Mortise 2 Way Layout

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

12 11 10 9 8 7 6 5 4 3 2 1

KEY PLAN:
N

A
CIN
FOR CONTINUATION, REFER DRAWING (ZONE 1)

ARA
H H

BID
JL.
E

ATA
DIN
DAR
ALL INSTALLATIONS

KAN
O IS
ACCESS DOOR JL.
MT.

OTT
HAR
YON
O

JL.
IN THIS AREA TO
IX-RACK-NER2-2-01

LEGEND
C01
WALL MOUNT DOME
C02
IN-CEILING DOME

9600
C03
SURFACE CEILING MOUNT
C04 EXTERNAL BULLET CAMERA
CARD READER + PIN

PHASE 2 BIOMETRIC CARD READER


ELECTRIC MORTISE LOCK
G G
PHASE 1 DOOR CONTACT

FFL +29.60
HEAVYDUTY SHUTTER CONTACT

F/HCP 02
NER 2-2 EMERGENCY BREAK GLASS UNIT
FFL +29.65 ELECTRICAL INTERLOCKED DOORS
50 ROOM 2-2 LOCAL DOOR ALARM
FFL +29.65
POWER TRANSFER HINGE
M 02 PANIC ALARM BUTTON
NER 2-2
ELECTROMAGNETIC LOCK
FFL +29.60 IX-C01-NER2-02-01
AUDIO INTERCOM UNIT

C01
AUDIO INTERCOM - MASTER
D SHEAR LOCK
IX-18.2-NER2-02-01 ACT IX-C01-ELR2-02-01
ACT EXIT PUSH BUTTON

C01
18.2 NER 2-2
18.2

C0
EXIT PUSH BAR - ELECTRONIC

1
IX-C01-GLL-02-02 IX-18.2-ELR2-02-01
D C DOOR CONTROLLER
NER 2-2 UTP CAT 6A CABLE FOR CCTV
AWG22 CABLE FOR ACCESS DOOR
CABLE TRUNKING SECURITY

STAIR 02

C01
GOODS LIFT IX-19.13-STR2-02-01 IX-C01-STR2-02-01

UP
F NER 2-2 F
02
ACT
9600

19.13

PHASE 2

PHASE 1
GOODS LIFT PL02
LOBBY
LIFT LOBBY

FIRE PANEL /
FFL +29.65
01
GOODS LIFT

FOR CONTINUATION, REFER DRAWING (GANTRY)


IX-5.5-FP-02-01
01 ACT
FL/PL 01 R4 As per BDDC Comment CP 21/11/2023
5.5
FFL +29.65 R1 As per BDDC Comment CP 20/10/2023
C
REV. NO. REVISION DESCRIPTION BY DATE

IX-5.5-ICT-02-01 IX-5.5-CHWP-02-01 NER 2-1


E IX-C01-LL1-02-01
IX-5.5-CHWP-02-02 IX-5.5-ICT-02-02 PROJECT TITLE: E
NER 2-1 ACT ACT ACT ACT
ICT RISER
5.5 CHWP
5.5 RISER 01 5.5 ICT 5.5
RISER
IX-C01-GLL-02-01
C
HARYONO DATA CENTER

C
NER 2-2 NER 2-1

01
ACT M.T. HARYONO, JAKARTA TIMUR, INDONESIA.
IX-C03-COR1-02-01 18.6 IX-C01-COR1-02-03
CORRIDOR 01

C03

C01
IX-18.6-LL1-02-01 FFL +29.65
ACT IX-19.10-DH1-02-01 (2.1M CLEAR) IX-19.10-DH1-02-02 ACT CLIENT:
9000

19.10 19.10
1
C0 FFL +29.65
KNOCK OUT PANEL IN PHASE 1 DAY 1 FOR FUTURE ACCESS & NER 2-2
IX-C01-COR1-02-01 IX-C01-COR1-02-02
DOOR INSTALLATION IN PHASE 2 NER 2-2
1
HOT AISLE

C03
C0 IX-C03-DH1-02-03 IX-C03-DH1-02-10

C03
NER 2-2 NER 2-1
C03 IX-C03-DH1-02-17 C03
IX-C03-DH1-02-01 NER 2-2 C03
NER 2-2
IX-C03-DH1-02-18
NER 2-2 PROJECT MANAGER / QS CONSULTANT:

COLD AISLE

C03

C03
IX-C03-DH1-02-04 IX-C03-DH1-02-11
PHASE 2 NER 2-1 NER 2-1
NER 2-2 NER 2-1
HE-C01-ELR1-02-01
D PHASE 1 C01
HE-C01-NER1-02-01
D
B PT. TURNER & TOWNSEND
1
C0
International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com
ELV RISER

ICT RISER

NER 2-1

C03

C03
ELECTRICAL
IX-C03-DH1-02-05
MEP SHAFT
RISER
ROOM 2-1
HE-18.3-ELR1-02-01
FFL +29.65
HE-18.2-NER1-02-01 ACT
FFL +29.65
NER 2-2 HOT AISLE IX-C03-DH1-02-12
NER 2-1
M&E CONSULTANT:

ACT 18.2

HE-18.3-SRG1-02-01
18.3 IX DATA HALL (DH2-1)
126 RACKS MECHANICAL
1
C01

C0
RISER 3 ANSON ROAD #17-03 SPRINGLEAF
ACT ACT NER 2-1 HE-18.4-COR2-02-01 ACT
5.4 HE-C01-COR2-02-02 TOWER, SINGAPORE 079909
HE-C01-SRG1-02-02 19.13
18.3
COLD AISLE A company of

