INTRODUCTION
The easi-edge difference
We design, fabricate, manage and hire products And what’s more, we also offer a simple
to provide practical industry leading solutions pricing system where we provide a quote
to all your working at height issues. with no hidden extras once the project
easi-edge products are designed to conform to has begun.
Working at Height Regulations 2005 and the Our dedicated sales managers can take your
British and European standard for temporary preliminary drawings or 3D model, propose
edge protection BS EN 13374. and detail a scheme for site safety that can
We are founding members of the Edge be easily incorporated during the fabrication
Protection Federation (EPF) and our mission and erection or general construction process.
is to make working at height safe for all The easi-edge team will coordinate all
site operatives. deliveries to your site to suit project phases,
Our commitment to excellence through with continuous on-site support provided
both superior product service is unparalleled. by experienced field engineers whose
All products are designed by chartered qualifications include CSCS certification
structural engineers and are rigorously tested. and Train the Trainer certificates.
Our experienced people are able to offer you
advice on solutions to your working at height
issues. We underpin our commitment through
ISO 9001, 14001 and OHAS 18001.

01777 870901 www.easi-edge.co.uk 3


SYSTEM
OVERVIEW
easi-edge SYSTEMS

OVERVIEW
BOLT-ON SACRIFICIAL CLAMP-ON STAIRS
BOLT-ON STUB SACRIFICIAL SOCKET CLAMP-ON SURFACE MOUNTED
‘L’ BRACKET SOCKET
UB/UC SECTIONS

Centres change depending 60x40x4SHS seamless Maximum flange


on section depth minimum 130mm long thickness of 38mm

PFC SECTIONS

Rotated depending on 60x60x4SHS seamless


section depth minimum 130mm long

SHS/RHS SECTIONS

With the use of blind bolts 60x60x4SHS seamless


minimum 130mm long

CHS SECTIONS

COLD FORMED
SECTIONS
PRE-CAST CONCRETE

Surface & face fix Cast inserts or drill & fix


(please contact with your
requirements)

STRUCTURAL TIMBER

Surface, face & soffit fix Surface fix


(please contact with (please contact with
your requirements) your requirements)

01777 870901 www.easi-edge.co.uk 5


WHICH SYSTEM?

There are three main systems to choose from:

STANDARD BOLT-ON SACRIFICIAL SOCKET CLAMP ON

Whichever system is chosen they share some


common features
• Ground level beam dressing is preferable
• The Posts should be positioned at a maximum of 1900mm apart along the
beams and approx. 300mm from the centre of the columns at each end.
Centre of column

Centre of column

Split equal Split equal Split equal Split equal


(1900 Max.) (1900 Max.) (1900 Max.) (1900 Max.)
50

100

22 dia

300 approx. 300 approx.

6 01777 870901 www.easi-edge.co.uk


CLEARANCES

Shown here are the clearance forms Barriers initially set on lower hook to
provide final clearance for finished
for each type of system, these are to slab (as shown). It can be moved to
be completed by the customer, so the upper hook to provide an extra
that we know the specific positioning 100mm clearance (if required).

1050 o/barrier
requirements for each project.
The general standard is to set the
system with 20mm clearance in
STRUCTURAL
TOPPING

both the horizontal and vertical


PRE-CAST
PLANK

directions. However, you may find Vertical final


clearance
certain aspects of the build require required
greater or lesser clearances. Alternative slab
configuration

Horizontal clearance required


(to outer barrier)

Depth of slab/screed/trim

Barriers initially set on Barriers initially set on lower hook to


lower hook to provide final provide final clearance for finished
clearance for finished slab slab (as shown). It can be moved to
(as shown). It can be moved the upper hook to provide an extra
to the upper hook to provide 100mm clearance (if required).
1050 o/barrier

an extra 100mm clearance 1050 o/barrier


(if required).

Vertical final Vertical final


clearance clearance
required required

Horizontal clearance required


(to outer barrier)

Depth of slab/screed/trim
Sockets are typically on centre line &
socket length is at least as deep as slab
(to avoid posts being cast into floor).

01777 870901 www.easi-edge.co.uk 7


CLEARANCES

The two hook option


Whichever system is used, the default setting will give the option of initially
hanging the barriers with the lower handrail in the second hook to suit the
final, agreed clearance.
The barriers can be lifted by 100mm vertically if required, by using lower
handrail in the first hook to give a working clearance gap under the barriers
for edge trim installation, slab floating etc.

