0 CLIENT: CONSULTANT: CONTRACTOR:

WORK INSPECTION REQUEST (WIR)


Date:31-01-2023
Project No. & Name: GRP-07-NU002-Construction and operate phase-1 green Riyadh nursery project WIR No.: .: GRP-07-
NU002-MAG-CIV-
WIR-00690
Coordinates: E N to E N
Rd
From To Widt
No./Carriagewa Layer: BFRL
CH: CH h:
y:
Location: From Minu
to MH No. Minus
Total
PS/ITP/RA: Others:
MH No: s length:
Around Towards MH/ and
plus Towards MH/Chamber No:
MH/Chamber No. Chamber No: plus
Preliminary Road Work Potable Water Works Electrical Works Provisional Sum
Ground Investigation Storm Water Network Irrigation Works Structural work Others
Demolition & Protection Sewerage Works Street Lighting Day Works
Bill-4,item A & B portable
B.O.Q.:
water & septic tank
Work inspection request for surface prepration for external Contract /Shop GRP-07-NU002-MAG-STR-
Description Drawing: DWG-SD-00004
waterproofing at Under Ground tank @ Road-5 STAGE-4 as per
of Work:
attached drawing. GRP-07-NU002-MAG-CIV-
Spec. Ref.
MAT-00039
Preceding RFA:
Ready For
Requested by Contractor Consultant Returned by Consultant Contractor
Inspection Remarks
Receive Sign. Receive Sign.
Date Time Sign. Date Time Date Time
31-01- 31-01- 10-00
11-00 Am
2023 2023 AM
31-01-
11-00 Am 0
2023

Status
Position Observation / Remarks (with attachments, if any) Signature with date(s)
 X
Surface prepration for external waterproofing at Under
Inspector Ground tank @ Road-5 STAGE-4 as per attached drawing
has been done and inspected.
Muhammad Zia Ur Rehman
Surveyor 04/02/2023

External surface preparation for water proofing at


Material underground Water tank @ Road -5 as per attached drawing
Inspector/ has been done OK. Choudhry Yousuf
Engineer

ARE

Quantity
Surveyor
Approved B Approved Revise & Resubmit Rejected
Status Code A C D
With Comments
Consultant Date Time Signature
Eng Elmughdad Mohammed
Comments 04-Feb-2023 Sr Civil Eng
Received by Contractor
Date Time Signature