C03

C03
ACT IX-C03-DH1-02-06 FFL +29.65 IX-C03-DH1-02-13 Tel: +65 6226 3106 | www.red-eng.com
NER 2-1 HE-5.4-ICT-02-01 STAIR 01 NER 2-2
18.4 NER 2-1
C01

IX-19.13-STR1-02-01
N/V
9200

FFL +29.65
ARCHITECT:
HE-C01-COR2-02-01
NER 2-1 ACT
19.10 AWP PTE LTD
C01

MECHANICAL
C01

RISER
ALL INSTALLATIONS HE-19.10-MMR1-02-01 143 CECIL STREET, #12-00 GB BUILDING
IX STORAGE 01HE-C01-MMR1-02-04

C03

C03
ACCESS DOOR NER 2-1 HE-C01-MMR1-02-01
NER 2-2
IX-C03-DH1-02-07
NER 2-2 HOT AISLE IX-C03-DH1-02-14
NER 2-1
SINGAPORE 069542, Tel: + 65 63376777,
Fax:+ 65 63396956 www.awparchitects.com
IN THIS AREA TO FFL +29.65
Proj. email: awp220603c@awparchitects.com
C NER 2-2 C
IX-RACK-NER2-2-01 HE-C03-MMR1-02-02
MMR 01 NER 2-2 C&S CONSULTANT:
FFL +28.41
C03

C03

28 RACKS IX-C01-STR1-02-01
Structural

C03

C03
FFL +29.65 IX-C03-DH1-02-08
COLD AISLE IX-C03-DH1-02-15
Civil

MECHANICAL
HE-C03-MMR1-02-01 C01 NER 2-2 NER 2-1
NER 2-1
A
NER 2-1
HE-C01-SRG1-02-01 C03 Indonesia
IX-C03-DH1-02-19 C03
IX-C03-DH1-02-02 NER 2-2 GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6, JAKARTA SELATAN 12720
NER 2-2
C01

Tel: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com


PLANTER
C01

C 01
C03

C03
HE-C01-MMR1-02-03 IX-C03-DH1-02-09 IX-C03-DH1-02-16 SECURITY CONSULTANT:
HE-C01-MMR1-02-02
NER 2-1
NER 2-2
NER 2-2
HOT AISLE NER 2-1

16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318


Tel: +65 6227 2038 | singapore@controlrisk.com
10775 9325 3100 8350 10700
GENERAL CONTRACTOR:
B PT. Berca Buana Sakti B
PT. Berca Mandiri Perkasa
JOINT OPERATION
Jl. RC. Veteran No. 4 Bintaro,Jakarta
12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003
1 2 3 4 4A 5
SHOP DRAWING
DRAWING TITLE:
DATA HALL BUILDING 1 - SECOND FLOOR
ELECTRONIC SECURITY SYSTEM ( ZONE 2 )

REFERENCE DRAWING
SCALE 1 : 100 A1 SIGNATURE DATE
DRAWING TITLE DWG. NO. REV DATE
DRAWN DRF IRFAN M. 09-01-2024
GENERAL ARRANGMENT (PHASE 1) 2ND STOREY AWP220603C/CN/253 7 15-11-23
CHECKED ARC SUBHAN 09-01-2024
A A
STRUCTURAL LAYOUT 228003-TTW-01-L1-DR-S-0059 0 28-10-22 RIBUT S. 09-01-2024
CHECKED STR
ME/P IFC LAYOUT HR01- CRG- DC- 02- DR- V-2003 2 31-07-23 CHECKED ME/P SINAR G. 09-01-2024
APPROVED EM JOEBEN 09-01-2024
DRAWING NO. REV.NO.

HDC-BBS-IXD-02-DR-V-2003-B R7
12 11 10 9 8 7 6 5 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

KEY PLAN:
N

A
CIN
FOR CONTINUATION, REFER DRAWING (ZONE 1)

ARA
H H

BID
JL.
E

ATA
ALL INSTALLATIONS

DIN
DAR
ACCESS DOOR

KAN
O IS
JL.
MT.

OTT
IN THIS AREA TO HAR
YON
O

JL.
IX-RACK-NER3-2-01

LEGEND
C01
WALL MOUNT DOME

9600
C02
IN-CEILING DOME
C03
SURFACE CEILING MOUNT
C04 EXTERNAL BULLET CAMERA

PHASE 2 CARD READER + PIN


BIOMETRIC CARD READER
ELECTRIC MORTISE LOCK
G PHASE 1 G

FFL +36.20
DOOR CONTACT

F/HCP 03
NER 3-2
HEAVYDUTY SHUTTER CONTACT
FFL +36.25
ELECTRICAL EMERGENCY BREAK GLASS UNIT
50 ROOM 3-2
INTERLOCKED DOORS
FFL +36.25
LOCAL DOOR ALARM
M 03 POWER TRANSFER HINGE
NER 3-2
PANIC ALARM BUTTON
FFL +36.20 IX-C01-NER2-03-01
ELECTROMAGNETIC LOCK

1
C0
AUDIO INTERCOM UNIT
D AUDIO INTERCOM - MASTER
IX-18.2-NER2-03-01 ACT ACT IX-C01-ELR2-03-01
SHEAR LOCK

C01
18.2 18.2 EXIT PUSH BUTTON
NER 3-2

1
C0
IX-18.2-ELR2-03-01 EXIT PUSH BAR - ELECTRONIC
IX-C01-GLL-03-02 D C DOOR CONTROLLER
NER 3-2
UTP CAT 6A CABLE FOR CCTV
AWG22 CABLE FOR ACCESS DOOR
STAIR 02 CABLE TRUNKING SECURITY

