Gjbedtp CRJGR Ab Sipy SSP S5.0 T DR 0019

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GJ

BE
DT
P/ R
CR EF
JG ER

WALL B15-07
R/ D
W W 11
13 82
NC .71

CH
4

BC281
D/ G
SI :
CH -50

12
PY

5
-U 11
113 114 11 116 13. 7
13 13 5
13 13. P 030 20 200
.63 190
NC .25NA .60 NA NC 12 03 20
11 4 2 12 9 20
2 4 JO .75 12 04 JO .72
6 JO .80 5 12 08
RE JO .72
13 0
.58 2

7
KS
/S
20
12 02 20
20
20 06
12. 07
12
JO .77

CH 0
2 12 05 JO .77
JO 771
JO .93 6
4
131
5.2
19.
NA 278
11
/ 12
19 0 19.41
9 118
19.
11
117 19.017 11
19 74

25/10/2023
20/12/2022
11/08/2022
15/12/2020
13/01/2020
CB .43 CBT 4 RC 068 18 RC5
T 2 RC .60 1 NA .27
7IL 4
DB
200
13 1
BO .46
0

CH 25
C2
81
- 136
13.
13 OF 964
19 0 C
TS
NA .23
0
-L
11
14 80
NC .85
8

CH
YD

1
/00
106
14
11 11 107 P .26
1 14 0 10 108
14 9
12 RE
14 NC .6714 9 14NC .29
18 9 NA1 .98 NA .81 9
NA .86
.4 2 1
9
01 49

75

SECTION.
MATCH LINE CH.749500
13
15 4
NC .38
2

105
100 15
10 10 P .09
103 15 4 2
RE 15 1 16102 15 NC .33
16
.0 NC .70NA .03 NA .95 0
3 3 6
20

128
19
NA .09
MATCH LINE 3
CH.750200 13
15 5
OF .65
C 9

133
16
NC .13
0

127
19
NA .53
8

132
12 17
121 12 123 19 5 124 NC .27
19. 19 2 19 RC .15 19. 3
CB 827
CB .81 RC .63 B RC8IL 603
T T 3 7

DRAINAGE SYSTEM AT RC WALL B15-07.


16
12
50 19 6
NA .67
4
mm

REVISED BC282 & BC283 OUTLET CHANNEL.


ØM
SW
ate
rP
12 ipe
00

REVISED TSD BASED ON CURRENT SITE CONDITION


R.O.W
m

UPDATED TSD AT CH. 750 850 TO CH. 751 050 (LSH)

a) REVISED INLET BC 282 BASED ON SITE CONDITION


(PU
m B)
ØM
SW
ate
r

0
61
19 86
CH -150 Pip
e( .97 04
4

PU
B)

-10

a) REVISED RIP-RAP ARRANGEMENT AWAY FROM EXISTING PUB PIPE


CH

- REVISED DRAIN TYPE AT SOIL NAIL TO V-DRAIN (B15-05 & B15-06) AND PROVIDE

b) UPDATED DRAINAGE SYSTEM CH 749250 TO CH 749525 BASED ON LATEST CROSS


F
E
C

G
D
0
-20

FSY

YSO
YSO
YSO

MUS
CH

MUS
ZATI/ADH
MS/FNA/ZUL

MUS
AA/AINI

14/12/2018
RETAINING WALL B15-05

16
50
m m
ØM
SW
ate
r Pip
12
ROB 30

00 e(
PU
mm
ØM B)
SW
ate
rP
ipe
(PU
B)

JALAN DEWATA

BC282
TO
TA
MA
NS
UR
IA
> >>

60
0m
m
ØM
SW
ate
rP
ipe
RETAINING WALL B15-06

SEPAKAT SETIA PERUNDING (SDN.) BHD.


16
50
mm
ØM
SW
ate
rP
12 ipe
00 (PU
mm
ØM B)
SW
ate
rP
ipe
( PU
B )

16
50
mm
ØM
SW
ate
rP
12 ipe
00 ( PU
mm
ØM B)
SW
ate
rP
ipe
( PU
B)
Tel : 603-2263 1111
Jalan Sultan Hishamuddin,

Website : www.ktmb.com.my
50621 Kuala Lumpur, Malaysia.
KERETAPI TANAH MELAYU BERHAD
CH
75

GJ
BC283

BE
D TP
/ CR REF
JG ER
C
RETAINING WALL B15-07

R/ D
W W
H
BC281

D/ G
KEMENTERIAN PENGANGKUTAN MALAYSIA

SI :
CH -50
12

PY
5

-U
KS
/S
CH. 749500 TO CH. 750900
CH 0

5.2
GJ
BE / DB
D
CH 25

C2
TP 81
16
/C RE -T
50
m
S-
m
RJ FE
ØM G R L
CH

SW R
YD
ate /W
DW /
1

rP
00
12
00 ipe(
D/ G 01
P :
75

mm UB SI
)
GJBEDTP/CRJGR/WD/SIPY-SSP/S5.0/T-DR/0019

ØM PY
CH 32

TRACKSIDE DRAINAGE - LAYOUT PLAN


CH 0

SW -U
CH 82

ate
Pipr K
e( S/
PU
B) S5
.2/
MATCH L DB
INE C2
83 MATCH LINE CH.750200
-T
S-
LY
D /00
CH.750900 01

16
50
mm
ØM
SW
ate
rP
12 ipe
00 ( PU
mm
ØM B)
SW
100

a te
0

rP
WORKING DRAWING

CH -150 ipe
(PU
B)
-10

CH -
0
CH

AND MAINTENANCE OF ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR BAHRU.


KERAJAAN MALAYSIA

G
CH -15

DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING, COMMISSIONING

REF. NO : D:\ADHAM\SP3D\SECTION 5\TRACKSIDE\ZT\GJBEDTP-CRJGR-WD-SIPY-SSP-S5.0-T-DR-0019_REV G.DWG 30-OCT-2023 09:31

You might also like