Cleanouts, Floor Drain&roof Drain - Afaq Alamalz - Rev - 02 - Grp-07-Nu002-Mag-Mec-Mat-00022
Cleanouts, Floor Drain&roof Drain - Afaq Alamalz - Rev - 02 - Grp-07-Nu002-Mag-Mec-Mat-00022
Note(1): Employer’s/ Engineer’s approval is for conformance with information given and design concept expressed in Contract Documents. Approval does not authorize changes to
Contract Documents. Employer’s/ Engineer’s approval does not relieve the Contractor from his contractual obligation to ensure conformance to all Contract Documents. Any
deviations, to the Contract Documents found subsequent to Employer’s/ Engineer’s approval are to be corrected by the Contractor at no extra Cost/Time to the Employer.
Transmittal Title Material Submittal for Cleanouts, Floor Drain & Roof Drain - Saudi Ceramic Status Code: Status Code “C” (Revise and Resubmit) “C”
Status Code:
Document Type Material Submittal CRS Prepared by: PMC
Department(s) Mechanical CRS Reviewed by: Project Director
Involved
Transmittal Received 07-JULY-2022 Project Director
Date by PMC CRS Approved: Sign
Transmittal Respond 24-JULY-2022
Date by PMC
Status codes :
A: Reviewed - Work may proceed;
B: Reviewed with comments - Revise and resubmit. Work may proceed subject to incorporation of comments; C: Objection
- Revise and resubmit. Work may not proceed; and
D: Review not required. Work may proceed.
Responded Revised
No. Doc/Section/ PMC Comments (Rev.0) Contractor Response (Rev.01) PMC Comments (Rev.01)
By Status
Page
REMARKS: The submitted catalogue shall have the proposed products highlighted for easy
Engineer’s identifications. Moreover, the material of the cleanout, floor drain depends on
Comments: the location of installations (Exposure to the ambient conditions) and also the
NOTED, ATTACHED SELECTED MODE
proposed product (in design, appearance, etc) shall match with architectural
1.
perspective too. Hence, Contractor to identify the locations of clean outs,
Floor Drains and Roof Drains, highlight the information in the submittal and
mention clearly the material of the products as per the locations. A table in
this regard is highly appreciated.
Contractor to provide a sample board of intended proposal along with material attached
2. submittal for review and approval. NOTED, ALL SAMPLE SEND TO SITE NO SAMPLES ARE AVAILABLE AT SITE, PLEASE Sr. Mechanical
Engineer
sample
PROVIDE THE SAMPLES
Ref : [filename]
Page 1 of 1 PRINTED : 7/24/2022