Jul 2023 Activities Highlight
Maintenance & HSSE Scopes
List of Activity Date Remark Deferred Activity:
FWP-B Pump Change Out 20 Jun – 04 Jul Ongoing • MPM I-Care Visit deferred to
VPAD (Valve Passing Acoustic Detection) 20 Jun – 04 Jul Ongoing September due to SWP
readiness.
GTG C & D Cooler Bolt Replacement 27 Jun – 18 Jul Ongoing
Fabric Maintenance Campaign 20 Jun – 31 Jul Ongoing • Ex-Verification (Electrical &
Instrument) deferred to W4
CPBM Inspection 04 Jul – 18 Jul July due to readiness.
Utility Water Pump A Removal 11 Jul – 18 Jul
• Hydraulic Pump Crane West
Telecommunication PM 11 Jul – 25 Jul 6M PM & East deferred to October
Well Greasing 11 Jul – 25 Jul 6M PM due to SWP readiness.
LEV Certification 18 Jul – 25 Jul Delay mob by 1 week • Noise Identification &
Ex Verification (Electrical & Instrument) 25 Jul – 24 Oct To confirm manpower availability Engineering Study deferred to
August due to manpower
Technical Services Scopes readiness.
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
95
94
94
94
94
94
94
94
Total POB Jul-23
mon
mon
mon
mon
mon
wed
wed
wed
wed
sun
thu
sun
thu
sun
thu
sun
thu
sun
tue
tue
tue
tue
sat
sat
sat
sat
sat
Day
fri
fri
fri
fri
Jul-23
01-Jul
02-Jul
03-Jul
04-Jul
05-Jul
06-Jul
07-Jul
08-Jul
09-Jul
10-Jul
11-Jul
12-Jul
13-Jul
14-Jul
15-Jul
16-Jul
17-Jul
18-Jul
19-Jul
20-Jul
21-Jul
22-Jul
23-Jul
24-Jul
25-Jul
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
Activity Name / Date
Jul-23
Core Crew Jul-23 63 63 63 68 68 68 68 68 68 68 66 66 66 66 66 66 66 64 64 64 64 64 64 64 65 65 65 65 65 65 65
Total Visitor Jul-23 32 32 32 27 27 27 27 27 27 27 29 29 29 29 29 29 29 31 31 31 31 31 31 31 29 29 29 29 29 29 29
LQ POB Limit Jul-23 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95
1
Jul-23
Fabric Maintenance Jul-23 10 10 10 13 13 13 13 13 13 13 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Fabric Maintenance Maint. Campaign Jul-23 10 10 10 13 13 13 13 13 13 13 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Maintenance Jul-23 18 18 18 4 4 4 4 4 4 4 15 15 15 15 15 15 15 16 16 16 16 16 16 16 9 9 9 9 9 9 9
Metering Validation Compliance Jul-23 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Vibration Monitoring (CPBM Inspection) Routine Maint. Jul-23 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GTG C & D Cooler Bolt Replacement Corrective Maint. Jul-23 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
FWP-B Pump Change Out Corrective Maint. Jul-23 11 11 11
P-5511A 3Y Utility Water Pump Removal/Installation Routine Maint. Jul-23 5 5 5 5 5 5 5
P-4103B 3Y LPKO Pump Removal/Installation Routine Maint. Jul-23 5 5 5 5 5 5 5
Ex Verification (Electrical & Instrument) Maint. Campaign Jul-23 6 6 6 6 6 6 6
6M, Telecommunication Routine Maint. Jul-23 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Well Greasing 6M Routine Maint. Jul-23 3 3 3 3 3 3 3 3 3 3 3 3 3 3
VPAD (Valve Passing Acoustic Detection) Inspection Jul-23 3 3 3
LEV Certification HSE Jul-23 2 2 2 2 2 2 2
SGS Laboratory Technician Laboratory Jul-23 1 1 1
Asset Integrity Jul-23 0 0 0 0 0 0 0 0 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 7 7 7 7 7 7 7
1Y Flexible Hose Inspection Inspection Jul-23 3 3 3 3 3 3 3
KBB Cooling Fan Sprocket & GI For Cooler Fan System MOC Jul-23 4 4 4 4 4 4 4 4 4 4
Jul
P-4103B 3Y LPKO PUMP
Installation
18-Jul-23 25-Jul-23 5 90000066146 Spencer
l l l l l l l 7
Jul
Utility Pump P-5511A
Removal
11-Jul-23 18-Jul-23 5 90000064485 Spencer
l l l l l l l 7
Jul
Ex-Verification (Electrical &
Instrument)
25-Jul-23 31-Oct-23 6
90000066637
(Multiple WOs)
Kenneth
l l l l l l l 42
Jul
Instrument Tubing
Inspection 2022 & 2023
11-07-23 01-08-23 4
90000067040
(Multiple WOs)
Jessey
l l l l l l l 21 Workpack AFC Target : 3/7/23
modification
5
SCEDRA WO
Main WorkCtr Planner group LAFD MaintActivType Order Functional Loc. Description
KINST KLP 20-07-2023 S03 90000063437 KBB-67FD-0021 1Y, FIRE DAMPER INSPECTION LQL2 NON HAZ
KINST KLP 27-07-2023 S03 90000063438 KBB-67FD-0031 1Y, FIRE DAMPER INSPECTION LQL3 NON HAZ
KINST KLP 24-07-2023 S03 90000063439 KBB-67FD-0041 1Y, FIRE DAMPER INSPECTION LQL4 NON HAZ
KMECH KLP 07-07-2023 S03 90000063434 KBB-U-67-NA-6701 1Y, VENTILATION SYS VISUAL INSP 6701
KINST KLP 06-07-2023 S03 90000063807 KBB-23VTZ-1009 1Y SCE VIBRATION TRANSMITTER FT (X-2307)
KINST KLP 06-07-2023 S03 90000063808 KBB-23VTZ-1088 1Y SCE VIBRATION TRANSMITTER FT (X-2306)
KINST KLP 10-07-2023 S03 90000063798 KBB-26NFD-2101 1Y, FIRE DAMPER INSPECTION SYS 26 TR 2
KINST KOH 03-07-2023 S03 90000064171 KBB-26BEZ-1700A 6M, DETECTOR FLAME UV/IR GTC 1 FT
KINST KOH 05-07-2023 S03 90000064174 KBB-26GCZ-1107 6M, DETECTOR GAS GTC 1 FUNCTION TEST
KINST KOH 03-07-2023 S03 90000064175 KBB-26GP-1102 6M, DETECTOR OIL MIST GTC 1 FT
KINST KOH 04-07-2023 S03 90000064172 KBB-26HFZ-1101 6M, DETECTOR HEAT GTC 1 FUNCTION TEST
KINST KOH 03-07-2023 S03 90000064173 KBB-26HFZ-1107 6M, DETECTOR TEMP AIR VENT SYS GTC 1 FT
Notes:
• 5 WOs required SCEDRA due to unavailability of HVAC Contract
• 5 WOs required SCEDRA to align with GTC 8K PM
• 2 WOs required SCEDRA to align with Malikai Nov ESD or potentially execute online by KBB
6