Typical installation position - Optional modified position -


Barriers can be set on lower hook to Barriers can be set on upper hook to
provide final clearances for finished provide an extra 100mm clearance
slab (as shown) (as shown)

100

1050mm o/barrier
1050mm o/barrier

Agreed gap Working gap

Top of slab level

System enhancements available


Netting – this can be combined with our system by attaching to the top rail of the barriers
at 600mm centres. This is where our system is capable of spreading the load effectively.
Telescopic rail and top-up barriers – can be used to provide a ‘double height’ option.
Please contact our sales team for more information.

8 01777 870901 www.easi-edge.co.uk


BARRIERS

There are four barrier sizes available for use.

FULL BARRIER HALF BARRIER


E-H0100 Full barrier (22kg) E-H0200 Half barrier (11.5kg)

1050mm
19
00
1050mm

mm 70
22 (M 0m
57
mm ax P 10 m
(M
Ov os 57 ax
era t Ctrs mm Pos
ll l ) Ov tC
eng era trs
th ll l )
eng
th

THREE QUARTER BARRIER QUARTER BARRIER


E-H0150 Three quarter barrier (16kg) E-H0250 Quarter barrier (8.7kg)
1050mm
1050mm

12 30
00 0m
15 mm 65 m
57 ( (M
mm Max 7m ax
Pos m Pos
Ov Ov tC
era tC era trs
ll l tr ll l )
eng s) eng
th th

Size and weight may vary slightly across the stock.

01777 870901 www.easi-edge.co.uk 9


BOLT-ON
SYSTEM
BOLT-ON SYSTEM

The unique single bolt fixing solution helps reduce the exposure
to working at height.
The bolted assembly with both horizontal and vertical adjustment
facility is pre-detailed and delivered to site indexed to suit the floor
slab detail.

Typical components which make-up a Post assembly:

STANDARD STUB

0
30 40
0

E-00650 300mm Stub (1.9kg) E-00750 400mm Stub (2.15kg)

STANDARD & EXTENDED BOOT 650mm


500mm

E-00500 standard Boot (3.2kg) E-00550 extended Boot (3.85kg)

STANDARD POST TYPICAL ASSEMBLY OF POST

Post
1070mm

Boot
Stub

E-00400 standard Post (3.6kg)

01777 870901 www.easi-edge.co.uk 11


BOLT-ON SYSTEM
Extra items available within the system
TYPICAL POST DRESSED WITH (depending on the steelwork section sizes
BARRIERS (SHOWING OVERLAPS) on the build)
150
mm STUB SPACER
150
mm

0
20
0 20

E-00800 E-00810
200mm spacer 200mm spacer
(5.8kg) (2.65kg)

0
40

E-00900 400mm spacer (9.9kg)

0
40

E-00910 400mm spacer (3.5kg)

MAXIMUM EXTENTS OF SYSTEM

500mm to
underside
of panel
mm
00
10

12 01777 870901 www.easi-edge.co.uk


BOLT-ON SYSTEM

Typical Drilling Details


UB/UC - Depending on the depth of the section size, the Stub may have to
be positioned lower, or rotated. Three drilling options are available.
PFC – Depending on the depth of the section the Stub may require rotating
90 degrees. Two drilling options available.
SHS/RHS – Depending on the depth of the section the Stub may require
rotating 90 degrees. Two drilling options available. This requires the use of
blind bolts (if this is not suitable please consider the sacrificial socket system).

All holes 22mm diameter

UC/UB

Up to 178 UB or 152 UC

533 UB and above or


305 UC and above
Up to 457 UB or 254 UC

01777 870901 www.easi-edge.co.uk 13


BOLT-ON SYSTEM

PFC

Up to a 180 PFC 200 PFC and above

SHS

Up to a 180 RHS/SHS 200 RHS/SHS and above

14 01777 870901 www.easi-edge.co.uk


BOLT-ON SYSTEM
Centre of column

Centre of column
Split equal Split equal Split equal Split equal
(1900 Max.) 50 (1900 Max.) (1900 Max.) (1900 Max.)

100

22 dia

300 approx. 300 approx.

Typically the hole pairs should be positioned 300mm from


column centres at each end, the remaining length is covered
EXTERNAL CORNER
at 1900mm centres, with the remaining closing gap being
covered by either three quarter / half or quarter barrier. If it
is above the maximum for a three quarter barrier (1200mm)
then you can always pitch all the Posts at equal centres.
• On roof beams, smaller set-out dimensions are required at 30 0
0 30
the ends of the beams (300mm then 1200mm) to provide
greater overhang of the barrier to cover the gap normally
occupied by a column.
• If holes land near to joints along the length of the beam, INTERNAL CORNER
then set the holes at 300mm either side of this joint.
• External corners on floors – 300mm from the centre of 0 30
0
45
columns then 1500mm to allow extra overhang of
barriers to close off corners.
• Internal corners – from column centres – 300mm in one
direction and 450mm in the other direction. This ensures
that the bolt-on Stubs do not clash.
• Please note the positioning is flexible within reason and
adjustable to clear connections, etc.
• Cellular beams should be detailed as above. Adjust the
holes that clash with connections or cells and then take an
overview of the centres ensuring the maximum 1900mm
is not exceeded.