C01
GOODS LIFT IX-19.13-STR2-03-01 UP
IX-C01-STR2-03-01
NER 3-2
F 02 F
ACT
9600

19.13

PHASE 2

PHASE 1
PL02
GOODS LIFT
LOBBY
LIFT LOBBY
GOODS LIFT 01
IX-5.5-FP-03-01
01

FOR CONTINUATION, REFER DRAWING (GANTRY)


ACT
5.5 FL/PL 01 R4 As per BDDC Comment CP 21/11/2023
C R1 As per BDDC Comment CP 20/10/2023

REV. NO. REVISION DESCRIPTION BY DATE

01
IX-5.5-ICT-03-01 IX-5.5-CHWP-03-01 NER 3-2 IX-5.5-CHWP-03-02

C
NER 3-1 IX-5.5-ICT-03-02
IX-C01-LL1-03-01
E IX-C01-GLL-03-01 ACT
ICT RISER ACT ACT ACT
ICT RISER
PROJECT TITLE: E
5.5 CHWP
5.5 RISER CHWP
5.5 RISER 5.5

C
HARYONO DATA CENTER

01
NER 3-2 NER 3-1
ACT
IX-C03-COR1-03-01 18.6 IX-C01-COR1-03-03
M.T. HARYONO, JAKARTA TIMUR, INDONESIA.

L2
C01
C03
IX-18.6-LL1-03-01
CORRIDOR 01 (2.1M CLEAR)

GANTRY LEVE
ACT IX-19.10-DH1-03-01 IX-C01-COR1-03-02 IX-19.10-DH1-03-02 ACT
9000

19.10 NER 3-2 FFL +36.25 19.10


CLIENT:

C0
NER 3-2

1
IX-C01-COR1-03-01
1
C0 COLD AISLE IX-C03-DH1-03-10

C03

C03
KNOCK OUT PANEL IN PHASE 1 DAY 1 FOR FUTURE ACCESS & IX-C03-DH1-03-03 NER 3-1
DOOR INSTALLATION IN PHASE 2 NER 3-2 IX-C03-DH1-03-17
NER 3-2 C03
C03 IX-C03-DH1-03-01
NER 3-2 IX-C03-DH1-03-18 C03
NER 3-2
PROJECT MANAGER / QS CONSULTANT:

C03

C03
PHASE 2 NER 3-1
IX-C03-DH1-03-04
NER 3-2 HOT AISLE IX-C03-DH1-03-11
NER 3-1 ICT RISER
HE-C01-ELR1-03-01 HE-C01-NER1-03-01
PHASE 1 C01 NER 3-1
1
D B C0 D
HE-18.2-NER1-03-01 ELECTRICAL PT. TURNER & TOWNSEND
RISER
International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
ELECTRICAL ACT Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com
COLD AISLE

C03

C03
ICT RISER
EL RISER

ROOM 3-1 NER 3-1 18.2 IX-C03-DH1-03-05 IX-C03-DH1-03-12


FFL +36.25 FFL +36.25 FFL +36.25 NER 3-2 NER 3-1
HE-18.3-ELR1-03-01 M&E CONSULTANT:
ACT
18.3
NER 3-1
HE-C01-COR2-03-02 IX DATA HALL (DH 3-1)
132 RACKS MECHANICAL
C01

HE-18.4-COR2-03-01 RISER
ACT ACT
5.4 CORRIDOR 02 ACT 19.13 3 ANSON ROAD #17-03 SPRINGLEAF
HE-C01-COR2-03-01

C03

C03
MECH EQUIPMENTS SPACE NER 3-1 HE-5.4-ICT-03-01(1.5M CLEAR) 18.4 IX-C03-DH1-03-06
NER 3-2 HOT AISLE FFL +36.25 IX-C03-DH1-03-13
NER 3-1 A company of
TOWER, SINGAPORE 079909
C01

STAIR 01 Tel: +65 6226 3106 | www.red-eng.com


GREEN DECK SPACE

MECHANICAL
9200

IX-19.13-STR1-03-01

RISER
N/V FFL +29.65
ACT ACT ARCHITECT:
C01

C01

19.10 HE-C01-MMR2-03-04 18.3

ALL INSTALLATIONS HE-C01-MMR2-03-01 HE-19.10-MMR2-03-01 NER 3-2 HE-18.3-SRG2-03-01


MECHANICAL
RISER AWP PTE LTD
NER 3-1
COLD AISLE

C03

C03
ACCESS DOOR IX-C03-DH1-03-07 IX-C03-DH1-03-14 143 CECIL STREET, #12-00 GB BUILDING
NER 3-2 NER 3-1 FUEL RISER
SINGAPORE 069542, Tel: + 65 63376777,
IN THIS AREA TO Fax:+ 65 63396956 www.awparchitects.com
IX-C03-MMR2-03-01 3
IX-RACK-NER3-2-01 NER 3-1
IX STORAGE 02 C0 Proj. email: awp220603c@awparchitects.com
C MMR 02 HE-C03-DH1-03-03 C
C03

FUEL RISER
32 m²
C03

NER 3-2 NER 3-2


30 RACKS FFL +28.41
C&S CONSULTANT:
FFL +36.25 IX-C01-STR1-03-01
IX-C03-MMR2-03-02
FFL +36.25
C03

C03
NER 3-2 IX-C03-DH1-03-08
HOT AISLE IX-C03-DH1-03-15 Structural

MECHANICAL
C01 NER 3-2 NER 3-1
Civil

RISER

MECHANICAL
A C03
IX-C03-DH1-03-02
IX-C03-DH1-03-19 C03
NER 3-2
Indonesia
C01

NER 3-2 GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6, JAKARTA SELATAN 12720
PLANTER
C01

