182 Remaining Construction Work Schedule-20231206-A
182 Remaining Construction Work Schedule-20231206-A
23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9
24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Area Person In Site Supervisor
SN. Description Description Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE Construction Team
182 Chemical Injection System Area Target MC Completion Date-2024-2-29 Changqingzeng 12/11/2023 1/15/2024
1.2 化学加药撬找正及二次灌浆 Alignment and Second Grounting Changqingzeng Lian Junhai EQ 8 12/29/2023 1/5/2024
2.1 棚子安装 Instllation of 182 Shelter Changqingzeng Li Chengwei Structure 12 12/29/2023 1/9/2024
3.1 支架安装 Installation of Support Changqingzeng Shi Yanbing PIP 8 12/11/2023 12/18/2023
3.2 管道安装(460寸) Installation of AG Pipe(460-Inch) Changqingzeng Shi Yanbing PIP 10 1/6/2024 1/15/2024
4 Electrical and Instrument/Telecom Electrical and Instrument/Telecom Changqingzeng Xi Chunming ELE/INT/TEL 12/19/2023 12/26/2023
4.1 电缆桥架安装 Instllation of Cable Tray Changqingzeng Xi Chunming ELE/INT/TEL 4 12/19/2023 12/22/2023