01777 870901 www.easi-edge.co.uk 15


BOLT-ON SYSTEM

Installation of the bolt-on system STAGE 1


• The Post, Stub and Boot are pre-assembled and delivered to

Outside of build
site set to suit the relevant floor slab thickness and overhang.

Inside of build
• The face of the top hook is colour coded.
• With each delivery of components, a colour coded drawing
will be provided showing which colour of Post assembly is
to be fixed to which beam.
• The unique ‘single bolt fixing’ system allows for quick and
easy installation and removal. STAGE 2
• The Post assemblies should be installed using M20x60
bolts supplied.
• The Post hooks should always face into the building.
• With the Posts in position, barrier panels should be applied,
initially set with on lower hook to provide final clearance for
finished slab.
• Barrier panels should overlap adjacent barriers by at least STAGE 3
one aperture at each Post where possible.
• Secure the barriers to the Post, the cable ties provided are
to be fitted as a visual aid for inspection
• The section can now be craned into position.
• Use two number pipe clamps to secure the barriers top
and bottom on all external and internal corners
Adjustment of the System STAGE 4
The following adjustment can be made on site:
• The barriers can be lifted by 100mm vertically if required,
by using lower handrail in the first hook to give a working
clearance gap under the barriers for edge trim installation,
slab floating etc.
• Utilising the indexing holes and pins provided, the system
can be adjusted both horizontally & vertically.

16 01777 870901 www.easi-edge.co.uk


SACRIFICIAL
SYSTEM
SACRIFICIAL SYSTEM

The sacrificial socket is generally welded to the top of the beam


by the steel contractor, and will be cast into the concrete slab.

Typical components which make-up a Post assembly:

STANDARD POST EXTENSION STANDARD POST

1070mm
425mm

E-01000 standard Post extension (2.3kg) E-00400 standard Post (3.6kg)

SACRIFICIAL SOCKET TYPICAL ASSEMBLY OF POST

standard Post

60x60x4.0 SHS hot finished BS EN 10210


seamless section is to be welded to steelwork,
by the fabricator. Post extension

If using this system please contact for a sample


Post extension prior to manufacture to ensure
the SHS is a suitable size.

18 01777 870901 www.easi-edge.co.uk


SACRIFICIAL SYSTEM

Extra items available within the system.

TYPICAL POST DRESSED WITH LONG POST EXTENSION


BARRIERS (SHOWING OVERLAPS)

150
mm
150
mm

E-03300 long Post extension (4.15kg)

MAXIMUM EXTENTS OF SYSTEM

847mm
clearance to
underside
barrier

01777 870901 www.easi-edge.co.uk 19


SACRIFICIAL SYSTEM

Detailing sockets for the sacrificial system


• 60x60x4.0 SHS hot finished BS EN 10210 seamless section is
to be welded to steelwork, by the fabricator. If using this system
please contact for a sample post extension prior to manufacture
to ensure the SHS is a suitable size.
• The minimum length of socket should be 130mm. Socket lengths
should always match the depth of the slab as a minimum.
• Sockets are generally positioned on the centre line of the top
of sections but alternative positions are acceptable if required
as shown below.

PRE-CAST
DECKING DECKING PLANK

Socket on centre of beam Socket at internal edge of beam Socket at internal edge of beam
Standard position Modified position to avoid cross bracing Modified position to avoid pre-cast planks
Centre of column

Centre of column

Split equal Split equal Split equal Split equal


(1900 Max.) (1900 Max.) (1900 Max.) (1900 Max.)

60x60x4 SHS seamless

300 approx. 300 approx.

20 01777 870901 www.easi-edge.co.uk


SACRIFICIAL SYSTEM

Installation of the sacrificial system STAGE 1


• The Post and Post extension are pre-assembled and delivered
to site set to suit the relevant floor slab thickness.
• Simply insert the Post assembly into the appropriate sockets.
• The face of the top hook is colour coded.
• With each delivery of components, a colour coded drawing
will be provided showing which colour of Post assembly is
to be inserted into which sacrificial socket.
• The Post hooks should always face into the building.
• With the Posts in position, barrier panels should be applied,
initially set with on lower hook to provide final clearance for STAGE 2
finished slab.
• Barrier panels should overlap adjacent barriers by at least
one aperture at each Post where possible.
• Secure the barriers to the Post, the cable ties provided are
to be fitted as a visual aid for inspection.
• The section can now be craned into position
(if dressed at ground level).
• Use two number pipe clamps to secure the barriers top
and bottom on all external and internal corners.

