Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

SWTCI-

QAQC-
NCR, Rev
0.0, s.
2023

NON-CONFORMANCE REPORT
REPORT INFORMATION
PROJECT TITLE:
LOCATION:
CLIENT:
DATE OF INSPECTION:
INSPECTION BY:
REQUEST NO.: NCR-LIT-YYYYMMDD-000-000
INSPECTION DETAILS
Works inspected: LAYOUT/STAKING FORMWORKS ARCHITECTURAL OTHERS, SPECIFY:
EARTHWORKS CONCRETING INTERIOR DESIGN
REINFORCEMENTS STEEL UTILITIES
Reference Drawing/Shop Drawing:
Area of concern:
NON-CONFORMANCE DETAILS:

PHOTOGRAPH:

CORRECTIVE ACTION:

NCR CLOSE-OUT

INSPECTED BY REVIEWED AND ACCEPTED BY CONFORME


NAME
QAQC Engineer PIC/PE/PM PROJECT SUPERVISOR
SIGNATURE
DATE

NOTED:
QAQC Manager
NAME SIGNATURE DATE
Note: Attach appropriate and relevant documents to aid in the communication. Attach photographs of inspection with project name, location, structure inspected, date and time
Submit a copy to QAQC Manager within 24 hours.

You might also like