SOIL NAILING PULL-OUT TEST

PLTA POSO 1

AREA DAM
PT. POSO ENERGY PAMONA SATU

Location : Dam - Slope L1, L2 Coordinate X = 238759.39 Elevation : 496,7 m


Supervisor : Geologist Y= 9815318.53 Time & date : 29 Oktober 2017
Soil Length : 9 m Installation Time : Februari 2017
Nailing Diameter : 3 cm Testing Date : 29 Oktober 2017
Point Diameter : 6 cm Tested by : Teguh
SL-01 Grout Material :C:W=1:1

Pull-Out
Load Displacement
(ton) Rata2 Dial (1/100 mm) Dial 1 Dial 2
0 0 0 0
4 160 160 160
8 336.5 318 355
12 417.5 445 390
16 529 581 477
Displacement Dial Gauge

20 709.5 709 710


24 866 861 871
( 1/100 mm)

Load vs Displacement
3000
(Dial Gauge) Chart
2500
2000
1500
1000
500
0
Load (Ton)
0 4 8 12 16 20 24

Kontraktor Pengawas/ CME

Asmaruddin Surya Saifuddin Tang Kristina Langguna Kukun Yosiko


Geologis Kordinator DAM Geologis Kordinator DAM
SOIL NAILING PULL-OUT TEST

PLTA POSO 1

AREA DAM
PT. POSO ENERGY PAMONA SATU

Location : Dam - Slope L1, L2 Coordinate X = 238750.46 Elevation : 502.9 m


Supervisor : Geologist Y= 9815321.131 Time & date : 30 Oktober 2017
Soil Length : 9 m Installation Time : Februari 2017
Nailing Diameter : 3 cm Testing Date : 30 Oktober 2017
Point Diameter : 6 cm Tested by : Teguh
SL-3 Grout Material :C:W=1:1

Pull-Out
Load Displacement
(ton) Rata2 Dial (1/100 mm) Dial 1 Dial 2
0 0 0 0
4 204 203 205
6 262 259 265
8 367.5 364 371
10 406 403 409
12 502.5 494 511
14 568.5 568 569
16 682.5 670 695
18 755.5 739 772
Displacement Dial Gauge

20 847.5 829 866


( 1/100 mm)

22 931.477 912 951


24 1071.1074 1048 1094

Load vs Displacement
(Dial Gauge) Chart
3000

2500

2000

1500

1000

500

0 Load (Ton)
0 5 10 15 20 25

Kontraktor Pengawas/ CME

Asmaruddin Surya Saifuddin Tang Kristina Langguna Kukun Yosiko


Geologis Kordinator DAM Geologis Kordinator DAM
SOIL NAILING PULL-OUT TEST

PLTA POSO 1

AREA DAM
PT. POSO ENERGY PAMONA SATU

Location : Dam - Slope L1, L2 Coordinate X = 238740.38 Elevation : 512.72 m


Supervisor : Geologist Y= 9815329.35 Time & date : 30 Oktober 2017
Soil Length : 9 m Installation Time : Februari 2017
Nailing Diameter : 3 cm Testing Date : 30 Oktober 2017
Point Diameter : 6 cm Tested by : Teguh
SL-02 Grout Material :C:W=1:1

Pull-Out
Load Displacement
(ton) Rata2 Dial (1/100 mm) Rata2 Dial (mm) Dial 1 Dial 2
0 0 0 0 0
4 95 0.95 90 100
8 214.5 2.145 200 229
12 320 3.2 310 330

Displacement Dial Gauge


16 464.5 4.645 456 473
20 518.5 5.185 506 531

( 1/100 mm)
24 680 6.8 669 691

Load vs Displacement
10
(Dial Gauge) Chart
8

0 Load (Ton)
0 4 8 12 16 20 24

Kontraktor Pengawas/ CME

Asmaruddin Surya Saifuddin Tang Kristina Langguna Kukun Yosiko


Geologis Kordinator DAM Geologis Kordinator DAM
CONSTRUCTION SOIL NAILING PULL-OUT TEST
MANAGEMENT
POSO HYDROPOWER PROJECT PLTA POSO 1
Site Sulewana, Poso, - Sulawesi
Tengah
Location : Diversi Coordinate X = Elevation :
Structur : Y= Time & date : 30 Oktober 2016
Soil Nailing Length : 6 m Installation Time :
Diameter : mm Testing Date :
Borehole Diameter : mm Testing Time :
Grout Material :
Pull-Out Remarks :
Load Dial Gauge Displacement
(ton) (mm) (mm)
0 0
5 210
6 305 14

7 411
8 755 13

9 884
10 1055 12

11 1215
12 1587 11

13 2140
Pull-Out Load (tf)

14 2422 10

15 3090
9

0
0.000 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000
Displacement (mm)

Disetujui :
PT. Poso Energy Satu Pamona

(____________________) (_______________________) (_____________________)