Adjustment of the System STAGE 3


The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.

01777 870901 www.easi-edge.co.uk 21


CLAMP-ON
SYSTEM
CLAMP-ON SYSTEM

Typical components which make-up a Post assembly:

‘L’ BRACKET
525mm

765mm

925mm
m m
0m 0m m
50 74 0m
74

E-01100 500 ‘L’ bracket (6.3kg) E-01150 740 ‘L’ bracket (7.85kg) E-01175 900 ‘L’ bracket (8.4kg)

STANDARD POST TYPICAL ASSEMBLY OF POST


1070mm

standard
Post

‘L’ bracket

E-00400 standard Post (3.6kg)

01777 870901 www.easi-edge.co.uk 23


CLAMP-ON SYSTEM

TYPICAL POST DRESSED WITH Extra items available within the system.
BARRIERS (SHOWING OVERLAPS)
15
POST EXTENSION
0m
m
15
0m
m

E-2400 Short Post extension (1.2kg)

E-2450 Long Post extension (2.3kg)

MAXIMUM EXTENTS OF SYSTEM


Clearance shown are
to underside of barrier
504mm

744mm

940mm

24 01777 870901 www.easi-edge.co.uk


CLAMP-ON SYSTEM

Installation of the Clamp-on System STAGE 1


• Apply the horizontal foot of the bracket and Post assembly
to the bottom flange of the beam with one of the sliding
clamps on each side.
• Slide the clamps hard up to the section toes on each side.
• Tighten the screws onto the flanges on both sides. This will
clamp the bracket tight to the underside of the section.
• The Post hooks should always face into the building.
• With the Posts in position, barrier panels should be applied,
initially set with on lower hook to provide final clearance for
finished slab. STAGE 2
• The section can now be craned into position
(if dressed at ground level).
• Use two number pipe clamps to secure the barriers top
and bottom on all external and internal corners.
Adjustment of the System
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.

STAGE 3

01777 870901 www.easi-edge.co.uk 25


CLAMP-ON SYSTEM

Positioning of the system


As with the bolt-on and sacrificial systems the position of the
clamp-on brackets should generally be at 1900 maximum
centres along the beam and 300mm from column centres.

Split equal Split equal Split equal Split equal


Split Equal Split Equal Split Equal Split Equal
(1900 Max.)
(1900 Max.) (1900
(1900 Max.)
Max.) (1900
(1900 Max.)
Max.) (1900 Max.)
(1900 Max.)
column

column
Column

Column
Center ofof

Center ofof
Centre

Centre
300 approx.
300 Approx. 300300
approx.
Approx.

EXTERNAL CORNER
External / internal corner – 300mm from the joint,
these may need adjusting to avoid a clash.
• Use two number pipe clamps to secure the barriers
top and bottom on all external and internal corners.
Adjustment of the system
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks. INTERNAL CORNER

26 01777 870901 www.easi-edge.co.uk


CONCRETE
SYSTEMS
CONCRETE SURFACE MOUNTED SYSTEM

This system can be used to strike the barriers internal to the build
once the slab is cast, the barriers could have previously been on
bolt-on Stubs (depending on build conditions).

Typical components which make-up a Post assembly:

SURFACE MOUNTED SOCKET STANDARD POST


310mm

1070mm

E-03450 surface mounted socket (2.4kg) E-00400 standard Post (3.6kg)

TYPICAL ASSEMBLY OF POST TYPICAL POST DRESSED WITH BARRIERS

Post

surface 19
mounted 00
mm
socket (M
ax
Ctr
s)

28 01777 870901 www.easi-edge.co.uk


CONCRETE SURFACE MOUNTED SYSTEM

Installation of the concrete surface STAGE 1


mounted system
Typically if this is a previous installation of bolt-on Stubs
with the barriers being moved internal to the build, then
the pitching of the Posts should reflect the same centres.
If this is a fresh installation then the barriers would be
set-out following the detailing guidelines as highlighted
in the sacrificial section.
STAGE 2
Typical drilling details
150mm minimum from the edge of slab.
Fixing bolts to be supplied by others.
Installation of the system
• The Post hooks should always face into the building.
• With the holes drilled sockets can be bolted down in
position, Posts can be installed in to the socket to the
required height.
• Barrier panels should overlap adjacent barriers by at
least one aperture at each Post where possible.
• With Posts in position barrier panels should be applied,
initially set with on lower hook to provide final clearance
for finished slab.
• Secure the barriers to the Post, the cable ties provided
are to be fitted as a visual aid for inspection
• Use two number pipe clamps to secure the barriers
top and bottom on all external and internal corners.
Adjustment of the System
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.

