FEL 3 BUSINESS CASE

Form-04 FEL 3

Purchase Drone Dji Fly Cart

For: MINES
Project Type : (Betterment/ Sustainability/ Asset Integrity/ R&D)

In order to establish a resourced and funded project, it is necessary to develop a clear and convincing
business plan for the initiative. The business plan will identify the benefits of meeting the objectives of
the initiative, and balance these against the costs and risks associated with realizing these benefits.
The business plan will also be used as a benchmark to compare against actual results, costs and
benefits in order to assess the ultimate results if the initiative is approved to proceed to project status.
CONTENTS

1. Executive Summary........................................................................................................................... 3
2. Problem Statement........................................................................................................................... 3
3. Project Scope.................................................................................................................................... 3
4. Project Schedule............................................................................................................................... 3
5. List of Equipment and Specification.................................................................................................. 4
6. HAZOP Study.................................................................................................................................... 6
7. Cost Estimate.................................................................................................................................... 7
8. Attachment List................................................................................................................................ 7
9. Approval........................................................................................................................................... 8
1. Executive Summary
This project aims to purchase handling sample tools as alternative handling samples by light
vehicle. The project objectives is to increase turn around sample preparation and assaying so as
process selective mining ore can produce a grade as planned
2. Problem Statement
The selective mining process to produce the planned grade requires fast sample assay data. This data
is used to make decisions about whether to do mining or stripping. Currently the time required to
obtain assay data is around 3 hours. Half of it is the sample delivery time. With an alternative
sample handling as a drone, it is hoped that the delivery time will be faster

*Data turn arroun samples 2023


3. Project Scope
To purchase 1 Unit Drone Dji Fly Chart, commonly for increase turn around samples data
4. Alternatives & Best Option
(According to previous stage, please summary in one or two paragraph the alternatives and best
option for this project).
Alternative #1: No capital Investment. Low performance turn around samples data

Alternative #2: Purchasing 1 Unit Drone Dji Fly Chart is the most alternative way to increase turn
around sample data. Therefore, we are recommending carrying on the project using the alternative.

5. Project Schedule
Start Date Duration
• Feasibility (TFR) 15 June 2024 6 months
• CAR Preparation 15 Nov 2024 6 months
• CAR Approval 15 Jan 2025 6 months
• Scope of Eng. Services 15 Feb 2025 6 months
• Contract Package 15 Mar 2025 6 months
• Tender 15 Apr 2025 6 months
• Engineering 15 Jun 2025 6 months
• Contract Package 15 Aug 2025 6 months
• Tender 15 Sep 2025 6 months
• Construction 15 Dec 2025 6 months
• Commissioning 15 May 2025 6 months
• Start-up 15 June 2025 6 months
• Close Out 15 July 2025 6 months
6. List of Equipment and Specification
(At this stage list of equipment can identify, mentioned at this paragraph & attached the reference or
quotation).
7. HAZOP Study
(From preliminary design please conduct HAZOP Study, highlighted the main issue in one or two
paragraph. Result of HAZOP study that has updated as reference for future stage/detail design).
8. Cost Estimate
(Develop cost estimate based on preliminary design with rough of magnitude 15 – 20%, at this
paragraph put summary for detail put as attachment).

9. Attachment List
(Ensure & Tick several supporting document as attachment)

No Description Checklist Additional Note

1 Preliminary Design
2 Utility/Infrastructure/Facilities Diagram
3 HAZOP Study/GPRA/WI (Risk Assessment)
4 MoC Document
5 Cost Estimate with rough of magnitude 15-20%
6 Quotation of equipment/Site Query
7 Project Assessment Level
8 FEL 1 – Engineering Report (if through FEL 1)
9 FEL 2 – Engineering Report (if through FEL 2)
10. Approval
(Document approval, if there any several stakeholder that maintain this asset please ensure that
they read & assign this document).
Signature Date
Prepared by

( Muhammad Arif Usman (…………………………………..) (................)


) Manager Sponsor

Reviewed by
:

( Jasman)
(…………………………………..) (................)
GM Sponsor

( …………………………..) (…………………………………..) ( …………… )


GM Maintenance

Approved by :

( Risal Baslang) (…………………………………..) ( …………… )


Snr. GM Sponsor

(……………………………………..…) (…………………………………..) ( …………… )


Senior GM Maintenance

Please added note if there any concern/critical for next stage:

…………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………………………………………………..