Tel: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com


C03

C03
HE-C01-MMR2-03-02 IX-C03-DH1-03-09

940
IX-C03-DH1-03-16
NER 3-1 HE-C01-MMR2-03-03 NER 3-2 NER 3-1 SECURITY CONSULTANT:
NER 3-2 COLD AISLE

16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318


10775 9325 3100 8350 10700 Tel: +65 6227 2038 | singapore@controlrisk.com

GENERAL CONTRACTOR:
B PT. Berca Buana Sakti B
PT. Berca Mandiri Perkasa
JOINT OPERATION
Jl. RC. Veteran No. 4 Bintaro,Jakarta
1 2 3 4 4A 5 12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003

SHOP DRAWING
DRAWING TITLE:
DATA HALL BUILDING 1 - THIRD FLOOR
ELECTRONIC SECURITY SYSTEM ( ZONE 2 )

REFERENCE DRAWING
SCALE 1 : 100 A1 SIGNATURE DATE
DRAWING TITLE DWG. NO. REV DATE
DRAWN DRF IRFAN M. 09-01-2024
GENERAL ARRANGMENT (PHASE 1) 3RD STOREY AWP220603C/CN/254 7 15-11-23
CHECKED ARC SUBHAN 09-01-2024
A A
STRUCTURAL LAYOUT 228003-TTW-01-L1-DR-S-0059 0 28-10-22 RIBUT S. 09-01-2024
CHECKED STR
ME/P IFC LAYOUT HR01- CRG- DC- 03- DR- V-2004 2 31-07-23 CHECKED ME/P SINAR G. 09-01-2024
APPROVED EM JOEBEN 09-01-2024
DRAWING NO. REV.NO.

HDC-BBS-IXD-03-DR-V-2004-B R7
12 11 10 9 8 7 6 5 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

KEY PLAN:
N

A
CIN
FOR CONTINUATION, REFER DRAWING (ZONE 1)

ARA
H H

BID
JL.
E

ATA
DIN
DAR
KAN
O IS
JL.
ALL INSTALLATIONS MT.

OTT
HAR
YON
O

JL.
ACCESS DOOR
IN THIS AREA TO COMPOSITE PANEL SYSTEM
INSULATED
(INCL. NECESSARY STRUCTURAL SUB-FRAMING FOR

SUB-FRAMING TO TEMPORARY
IX-RACK-NER8-2-01
REMOVABLE FACADE PANEL SYSTEM) TO SPECIALIST'S
DETAIL; KINGSPAN EUROPANEL F-SERIES (F5 VERTICAL

B5
FACADE METAL CLADDING LAID FM-APPROVED PANELS) OR APPROVED EQUIVALENT
SYSTEM TO SPECIALIST'S DETAIL SYSTEM. DESIGN INTENT REVIEW TO DWG: LEGEND
AWP220603C/CN/571. C01
WALL MOUNT DOME

9600
C02
IN-CEILING DOME

B12
B5

TEMPORARY
B2A
C03
SUB-FRAME SUPPORT FOR SURFACE CEILING MOUNT
METAL CLADDING FURTHER TO

FAP
C04 EXTERNAL BULLET CAMERA
SPECIALIST DESIGN / DETAIL.
TEMPORARY PHASING
ACCESS DOOR
RISER PLB
B8
PHASE 2 CARD READER + PIN
BIOMETRIC CARD READER
B7 MECH
ICT SHAFT RISER
ELECTRIC MORTISE LOCK
G JAN. PHASE 1 G

FFL +69.20
DOOR CONTACT

B33
ELEC RISER

F/HCP 08
M-SPAN OR EQUIVALENT PRE- CLOSET
PAINTED METAL CLADDING WITH HEAVYDUTY SHUTTER CONTACT

B8
WEATHER PROOF JOINT
ELECTRICAL EMERGENCY BREAK GLASS UNIT

50 ROOM 8-2 INTERLOCKED DOORS


FFL +69.25
LOCAL DOOR ALARM
M 08 POWER TRANSFER HINGE
B4 B1
B32 NER 8-2
PANIC ALARM BUTTON
STRUCTURAL SLAB/BEAM 50 FFL +69.20 IX-C01-NER2-08-01
NER 8-2
EXTENSION FOR FUTURE PHASE JAN 08 FFL +69.25
ELECTROMAGNETIC LOCK

1
TO C&S DETAIL

C0
PROPOSED FIXED ALUM. SINGLE BANK AUDIO INTERCOM UNIT
D

50
LOUVRE SYSTEM WITHOUT BLANKING AUDIO INTERCOM - MASTER
ELEC RISER PANELTO SPECS & DETAIL. REFER TO
IX-18.2-NER2-08-01 ACT ACT NER 8-2 DWG: AWP220603C/CN/573
SHEAR LOCK

B8
B33

C0
18.2

C01
18.2 IX-C01-ELR2-08-01 EXIT PUSH BUTTON

1
B8
B8 EXIT PUSH BAR - ELECTRONIC
IX-18.2-ELR2-08-01
ALC/AAC BLOCK WALL PANEL - KNOCK IX-C01-GLL-08-02 D C DOOR CONTROLLER
OUT PANEL FOR PHASING ACCESS NER 8-2 B8
UTP CAT 6A CABLE FOR CCTV
AWG22 CABLE FOR ACCESS DOOR
CABLE TRUNKING SECURITY
GOODS LIFT