01777 870901 www.easi-edge.co.uk 29


CONCRETE SIDE FIX

The bolted assemble with both horizontal and vertical adjustment


facility is pre-detailed and delivered to site indexed to suit the
floor slab detail.

Typical components which make-up a Post assembly:

STANDARD STUB STANDARD POST STANDARD & EXTENDED BOOT

E-00500
standard Boot

500mm
(3.2kg)
1070mm

0
30 E-00550

650mm
extended Boot
(3.85kg)

E-00600 300mm Stub (1.7kg) E-00400 standard Post (3.6kg)

FIXING ADAPTER PLATE TYPICAL ASSEMBLY OF POST TYPICAL POST DRESSED


WITH BARRIERS

standard Post

18
0m m 19
m 0m standard Boot 00
14 mm
(M
ax
fixing adapter Ctr
s)
KW-01-M05 plate
300mm Stub
Fixing adapter plate (2.22kg)

30 01777 870901 www.easi-edge.co.uk


CONCRETE SIDE FIX

Installation of the concrete surface STAGE 1


side fix system
• Minimum slab thickness required is 300mm thick
• With the adaptor plate in position as well as the Stub,
drill 2 number holes to suit a M12 bolt. Fixing bolts to
be supplied by others.
• Slide on the Boot and Post onto the Stub utilising the
indexing holes and pins provided, adjust the positioning
of the Boot on the Stub and the height of the Post relative STAGE 2
to the floor requirements.
• The Post hooks should always face into the building.
• Barrier panels should overlap adjacent barriers by at
least one aperture at each Post where possible.
• With Posts in position barrier panels should be applied,
initially set with on lower hook to provide final clearance
for finished slab. STAGE 3
• Secure the barriers to the Post, the cable ties provided
are to be fitted as a visual aid for inspection.
• Use two number pipe clamps to secure the barriers
top and bottom on all external and internal corners.
Adjustment of the System
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.
STAGE 4

01777 870901 www.easi-edge.co.uk 31


TIMBER
SYSTEMS
TIMBER SIDE FIX SYSTEM

Typical components which make-up a Post assembly:

STANDARD STUB STANDARD BOOT

500mm
0
30

E-00600 300mm Stub (1.7kg) E-00500 standard Boot (3.2kg)

STANDARD POST WOOD FIXING ADAPTER PLATE


1070mm

18
0m m
m 0m
14

E-00400 standard Post (3.6kg) KW-01-M05 wood fixing adapter plate (2.22kg)

TYPICAL ASSEMBLY OF POST TYPICAL POST DRESSED WITH BARRIERS

Post

Boot
19
00
mm
(M
Stub wood fixing ax
Ctr
adapter plate s)

01777 870901 www.easi-edge.co.uk 33


TIMBER SIDE FIX SYSTEM

Installation of the timber side fix system STAGE 1


• The wood fixing adaptor plate and the Stub are fixed to the face
of the timber. The overall integrity of the system is dependent
on all 6 adaptor plate fixing holes being utilised and the type
of fixing screws used. All users should carry out calculations
to identify which timber screw is suitable for the timber frame
and how many are required to ensure the edge protection is
securely fitted. easi-edge have carried out certain levels of
testing by a random section of structural timber and impact STAGE 2
testing in line with the requirements set out in the standard for
edge protection systems, BS EN 13374. To enable the system to
conform to this classification, the fixings should achieve a pull
out force of a minimum 20Kn.
• With the fixing adaptor plate in position as well as the Stub,
screw 6 number fixing screws into the face of the timber.
Fixing screws to be supplied by others.
• Slide on the Boot and Post onto the Stub utilising the STAGE 3
indexing holes and pins provided, adjust the positioning
of the Boot on the Stub and the height of the Post relative
to the floor requirements.
• The Post hooks should always face into the building.
• Barrier panels should overlap adjacent barriers by at
least one aperture at each post where possible.
• With Posts in position barrier panels should be applied,
initially set with on the lower hook to provide final STAGE 4
clearance for finished slab.
• Secure the barriers to the Post, the cable ties provided
are to be fitted as a visual aid for inspection
• Use two number pipe clamps to secure the barriers top
and bottom on all external and internal corners.
Adjustment of the system
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.

