECTION
Page A/1
Page A/2
Page A/3
Page A/4
Page A/5
Page A/6
Page A/7
Page A/8
Page A/9
Page A/10
Page A/11
Page A/12
Page A/13
To Ringkasan Tender :
APPENDIX A/1
1. BS 5228 : Code Of Practice For Noise Control On Construction And Demolition Site
2. Construction Industry Development Board Act, 1994
3. Electricity Regulations, 1994
4. Electricity Supply Act, 1990
5. Environmental Quality Act (Eqa), 1974
6. Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015
7. Environmental Quality (Clean Air) Regulation 2014
8. Environmental Quality (Scheduled Waste) Regulation 2005
9. Environmental Quality (Industrial Effluents) Regulation 2009
10. Environmental Quality (Sewage) Regulation 2009
11. Explosives Act, 1957
12. Factory and Machinery Act (FMA), 1967 Rev. 2006 and Regulations Under The Act.
13. Federal Territory (Planning) Act 1982 (Act 267)
14. Fire Services Act, 1988
15. Forestry Act 1984 (Act 313)
16. Guidelines For Hazard Identification, Risk Assessment And Risk Control, 2008, DOSH
17. Guidelines For Public Safety And Health At Construction Sites, 2007, DOSH
18. Guidelines For The Prevention Of Falls At Workplaces,2007, DOSH
19. Guidelines On Occupational Safety And Health In Tunnel Construction, 1998, DOSH
20. Guidelines On Occupational Vibration, 2003, DOSH
21. Industry Code Of Practice For Safe Working In A Confined Space, 2010, DOSH
22. Irrigation Areas Act, 1953
23. Land Conservation Act 1960 (Act 385)
24. Local Government Act, 1976
25. MS 2318, Code Of Practice For Demolition Of Buildings, 2010
26. National Land Code (Act 56 of 1965)
27. Occupational Safety And Health Act (OSHA), 1994 and Regulations Under The Act
28. Protection Of Wildlife Act, 1972 (Act 76)
29. Solid Waste And Public Cleansing Management Act 2007 (Act 672)
30. Standard ISO 45001 : Occupational Safety And Health Management System
31. Standard ISO 45001 : Environmental Management System
32. Street, Drainage and Building Act, 1974
33. Street, Drainage and Building Act, 1974;Act 133 and Amendment, 1978
34. The Planning Guidelines for Environmental Noise Limits and Control (DOE, 2004)
35. The Planning Guidelines for Vibration Limits and Control in Environment (DOE, 2004)
36. The Radiation Protection (Basis Safety Standards) Regulations 1987
37. Town And Country Planning Act 1976, (Act 172)
38. Uniform Building By-Law (UBBL), 1984
39. Workers Minimum Amenities Act 1990 (Act 446)
APPENDIX A/1A
5 Projector 1
(Specifications as attached)
A/17
1 Motorcycle 1
(Specifications as attached)
A/18
APPENDIX A/4
KLINIK KESIHATAN (JENIS 3) DENGAN KUARTERS
SELISING,PASIR PUTEH,KELANTAN (GANTIAN)
LIST OF LABORATORY EQUIPMENT
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
A/19
APPENDIX A/4
KLINIK KESIHATAN (JENIS 3) DENGAN KUARTERS
LIST OF LABORATORY EQUIPMENT
SELISING,PASIR PUTEH,KELANTAN (GANTIAN)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
A/20
APPENDIX A/4
A/21
APPENDIX A/5
1. Project Introduction
2. Management Responsibility
3. OSH Programme
Whenever there is any dispute arise, item listed as per Prosedur Kawalan
Keselamatan dan Kesihatan Pekerjaan JKR.PK(O).04B (Format Pelan
Keselamatan dan Kesihatan Pekerjaan, S-PLAN) under the latest version
of Sistem Pengurusan Bersepadu (SPB), JKR shall be reffered.
A/22
APPENDIX A/6
1. Introduction
2. OSH programme
5. Status of S-Plan
6. Status of HIRADC
Whenever there is any dispute arise, item listed as per Prosedur Kawalan
Keselamatan dan Kesihatan Pekerjaan JKR.PK(O).04B (Format Laporan
Keselamatan dan Kesihatan Pekerjaan), under the latest version of Sistem
Pengurusan Bersepadu (SPB), JKR shall be reffered.
A/23
APPENDIX A/7
JKR Minimum Environment Quality
National Water Quality
Aspects Parameter Requirement for Non- (Sewage) Regulations,
Standards (NWQS)
EIA Projects 2009
Standard A Standard B Class IIA Class IIB
Minimum earthwork
Phase construction ≤ 6
Soil Soil loss berms/benches for
KLINIK KESIHATAN (JENIS 3) DENGAN KUARTERS
slopes (≤ 6m per berm)
SELISING,PASIR PUTEH,KELANTAN (GANTIAN)
Reuse topsoil
Turbidity ≤ 200 NTU - - ≤ 50 NTU 15/5/2024 - 9:21 AM
Suspended Solid ≤ 100 mg/l ≤ 50 mg/l ≤ 100 mg/l ≤ 50 mg/l
Biochemical
Oxygen Demand ≤ 50 mg/l ≤ 20 mg/l ≤ 50 mg/l ≤ 3 mg/l
Minimum earthwork
Phase construction ≤ 6
Soil Soil loss berms/benches for
slopes (≤ 6m per berm)
Reuse topsoil
JKR E-Tender | SD210723
Turbidity ≤ 200 NTU - - ≤ 50 NTU
Suspended Solid ≤ 100 mg/l ≤ 50 mg/l ≤ 100 mg/l ≤ 50 mg/l
Biochemical
Oxygen Demand ≤ 50 mg/l ≤ 20 mg/l ≤ 50 mg/l ≤ 3 mg/l
5 @ 20°C (BOD) 5
Chemical
Oxygen Demand ≤ 100 mg/l ≤ 120 mg/l ≤ 200 mg/l ≤ 25 mg/l
1,2
(COD)
Water pH 5.5 - 9 6-9 5.5 - 9 6-9
≤ 100 ≤ 400
E-Coli ≤ 400 counts / 100 ml - - counts/ counts/
100ml 100ml
Dissolved
≤ 4 mg/l - - 5 - 7 mg/l
Oxygen (DO)
Oil and Grease ≤ 10 mg/l ≤ 5 mg/l ≤ 10 mg/l ≤ 40 µg/l, N
Ammoniacal
- ≤ 10 mg/l ≤ 20 mg/l ≤ 0.3 mg/l
Nitrogen (river)
Silt trap Turbidity ≤ 250 NTU
and
sediment
Total Suspended
basin ≤ 50 mg/l
Solid
discharge
Particulate Matter
≤ 120 µg/m3/day
(PM 10) (24hr)
3
Air
Particulate Matter
≤ 50 µg/m3/day
(PM 2.5) (24hr)
Reference:
1) 2 nd Schedule (Regulation 7), Environmental Quality (Sewage) Regulations 2009, Environmental Quality
Act 1974.