C01
LOBBY

B8
GOODS LIFT IX-C01-STR2-08-01

B8

B8
FFL +69.25 STAIR 02 NER 8-2
F 02 F
IX-18.6-GLL-08-01 24 m² ACT
9600

B2A
19.13
B12
B5

ACT
18.6 B8
B8
B8

PL02 B8

B8

FHB
GOODS LIFT LIFT LOBBY

B8

FIRE PANEL /
IX-5.5-FP-08-01

B8
B4 B1

B8
B8
01 01

B8
FL/PL 01 ER-COATED
FINISH

FOR CONTINUATION, REFER DRAWING (GANTRY)


THK) IN POWD

HR
ACT 7 m² ALUM. PANE
L (MIN. 10MM
SHALL BE
5.5 600X600MM) R4 As per BDDC Comment CP 21/11/2023
PANEL (MIN N HEIGHT
IR EM EN TS. ACCESS NTRY , INSTALLATIO
C B36
RE QU
INCLUDED ON
EACH FLOO
R OF GA
R1 As per BDDC Comment CP 20/10/2023
B8
FFL +69.25
IX-18.6-COR1-08-01 B8
REV. NO. REVISION DESCRIPTION BY DATE
1
NER 8-2 C0 IX-5.5-CHWP-08-02

B36
NER 8-2 IX-5.5-ICT-08-01 IX-5.5-CHWP-08-01 IX-5.5-ICT-08-02
IX-C01-GLL-08-01 ACT IX-C01-LL1-08-01 B24

E ACT
ICT RISER ACT ACT ICTACT
RISER PROJECT TITLE: E
B9A 18.6 5.5 CHWP
5.5 RISER CHWP
5.5 RISER 5.5

C
01
B9

ALC/AAC BLOCK WALL PANEL - KNOCK


OUT PANEL FOR PHASING ACCESS
B9 ACT
18.6
B9
NER 8-2
IX-C01-COR1-08-04
HARYONO DATA CENTER
M.T. HARYONO, JAKARTA TIMUR, INDONESIA.

C01
IX-18.6-LL1-08-01
CORRIDOR 01 (2.1M CLEAR) FFL +69.25
ACT IX-19.10-DH1-08-01 IX-19.10-DH1-08-02 ACT
9000

19.10 FFL +69.25 19.10


B12

CLIENT:

1
B5

1
C0

C0
B2A
IX-C01-COR1-08-02 IX-C01-COR1-08-03

B28A
NER 8-1 NER 8-2
STRUCTURAL SLAB/BEAM ALC/AAC BLOCK WALL PANEL - KNOCK
HOT AISLE

C03

B31
IX-C03-DH1-08-04

C03
EXTENSION FOR FUTURE PHASE OUT PANEL FOR PHASING ACCESS IX-C03-DH1-08-11
TO C&S DETAIL NER 8-2 NER 8-1

ELE RISER
IX-C03-DH1-08-18
C03 IX-C03-DH1-08-01 C03

PDU
NER 8-2 NER 8-2
IX-C03-DH1-08-02 C03 C03
NER 8-2 IX-C03-DH1-08-19
FFL +69.25 NER 8-2
PROJECT MANAGER / QS CONSULTANT:

C03

C03
PHASE 2 NER 8-1 NER 8-1 B3A
IX-C03-DH1-08-05
NER 8-2 COLD AISLE B27
IX-C03-DH1-08-12
NER 8-1
B4 (900x1000)
B26A (1700x1000)
HE-C01-ELR1-08-01 HE-C01-NER1-08-01
PHASE 1 C01 ACT
B

PDU
1

D 18.6 B11 D
C0

HE-18.2-NER1-08-01 PT. TURNER & TOWNSEND


IX-18.6-COR1-08-01
International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
ACT FFL +69.25 SPARE
Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com
HOT AISLE

C03
EL RISER

ICT RISER

C03
ELECTRICAL 18.2 IX-C03-DH1-08-06
ROOM 8-1 IX-C03-DH1-08-13
TOILET NER 8-2 NER 8-2 NER 8-1
HE-18.3-ELR1-08-01
FFL +69.25
SFL +69.25 M&E CONSULTANT:
IX-C01-COR1-08-01

ELE RISER
ELE
RISER
ACT
18.3 NER 8-1 HYDRANT
01 IX DATA HALL (DH 8-1)

PDU
B6 FFL +69.25 RISER B8 C
B5A

126 RACKS
50

FHB

150mm HIGH BUND WALL BELOW


150mm HIGH BUND WALL BELOW
ACT B6
ACT
3 ANSON ROAD #17-03 SPRINGLEAF
FAP

5.4 19.13
ELEC RISER

C03

C03
HE-5.4-ICT-08-01 STAIR 01
IX-C03-DH1-08-07
COLD AISLE IX-C03-DH1-08-14 TOWER, SINGAPORE 079909
B2

NER 8-2 NER 8-1 A company of


IX-19.13-STR1-08-01 Tel: +65 6226 3106 | www.red-eng.com
N/V ICT RISER
9200

B28
B12

B21
B6
B6
B2

UP
ARCHITECT:

PDU
IX-C01-STR1-08-01
C0

B2
PLANTER

NER 8-1
1

AWP PTE LTD


B5A

ALL INSTALLATIONS MECH RISER


HOT AISLE

C03

C03
ACCESS DOOR POTENTIAL LEASABLE SPACE 04 IX-C03-DH1-08-08 IX-C03-DH1-08-15 143 CECIL STREET, #12-00 GB BUILDING
165 m² NER 8-2 NER 8-1 FUEL RISER SINGAPORE 069542, Tel: + 65 63376777,
IN THIS AREA TO Fax:+ 65 63396956 www.awparchitects.com
FFL +69.25 Proj. email: awp220603c@awparchitects.com
IX-RACK-NER8-2-01