34 01777 870901 www.easi-edge.co.uk


TIMBER SURFACE FIX SYSTEM

Typical components which make-up a Post assembly:

SURFACE MOUNTED STANDARD POST WOOD FIXING


SOCKET ADAPTER PLATE
310mm

1070mm
18
0m m
m 0m
14

E-03450 surface E-00400 KW-01-M05 wood fixing


mounted socket (2.4kg) standard Post (3.6kg) adapter plate (2.22kg)

TYPICAL ASSEMBLY OF POST TYPICAL POST DRESSED WITH BARRIERS

Post

surface socket 19
00
mm
(M
ax
wood fixing Ctr
adapter plate s)

01777 870901 www.easi-edge.co.uk 35


TIMBER SURFACE FIX SYSTEM

Installation of the timber surface fix system STAGE 1


• The wood fixing adaptor plate and the surface mounted socket
are fixed to the surface of the timber. The overall integrity of the
system is dependent on all 6 adaptor plate fixing holes being
utilised and the type of fixing screws used. All users should
carry out calculations to identify which timber screw is suitable
for the timber frame and how many are required to ensure the
edge protection is securely fitted. easi-edge have carried out
certain levels of testing by a random section of structural timber
and impact testing in line with the requirements set out in the
STAGE 2
standard for edge protection systems, BS EN 13374. To enable
the system to conform to this classification, the fixings should
achieve a pull out force of a minimum 20Kn.
• With the wood fixing adaptor plate in position as well as
the surface mounted socket, screw 6 number timber fixing
screws into the surface of the timber. Fixing screws to be
supplied by others.
• The Post hooks should always face into the building.
• With the surface sockets in position, Posts can be installed
in to the surface socket to the required height.
STAGE 3
• Barrier panels should overlap adjacent barriers by at least
one aperture at each Post where possible.
• With Posts in position barrier panels should be applied,
initially set with on the lower hook to provide final
clearance for finished slab.
• Secure the barriers to the Post, the cable ties provided are
to be fitted as a visual aid for inspection.
• Use two number pipe clamps to secure the barriers
top and bottom on all external and internal corners.
Adjustment of the system
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.

36 01777 870901 www.easi-edge.co.uk


TIMBER SOFFIT FIX SYSTEM

Typical components which make-up a Post assembly:

STANDARD STUB STANDARD BOOT

500mm
0
30

E-00600 300mm Stub (1.7kg) E-00500 standard Boot (3.2kg)

STANDARD POST WOOD FIXING RIGHT-ANGLE


ADAPTER PLATE
10
0m
m m
0m
20
1070mm

150mm

E-00400 standard Post (3.6kg) KW-02-0010 wood fixing right-angle


adapter plate (3.75kg)

TYPICAL ASSEMBLY OF POST TYPICAL POST DRESSED WITH BARRIERS

Post

Boot
19
00
mm
wood fixing (M
Stub ax
right angle Ctr
adapter plate s)

01777 870901 www.easi-edge.co.uk 37


TIMBER SOFFIT FIX SYSTEM

Installation of the timber soffit fix system STAGE 1


• The wood fix right angle adaptor plate and the Stub are fixed
to the soffit of the timber. The overall integrity of the system
is dependent on all 6 adaptor plate fixing holes being utilised
and the type of fixing screws used. All users should carry out
calculations to identify which timber screw is suitable for the
timber frame and how many are required to ensure the edge
protection is securely fitted. easi-edge have carried out certain STAGE 2
levels of testing by a random section of structural timber and
impact testing in line with the requirements set out in the
standard for edge protection systems, BS EN 13374. To enable
the system to conform to this classification, the fixings should
achieve a pull out force of a minimum 20Kn.
• With the wood fix right angle adaptor plate and the Stub in
position, screw 6 number timber fixing screws into the soffit
STAGE 3
of the timber. Fixing screws to be supplied by others
• The Post hooks should always face into the building.
• With the wood fix right angle adaptor plate and the Stub
in position, Posts can be installed in to the Boot to the
required height.
• Barrier panels should overlap adjacent barriers by at least
one aperture at each Post where possible. STAGE 4
• With Posts in position barrier panels should be applied,
initially set with on the lower hook to provide final
clearance for finished slab.
• Secure the barriers to the Post, the cable ties provided are
to be fitted as a visual aid for inspection
• Use two number pipe clamps to secure the barriers top
and bottom on all external and internal corners.
Adjustment of the system
The following adjustment can be made on site:
• The barriers can be raised by 100mm by transferring
the lower handrail to the upper of the top two hooks.