(i) Standard A: For location with downstream water intake
(ii) Standard B: For location with no downstream water intake
2) National Water Quality Standards for Malaysia
(i) Class IIA: Water Supply II - conventional treatment required
a. Fishery II - sensitive aquatic species
(ii) Class IIB: Recreational use with body contact
3) Recommended Malaysian Guidelines on Ambient Air Quality
4) Schedule 1 & Schedule 6, Planning Guidelines for Environmental Noise Limits & Control, (DOE, 2004)
5) Planning Guidelines for vibration Limits and Control of the Environment (DOE, 2004)
A/25
SEKSYEN II
SENARAI KUANTITI
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
GENERAL INFORMATION
KK3 SELISING
To Collection :
B1/1/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Pay Length
KK3 SELISING
To Collection :
B1/1/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Maintaining on site
C Allow for moving, handling and maintaining piling ITEM
equipment, plants, tools and ancillary equipment
about the site as often and whenever necessary
for the execution of the whole piling operation
including any excavation and filling required for
moving the plant, tools and ancillary equipment
from differing levels of the site erection of any
staging required, installing piles on embankments
or slopes and dismantling and removal on
completion and all idling time.
Temporary Works
D Allow for the provision of all temporary works ITEM
including staging etc. for piles to be installed on
slope, edge of building platform and the like.
PILING RECORD
E Allow for the submission of records of all piles in ITEM
triplicate duly signed by the Contractor and S.O's
representative and delivered to the S.O's as the
work proceed.
KK3 SELISING
To Collection :
B1/1/3
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
PRELIMINARY PILE
KK3 SELISING
To Collection :
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
B1/1/4
PRELIMINARY PILE
KK3 SELISING
To Collection :
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
B1/1/5
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Collection :
B1/1/6
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
KK3 SELISING
To Collection :
B1/2/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/2/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
Precast concrete spun piles with minimum
concrete grade 80N/mm2 to MS1314: Part 3:
2004 (Class B) as specified and as per Drawing
No. JKR/CKAS /03/26/D21 /42/P-FGTH/1[2] -
/2[2].
KK3 SELISING
To Collection :
B1/3/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/3/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
Precast concrete spun piles with minimum
concrete grade 80N/mm2 to MS1314: Part 3:
2004 (Class B) as specified and as per Drawing
No. JKR/CKAS /03/26/D21 /42/PE(DC)/1[2] -
/2[2].
KK3 SELISING
To Collection :
B1/4/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/4/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
KK3 SELISING
To Collection :
B1/5/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/5/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
KK3 SELISING
To Collection :
B1/6/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/6/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
KK3 SELISING
To Collection :
B1/7/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/7/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
KK3 SELISING
To Collection :
B1/8/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/8/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
WORKING PILES
KK3 SELISING
To Collection :
B1/9/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B1/9/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
TESTING
KK3 SELISING
To Collection :
B/10/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Summary :
B/10/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
SUMMARY
KK3 SELISING
To Ringkasan Tender :
B1/SUM/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
SEKSYEN II
SENARAI KUANTITI
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 10
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 2676
like
FORMWORK
Class F1 formwork as specified
H To edges and faces of pile caps; 0.50m - 1.00m M 518
high
KK3 SELISING
To Collection :
B2/1/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Item Description
COLLECTION
KK3 SELISING
To Collection :
B2/1/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
KUARTERS 2F & 2G
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 2
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 678
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/2/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
KUARTERS 2F & 2G
COLLECTION
KK3 SELISING
To Collection :
B2/2/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
PENCAWANG ELEKTRIK
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 1
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 272
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/3/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
PENCAWANG ELEKTRIK
COLLECTION
KK3 SELISING
To Collection :
B2/3/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 1
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 317
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/4/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
COLLECTION
KK3 SELISING
To Collection :
B2/4/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
STOR
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 1
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 181
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/5/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
STOR
COLLECTION
KK3 SELISING
To Collection :
B2/5/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
RUMAH PAM
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 1
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 452
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/6/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
RUMAH PAM
COLLECTION
KK3 SELISING
To Collection :
B2/6/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
PONDOK PENGAWAL
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 1
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 91
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/7/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
PONDOK PENGAWAL
COLLECTION
KK3 SELISING
To Collection :
B2/7/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Rate
Item Description Unit Quantity
(RM)
RUMAH SAMPAH
EXCAVATION
Excavate pit starting from reduced level; get out,
part return, fill in, well ram and remainder load
and cart away from site, level grade and ram
bottom, trim sides including planking and strutting
IN-SITU CONCRETE
Plain Concrete Grade C12/15 as specified;
blinding screed; laid on earth or hardcore
B Under pile caps; not exceeding 100mm thick M3 1
REINFORCEMENT
Reinforcement bars; hot rolled deformed high
tensile steel according to MS146 (fyk =
500N/mm2) as specified
In pile caps
D 12mm Diameter; Links, stirrups, binders and the KG 136
like
FORMWORK
Class F1 formwork as specified
KK3 SELISING
To Collection :
B2/8/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
Item Description
RUMAH SAMPAH
COLLECTION
KK3 SELISING
To Collection :
B2/8/2
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
BILL NO. B2 - PILE CAPS
SUMMARY
5 STOR B2/5/2
KK3 SELISING
To Ringkasan Tender :
B2/SUM/1
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723
Amount
(RM)
15/5/2024 - 9:21 AM
JKR E-Tender | SD210723 BLOK KLINIK KESIHATAN JENIS 3
SUMMARY
Surface Excavation
A Excavate oversite with maximun depth not exceeding 0.25m deep, m3 507
spread, levelled and well ram on site as directed by Superintending
Officer
Excavate, get out, part return, level, grade and ram bottom trim sides
and remainder load and cart away from site, including planking and
strutting
C Excavate apron beam with maximun depth not exceeding 1.00m deep m3 7
D Excavate cable trench with maximun depth not exceeding 2.00m deep m3 22
E Excavate lift core wall with maximun depth not exceeding 4.00m m3 20
FILLING
LEAN CONCRETE
TO COLLECTION RM
N In apron beam m3 13
TO COLLECTION RM
REINFORCEMENT
In ground beam
E 10mm diameter rod as stirrups kg 9,675
In ground slab
L 10mm diameter rod kg 6,297
To cable trench
M 10mm diameter rod kg 664
In apron slab
Q 10mm diameter rod kg 763
In plinth slab
R 10mm diameter rod kg 243
TO COLLECTION RM
REINFORCEMENT (CONT'D)
Steel fabric reinforcement to MS145, well lapped at joints including all
cutting and waste (measures nett-no allowance made for laps)
C In ramp slab m2 15
BRC A8 as specified:-
F In plinth slab m2 130
FORMWORK
Class F1 Formwork as specified
G To sides of column stump (Provisional) m2 270
TO COLLECTION RM
Damp proof membrane with all joints thrice 50mm folded and stapled
together and laid under concrete slab (measured nett and no
allowance made for laps)
A Approved damp proof membrane laid under ground floor slab and side m2 3,043
and soffit of ground beam
Waterproofing
D To cable trench m2 16
E To sump pit m2 1
TO COLLECTION RM
ANTI-TERMITE
WATERSTOP
TO COLLECTION RM
SUNDRIES
B Supply and laid 2 layers 4 nos. 150mm diameter HDPE PN10 pipe m 129
complete with and including all necessary excavation, backfilling,
concrete works, brickwork, formwork and reinforcement including
fixing accessories all as per manufacturers' detail and specification
and to the approval of Superintending Officer and as per architectural
drawing no. JKR/CA/P-KK3/10/123/PEL21/004/1
Electrical Pit
TO COLLECTION RM
SUNDRIES (Cont'd)
A Overall size 380mm x 380mm x 810mm deep concrete gully trap pit no 1
including all necessary excavation, concrete formwork, reinforcement,
approved finishes, and waterproofing complete with and including
approved removable concrete cover all as per drawing No.
JKR/CKM/PAP/BM/KK3ID/PSP/2021/2-12 and Superintending Officer
approval.