PDU
C FUEL RISER C
(Future Fitting Out)
NER 8-1
C&S CONSULTANT:
SFL+69.20 IX-C01-STR1-08-02 MECH RISER
C03

C03
B5A
B25
FFL+69.20 B26
C01
IX-C03-DH1-08-09
NER 8-2 COLD AISLE B15 IX-C03-DH1-08-16
NER 8-1
Structural
A
(Phase 1 Day 1)
MECH RISER Civil
HE-5.4-PLS-08-01
C03 IX-C03-DH1-08-03 IX-C03-DH1-08-20 C03 Indonesia

PDU
B37A
NER 8-2 NER 8-2
ACT GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6, JAKARTA SELATAN 12720
B23

PLANTER
B23

B5A

5.4
B19

B5
IX-C03-DH1-08-17 Tel: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com
C03

MECH

C03
150mm HIGH BUND WALL BELOW

B30
RISER IX-C03-DH1-08-10
B5
NER 8-2 NER 8-1
SECURITY CONSULTANT:

B30
B5A
B5
HOT AISLE B5
FAP

16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318


10775 9325 3100 8350 INSULATED COMPOSITE PANEL SYSTEM
10700 Tel: +65 6227 2038 | singapore@controlrisk.com
(INCL. NECESSARY STRUCTURAL SUB-
FRAMING FOR REMOVABLE FACADE PANEL
SYSTEM) TO SPECIALIST'S DETAIL; KINGSPAN GENERAL CONTRACTOR:
EUROPANEL F-SERIES (F5 HORIZONTAL LAID
B
FM-APPROVED PANELS) ORAPPROVED
EQUIVALENT SYSTEM. DESIGN INTENT REVIEW
PT. Berca Buana Sakti B
TO DWG: AWP220603C/CN/571. PT. Berca Mandiri Perkasa
JOINT OPERATION
Jl. RC. Veteran No. 4 Bintaro,Jakarta
1 2 3 4 4A 5 12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003

SHOP DRAWING
DRAWING TITLE:
DATA HALL BUILDING 1 - EIGHT FLOOR
ELECTRONIC SECURITY SYSTEM ( ZONE 2 )

REFERENCE DRAWING
SCALE 1 :100 A1 SIGNATURE DATE
DRAWING TITLE DWG. NO. REV DATE
DRAWN DRF IRFAN M. 09-01-2024
GENERAL ARRANGMENT (PHASE 1) 8TH STOREY AWP220603C/CN/259 6 20-08-23
CHECKED ARC SUBHAN 09-01-2024
A A
STRUCTURAL LAYOUT 228003-TTW-01-L1-DR-S-0059 0 28-10-22 RIBUT S. 09-01-2024
CHECKED STR
ME/P IFC LAYOUT HR01- CRG- DC- 08- DR- V-2009 2 31-07-23 CHECKED ME/P SINAR G. 09-01-2024
APPROVED EM JOEBEN 09-01-2024
DRAWING NO. REV.NO.

HDC-BBS-IXD-08-DR-V-2009-B R7
12 11 10 9 8 7 6 5 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1

KEY PLAN:
N

A
CIN
FOR CONTINUATION, REFER DRAWING (ZONE 1)

ARA
H H

BID
JL.
E

ATA
DIN
DAR
KAN
O IS
ALL INSTALLATIONS JL.
MT.

OTT
HAR
YON
O

JL.
ACCESS DOOR
IN THIS AREA TO COMPOSITE PANEL SYSTEM
INSULATED
(INCL. NECESSARY STRUCTURAL SUB-FRAMING FOR
SUB-FRAMING TO TEMPORARY
IX-RACK-NER9-2-01
REMOVABLE FACADE PANEL SYSTEM) TO SPECIALIST'S
DETAIL; KINGSPAN EUROPANEL F-SERIES (F5 VERTICAL

B5
FACADE METAL CLADDING LAID FM-APPROVED PANELS) OR APPROVED EQUIVALENT
SYSTEM TO SPECIALIST'S DETAIL SYSTEM. DESIGN INTENT REVIEW TO DWG: LEGEND
AWP220603C/CN/571. C01
WALL MOUNT DOME

9600
C02
IN-CEILING DOME

B12
B5

TEMPORARY
B2A
C03
SUB-FRAME SUPPORT FOR SURFACE CEILING MOUNT
METAL CLADDING FURTHER TO

FAP
C04 EXTERNAL BULLET CAMERA
SPECIALIST DESIGN / DETAIL.
TEMPORARY PHASING
ACCESS DOOR
RISER PLB
B8
PHASE 2 CARD READER + PIN
BIOMETRIC CARD READER
B7 MECH
ICT SHAFT RISER
ELECTRIC MORTISE LOCK
G PHASE 1 DOOR CONTACT
G

B33
ELEC RISER

F/HCP 09
M-SPAN OR EQUIVALENT PRE-
PAINTED METAL CLADDING WITH HEAVYDUTY SHUTTER CONTACT

B8
WEATHER PROOF JOINT
EMERGENCY BREAK GLASS UNIT
ELECTRICAL
50 ROOM 9-2 INTERLOCKED DOORS
FFL +75.85 LOCAL DOOR ALARM
B4 B1
M 09 POWER TRANSFER HINGE
B32 NER 9-2
PANIC ALARM BUTTON
STRUCTURAL SLAB/BEAM 50 FFL +75.80 IX-C01-NER2-09-01
NER 9-2
EXTENSION FOR FUTURE PHASE JAN 09 ELECTROMAGNETIC LOCK