38 01777 870901 www.easi-edge.co.uk


STAIRS

01777 870901 www.easi-edge.co.uk 39


STAIRS

Cast-in Socket/Surface Mounted System


This system can be designed in with cast-in sockets or retrofitted
with drill and fix of the surface mounted posts.

Typical components which make-up a Post assembly:

SURFACE MOUNTED POST SOCKET STAIR POST


310mm

1090mm

E-03450 surface mounted Post socket (2.4kg) E-00450 stair Post (3.5kg)

TYPICAL ASSEMBLY OF POST STAIR WING

standard
Post

surface
mounted
post

E-02000 stair wings (13.2kg)


supplied as pairs

40 01777 870901 www.easi-edge.co.uk


STAIRS

EXAMPLE OF DRESSED STAIRS

TYPICAL DRESSING OF FLIGHTS


(SHOWING STAIR WINGS)
169 mm typ.

250 mm typ.

01777 870901 www.easi-edge.co.uk 41


STAIRS

TYPICAL DRESSING OF FLIGHTS (BARRIER COMBINATIONS & POSITIONS)


Based on a 250mm going & 169mm rise.

3/4
1/4 1/2 3/4

1352 mm
1183 mm
1014 mm

mm
845 mm

m mm mm 12
7m 09 11 21
0 15 18
12
1000 mm 1250 mm 1500 mm 1750 mm
5 Risers 6 Risers 7 Risers 8 Risers

1/2
F
F 3/4
1690 mm
1521 mm

1521 mm

mm mm mm
14 14 16
24 24 27

2000 mm 2000 mm 2250 mm


9 Risers 9 Risers 10 Risers

3/4
3/4
F F
2028 mm
1859 mm

mm mm
18 19
30 33

2500 mm 2750 mm
11 Risers 12 Risers

F
F

F F
2366 mm
2197 mm

mm mm
21 23
36 39

3000 mm 3250 mm
13 Risers 14 Risers

42 01777 870901 www.easi-edge.co.uk


STAIRS

Detailing of the System


There are a few basic set-out procedures to apply when detailing the surface mounted system.
Landing Corner – 250mm from the corner, further if a wall is to be built along the edge of the landing.
Typically 100mm - in from the edge of the concrete (flights and landings).
Returns on flights may require single Post and quarter panel.
Different maximum centre for panels when used on stairs to avoid too much clashing.
Please note these are starting parameters and within reason are adjustable.

TYPICAL LANDING PLAN


250mm 250mm
150mm
100mm

100mm

100mm

100mm
100mm

250mm

TYPICAL SECTION ON TREADS


Wall

= =
40 100 Typ 100 Typ 40 100 Typ 100 Typ

140 140
o/Stairs o/Stairs

TYPICAL TREAD DETAILS


Position cast-in sockets 100mm from edge
or from inside face of wall if built onto stairs

01777 870901 www.easi-edge.co.uk 43


STAIRS

Installation of the stair system STAIR SOCKET


• This system can be dressed to the PC stairs at ground level
(preferable) or in-situ, whichever is most suitable. If ground
level installation is not an available option then PPE should
be utilised in accordance with working at height regulations.
• The cast-in fixings (M16x100) will have been installed at
appropriate positions around the castings.
• Surface mounted stair sockets (E-03450) should be applied
to the cast-in fixings and M16x45 set screws and washers
inserted and hand tightened.
• Posts should now be inserted into the sockets and indexing
pins inserted to set the height required. Stair Posts (E-00450)
should be used on the stair flights and standard Posts
(E-00400) used on landings.
• The Post hooks should always face into the stair.
• Holes in the baseplates of the units are slotted allowing
final positioning adjustments to be made (temporary
application of barriers may help positioning). The screws
should be fully tightened.
• Stair wings (E-02000) should be attached to the top and
bottom panels of each flight. With each initial delivery of a
staircase a marked up print will be supplied indicating Post
locations and barrier sizes.
• Secure the barriers to the Post, the cable ties provided are
to be fitted as a visual aid for inspection.
• Use two number pipe clamps to secure the barriers
top and bottom on all external and internal corners.

CAST IN SOCKET DETAIL


M16 CAST-IN
SOCKET

Please note these are


100 U.O.S. = = starting parameters and
within reason adjustable.

44 01777 870901 www.easi-edge.co.uk


PEDESTRIAN
SEGREGATION
SYSTEM

01777 870901 www.easi-edge.co.uk 45


PEDESTRIAN SEGREGATION SYSTEM

The easi-ped system can be installed free-standing at ground


level, providing segregation for walkways and voids.

