Professional Documents
Culture Documents
Screenshot 2023-12-26 at 4.01.25 PM
Screenshot 2023-12-26 at 4.01.25 PM
8
23
PA-9 [Total No. of Pages : 2
i c-
[5931]-15
t at
S.E. (Electrical Engineering)
5s
7:3
203141 : POWER GENERATION TECHNOLOGY
02 91
0:3
(2019 Pattern) (Semester - I)
0
31
6/0 13
Time : 1 Hour] [Max. Marks : 30
0
1/2
Instructions to the candidates:
.23 GP
8
C
23
3) Neat diagrams must be drawn wherever necessary.
ic-
4) Assume suitable additional data, if necessary.
16
tat
5) Use of non-programmable calculator is allowed.
8.2
5s
.24
7:3
91
Q1) a) Write different methods which are used for increasing the efficiency of
49
0:3
OR
CE
81
8
Q2) a) Explain coal handling system in thermal power plant with neat flow
chart. -23
.23
[6] tic
16
i) Generator output : 60 MW
1
:37
49
Q3) a) Explain with neat sketch the working of a nuclear power station. [6]
16
b) State when and where diesel electric power plants are used? [4]
8.2
P.T.O.
OR
8
23
Q4) a) Explain the function of moderator. Why does a breeder reactor require
i c-
no moderator? [6]
t at
b) Write a short note on applications of gas turbine power plant. [4]
5s
7:3
c) Name the essential components of a diesel power plant and explain
02 91
lubrication system.
0:3
[5]
0
31
6/0 13
0
1/2
.23 GP
E
81
8
C
23
ic-
16
tat
8.2
5s
.24
7:3
91
49
0:3
30
31
01
02
1/2
GP
6/0
CE
81
8
-23
.23
tic
16
sta
8.2
:35
.24
1
:37
49
9
10
0
6/0 13
023
0
1/2
.23 GP
CE
81
16
8.2
.24
49
[5931]-15 2