‘QNGEN/Pap.F002 ee REQUEST FOR INSPECTION poate ELECTRIFIED DOUBLE TRACK FROM | RFINoiexoat- Site ae uF ‘ence ene Sone SONGORTTM SONERO 1180740 GEMAS TO JOHOR BAHRU $s. pauspun- cus-Fou- OOD15 4/05/2024] (TINE COTWK Csys COstN CODEP COGEN ‘A: Description of Work Date/Time of Inspection Bru spacing > Inspection for bam Lennching , Elastometne Bearing , Date: 24 /05/2022 Time: 09:00 07 Robber Ped, Epary lonusting , Boum Securing » and Boum Positioning (BMI-Bms) SPhn3 Element: P7 85407 Location: Gav_ Sree Drawing Ref Inspection Checklist Attached: Ziv No Previous Stage Approved Vide RFI No: Dated: ‘Requested by Contractor's Representative Received by Consultant's Representative Name: Name: Y\-S 7 Yeoh ‘Sdn Bhd ignation: (9 Designation: Syarat Penbenan Yeoh Ting Lay Sn Bh Designation: % Date & Time: Date & Time, “FS / tas lo Sf agieass eo ‘Signature: ‘Signature: en (ey) B: Permission to Proceed Zives TNo C: Inspection Result (to be completed by Consultant) at PASSED. [PASSED WITH COMMENTS. ¢. Activity partially completed, pending test report et. [1 FAILED. Remedial works listed below to be completed and RE-INSPECTION required. (Ldentical RFI ref. to be raised with Rev. A, B,C, ete.) (1 CANCELLED. E.g, Activity cancelled, duplicate RFI submis mm Ave atttihy bee lyan dive evel comnted € m Seevredh hemmporoey with Why at ion, ete. Contractor i allowed to proceed to next stage of works: J Yes ONo D: RFT Closure $ REI Closure Status: Reveived by Contractors Rep. ‘Acknowledged by ICC's Rep. Name: Designation: Date Time Signature: 2.4 Note: RFI Form shall be submitted to Consultant 24 hours before the commencement of work. V Samples and Method Statement for the works shall be approved before works are allowed to commence. ‘Contractor's Canv ‘qvinire.ro19 caecentccxce TEAM LACH MSPETONGHERST eo) RECHIRED DOURE AGRON Th, Zan SPY = RET-THP> SSBASRK ~~ PO -e 205 [Cmnase tocaion: BEy SPoRLINE SPA B pate: iamara 24/05 [2022 |Structure /Element: BEAM LAONLIsING? lTime OF 100 94 [cation ct wepecton: SAAN lowe tet: AS Pir Adtoched z oo DESCRIPTION OF WORKS: a NIA REMARKS peta oe 1 [Visual inspection of the precast element conducted Bi no defects noted eee 2 [tees 8 otewrent of bearing pai ceed iP intraarea rate ado theta Ga pen Srueture my Surouhy, 4 |Levels & alignment of bearing pads checked = [ose aimcina cma — “Visas ina cane gi: lance 7 (eae bane cin arenes bere ad [beads Apnea yard an oad da [etter bene eld amas Yoo Aemororyy Seu wth wit tobe he be to oly coches 10 Coesbeeinn - = cescarnon Hi 3 |Acknowledged by Contractor's Representatives re [inspected by Consultant's Representatives name: Name: Vs S lepe at Pebenaan Yeoh Tiong Lay Sn ht enna Paha en aay Sn pening one La pes gi nee: Si Pn ed 7 ee ee, ne ee, ale Toe RTT Bap ND OT DE RUNS DOTETD WE VOSS DION DOSS | DESIGN, CONSTAUTTION, SUPPIY, INSTALLATION, COM?! ETION, 1-°*INS, COMAISIONING [MAINTENANCE OF ELECTRIFIED DOUBLE TRACK FROM GEM.A5 TO JOHOR BAHAR sce: RV sean: 2 | omrosmoy: baw! re. | uence: 24290 beat a z tae “7 Rae las fons 24205 [eA 9a iso / 184 | M90 }'40 3 145 f1as > 195 /i4y eae Weetes fia @ 187 f149 wee So / 16g > Ler i 1, git fae