1
FFL +75.85
TO C&S DETAIL

C0
PROPOSED FIXED ALUM. SINGLE BANK AUDIO INTERCOM UNIT
D

50
LOUVRE SYSTEM WITHOUT BLANKING AUDIO INTERCOM - MASTER

01
ELEC RISER PANELTO SPECS & DETAIL. REFER TO
IX-18.2-NER2-09-01 ACT

C
ACT DWG: AWP220603C/CN/573
SHEAR LOCK

B8
B33
IX-C01-GLL-09-02 18.2 18.2

C01
EXIT PUSH BUTTON
NER 9-2 B8 IX-C01-ELR2-09-01
IX-18.2-ELR2-09-01 NER 9-2 B8 EXIT PUSH BAR - ELECTRONIC
ALC/AAC BLOCK WALL PANEL - KNOCK D C DOOR CONTROLLER
OUT PANEL FOR PHASING ACCESS B8
UTP CAT 6A CABLE FOR CCTV
AWG22 CABLE FOR ACCESS DOOR
CABLE TRUNKING SECURITY

C01

B8
GOODS LIFT IX-19.13-STR2-09-01
IX-C01-STR2-09-01

B8

B8
STAIR 02 NER 9-2
F 02 F
IX-18.6-GLL-09-01 ACT
9600

B2A
19.13
B12
B5

ACT
18.6 B8
B8
B8

GOODS LIFT PL02 B8


LOBBY

B8

FHB
LIFT LOBBY
FFL +75.85 GOODS LIFT 01

B8

FIRE PANEL /
IX-5.5-FP-09-01

B8
B4 B1

B8
B8
01

B8
FINISH
ER-COATED

FOR CONTINUATION, REFER DRAWING (GANTRY)


THK) IN POWD

HR
ACT ALUM. PANE
L (MIN. 10MM
5.5 FL/PL 01 PANEL (MIN
600X600MM)
SHALL BE
N HEIGHT R4 As per BDDC Comment CP 21/11/2023
IR EM EN TS. ACCESS NTRY , INSTALLATIO
C B36
RE QU
INCLUDED ON
EACH FLOO
R OF GA
R1 As per BDDC Comment CP 20/10/2023
FFL +75.85
B8

IX-18.6-COR1-09-01 B8
REV. NO. REVISION DESCRIPTION BY DATE
1
C0 IX-5.5-CHWP-09-02

B36
NER 9-2 IX-5.5-ICT-09-01 IX-5.5-CHWP-09-01 NER 9-2 IX-5.5-ICT-09-02
IX-C01-GLL-09-01 ACT IX-C01-LL1-09-01
B24

E ACT
ICT RISER ACT ACT ACT
ICT RISER
PROJECT TITLE: E
B9A
150mm 18.6
HIGH BUND 5.5 CHWP
5.5 RISER CHWP
5.5 RISER 5.5

C
01
WALL BELOW B9

ALC/AAC BLOCK WALL PANEL - KNOCK


OUT PANEL FOR PHASING ACCESS
B9 ACT
18.6
B9
NER 9-2
IX-C01-COR1-09-04
HARYONO DATA CENTER
M.T. HARYONO, JAKARTA TIMUR, INDONESIA.

C01
IX-18.6-LL1-09-01 FFL +75.85
ACT IX-19.10-DH1-09-01 CORRIDOR 01 (2.1M CLEAR) IX-19.10-DH1-09-02 ACT
9000

19.10 19.10
B12

FFL +75.85 CLIENT:

1
B5

1
C0

C0
B2A
IX-C01-COR1-09-02 IX-C01-COR1-09-03

B28A
NER 9-1 NER 9-2
STRUCTURAL SLAB/BEAM ALC/AAC BLOCK WALL PANEL - KNOCK
HOT AISLE IX-C03-DH1-09-11

C03

C03

B31
EXTENSION FOR FUTURE PHASE OUT PANEL FOR PHASING ACCESS IX-C03-DH1-09-04
TO C&S DETAIL NER 9-1
NER 9-2

ELE RISER
IX-C03-DH1-09-18

PDU
C03 IX-C03-DH1-09-01 NER 9-2 C03
IX-C03-DH1-09-02 C03 NER 9-2 C03
IX-C03-DH1-09-19
NER 9-2 NER 9-2
FFL +75.85
PROJECT MANAGER / QS CONSULTANT:

C03

C03
PHASE 2
B26A (1700x1000)
NER 9-1 NER 9-1 B3A
IX-C03-DH1-09-05
NER 9-2 COLD AISLE B27
IX-C03-DH1-09-12
NER 9-1
B4 (900x1000)
HE-C01-ELR1-09-01
PHASE 1 1
HE-C01-NER1-09-01

PDU
C0
ACT
B
1

D 18.6 B11 D
C0

HE-18.2-NER1-09-01 PT. TURNER & TOWNSEND


IX-18.6-COR1-09-01
International Financial Centre, 26F Jl. Jend. Sudirman Kav 22-23, Jakarta
PROPOSED REMOVABLE ALUM. SINGLE ELECTRICAL ACT SPARE
Selatan 12920 Tel: +62 21 252 3895 www.turnerandtownsend.com
ELEC RISER

BANK LOUVRE SYSTEM WITHOUT


HOT AISLE

C03

C03
ROOM 9-1 18.2 IX-C03-DH1-09-06
FFL +75.85 IX-C03-DH1-09-13
ICT RISER

BLANKING PANEL TO SPECS & DETAIL.