Please take note that the designs for concealed perimeter drain
and sumps is by state JKR's Engineer.
TO COLLECTION RM
COLLECTION
TO SUMMARY RM
General Note :-
If the opinion of the tenderer, the precast items may be cast into
smaller/bigger units, he should first seek clarification and approval from
the Superintending Officer. All costs in connection with any
amendments to the precast items shall be borne by the tenderer.
The tenderer shall provide, erect, kept insured, maintain and remove
on completion all requisite machineries, scaffolding, hoist, ladder,
staging, tarpaulines, tools, vehicles, tackles and other plant and
apparatus, as required by all trades as are necessary for the execution
of the works. Should the tenderer leave this item unpriced, then the
cost of all necessary plants and tools is deemed to be included in the
price of each of the items in the Bills of Quantities.
TO COLLECTION RM
Prices for the Industrialised Building System (IBS) shall include for the
planning, design, manufacture, supply and installation of all Precast
Elements including all associated in-situ site works, machinery and
plant, labour including project management and supervision cost,
manufacturer's guarantee and any other charges, all as per Architect's
and Engineer's drawing.
TO COLLECTION RM
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/1[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/2[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/3[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/4[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/5[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/46[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/61[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/65[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/77[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/80[107]
JKR/CKAS/P-KK3(ID)/03/26/PEL-21/84[107]
JKR/CKAS/P-IBS/PEL15/NA01A
JKR/CKAS/P-IBS/PEL15/NA02A
JKR/CKAS/P-IBS/PEL15/TC01A
JKR/CKAS/P-IBS/PEL15/BR-2560/BR 09
JKR/CKAS/P-IBS/PEL15/BR-3070A/BR 13
JKR/CKAS/P-IBS/PEL15/BL-4070/BL 07
JKR/CKAS/P-IBS/PEL15/ADD/BL02
JKR/CKAS/P-IBS/PEL15/BT-5070/BT 08
JKR/CKAS/P-IBS/PEL15/ADD/BT03
JKR/CKAS/P-IBS/PEL-15/CS/CS 01
JKR/CKAS/P-IBS/PEL-15/CN/CR 01
JKR/CKAS/P-IBS/PEL-15/CN/CR 02A
JKR/CKAS/P-KK3ID/03/26/PEL-21/IBS/1[1]
TO COLLECTION RM
Precast Column
TO COLLECTION RM
Precast Beam
Roof beam
P Type PBR1; 250mm x 600mm x 6600mm no 20
TO COLLECTION RM
IN-SITU CONCRETE
C In stiffeners (Provisional) m3 15
G In sleeper beam m3 18
K In window copping; not exceeding 100mm thick; including all necessary m 170
reinforcement, formwork and other necessary items to complete the
installation all as per engineer drawing no. JKR/CKAS/P-
KK3ID/03/26/PEL-21/NA/[3/4] -[4/4] and architectural drawing no
JKR/CA/P-KK3/10/123/ PEL21/004/5
REINFORCEMENT
TO COLLECTION RM
REINFORCEMENT (Cont'd)
In stiffeners (Provisional)
TO COLLECTION RM
In sleeper beam
TO COLLECTION RM
Steel I-Beam
TO COLLECTION RM
Steel I-Beam
PERIPHERAL TIES
TO COLLECTION RM
COLLECTION
Page 3/E2/1
Page 3/E2/2
Page 3/E2/3
Page 3/E2/4
Page 3/E2/5
Page 3/E2/6
Page 3/E2/7
Page 3/E2/8
Page 3/E2/9
Page 3/E2/10
TO SUMMARY RM
IN-SITU CONCRETE
Vibrated Reinforced Concrete Grade C32/40, with minimum cement
content 300kg/m3 and maximum free water content in between 160-
180kg/m3 as specified
TO COLLECTION RM
In topping up
In plinth slab
P 10mm diameter rod kg 158
BRC A8 as specified:-
H In plinth slab m2 80
FORMWORK
G To soffit of suspended floor slab; strutting exceeding 3.50m but not m2 311
exceeding 5.00m
TO COLLECTION RM
COLLECTION
Page 3/E3/1
Page 3/E3/2
TO COLLECTION RM
ROOF TRUSSES
Notes:-
iii) The Contractor shall note that the PRT roof trusses shall
be design to suit the ceiling, the location of water tanks, roof
coverings, mechanical & electrical (M & E) facilities and
whatever load deemed necessary for the functional purpose
of the building. The water tanks shall not supported by the
PRT. In the case where the PRT roof trusses are designed
at centers which do not suit or facilitate the fixing of the
ceiling, the Contractor shall include in his design of the PRT
roof trusses for any additional bearers, tie-beams, ceiling
joists, etc. required to facilitate the ceilings panel. The
Contractor shall also in his design, facilitate the fixing of
timber rafters and its components used as an architural
feature along the eaves of the PRT.
TO COLLECTION RM
Notes (cont’d):
iv) The Contractor shall ensure that all truss member
located on the ducting bracket shall be protected with rubber
pad to reduce the vibration caused by ducting. Rod to
support ducting shall be installed on web plane member
(stronger axis to decrease twisting on truss member). Drilling
is strictly prohibited on all truss members. M & E services
shall be installed using strap. The design of trusses shall
cater all load for M&E services.
Rates to include
Rates for the PRT roof trusses and rafters shall include for all
necessary materials, fabricating, delivery to site, hoisting and
fixing in position, all fixing accessories including holding down
bolt or ram setting, all ancillary item and temporary works for
the complete installation of the PRT.
Rates for the PRT roof trusses shall also include for design
fees, testing for compliance, quality assurance and control
and all other necessary cost for patent right design,
trademark or name.
TO COLLECTION RM
TO COLLECTION RM -
REINFORCEMENT
High Tensile deformed rod reinforcement (500N/mm2)
according to MS146 as specified
In flat roof slab
N 10mm diameter rod kg 147
In roof slab
P 10mm diameter rod kg 598
TO COLLECTION RM
REINFORCEMENT (cont'd)
High Tensile deformed rod reinforcement (500N/mm2)
according to MS146 as specified
In water tank slab
A 16mm diameter rod kg 5952
In plinth slab
B 10mm diameter rod kg 233
In gutter slab
D 10mm diameter rod kg 4013
In gutter wall
E 10mm Diameter; Links, stirrups, binders and the like kg 2267
FORMWORK
Class F1 Formwork as specified
L To soffits of flat roof slab; over 1.0m wide; strutting exceeding m2 40
3.50m but not exceeding 5.00m
TO COLLECTION RM
FORMWORK (cont'd)
BRICKWORK
Light weight concrete block as specified; bedded and jointed
in cement mortar (1:3) reinforced with including "exmet" brick
reinforcement in every fourth course with dowel bar with
hook at both ends as specified
G 150mm Thick; stretcher bond; parapet walls and roof support m2 120
walls.
WATERPROOFING
Waterproofing Coating "FLOWCRETE Procoat PU" or other
approved equivalent UV stable polyurethane floor coating
system laid on cement and sand (1:3) screed (measured
separately) all in accordance with manufacturer's instruction
and recommendation (measured nett- no allowance made for
laps), all as per drawing no. JKR/CA /P-KK3/10 /123/PEL21
/004/BM1 & 2.
TO COLLECTION RM
FINISHES
20mm Thick cement and sand (1:3) rendering with an
approved plasticiser finish with steel trowel as specified.