Ld Sef 20 Te ae ference Hist S37 Sq cenuuresces sis ouer: as covriessosuos * 5) “) y= weed uw Referciny LineC seks i Ls /eas Sore 7, alle = 1 *3 i AemmiasarsMUACe ESSAY (ag ada get po 0 | JAS) Rg (AS) e Ses 41 Gin edatvaminstce Cy, G CONCRETE EMPIRE SON.BHD ISSUED BATE jrev.no. DOCUMENT TLE: PRE-DELIVERY CHECKLIST 7] eu = ae DESIGW, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING, COMASIONING AND MIANTENANGEOE ELEcTRinieD DOUBLE TRACK FROM GEMAS TO JOHOR BHARU PRECAST PRODUCT |PRE-TENSIONED T-BEAM. “7 Beomneterence | BRV— Gs [P2- BSL/B— Bin (ZAACnn — Typer) an 3 % [eediines” Z 4 POST-CONCHETING Not a Description ceptable emarks iN da hea Acceptable Meat ac [actual tenth = [Super Elevation (S.£) 2.5%, 43.75mm vs 1750mm template) ail [Offset distance of coupler from beam edge. “ [Offset distance of duct holes from beam edge. 4 JRoughering at free end (El), side face 100mm strip oe Junroughened, 600mm strip roughened JPoverenriat fied en intermesit ied, om oo WSS side surface 300mm width until edge. a Bs fo 7 [eight of starter bars (220mm 4/- 10mm) ie 2 |Roushening beam flanges fae th starter bar) Zz 9 [Roughening of end face at fixed end (with starter bars) a Skeich Plan (Defective Area Wanye @ tegaty volvo + 3G me Go wetiy deh =r pe Ta CONCRETE EMPIRE SOW.8HO [ssueD bare ~~] “saan stom men es = REVNO o L DOCUMENT TITLE: POST CONCRETING CHECKLIST cen Te ae ESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING, CONNASTONING ANO MAINTENANCE OF Recrrrieo DOUBLE TAACKFROM GEMASTOJOHORSHARY Jpnecasreaoouct — Jent-rewsioneD 7-6eam z [oeam Reference BR asi [pz — BSL /@- BAN (24 qm Tei) sea “Paine concreTNG 5] 1 [eonereine date Tigiteas [2 [concreting time 3 [Tenperetwe Per faiowabier 36°C Acwok Fon SHU, TSE Ty a Pesan: S205 So wm AWAIT: BS TN DoD 5 [Top of beam to betroom frshed Regpeel apt ep where [es frescuse OVE ena ame one eee . we Sess atetine = ston PORN he ecinton cate | pc Temas OCs: sernal 1 [Super Elevation SE) 2.5% aser) ral sarees, 3 fins ah ety Z -~ EVE GR oo tent am reas. a potertine: co ‘Suppor postion (cim from beam end) [> _* | Foneycomb (detected Fany) 2 -yW |”, | fouaheningoFHanges side face tt 3 Isarter bat) < 4 JRougheniag at fixed end with starter bar) | ~~ Prctection of expasedeut of srands at 5 free end (without start bar with 25mm | thick pony mortar [checking of ue coupler/ducts postion Sohn oo bel be Fon Sie § |actived ena ae 7 |stencting| 28 [Hotsing (post to group) x pe oF 1B Dectey 9 [Rectication works involved Gs hme Joe at te cle Ly lee coe ae (7) wetterment te te tec mar pe TO Ct@ig ) mt meld Gent te ES eee Ge. Ke Rem abetcches Copnge © rule), IG red lentnge te be ety Or Galaeten Recorded by are Dateyrine: [ 4 DESCRIPTION OF DEFECT/FINDING ocrecreD DATE jrocaTion: LS and RAS lPROPOSED REMEDIAL WORK In SKETC RESPONDED BY: 1 fame 2 CHANT AM. ate hme: S/H Mam - broposed 4 Weack away loose comevete ure bushing Tools nti 2 ~ fate with Adailes P42 Ta SeMALNO: CEH T0 (3 waouer + BRI Grout Lenkage ene 1H BLAN/ATIACHMENT : mn Comeyele - ‘We have no abjection to the proposed rectification work due to grout leakage at the soffit of beam All repair work shall