PVsyst V7.4.6
VC0, Simulation date:
07/05/24 15:25
PVsyst TRIAL
with V7.4.6
Calcul economic
Balances and main results
PVsyst TRIAL
June 195.9 80.23 21.58 196.8 192.0 21227 20493 0.861
July 203.4 79.68 24.07 207.3 202.1 22163 21396 0.853
August 178.4 74.99 24.13 193.2 188.5 20715 20016 0.857
September 125.5 55.72 18.08 147.3 143.7 16121 15566 0.874
October 85.6 39.65 11.82 111.2 108.3 12412 11978 0.891
November 46.0 24.50 6.61 64.3 62.5 7290 7004 0.900
December 34.8 21.99 1.00 49.8 48.3 5746 5506 0.914
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
07/05/24 PVsyst Evaluation mode Page 1/2
Project: Proiect_SSP
Variant: Calcul economic
PVsyst V7.4.6
VC0, Simulation date:
07/05/24 15:25
PVsyst TRIAL
with V7.4.6
Project summary
Geographical Site Situation Project settings
Bucuresti Latitude 44.44 °N Albedo 0.20
Romania Longitude 26.07 °E
Altitude 71 m
Time zone UTC+2
Weather data
Bucuresti
Meteonorm 8.1 (1991-2010) - Synthetic
System summary
PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings
System information
PV Array Inverters
Nb. of modules 168 units Nb. of units 1 unit
Pnom total 121 kWp Pnom total 120 kWac
Pnom ratio 1.008
Results summary
Produced Energy 170.79 MWh/year Specific production 1412 kWh/kWp/year Perf. Ratio PR 87.91 %
PVsyst TRIAL
Project and results summary
Table of contents
2
PVsyst TRIAL
PVsyst TRIAL
07/05/24 PVsyst Evaluation mode Page 2/2