PAINTING WORKS
Approved prepare and apply one coat prime and two coats of
acrylic weathershield paint as specified
TO COLLECTION RM
A Ridge capping m 65
B Valley tiles m 6
D Hip capping m 25
E Valley tiles m 5
Insulation Works
Fascia Board
TO COLLECTION RM
Insulation Works
E Double sided aluminium foil insulation laid to slope under roof m2 885
covering (measured nett- no allowance for laps)).
(Provisional)
TO COLLECTION RM -
Flashing
Bluescope' or other approved equivalent cover flashing
0.48mm TCT in Clean Colorbond steel sealed with silicon
sealant in approved colour to match fixed with and including
all necessary fastener, waterproof cement mortar plastering
or grouting, approved seal and forming 20mm x 20mm
groove to be provided while casting concrete and other
related works. All in acccordance with the manufacturer's
recomendations, S.O. approval and drawing no. JKR/CA/P-
KK3 /10/123/PEL21 /004/BM/4 - 6. (measured nett and no
allowance made for laps)
B 100mm Wide Cover Flashing tug into groove m 284
D 700mm Girth twice bend Cover Flashing one end dressed m 138
over roof deck and the other fixed to brickwall complete with
all necessary accessories
TO COLLECTION RM
Gutter
TO COLLECTION RM
COLLECTION
Page 3/E4/1
Page 3/E4/2
Page 3/E4/3
Page 3/E4/4
Page 3/E4/5
Page 3/E4/6
Page 3/E4/7
Page 3/E4/8
Page 3/E4/9
Page 3/E4/10
Page 3/E4/11
TO SUMMARY RM
Staircase
D 12 mm Diameter kg 1416
Landing Beam
E 8 mm Diameter kg 73
F 20 mm Diameter kg 483
Landing Slab
G 16 mm Diameter kg 1,863
TO COLLECTION RM
STRUCTURAL STEELWORK
METALWORK
HANDRAIL, BALUSTRADES AND RAILING
Railing
CATLADDER
TO COLLECTION RM
STAIRCASE FINISHINGS
D To landing slab m2 37
PAINTING WORKS
TO COLLECTION RM
COLLECTION
Page 3/E5/1
Page 3/E5/2
Page 3/E5/3
TO SUMMARY RM
TO COLLECTION RM
ALUMINIUM WORKS
H 1100mm high m 32
TO COLLECTION RM
COLLECTION
Page 3/E6/1
Page 3/E6/2
TO SUMMARY RM
WINDOWS
IN-SITU CONCRETE
ALUMINIUM WORKS
Note:-
The quantity given herein are not to be used as the basic for
ordering the window and fixed panel units, the contractor shall
prior to placement of his orders, verify from the drawing and
physical work on the site and subsequently confirm with the
S.O, the numbers and exact size of window and fixed panel unit
show in his Bill and shall allow herein the extra costs incurred or
savings accured for any minor difference in size and all
adjustment necessary for the window and fixed panel units
TO COLLECTION RM
WINDOWS (Cont'd)
CASEMENT WINDOW
TO COLLECTION RM
WINDOWS (Cont'd)
TO COLLECTION RM
WINDOWS (Cont'd)
TO COLLECTION RM
WINDOWS (Cont'd)
COMPOSITE WINDOW
TO COLLECTION RM
Internal Glazing
TO COLLECTION RM
WINDOWS (Cont'd)
GLAZING
Supply and fix 6mm thick M.S.G. grey tinted or other approved
equivalent clear float glass panel to aluminium window frame as
manufacturer's details
Supply and fix 6mm thick M.S.G. grey tinted or other approved
equivalent clear float glass panel with 70% tinted with visible
light transmission (VLT) not less than 30% solar heat reduction
exceeding 40% to aluminium window frame as manufacturer's
details
Supply and fix 6mm thick M.S.G. grey tinted or other approved
equivalent double glazed float glass to aluminium window frame
as manufacturer's details
TO COLLECTION RM
WINDOWS (Cont'd)
TO COLLECTION RM
IN-SITU CONCRETE
DOOR FRAME
TO COLLECTION RM
TO COLLECTION RM
DOOR LEAF
TO COLLECTION RM
Phenolic Door
TO COLLECTION RM
GLASS DOOR
Supply and install 6mm thick clear float glass complete with
painted aluminium frame, glass, ironmongeries (measured
separately) and all necessary accessories all as door schedule,
manufacturer's details and recommendations and to the
approval of Superintending Officer and all as per drawing no.
JKR/CA/P-KK3/10/123/PEL21/004/(P/1-P/5) & JKR/CA/P-
KK3/10/123/ PEL21/ 004/P/(P/1-P/4)
ROLLER SHUTTER
Supply and install the following one hour fire rated door
complete with door frames, steel plate, ironmongeries
(measured separately) and painting obtained from approved
manufacturer and approved by the Fire Authority and SIRIM
including obtaining test certificate and all as per Architect's
drawing No. JKR/CA/P-KK3/10/123/PEL21/004/P/1-4 &
JKR/CA/P-KK3/10/123/PEL21/004/P/P/1-4
TO COLLECTION RM
PAINTING
Prepare and apply one coat approved alkali resisting primer and
two coats of gloss enamel paint as specified :-
TO COLLECTION RM
COLLECTION
Page 3/E7/1
Page 3/E7/2
Page 3/E7/3
Page 3/E7/4
Page 3/E7/5
Page 3/E7/6
Page 3/E7/7
Page 3/E7/8
Page 3/E7/9
Page 3/E7/10
Page 3/E7/11
Page 3/E7/12
Page 3/E7/13
Page 3/E7/14
TO SUMMARY RM
TO COLLECTION RM
TO COLLECTION RM
TO COLLECTION RM
METAL WORKS
TO COLLECTION RM
COLLECTION
Page 3/E8/1
Page 3/E8/2
Page 3/E8/3
Page 3/E8/4
TO SUMMARY RM
IN-SITU CONCRETE
DOOR FRAME
TO COLLECTION RM
TO COLLECTION RM
DOOR LEAF
RM
TO COLLECTION RM
TO COLLECTION RM
Phenolic Door
TO COLLECTION RM
GLASS DOOR
Supply and install 6mm thick clear float glass complete with
painted aluminium frame, glass, ironmongeries (measured
separately) and all necessary accessories all as door
schedule, manufacturer's details and recommendations and
to the approval of Superintending Officer and all as per
drawing no. JKR/CA/P-KK3/10/123/PEL21/004/(P/1-P/5) &
JKR/CA/P-KK3/10/123/ PEL21/ 004/P/(P/1-P/4)
ROLLER SHUTTER
TO COLLECTION RM
Supply and install the following one hour fire rated door
complete with door frames, steel plate, ironmongeries
(measured separately) and painting obtained from approved
manufacturer and approved by the Fire Authority and SIRIM
including obtaining test certificate and all as per Architect's
drawing No. JKR/CA/P-KK3/10/123/PEL21/004/P/1-4 &
JKR/CA/P-KK3/10/123/PEL21/004/P/P/1-4
TO COLLECTION RM
PAINTING
TO COLLECTION RM
COLLECTION
Page 3/E9/1
Page 3/E9/2
Page 3/E9/3
Page 3/E9/4
Page 3/E9/5
Page 3/E9/6
Page 3/E9/7
Page 3/E9/8
Page 3/E9/9
TO SUMMARY RM
IRONMONGERIES
Hinges
Floor Spring
C Newstar EY/ AL Double Action Hold-Open Floor Spring (H3) no 2
Locksets
D ASEMA ABLOY EY/LC906PZ/CY323U/LH2802/19D/8822 no 99
/A7 Mortise Lockset (L1.1)
E ASEMA ABLOY EY/LC906PZ/CY321U/LH2802/19D/8822 no 7
/A7 Mortise Lockset (L1.2)
F ASEMA ABLOY EY/LC906PZ/CY322U/LH2802/19D/4822 no 5
/A7 Mortise Lockset (L1.3)
TO COLLECTION RM
IRONMONGERIES (Cont'd)
Locksets (Cont'd)
A ABLOY Yank EY/LC8560DL/CY322U/ES516-8/A7 Mortise no 24
Deadlock (L5.2)
Roller Latch
H ABLOY EY/4238 Heavy Duty Roller Latch (RL) no 20
Padlock
TO COLLECTION RM
IRONMONGERIES (Cont'd)
Door Pull
D ASEMA TG300S/A7 Stainless Steel Door Pull (P1) no 44