be witness and signed-off by IOW at site seRAtNG: CEP TAL IGA wapucr : Bey san: Bl [Pa - sl. BEAMNO : bud | loescrIPTION OF DEFECT/FINDING: Werfer mavk locrecren oare: (8 [1 [26 ltocarion: RNS | ace ntnsncecnnrat nts meen: naan sree |pnoposeD REMEDIAL WORKIN SKETCH PLAN/ATIACHMENT asi Proposed to reiwoyed Looe — pavficles weiney coger wire brash f bushiyy Tole ~ batch Adester iennediately Taps the detect ave. Jnesronoeo ev: 1 We have no objection to the proposed rectification work for watermark on the beam surface Iw init + CHAS bet 2. Allcepair work shall be witness and signad-off by 1OW at ste Pee ed Mans aR RetNo: — JesicericenicuPcresaco STRESSING CHECKLIST Rev. No, 0 CONCRETE EMPIRE DN BMD Dates osjio0R ‘SUNT eaaleeT SIGH, CONSTRUCTION. SUFFLY, INSTALLATION, COMPLETION, TESTING, CONMISTONING ANS] [MAINTENANCE OF ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR ANARU. [PRECAST BEAM —— [PRECAST PRE-TENSIONED TEAM (“EAH REFERENCE Proetion ine no nos Stand Length 80000 Stand S20 (08) 1.2mm Bean #1: BRY-8SUP2.8SLIB-8N Biressing ere 186 IN per stand Beem #2 :BRV-BSLIP2 BSUB-BN2 lengatn (2000ps-100%) 388 mm Total theoretical elongation 0-100%) 487 mm Streesing pressure 8780 pt etal presoure 2000 p8 ote :ewaat ‘Stand no A col nanibor BaTORTOET Soak Ateam e/n/ao2) Elongaen of erand 2000pa | Eengaon vara “al ah slongaton (rm) ‘Toia songatan waa 0 105 270 co% tn) 3h 370. 5) zi 5 70. O54 ri 270 027 a 233 ard 207 o27 100) 2a oar 2. 270 208 325 a3 235 Sas 25 270 x 1 + 270 205 325 270 70 279 CE MIX SDN BHD (No Syerikat: 1026603-U) Office: 41-BA, Block L, Jalan PJU 1/36, Sunwaymas Commercial Centre, 47301 Petaling Jaya, Selangor Darul Ehsen ‘Tel: 03 - 7880 2745 /03- 7886 0712 Fax: 09-7880 2658, Factory: Lot 6004 H.S (M) 1913, Rancangan Tanah Beli, 42700 Banting, Solengor Darul Ehsan Fax: 03 - 8873 1636, CTR NO :34522 CONCRETE TEST REPORT TO: DATE 23.41.2021 CONCRETE EMPIRE SDN BHD PLANT ‘SEPANG 41-5A.BLOCK LJALAN PJU 1/36, ‘SUNWAYMAS COMMERCIAL CENTRE, PETALING JAYA PROJECT PC155 JOB SITE ; DOUBLE TRACK FROM GEMAS TO JB SECTION 5-8RV SPURLINE CHARACTERISTIC STRENGTH AT 28 DAYS (MPa) G55 SPECIFIED SLUMP (mm) 2 22081-20 CEMENT BRAND OPC COARSE AGGREGATE TYPE : 20MM GRADED GRANITE FINE AGGREGATE TYPE : WASHED MINING SAND ADMIXTURE BRAND : RPF RAPIDCAST LOCATION OF CONCRETE : BRV-BSL/P2-BSL/B-BMM1 (SET 4) i rl DENSI) qCOMPRESSIVEmm RENCTH (Mpa) to | t6.t1.2021 | 23.11.2021 7 218 58.8 20 | 16.11.2021 | 23.11.2021 7 215 2449.2 58.1 21 | 16.11.2021 | 23.11.2021 7 216 2450.4 58.8 FOR CE Mix Sdn Bhd AVERAGE MPA QUALITY CONTROLLER CE MIX SDN BHD (No Syaricat : 1028603-U ) Office : 41-6A, Block L, Jalan PJU 1/3C, Sunwaymas Commercial Centre, 47301 Petaling Jaya, Selangor Darul Ehsan Tel: 08 - 7880 2745 / 03-7888 0712 Fax: 03-7880 2658 Factory: Lot 6004 HS (M) 1913, Rancangan Tanah Belle, £2700 Banting, Selangor Derul Ehsan Fex: 08-8873 1838 CTR NO :34523 CONCRETE TEST REPORT To: DATE 223.41,2021 CONCRETE EMPIRE SON BHD PLANT: SEPANG 47-5A,BLOCK LJALAN PJU 1/30, SUNWAYMAS COMMERCIAL CENTRE,PETALING JAYA, PROJECT :PC155 JOB SITE, DOUBLE TRACK FROM GEMAS TO JB SECTION 5-BRV SPURLINE CHARACTERISTIC STRENGTH AT 28 DAYS (MPa) G55 ‘SPECIFIED SLUMP (mm) 2204-20 CEMENT BRAND orc. COARSE AGGREGATE TYPE : 20MM GRADED GRANITE FINE AGGREGATE TYPE : WASHED MINING SAND ADMIXTURE BRAND :RPF RAPIDCAST LOCATION OF CONCRETE : BRV-BSL/P2-BSL/B-BM1 (SET 2} wm) wero: | 211201 | 7 215 | 2450. 