Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PT.

Pamapersada Nusantara
District ................. FORM OBSERVASI OCC EXCAVATOR
TANGGAL C/N UNIT EGI SHIFT
JAM AWAL JAM AKHIR OPERATOR
LOKASI NRP

TYPE OB ON MUD
MATERIAL *)
SPESIFIK Blasting OK Blasting Not OK RIPPING KERAS ALOT OTHERS

METODE LOADING *) Single Bench Loading Double Bench Top Loading


Single Side Loading Double Side Loading
LEBAR FRONT *) < 25 meter ≥ 25 meter
TINGGI JENJANG *) Di bawah vessel DT Sejajar vessel DT Di atas vessel DT
MACHINE HIGH PERFORMANCE LOW PERFORMANCE
Loading Avg Dig
NO C/N DT Item 1 2 3 4 5 6 7 8 9 10 Loss Time Avg C/T Keterangan
Time Time
Dig. Time
1
Cycle Time

Dig. Time
2
Cycle Time

Dig. Time
3
Cycle Time

Dig. Time
4
Cycle Time

Dig. Time
5
Cycle Time

Dig. Time
6
Cycle Time

Dig. Time
7
Cycle Time

Dig. Time
8
Cycle Time

Dig. Time
9
Cycle Time

Dig. Time
10
Cycle Time

Dig. Time
11
Cycle Time

Dig. Time
12
Cycle Time

Dig. Time
13
Cycle Time

Dig. Time
14
Cycle Time

Kesimpulan : Digging Time (detik) Total Observasi (menit) Repair Front


Loss Time
Cycle Time (detik) Efektif WH (%) (Menit) Reposisi
Loading Time Hanging

Metode Loading Single bench loading Pengamatan MTO YES NO


Aplikasi sudut swing < 90 ° < 90 - 180° 1 Cara digging ( Optimal Heaped )
material condition E A S E A S 2 Cara pengambilan ( digging squence )
CT REKOMENDASI MAX 28 31 34 31 34 37 3 Pengaturan sudut swing
Double bench loading 4 Positioning
Aplikasi sudut swing < 90 ° < 90 - 180° 5 Arah penggalian
material condition E A S E A S 6 Kerapian Front
CT REKOMENDASI MAX 28 31 34 31 34 37 Instructor OTD SECT HEAD
Top Loading
Aplikasi sudut swing < 90 ° < 90 - 180°
material condition E A S E A S
CT REKOMENDASI MAX 33 36 39 36 39 42 NAMA
NRP

You might also like