E ASEMA TGN300/A7 Stainless Steel Door Pull (P2) no 2
F ASEMA TG600S/30D/A7 Stainless Steel Door Pull (P3) no 4
G ASEMA TW220/A7 Stainless Steel Door Pull (P4) no 25
TO COLLECTION RM
IRONMONGERIES (Cont'd)
Accessories
TO COLLECTION RM
IRONMONGERIES (Cont'd)
Accessories( cont'd)
Construction Key
RM
COLLECTION
Page 3/E10/1
Page 3/E10/2
Page 3/E10/3
Page 3/E10/4
Page 3/E10/5
TO SUMMARY RM
Wall Finishes
TO COLLECTION RM
TO COLLECTION RM
Floor Finishes
Paving Work
D To floor m2 476
G To floor m2 122
TO COLLECTION RM
Ceiling Finishes
B Ceiling to height of not exceeding 3.60m high from floor level m2 168
TO COLLECTION RM
COLLECTION
Page 3/E11/1
Page 3/E11/2
Page 3/E11/3
Page 3/E11/4
TO SUMMARY RM
B To isolated columns m2 33
E To walls m2 ####
TO COLLECTION RM
TO COLLECTION RM
COLLECTION
Page 3/E12/1
Page 3/E12/2
TO SUMMARY RM
TO COLLECTION RM
Dividing Strip
TO COLLECTION RM
Waterproofing Membrane
TO COLLECTION RM
COLLECTION
Page 3/E13/1
Page 3/E13/2
Page 3/E13/3
TO SUMMARY RM
B Ceiling to height of not exceeding 3.50m high from floor level M2 120
(Type FB1)
C Ceiling to height of not exceeding 3.50m high from floor level M2 1880
(Type GB1)
E Ceiling to height of not exceeding 3.50m high from floor level M2 957
(PC1)
TO COLLECTION RM
A Ceiling to height of not exceeding 3.50m high from floor level M2 502
(Type LGB1)
TO COLLECTION RM
COLLECTION
Page 3/E14/1
Page 3/E14/2
TO SUMMARY RM
TO COLLECTION RM
(Cont'd)
B Type B7; size 1500mm (L) x 1000mm (H); fixing brackets with no 5
screws; sealing at back with mastic sealant
C Type B8; size 690mm (L) x 483mm (W) x 300mm (D); fixing no 3
brackets with screws; sealing at back with mastic sealant
TO COLLECTION RM
(Cont'd)
Bottle trap
TO COLLECTION RM
(Cont'd)
Tap
C Type T3; 'Ark 302' or other approved equivalent hose bib tap no 13
with extended spout, 1/2" hose coupling, ball lever handle and
quarter turn ceramic disc
TO COLLECTION RM
(Cont'd)
Tap (Cont'd)
Floor trap
Grab Rail
TO COLLECTION RM
(Cont'd)
Plaster Trap
Emergency Shower
TO COLLECTION RM
(Cont'd)
Shower tap
Mirror
TO COLLECTION RM
(Cont'd)
Soap Dispenser
Hook
D Type A10; Approved wall mounted i.v hook 3.5 inches tall by 2 no 5
inches wide made of steel powder coated white with stainless
steel IV hook swivels in wall mount in 9 inch reach
TESTING
TO COLLECTION RM
COLLECTION
Page 3/E15/1
Page 3/E15/2
Page 3/E15/3
Page 3/E15/4
Page 3/E15/5
Page 3/E15/6
Page 3/E15/7
Page 3/E15/8
TO SUMMARY RM
GENERALLY
TO COLLECTION RM
B 5mm thick steel plate as water tank base, hoisted and placed NO 6
in position at approximately 9500mm above ground floor
level, and painted with one coat undercoat and one coat gloss
enamel paint all to the approval of Superintending Officer and
as per drawing No. JKR/CKM/PAP/BM/KK3ID/PIR/2021-2/7-
15 & 9-15
C Waste water, soil and vent pipes, neutralizing tank with and ITEM
including all requisite fittings from sanitary appliances and
from and including floor traps and outlet grating to last
connecting manholes or precast concrete channel drains
including all necessary excavation, concrete casing around
pipework, connections with requisite pipe fittings, and
requisite openings or holes in roof, floors, beams and wall,
complete all as per drawing no.
JKR/CKM/PAP/BM/KK3ID/PSP/2021/1-12 TO 7-12
TESTING
Plumbing Installation
TO COLLECTION RM
COLLECTION
Page 3/E16/1
Page 3/E16/2
TO SUMMARY RM
JKR/CA/P-KK3/10/123/PEL21/004/BP/1-8
JKR/CA/P-KK3/10/123/PEL21/004/B/JK/1-6
JKR/CA/P-KK3/10/123/PEL21/004/B/M/1-39
JKR/CA/P-KK3/10/123/PEL21/004/B/SPEC
JKR/CA/P-KK3/10/123/PEL21/004/B/1- 6-1
JKR/CA/P-KK3/10/123/PEL21/004/BD/1
JKR/CA/P-KK3/10/123/PEL21/004/MKM-1
JKR/CA/P-KK3/10/123/PEL21/004/NB-1
JKR/CA/P-KK3/10/123/PEL21/004/HT/1-6
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
comprising of shelves, drawers, doors, fixed panels including
all necessary housing grooves and other labour and
approved finished complete with and approved
ironmongeries :-
Worktop
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Worktop (Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Worktop (Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Worktop (Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Worktop (Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Worktop (Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Kaunter Dispensari
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Kaunter Rehabilitasi
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Hatch
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Hatch (Cont'd)
A Hatch Type H5 overall size 600mm x 550mm high wall NO 1
opening and 25mm thick stainless steel medical gred 316
complete with and including all necessary framing and fixing
accessories all to Architect's detail and as per drawing no.
JKR/CA/P-KK3/10/123/PEL21/004/HT/5
(Bilik Sterilisasi)
B Hatch Type H6 overall size 800mm x 875mm high consist of NO 1
1 no. of 600mm x 400mm x 6mm thick fixed glass and 2 nos.
of 300mm x 200mm x 6mm thick clear double glazing
lockable sliding glass panel and 18mm moisture resistance
chipboard and formica melamine finish 0.7mm thick standing
counter top complete with and including all necessary framing
and fixing accessories all to Architect's detail and as per
drawing no. JKR/CA/P-KK3/10/123/PEL21/004/HT/6
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Kabinet Berkaki
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM -
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM -
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Almari
Almari; constructed of 18mm thick moisture resistance
chipboard V-313 with white melamine finish with 2mm PVC
edging and with 18mm thick ' tetingkat boleh laras' moisture
resistance V-313 with white melamine finish with 2mm PVC
edging and with 18mm thick moisture resistance chipboard V-
313 formica HPL postforming door panel with 2mm PVC
edging sel. closed type cabinet with 45° edging on
below/top/ in between and including 250mm high, 30mm
diameter stainless steel support with leg adjuster and all
accessories to Architect's detail
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Almari (Cont'd)
Rak Dinding
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Locker
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Notice Board
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Backdrop
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
E NO 7
LBW2: (450/600/900mm) x 300mm x 700mm high as per
drawing no. JKR/CA/P-KK3/10/123/PEL21/004/MKM-1
(Makmal, 3 nos.)