23 | 16.11.2021 | 23.11.2021 7 215 2450.7 14 24 | 16.11.2021 | 29.11.2021 7 215 2450.4 595 FOR CE Mix Sdn Bhd AVERAGE MPA: 58.5 ‘QUALITY CONTROLLER VERIFIED BY CE MIX SDN BHD. (No Syarikat : 1026603-U) Office: 41-54, Block L, Jalan PJU 1/3C, Sunwaymas Commercial Contr, 47201 Petaling Jaya, Selangor Darul Ehsan. ‘Tel: 03 - 7880 2745 /03- 7888 0712 Fax: 09-7880 2658 Factory: Lot 6004 H.S (Mi) 1913, Rancangan Tanah Bila, 42700 Banting, Selangor Darul Ehsan Fax : 03 - 8873 1636, CTR NO :34552 CONCRETE TEST REPORT TO: DATE £14.12.2004 CONCRETE EMPIRE SDN BHD PLANT SEPANG 41-5A,BLOCK LJALAN PJU1/3C, SUNWAYMAS COMMERCIAL CENTRE,PETALING JAYA PROJECT PC155 JOB SITE : DOUBLE TRACK FROM GEMAS TO JB SECTION 5-8RV SPURLINE CHARACTERISTIC STRENGTH AT 28 DAYS (MPa) 2655 ‘SPECIFIED SLUMP (mm) 2041-20 CEMENT BRAND 2 OPC COARSE AGGREGATE TYPE :20NIM GRADED GRANITE FINE AGGREGATE TYPE : WASHED MINING SAND. ‘ADMIXTURE BRAND ERPF RAPIDCAST LOCATION OF CONCRETE : BRV-BSL/P2-BSL/B-BM1 (SET 1) a] Terao | 1412200 | 28 216 2448.9 26 | 16.11.2021 | 14.12.2021 28 218 2449.2 608 27 | teat2021 | 14.12.2021 28 218 2449.6 709 FOR CE Mix Sa AVERAGE MPA: 70.2 ‘QUALITY CONTROLLER VERIFIED BY CE MIX SDN BHD. (No Syarkat : 1026603-U ) Ofee: 41-8A, Block L, Jalan PJU 1/9C, Sunwaymas Commercial Cente, 47301 Petaling Jaya, Selangor Darul Ehsan Tel: 03-7880 2745 / 03-7886 0712 Fax: 03-7880 258 Factory: Lot 6004 H.S (MA) 1913, Rancangan Tanah Bella, 42700 Banting, Selangor Darul Ehsan Fax: 03-8873 1636 CTR NO :34553 CONCRETE TEST REPORT To DATE 14.12.2024 CONCRETE EMPIRE SON BHD PLANT =: SEPANG. 41-5A,BLOCK LJALAN PJU 1/86, SUNWAYMAS COMMERCIAL CENTRE,PETALING JAYA, PROJECT PC155 JOB SITE DOUBLE TRACK FROM GEMAS TO JB SECTION §-BRV SPURLINE CHARACTERISTIC STRENGTH AT 28 DAYS (MPa) 2 G55 SPECIFIED SLUMP (mm) 2204/-20 CEMENT BRAND OPC. COARSE AGGREGATE TYPE : 20MM GRADED GRANITE FINE AGGREGATE TYPE WASHED MINING SAND ADMIXTURE BRAND RPF RAPIDCAST LOCATION OF CONCRETE : BRV-BSL/P2-BSL/B-BM1 (SET 2) DAT 28 | 16.11.2021 | 14.12.2021 29 | 16.11.2021 | 14.12.2021 28 30 | 16.11.2021 | 14.12.2021 28 FOR CE Mix Sdn Bhd AVERAGE MPA: 70.3 uss VERIFIED BY ==“ ESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMP! ETION, 1° ING, COMMISIONING & | | ‘MAAINTENANCE OF ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR ana suenvo: mast mereusotaum ee wAWe® [| COF é vi Adu i ioe: sean: 2 \' omrosmow: _ Bin woes | uenarns 2 312 a aoe Lis Jeng i 2464 Ati - 205 (202 i i204 / i, \ | = 20g dass Be , | 208 /200 L 400 os a fo i S ae fas Dafererce ve? § aS ' semmreaseoracevarcany ay tadg pest Came Pelee] magn =F S| 10 TS 168 He IS TNS 0 os + His His He tan | CONCRETE EMPIRE SON.BHD DOCUMENT TITLE: PRE-DELIVERV CHECKLIST [cunt DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING, COMMISIONING AND MAINTENANCE OF ldpsaant |ELECTRIFIED DOUBLE TRACK FROM GEMAS TO JOHOR