Form Title: www.occ-oro.

com Issue No: Page No:


Official Letter 2 Page 1 of 2

Lakk/Ref No/lØ`……..…………………..
Guyyaa/Date/k” ……...…………………..

ZHONGMEI ENGINEERING GROUP LTD, Ethiopia Branch


Addis Ababa
Reference: Transfer of 23 Different Large Machinery and Plant as well as 128 Different Spare
Parts
Subject: Final request for delivery of missing items and installation, testing & commissioning of
tower crane

It is to be recalled that, we have made a bilateral agreement for the transferring of 23 different large
Machinery and plants as well as 128 different spare parts at Arjo Didhessa Dam Project. This time
around, we are at the final stage of the transfer. To finalize the handing over of the tower crane and
commence the installation, testing & commissioning of it, the following items of the tower crane are
found missing, without which the tower crane is incomplete, cannot be installed & made operational.

Sn Item Description Unit Qty Remark


1 Bolts with nuts for all standard mast each all
sections & frames
2 Pins with Cotter pins for arm each all
3 Slewing Mechanism unit Assembly 1
4 Fixing Angle each 1
5 Anchor Frame Assembly 1
6 Pulley Assembly 1
7 Electric cabinet, PLC control Assembly 1
8 Arm tips Assembly 1
9 Transition day Assembly 1
10 Pump station Assembly 1
11 Embedded legs each 4
12 Lifting Mechanism Assembly 1
13 Luffing Mechanism Assembly 1
Form Title: www.occ-oro.com Issue No: Page No:
Official Letter 2 Page 2 of 2

14 Pole (No22 on the catalogue) each 4


15 Balance weight (Ballast) each all
16 Active trolley Assembly 2
17 Arm tip section Assembly 1
18 Others which are going to be identified during assembling
As the heavy rain season starts next month, OCC has planned to start the erection work after a week.

So, your company has to fulfill its obligation according to the contractual agreement made between us.
Otherwise, OCC will be forced to take legal action to solve the problem it faces.

Hoping to have prompt response from you, we remain.

C.C With Best Regards,

 Office of the Chief Executive Officer


 Office of the Deputy Chief Executive Officer
 Finance & Budget Administration Directorate
 Procurement, Supply & Property Administration Directorate
 Manufacturing & Production Directorate
 Machinery and Vehicles Administration & Maintenance Directorate
 Technical Committee
OCC, Finfinne
 Arjo Dedhesa Dam Construction Project
Arjo