(Ruang Basah, 4 nos.)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
TO COLLECTION RM
Supply, fix and install the following cabinet & furnitures and
fittings constructed of postforming laminated chipboard with
HPL (High Pressure Laminated) unless ortherwise stated
……….
(Cont'd)
Curtain Track
B Approved curtain track (CT) hanger to be hang 2800mm M 40
below ceiling all to the manufacturer's detail and all as per
drawing no. JKR/CA/P-KK3/10/123/PEL21/004/R/3
Mirror
D Type M6: Approved gym mirror size 4000mm x 1800mm No 1
high. (no details)
(Gymnasium)
TO COLLECTION RM
COLLECTION
CARRIED FORWARD RM
BROUGHT FORWARD RM
COLLECTION
CARRIED FORWARD RM
BROUGHT FORWARD RM
COLLECTION
CARRIED FORWARD RM
BROUGHT FORWARD RM
COLLECTION
TO SUMMARY RM
ELEMENT 18 - SUNDRIES
ABLUTION
The following are the construction of Ablution:-
IN-SITU CONCRETE
Vibrated Reinforced concrete Grade C32/40 as specified
TILING WORKS
20mm thick bed baking cement and sand (1:3) screed to
receive non-slip homogenous tiles as specified:-
TILING WORKS
Scupper Drain
TO COLLECTION RM
TO COLLECTION RM
B 10mm thick m2 37
SQUATTING BASE
TO COLLECTION RM
TO COLLECTION RM
RAINWATER HARVESTING
TO COLLECTION RM
COLLECTION
Page 3/E18/1
Page 3/E18/2
Page 3/E18/3
Page 3/E18/4
Page 3/E18/5
TO SUMMARY RM
SUMMARY
B ELEMENT 2 - FRAME
D ELEMENT 4 - ROOF
E ELEMENT 5 - STAIRCASE
S ELEMENT 17 - MISCELLANEOUS
Excavation
CONCRETE WORK
IN-SITU CONCRETE
Plain Concrete
TO COLLECTION RM
IN-SITU CONCRETE
B In ground beam m3 33
In column stump
In ground beam
TO COLLECTION RM
In column stump
In ground beam
In ground slab
In apron slab
TO COLLECTION RM
PERIMETER DRAIN
TO COLLECTION RM
SUMP, IN 10 NOS.
Brick Sumps
TO COLLECTION RM -
TO COLLECTION :
Page E1/1
Page E1/2
Page E1/3
Page E1/4
Page E1/5
TO SUMMARY RM
General Note :-
TO COLLECTION RM
JKR/CKASJ/S-13/FG-PIA/1(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/2(36)
JKR/CKASJ/S-13/FG-PIA/3
JKR/CKASJ/S-13/FG-PIA/6(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/7(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/8(36) Pindaan B
JKR/CKASJ/S-13/FG-PIA/9(36)
JKR/CKASJ/S-13/FG-PIA/12(36)
JKR/CKASJ/S-13/FG-PIA/13(36)
JKR/CKASJ/S-13/FG-PIA/14(36)
JKR/CKASJ/S-13/FG-PIA/15(36)
JKR/CKASJ/S-13/FG-PIA/16(36)
JKR/CKASJ/S-13/FG-PIA/19(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/20(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/21(36) Pindaan C
JKR/CKASJ/S-13/FG-PIA/22(36) Pindaan C
JKR/CKASJ/S-13/FG-PIA/23(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/26(36) Pindaan B
JKR/CKASJ/S-13/FG-PIA/27(36) Pindaan B
JKR/CKASJ/S-13/FG-PIA/28(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/29(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/33(36) Pindaan C
JKR/CKASJ/S-13/FG-PIA/34(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/35(36) Pindaan A
JKR/CKASJ/S-13/FG-PIA/36(36)
TO COLLECTION RM
Precast Column
TO COLLECTION RM
TO COLLECTION RM
TO COLLECTION RM
A Stiffeners m3 5
B Floor beam m3 20
D Roof beam m3 8
Stiffeners
G 10mm Diameter kg 30
H 6mm Diameter kg 11
Insitu beam
Roof beam
Stiffeners
M 16mm Diameter kg 81
TO COLLECTION RM
Beam
G 12mm Diameter kg 23
Roof Beam
TO COLLECTION RM
COLLECTION
Page E2/1
Page E2/2
Page E2/3
Page E2/4
Page E2/5
Page E2/6
Page E2/7
TO SUMMARY RM
IN-SITU CONCRETE
TO COLLECTION RM
D
Ditto in insitu topping for concrete coping slan: ledge m2 120
TO COLLECTION RM
COLLECTION
Page E3/1
Page E3/2
TO SUMMARY RM
ROOF TRUSSES
Notes:-
TO COLLECTION RM
Notes (cont’d):
TO COLLECTION RM
Rates for the PRT shall also include for design fees,
testing for compliance, qualitty assurance and
control and all other necessary cost for patent right
design, trademark or name.