BHARU precast pRoouct AM eam Reference Y2= WCB aT Do ie POST CONCRETING Io Description Acceptable ecteab cr 7 [actual cenath Zz 2 [Supertlevetion (5£) 25%, 43.75mm vs1750mm template) | 3 [otter distonce of coupler from bear alge ea 2 [oitsetcistance of duct hoes from beam edge = Cee corerooeet tt < 4 JReveteningat fixed end intermediate ier us Ss sce surface 300mm with untied ale [pete of starter bars (120% +/- 10mm) oe 8 [Roughening beam flanges face (with sterter bars). _ 3 fRouehening of end face at fined end (wth storterbars) | Siateh Plan (Gelectve Area fanyl> & Heats vee 1 Biren CoM vandals me Ne TR Pech iceomtty + Inspected by ‘concrere em a IELECTRIFED DOUBLE TRACK FROMA GEMAS TO IPRECASTPROOUCT _ [PRETENSIONEDTOEAM, ESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING, COMMMIENONT i fe i CONSTRUCTION, SUPPLY, HSTALLATION, COMPLETION, TESTING, COMMISION NERO INCRETING CHECKES ING AN baaibivenANNCE OE JOHOR BHARU aeamtoteenea | BRN BSL fi z= WSC e- Ort CaO Tape z I a qoiine ape ny pret She eect Eben ote cue ony ODay fon leete aaggengete eve de apenas Gaicierns [7 ane one Wns 2 [eens tne 3 ffenperture Po Rone ae haa 1p beet mes Raa AAI net eet op of beam to be broom finished Bees copied on op e 6 fretaibe See oo = a [Remark ee Name: , = eA i] acon ena | ar ic O65: teamed 1 Piserieaantgasetoey [oe 2 [pei oanetar 0mm e/aamm | >= 3 [fons ny Zz Fema = trina Fenn Oe er [1 | Seppor poston eam from beam anah - eveconb tected Tam 2 a“ y hana ge TE TT Stee en avenged nd with sterbon f| rctecioncfempned en ftir free end (without start bar) with 25mm, a ik epon moar eect bulk colo postion {- & bret theo et tes 7 [sence 8 [Hogging (post to group) Rate GCF 3 Peter wos ronal Cte ne Gent be aenasanliife. tlarmtetrsimeninc th ame ee CHO) ge capes. G Gat eenge Ae be weet) FB meet CTE I), oraaoy strmtno: C&f TQ (b vianucr : BV SPAN ‘BSL Pas soa | PAP tJ bescriptiow oF verecr/rwowe: Grout Leakage DevEcTeD bare rocarion: LHS and REC eet PROPOSED REMEDIAL WORK IN SKETCH PLAN/ATTACHMENT : ~ bro pesed bh tack avay loose conevet ase Lnuthing ook fil oud comevete . ~ Bale wit Adailex P42 14. 1. We have no objection to the proposed rectification work due to DED BY: Pee ‘erout leakage at the soffit of beam MAME: CHARS LOH 2 Allrepatrwork shall be witness and signed off by IOW at site me. 2/21 Han. fre Reto: [oBcePresueuPoresraco] STRESSING CHECKLIST meio Py covensrs npr 04 81D Baer wean SRT aie DESIGN, CONSTRUCTION, SUPPLY, Ne TALLATION, COMPLETION, TESTING, CONISTONNNG RH —] MAINTENANCE OF ELECTRIFIED DOUBLE TRACK FROM GENAS To JOHOR SHARU [—rarcrsraom—} 3 af ["wEAW REFERENCE Proseton tne no Lie 8 Stand natn 2000 Stand Si) ‘sann beam: RV-26UP2.85U8-EN4 Seeing tron ‘et pr stand Been? : BRV-BSLP2 ESUBSN2 Bergan ab0,3-100%) aan ‘oat hearse Congelon(©400%) 467 mm | Seeing pressure Hers0pa Intl pressure $2000 pt ae :ertvaeat Elopton of sand 20085] Bergan vara 00% (rn 4 20 195) 370 oe z a ata on a 80 a8 a, ae es ‘Toialaongaton atlance (6) Tot 27 ‘Send ne. oo oe 365, 369, 38 3 0 Oa 480 a8 a8 200 28e a0 as a0 238 a8 280 200 a a (cof marian BETOSAOOTS ek Vaivar Atgam ARG, 6/1/2025 6 fufror

You might also like