REFER TO DWG: AWP220603C/CN/573 TOILET FFL +75.85 NER 9-2 NER 9-2 NER 9-1
HE-18.3-ELR1-09-01 M&E CONSULTANT:
IX-C01-COR1-09-01
SFL +75.85

ELE RISER
ELE ACT
01 IX DATA HALL (DH 9-1)

PDU
RISER NER 9-1
18.3 FFL +75.85
HYDRANT B8 C
B5A
B6 RISER
126 RACKS
50

FHB

150mm HIGH BUND WALL BELOW


150mm HIGH BUND WALL BELOW
ACT B6
ACT
3 ANSON ROAD #17-03 SPRINGLEAF
FAP

5.4 19.13
ELEC RISER

C03

C03
HE-5.4-ICT-09-01 STAIR 01 IX-C03-DH1-09-07
COLD AISLE FFL +75.85 IX-C03-DH1-09-14 TOWER, SINGAPORE 079909
B2

NER 9-2 NER 9-1 A company of


N/V
IX-19.13-STR1-09-01 Tel: +65 6226 3106 | www.red-eng.com
GREEN DECK SPACE

ICT RISER
9200

B28
B12

B21
B6
B6

PDU
B2

UP
IX-C01-STR1-09-01 ARCHITECT:
C0

B2
NER 9-1
1

AWP PTE LTD


B5A

ALL INSTALLATIONS MECH RISER


HOT AISLE

C03

C03
ACCESS DOOR POTENTIAL LEASABLE SPACE 05 IX-C03-DH1-09-08 IX-C03-DH1-09-15 143 CECIL STREET, #12-00 GB BUILDING
165 m² NER 9-2 NER 9-1 FUEL RISER SINGAPORE 069542, Tel: + 65 63376777,
IN THIS AREA TO Fax:+ 65 63396956 www.awparchitects.com
FFL +75.85

PDU
IX-RACK-NER9-2-01 Proj. email: awp220603c@awparchitects.com
C FUEL RISER C
(Future Fitting Out)
NER 9-1
C&S CONSULTANT:
SFL+75.80 IX-C01-STR1-09-02 MECH RISER
C03

C03
B5A
B25
FFL+75.80 B26
C01
IX-C03-DH1-09-09
NER 9-2 COLD AISLE B15 IX-C03-DH1-09-16
NER 9-1
Structural
A
(Phase 1 Day 1)
MECH RISER Civil
IX-C03-DH1-09-03 IX-C03-DH1-09-20 C03 Indonesia

PDU
HE-5.4-ICT-09-01 C03
B37A NER 9-2 NER 9-2
GRAHA CHANTIA L3, JL BANGKA RAYA NO. 6, JAKARTA SELATAN 12720
B23

PLANTER
B23

ACT
B5A

B19

B5 5.4 IX-C03-DH1-09-17 Tel: +6221 719 0011 | ttw.com.au | ttw@ttwindonesia.com


C03

C03
MECH 150mm HIGH BUND WALL BELOW

B30
B5 RISER IX-C03-DH1-09-10 NER 9-1
NER 9-2
SECURITY CONSULTANT:

B30
B5A
B5
HOT AISLE B5
FAP

16 COLLYER QUAY #22 01/02 INCOME @ RAFFLES SINGAPORE 049318


10775 9325 3100 8350 INSULATED COMPOSITE PANEL SYSTEM
10700 Tel: +65 6227 2038 | singapore@controlrisk.com
(INCL. NECESSARY STRUCTURAL SUB-
FRAMING FOR REMOVABLE FACADE PANEL
SYSTEM) TO SPECIALIST'S DETAIL; KINGSPAN GENERAL CONTRACTOR:
EUROPANEL F-SERIES (F5 HORIZONTAL LAID
B
FM-APPROVED PANELS) ORAPPROVED
EQUIVALENT SYSTEM. DESIGN INTENT REVIEW
PT. Berca Buana Sakti B
TO DWG: AWP220603C/CN/571. PT. Berca Mandiri Perkasa
JOINT OPERATION
Jl. RC. Veteran No. 4 Bintaro,Jakarta
1 2 3 4 4A 5 12330, Indonesia.
Tel. 021-7361979, Fax. 021-7362003

SHOP DRAWING
DRAWING TITLE:
DATA HALL BUILDING 1 - NINTH FLOOR
ELECTRONIC SECURITY SYSTEM ( ZONE 2 )

REFERENCE DRAWING
SCALE 1 : 100 A1 SIGNATURE DATE
DRAWING TITLE DWG. NO. REV DATE
DRAWN DRF IRFAN M. 09-01-2024
GENERAL ARRANGMENT (PHASE 1) 9TH STOREY AWP220603C/CN/260 6 20-09-23
CHECKED ARC SUBHAN 09-01-2024
A A
STRUCTURAL LAYOUT 228003-TTW-01-L1-DR-S-0059 0 28-10-22 RIBUT S. 09-01-2024
CHECKED STR
ME/P IFC LAYOUT HR01- CRG- DC- 09- DR- V-2010 2 31-07-23 CHECKED ME/P SINAR G. 09-01-2024
APPROVED EM JOEBEN 09-01-2024
DRAWING NO. REV.NO.

HDC-BBS-IXD-09-DR-V-2010-B R7
12 11 10 9 8 7 6 5 3 2 1