Design, supply, fabricated and deliver to site Cold
Formed Steel Roof Trusses/Timber Roof Trusses
including fixing and hoisting in position all fabricated
PRT rafters,chords, bearers, tie down and bracings,
strut, wall plate, connectors and fixings, straps and
other associated ancillary fixing products and other
associated works, materials and labour required for
the complete installation of the PRT to the approval
of the Superitending Officer
TO COLLECTION RM
CONCRETE WORKS
Vibrated Reinforced Concrete Grade C32/40, with
minimum cement content 300kg/m3 and maximum
free water content in between 160-180kg/m3 as
specified
H To roof slab m2 66
TO COLLECTION RM
TO COLLECTION RM 0.00
Flashing
Waterproofing Coating
TO COLLECTION RM
TO COLLECTION RM
COLLECTION
Page E4/1
Page E4/2
Page E4/3
Page E4/4
Page E4/5
Page E4/6
Page E4/7
TO SUMMARY RM
B In landing beam m3 1
C 200mm landing slab m3 1
In landing beam
D 10mm Diameter kg 17
High Tensile bar reinforcement as specified:-
In landing beam
E 16mm Diameter kg 13
F 25mm Diameter kg 32
In landing slabs
G 16mm Diameter kg 567
In staircase
TO COLLECTION RM
STRUCTURAL STEELWORK
CATLADDER
TO COLLECTION RM
STAIRCASE FINISHINGS
TO COLLECTION RM
STAIRCASE FINISHINGS
PAINTING WORKS
TO COLLECTION RM
COLLECTION
Page E5/1
Page E5/2
Page E5/3
Page E5/4
TO SUMMARY RM
Aluminium Louvres
Box-up
TO SUMMARY RM
IN-SITU CONCRETE
ALUMINIUM WORKS
Note:-
TO COLLECTION RM
TO COLLECTION RM
Grille
TO COLLECTION RM
COLLECTION
Page E7/1
Page E7/2
Page E7/3
TO SUMMARY RM
C 6mm Diameter mild steel wall bonding tie, 450mm long, no 399
one end cast in concrete and other end built
Box-up
TO SUMMARY RM
CONCRETE WORK
INSITU CONCRETE
TO COLLECTION RM
Painting to Door
Prepare and apply one coat approved alkali resisting
primer and two coats of gloss enamel paint as
specified:-
C To surface of doors m2 91
D To edges of doors average width 100mm m 125
Grille
Supply and fix in position the following grille with
aluminium frame including painting to manufacturer's
detail as per Architect's drawing No. CA/P-
FGTH/10/26/PEL13/P/1:-
TO COLLECTION RM
Ironmongeries
Hinges
Mortise Deadlock
Lockset
D ABLOY ASEMA EY/ LC4230/ TE66N/ ST2104/ no 8
ES516-8/A or other approved equivalent stainless
steel mortise privacy lockset (L9.2)
Door Pull
E ASEMA TW220/A7 or other approvd equivalent no 2
stainless steel door pull (P5)
TO COLLECTION RM
Accessories
A
REBATED FOREND/LC 4230/A7 as described (A2.3) no 4
B ASEMA 200 & 300mm/ A7 or other approved no 4
equivalent stainless steel box type flush bolt (A3)
Construction Key
TO COLLECTION RM
COLLECTION
Page E9/1
Page E9/2
Page E9/3
Page E9/4
TO SUMMARY RM
B Extra over for 20mm x 12mm thick groove lining fixed to m 400
brickwall
C 100mm Thick Concrete Coping; ledge m2 326
D 100mm Thick Window Concrete Copping m2 24
TO COLLECTION RM
Ceiling Finishes
TO COLLECTION RM
COLLECTION
Page E10/1
Page E10/2
TO SUMMARY RM
C To wall m2 389
TO SUMMARY RM
A To floor m2 10
B To floor m2 368
300mm x 300mm x 9.5mm Thick selected homogenous
tiles laid in pattern, bedded, jointed and ointed in
matching coloured cement as described on cement and
sand screed (measured seperately) (jh):-
C To floor m2 368
D To skirting, 100mm high m 366
20mm Thick cement and sand (:3) screed to receive
non-slip homogenous tiles as specified:-
E To floor m2 96
300mm x 300mm x 9.5mm Thick selected non-slip
homogenous tils laid in pattern, bedded, jointd and
pointed on matching coloured cement as described on
cement and sand screed (Measured seperately) (jh1):-
F To floor m2 96
G To skirting, 100mm high m 120
20mm Thick cement and sand (1:3) screed to receive
non-slip homogeneous tiles as specified:-
H To floor m2 34
TO COLLECTION RM
A To floor m2 34
TO COLLECTION RM
COLLECTION
Page E12/1
Page E12/2
TO SUMMARY RM
TO COLLECTION RM
C To plasterboard m2 415
TO COLLECTION RM
COLLECTION
Page E13/1
Page E13/2
TO SUMMARY RM
Soap Holder
D Type PS1 310mm x 160mm x 95mm semi recessed no 8
soap & sponge holder in vc
Towel Rail
E Type PT 600mm x 125mm screw-to-wall towel rail holder no 8
complete with chrome plated bar
Toilet Roll Holder
F Type PTT 165mm x 165mm x 95mm semi recessed no 8
toilet holder in vc complete with plastic
TO COLLECTION RM
Floor Trap
Mirror
TESTING
Sanitary Fittings
k
k
TO COLLECTION RM
COLLECTION
Page E14/1
Page E14/2
TO SUMMARY RM
GENERALLY
TO COLLECTION RM
TO COLLECTION RM
A Wate water, soil and vent pipes with and including all Item
requisite fittings from sanitary appliances and from and
inlcuding floor traps and outlet grating to last connecting
manholes or precast concrete channel drains including
all necessary excavation, concrete casing around
pipework, connections with requisite pipe fittings, and
requisite openings or holes in roof beams and wall,
complete all as per drawing no.
JKR/CKM/PAP/BA/qfgt1/PSP/1/6-6/6
TESTING
Plumbing Installation
TO COLLECTION RM
COLLECTION
Page E15/1
Page E15/2
Page E15/3
TO SUMMARY RM
TO COLLECTION RM
COLLECTION
Page E16/1
Page E16/2
ELEMENT 17 - MISCELLANEOUS
TO SUMMARY RM
SUMMARY
TO SUMMARY RM -
DEMOLITION WORKS
TO COLLECTION RM
TO COLLECTION RM
TO COLLECTION RM
Existing Kuarters
TO COLLECTION RM
(Approximately : 364m2)
B Demolish, break out and dig out existing 'TANGKI AIR' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 2m2)
TO COLLECTION RM
A Demolish, break out and dig out existing 'TANGKI AIR' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 4m2)
B Demolish, break out and dig out existing 'TANGKI AIR' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 2m2)
TO COLLECTION RM
A Demolish, break out and dig out existing 'TANGKI AIR' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 10m2)
B Demolish, break out and dig out existing 'TANGKI AIR' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 20m2)
TO COLLECTION RM
(Approximately : 62m2)
(Approximately : 24m2)
(Approximately : 88m2)
TO COLLECTION RM
(Approximately : 20m2)
Existing Stor
B Demolish, break out and dig out existing 'STOR' single Item
storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 49m2)
C Demolish, break out and dig out existing ' STOR ENJIN Item
AIR' constructed of reinforced concrete structure, steel
post, roof structure and covering and other construction
works which interfere with execution of the work, cart
away all debris from site and backfilling voids with
selected materials approved by S.O.
(Approximately : 5m2)
TO COLLECTION RM
A Demolish, break out and dig out existing 'Bangunan PSR' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 174m2)
TO COLLECTION RM
A Demolish, break out and dig out existing 'KLINIK GIGI' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 342m2)
B Demolish, break out and dig out existing 'KLINIK IBU Item
DAN ANAK' single storey constructed of reinforced
concrete structure comprising of foundation, floor slab,
apron slab, frame, column, brickwall, roof structures and
covering, windows and doors, all finishes, perimeter
drain, all mechanical and electrical services, remove all
underground pipeworks, other construction works which
interfere with execution of the work, cart away all debris
from site and backfilling voids with selected materials
approved by S.O.
(Approximately : 258m2)
TO COLLECTION RM
Existing Farmasi
TO COLLECTION RM
A Demolish, break out and dig out existing 'KLINIK GIGI' Item
single storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 130m2)
B Demolish, break out and dig out existing ' BILIK Item
PEMANDU , GARAJ, BILIK ISOLASI, GARAJ' single
storey constructed of reinforced concrete structure
comprising of foundation, floor slab, apron slab, frame,
column, brickwall, roof structures and covering, windows
and doors, all finishes, perimeter drain, all mechanical
and electrical services, remove all underground
pipeworks, other construction works which interfere with
execution of the work, cart away all debris from site and
backfilling voids with selected materials approved by
S.O.
