CLIENT:

Ministry of Housing, Utilities


& Urban Communities

New Urban Communities


Authority

PROJECT ENGINEER:

D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D01D01 D01 D01 Dar Al-Handasa (Egypt)
────── ────── ────── D01 ────── ────── D01D01
────── ────── D01 ────── ──────
────── ──────
────── ────── ────── ────── ────── Shair & Partners
X01 X02 X03 ────── X04 X05 ──────
──────
T11 T12 ────── T13 X06T14 T15
W05 W06 W07 W08 W09
XX05 XX04
XX04' XX03 CONTRACTOR:

D01
──────
FEMCCGRD03
W10

D01 MEP CONSULTANT:


──────
Y06

HC TOILET TOILET CORRIDIOR


JANITOR
FEMAIL TOILETS

DN 2x600 mm
CABLE TRAY
D01 PROJECT NAME:
──────
D01
Y07
──────
Y07'
MALE TOILETS
Alamein Downtown Towers
FTR ROOM

D01
KEY PLAN: S
────── 2
T01
WASHING ROOM 100 A, CP
FOR DOMESTIC PUMP
1,3,5/ SMDB-MECH-GR-0

COLD ROOM
20 A, CP
FOR CIRCULATING PUMP
B1
2,4,6/ SMDB-MECH-GR-0

WASTE ROOM
E W
200 mm 630 A, CP
CABLE TRAY
FOR FIRE PUMP

630 A, CP
SMDB-MECH-GR-0 1
D01 FOR FIRE PUMP
CHILLER TRANSFORMER ROOM
──────
CP CP CP CP CP CP
T02
63 A, CP 300 mm 2
FOR JOCKEY PUMP CABLE TRAY
8,10,12/ SMDB-MECH-GR-0
N
20 A, CP GENERAL NOTES:
TR.UT1 FOR CIRCULATING PUMP FSMDBMECHGR0 1- FOR LEGEND, GENERAL NOTES AND LIST OF ABBREVIATIONS, REFER TO
LBS 7,9,11/ SMDB-MECH-GR-0 DRAWING NO. (DWG-CSCEC-D00-FD-EL-PW-00-GL-00-0001-00).
PUMP ROOM 2- STEEL WEATHER PROOF JUNCTION BOX INSTALLED IN THE SHAFT OF
EACH ELEVATOR TO RECEIVE SIGNALS FROM (BMS, TELEPHONE,
LBS
SOUND SYSTEM, CCTV, INTERCOM ,SESIMC SENSORS,............ETC).
3- ALL INDICATED ROUTING FOR ALL ELECTRICAL SYSTEMS ARE ONLY
INDICATIVE, THE METHOD OF SUPPORTING AND ALL REQUIRED
DETAILS FOR COMPLETE INSTALLATION SHOULD BE SHOWN ON SHOP
DRAWINGS.
4- FINAL CALCULATION FOR ALL CABLE TRAYS/LADDER SIZES TO BE
TR.UT2
SHOWN ON THE SHOP DRAWINGS
D01 5- THE EMERGENCY CABLES SHALL BE INSTALLED ON SEPARATE
CABLE TRAYS RATHER THAN THE NORMAL CABLES.
──────
6- ALL CABLE ROUTING IN THE SUBSTATION OR ELECTRICAL ROOMS SHOULD
T03 BE INSTALLED ON CABLE LADDER WITH SUSPENSION RODS EVERY 1 METER.
DOMESTIC WATER TANK - 01
7- ALL ROUTING IN ROOF LEVEL SHOULD BE INSTALLED IN COVERED
FIRE WATER TANK - 01 CABLE TRAYS.
FIRE WATER TANK - 02
DOMESTIC WATER TANK - 02 8-ALL BUSBARS SHALL BE LINKED BY APPROVED ACCESSORIES FROM
THE BUSWAY SUPPLIER TO ALLOW THE EXPANSION IN THE MOVEMENT JOINT.

9- ALL EQUIPMENT DIMENSIONS ARE PROVISIONAL EXACT DIMENSIONS


TR.CH1
LBS SHALL BE COORDINATED WITH EQUIPMENTS SUPPLIER.

10- COORDINATION WITH THE ROAD CONSULTANT AND THE LANDSCAPE


CONSULTANT FOR THE MEDIUM VOLTAGE CABLE ROUTING SHOULD BE
LBS
DONE WITHIN THE SHOP DRAWING STAGE.

11- SIZING EACH MANHOLE SHOULD BE SUBMITTED TO BE APPROVED IN


STAIR 03 THE SHOP DRAWINGS.
STAIR VESTIBULE 600 mm
CABLE TRAY 12- ALL EQUIPMENT DIMENSIONS ARE PROVISIONAL EXACT DIMENSIONS
STAIR VESTIBULE
SHALL BE COORDINATED WITH EQUIPMENTS SUPPLIER.
TR.CH2
D01 STAFF FEMALE CHANGING ROOM 13- THE MCC DETAILED LOADS AND LOCATION SHOULD BE REFLECTED
────── 600 mm NEXT STAGE
T04 CABLE TRAY

STORAGE

STORAGE JANITOR

IRRIGATIOIN WATER TANK 02

PUMP ROOM

FEMCCGRD02
BMS ROOM
100 A, CP
FOR Irrigation water pump set
IRRIGATIOIN WATER TANK 01 14,16,18/ SMDB-MECH-GR-0
DN
D01 CP
────── PARKING AREA
T05

600 mm
CABLE TRAY

D01
──────
D01
Y08
────── FM CLOSET
T06

PANEL ROOM

MVSG ELEVATOR ENTRANCE

200 mm
CABLE TRAY REVISION TABLE:
D01
──────
T07

BMS ROOM

FEMCCGRC01
ELEVATOR LOBBY-01 01 DETAILED DESIGN SUBMISSION SEP. 2022 T.A
00 DETAILED DESIGN SUBMISSION JAN. 2022 T.A
REV DESCRIPTION DATE APP.

DRAWING TITLE:

GROUND FLOOR PLAN PART B1 FEEDER ROUTING LAYOUT D01-RESIDENTIAL


1
1 : 100
TOWER-RESIDENTIAL TOWER
GROUND FLOOR PLAN PART B1
FEEDER ROUTING LAYOUT

DESIGNED: CHECKED: APPROVED:

M.R M.M T.A

DRAWN: DATE: SCALE:

A.R & M.A OCTOBER 2022 1 : 100

DWG-CSCEC-D01-DD-EL-PW-03-GF-B1-0000-01