Typical components which make-up a Post assembly:

FLOOR STAND

E-01300 2 Spigot (5.6kg) E-01350 4 Spigot (6.6kg)

STANDARD BARRIERS TYPICAL RUN OF EASI-PED


WITH BARRIERS

22
57
mm
ove
ral
l len
gth
ove 1057
ral mm
l le
ngt
h

E-H0100 E-H0250
Full barrier (22kg) Quarter barrier (8.7kg)

Assembly of the system


The floor plates and barriers can be installed
free-standing at ground level, with long runs
of the system it would need to be braced.

46 01777 870901 www.easi-edge.co.uk


SERVICES

01777 870901 www.easi-edge.co.uk 47


SERVICES

The complete easi-edge project management service includes:


• Nationwide sales team
• Total project management
• Technical detailing and support
• Deliveries & collections
• Field Engineers available throughout the project
• Problem solving
• Training
Technical Detailing & Support
The easi-edge technical team will work with you all the way
from detailing stage until the edge protection is returned to us.
With their CAD experience and knowledge of the system,
they will draw up a bill of material for each phase or delivery
and will work closely with your project managers to ensure
each phase is delivered to site, on time and indexed to suit
the building requirements.
Our dedicated technical team are available to:
• Attend meetings with main contractors and structural
steelwork fabricators before the project starts and as
necessary throughout the project.
• Identify most suitable system(s) for the project.
• Advise steel fabricator on drilling requirements,
in terms of size and location of holes etc.

48 01777 870901 www.easi-edge.co.uk


SERVICES

Delivery & Collections


The easi-edge delivery service is part and parcel
of the overall service available.
easi-edge can arrange delivery of all our products
throughout mainland UK.
All edge protection barriers are delivered to site
racked and banded on purpose built carriers, with
fixings securely loaded onto pallets.
To make life easier on site, all loads are clearly
labelled and easily cross referenced to marked
up print outs.
On-site Loading and Unloading
Off loading can be carried out by means of a
forklift or crane.
All carriers, stillages and pallets are used for
transportation purposes and are deemed as
packaging aids only.
When unloading or loading the equipment,
full wrap slings must be employed with each lift.
Please note that loading and off loading of the
equipment is the responsibility of the hirer and
is not included in any transport charges quoted.

01777 870901 www.easi-edge.co.uk 49


FIELD ENGINEERS

easi-edge provide a complete


service package to all our
customers. Not only do we
offer advice and delivery on
all our products, one of our
experienced Field Engineers
will also be assigned to your
project and are available for
on-site training, site inspections
and problem solving. • Rates for the transferred goods will be agreed
prior to the site transfer visit. An official
quotation, along with any specific details will
Tool box talks be sent to the customer taking over the hire.
As part of the complete service offered with
• A minimum of one representative from the
our edge and stair protection systems, tool
company who originally hired the system
box talks are available to educate the on
must be in attendance.
site operatives on the safe installation of the
system. The tool box talk will be arranged to • A minimum of one representative from the
coincide with the first delivery of edge or stair company intending to take over the hire of
protection. the equipment must be in attendance.
• A full site inspection will be carried out
Site inspections by the easi-edge representative. The site
After the initial tool box talk a follow up site inspection form will be completed by the
inspection can be requested to check the easi-edge representative.
installation of the edge protection. • The quantity of easi-edge to be transferred to
the new customer will be agreed and signed
Transfer of hire for by all three parties, using the easi-edge
Should the hire of the edge protection be transfer of hire form.
transferred over to another company, a full
• Until the transfer of hire has taken place
site inspection will be conducted to confirm
the original hire contract will remain and
a clean bill of health or to recommend any
the hirer will receive invoices until the
necessary remedial work. The Field Engineer
process has been completed.
will also calculate linear metres per floor
level or area and undertake a full site • A full order must be received by the second
inventory with both parties. company in order for the transfer of hire
process to be deemed complete.
When a transfer of hire is requested the
following must be adhered to:

50 01777 870901 www.easi-edge.co.uk


FOR MORE INFORMATION,
PLEASE CONTACT US
ENQUIRIES@EASI-EDGE.CO.UK
OR CALL US ON 01777 870901

easi-edge Ltd is a subsidiary


of Billington Holdings Plc
easi-edge Ltd T: 01777 870901
Ollerton Road, Tuxford, Newark, E: enquiries@easi-edge.co.uk
Nottinghamshire NG22 0PQ www.easi-edge.co.uk

You might also like