(Approximately : 199m2)
TO COLLECTION RM
Existing Tandas
Existing Sinki
TO COLLECTION RM
TO COLLECTION RM
Existing Signage
(Approximately : 1 nos)
TO COLLECTION RM
Existing Roads
TO COLLECTION RM
COLLECTION
TO COLLECTION RM
COLLECTION
TO COLLECTION RM
SITE CLEARANCE
Clear the site within the boundary of all shrubs, crops and
superfluous vegetation, remove all fallen tree trunks, tree,
stumps etc. grub-up roots, backfilling, make good all works
disturbed and remove all debris and surplus from site
(Area measured on plan approximately 16,535 m2)
TO COLLECTION RM
EARTHWORKS
TEMPORARY WORKS
Earth drain
TO COLLECTION RM
Wash Trough
Silt Trap
Check Dam
C Check Dam NO 8
Pipe Culvert
TO COLLECTION RM
Earth Sump
Silt fence
Interlocking Paver
TO COLLECTION RM
COLLECTION
Page E/2/1
Page E/2/2
Page E/2/3
Page E/2/4
Page E/2/5
TO SUMMARY RM
ROADWORKS (Cont'd)
Subgrade
Sub-Base
TO COLLECTION RM
ROADWORKS (Cont'd)
Tack Coat
Wearing Course
ROAD KERBS
TO COLLECTION RM
ROADWORKS (Cont'd)
Scupper Drain
ROAD MARKING
TO COLLECTION RM
ROADWORKS (Cont'd)
ROAD SIGNAGE
TO COLLECTION RM
ROADWORKS (Cont'd)
COLLECTION
Page E/3/1
Page E/3/2
Page E/3/3
Page E/3/4
TO SUMMARY RM
TO COLLECTION RM
TO COLLECTION RM
TO COLLECTION RM
TO COLLECTION RM
CONNECTION TO MAINS
TESTING
TO COLLECTION RM
COLLECTION
Page E/4/1
Page E/4/2
Page E/4/3
Page E/4/4
Page E/4/5
TO SUMMARY RM
WATER RETICULATION
Excavate trench for pipe, get out, part return, fill in, well
ram and remainder load and cart away from site, level,
grade and ram bottom, trim sides including planking and
strutting
TO COLLECTION RM
WATER RETICULATION
PIPE
TO COLLECTION RM
WATER RETICULATION
TO COLLECTION RM
WATER RETICULATION
HYDRANT
GARDEN TAP
INDICATOR POST
Valve marker post overall size 50mm Diameter x 750mm
Long including lattering, symboling and painting as
specified planted into ground. all as per drawing no.
JKR/CKAS/P-RA /BKA/30/PEL18 /(18/29) and /(19/29).
TO COLLECTION RM
WATER RETICULATION
CONNECTION TO MAINS
B Allow for the connection the existing water main pipe and
all necessary excavation, cast iron fittings, adaptors and
accessories necessary for the complete connection of the
pipes and leave the whole of the works in perfect working
order to the entire satisfaction of the S.O and all in
accordance with the requirement of the Local Authorities. ITEM
TESTING
TO COLLECTION RM
COLLECTION
Page E/5/1
Page E/5/2
Page E/5/3
Page E/5/4
Page E/5/5
TO SUMMARY RM
SEWERAGE
EXCAVATION
Excavation service trenches starting from ground
level, trench get out, part return, fill in, well ram and
remainder load and cart away from site, level, grade,
ram bottom, trim sides, and including backfilling with
compacted suitable backfill, selected soft granular
material to be compacted and planking and strutting
all as per dawing No. JKR/CKAS/07/26/
B20/89/SP/1[2] & JKR/CKAS/P-
SP/BKA/30/PEL18/(8/16 & 9/16)
TO COLLECTION RM
SEWERAGE (Cont'd)
MANHOLES
TO COLLECTION RM
SEWERAGE (Cont'd)
TO COLLECTION RM
SEWERAGE (cont'd)
TESTING
CONNECTION TO MAINS
TO COLLECTION RM
SEWERAGE (Cont'd)
TO COLLECTION RM
SEWERAGE (Cont'd)
TO COLLECTION RM
SEWERAGE
COLLECTION
Page E/6/1
Page E/6/2
Page E/6/3
Page E/6/4
Page E/6/5
Page E/6/6
TO SUMMARY RM
TURFING
TO COLLECTION RM
LANDSCAPING WORKS
PLANTING
TREES
TO COLLECTION RM
SHRUB
HARDSCAPE WORK
RUBBISH BIN
TO COLLECTION RM
FOOTPATH
CONCRETE BENCH
TO COLLECTION RM
COLLECTION
Page E/7/1
Page E/7/2
Page E/7/3
Page E/7/4
TO SUMMARY RM
DECORATIVE FENCING
TO COLLECTION RM
GATES
TO COLLECTION RM
ENTRANCE SIGNBOARD
TO COLLECTION RM
COLLECTION
Page E/8/1
Page E/8/2
Page E/8/3
TO SUMMARY RM
RETAINING WALLS
TO SUMMARY RM
COVERED WALKWAY
TO SUMMARY RM
COVERED CARPARK
TO SUMMARY RM
TIANG BENDERA
TO SUMMARY RM
TO SUMMARY RM
Subgrade
Sub-Base
Tack Coat
E One layer tack coat sprayed over bituminous binder course M2 294
surfaces to receive asphaltic concrete wearing course
(measure seperately)
Wearing Course
TO COLLECTION RM
RESURFACING WORKS
Tack Coat
B One layer tack coat sprayed over bituminous binder course M2 2,029
surfaces to receive asphaltic concrete wearing course
(measure seperately)
Wearing Course
ROAD MARKING
TO COLLECTION RM
ROAD KERBS
Scupper Drain
TO COLLECTION RM
WATER RETICULATION
PIPE
Excavate trench for pipe, get out, part return, fill in, well
ram and remainder load and cart away from site, level,
grade and ram bottom, trim sides including planking and
strutting
PIPE
TO COLLECTION RM
METER
CONNECTION TO MAINS
B Allow for the connection the existing water main pipe and
all necessary excavation, cast iron fittings, adaptors and
accessories necessary for the complete connection of the
pipes and leave the whole of the works in perfect working
order to the entire satisfaction of the S.O and all in
accordance with the requirement of the Local Authorities. ITEM
TESTING
TO COLLECTION RM
BOX CULVERT
TO COLLECTION RM
SUMPS
SUNDRIES
B Allow for make good existing services upon completion of
works
TO COLLECTION RM
COLLECTION
Page E/14/1
Page E/14/2
Page E/14/3
Page E/14/4
Page E/14/5
Page E/14/6
Page E/14/7
TO SUMMARY RM
TO SUMMARY RM -
STOR
TO SUMMARY RM
RUMAH PAM
TO SUMMARY RM
TO SUMMARY RM
*if applicable
TO COLLECTION
TO COLLECTION
TO COLLECTION
TO COLLECTION
TO COLLECTION
Vibration Measurement
TO COLLECTION
5.4 TRAINING
TO COLLECTION
a) Wash trough
b) Wash bay
TO COLLECTION
7.2 Sandbags
TO COLLECTION
i. Centrusemo pubscens M2
ii. Ficuspumila M2
iii. Parthenocissus himalayana M2
iv. Fern M2
v. ……… (any other suitable species) M2
TO COLLECTION
TO COLLECTION
11 MAINTENANCE
a) Silt fence. NR
b) Sandbags. NR
c) Silt trap. SUM HODT
d) Sediment basin/sediment pond. SUM CIVIL
e) Gabion wall. NR
f) Check dam. M3
g) Silt curtain/turbidity curtain. M2
h) Temporary drainage. M3
TO COLLECTION
14 WASTE MANAGEMENT
TO COLLECTION
16 FLORA MANAGEMENT
17 WILDLIFE MANAGEMENT
19 HERITAGE SITE
TO COLLECTION
TO COLLECTION
TO COLLECTION
TO COLLECTION
TO COLLECTION
COLLECTION:
G/1
G/2
G/3
G/4
Aerohub
TO COLLECTION
PROVISIONAL SUMS
Notes;
The Provisional Sums shall be expended
as directed by the Superintending Officer
or deducted in whole or part if not
required
TO COLLECTION