Daily Mapping Progress

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

© ALL RIGHTS RESERVED.

NO PART OF THIS DRAWING MAY BE


REPRODUCED OR TRANSMITTED IN ANY FORMS AND BY ANY
MEANS WITHOUT WRITTEN PERMISSION OF THE COPYRIGHT
HOLDER. CONTRACTORS AND CONSULTANTS ARE NOT TO
SCALE DIMENSIONS FROM THIS DRAWING. ONCE PRINTED AND
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 DISTRIBUTED THIS DOCUMENT IS ASSUMED UNCONTROLLED.

Y8

Y7

Y6

Y5

REV DATE CHKD DESCRIPTION

DC2

GH
PLN
FPR
Y4 DC1
BC

Quantity Surveyor
152 BEACH ROAD
#27-05/08 THE GATEWAY EAST,
SIGAPORE 189721
T:+65 6496 6300

Y3 Security Consultant
16 COLLYER QUAY
#22 01/02 INCOME@RAFFLES,
SIGAPORE 049318
T:+65 6227 2038
SINGAPORE@CONTROLRISKS.COM
Structural Consultant

Architectural Consultant
AWP PTE LTD
Y2 143 CECIL STREET
#12-00 GB BUILDING
SINGAPORE 069542
T: +65 63376777
F: +65 63396956
Y1 W:awparchitects.com
E:awp000000@awparchitects.com
X1 REF. NO. 199400898R
architecture interior design masterplanning
M&E Consultant

Singapore | t: +65 6408 3389 | www.red-eng.com | singapore@red-eng.com

Public Internal Restricted Confidential

= PILE CAP EXCAVATION Client


PT DATA CENTER FIRST NONGSA ONE
NONGSA DIGITAL PARK
JALAN HANG LEKIU KM 2
TELUK MATA IKAN NONGSA
BATAM, 29466

= CUT OF PILE INDONESIA

DAILY MAPPING PROGRESS = LEAN CONCRETE


Project

PROJECT SUNSHINE -
DATA CENTRE BUILDING 1
UPDATE = 06 MEI 2024
= PILE CAP REINFORCEMENT BAR Title

= CASTING OF PILE CAP


Designed Checked Drawn Rev
HD LKS ACE
Scale Date Created
1:150 FEB 2024
Dwg No.

A1 Project No. Company Volume Level Doc Type MEP Seq No.
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10

PEDESTRIAN FFL +15.45 m

D1/ST1 D1/ST2
Y8

Y7

D1/ST4

Y6

Y5

RL +15.30 m

Y4

SHOP DRAWING

152 BEACH ROAD


#27-05/08 THE GATEWAY EAST,
SIGAPORE 189721
T:+65 6496 6300

Y3 16 COLLYER QUAY
#22 01/02 INCOME@RAFFLES,
SIGAPORE 049318
T:+65 6227 2038
SINGAPORE@CONTROLRISKS.COM

Y2

Y1

Singapore | t: +65 6408 3389 | www.red-eng.com | singapore@red-eng.com

PT DATA CENTER FIRST NONGSA ONE


NONGSA DIGITAL PARK
JALAN HANG LEKIU KM 2
TELUK MATA IKAN NONGSA
BATAM, 29466
INDONESIA

TIE BEAM EXCAVATION ANTI TERMINITE ON SLAB

PROJECT SUNSHINE -
LEAN CONCRETE 50 MM DATA CENTRE BUILDING 1

LEAN CONCRETE ON SLAB DC1


1ST STOREY FLOOR LEVELS

TIE BEAM REINFORCING FLOOR REINFORCING RD AS ZN


C1
1 : 150 MARET 2024
TIE BEAM CASTING FLOOR CASTING
BAT01-SHD-STR-2100-A
© ALL RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE

0
REPRODUCED OR TRANSMITTED IN ANY FORMS AND BY ANY

18.0
MEANS WITHOUT WRITTEN PERMISSION OF THE COPYRIGHT

0
HOLDER. CONTRACTORS AND CONSULTANTS ARE NOT TO

.0
9.298

25
SCALE DIMENSIONS FROM THIS DRAWING. ONCE PRINTED AND

10.00
DISTRIBUTED THIS DOCUMENT IS ASSUMED UNCONTROLLED.

14.197 26.386
7.716 25.692 LEGEND:

0
17.3

2 6.0
17.3 26.572
26.573
23.706
- PLATE BEARING TEST, ALLOWABLE SOIL BEARING CAPACITY = 200 kPa
8.278 14.517 WITH 3 TIMES SAFETY FACTOR (TEST LOAD = 600 kPa) TOTAL 7 NOS.

13.00

0
.0
25.1
10.873 - PLATE BEARING TEST, ALLOWABLE SOIL BEARING CAPACITY = 250 kPa

21
11
.0 18.2
0
WITH 3 TIMES SAFETY FACTOR (TEST LOAD = 750 kPa) TOTAL 2 NOS.

0
18.2 24.0 26.391

.0
19.7 22.8

23
11.9 19.4 21.9 PTK 26.520
13.1 18.7 20.8
10.4 19.5
10.3
10.3 13.2 26.654
109.. 34
10 . 3
BOX U L P E T 10.4
PTK
B BO XO XU UL LP EP ET T

10 . 1 10 . 3
109. . 41 P R T B O X U L P E T
10 . 3 PPRRTT

17.0 21.2
BOX U L P E T

10 . 6
GL

20.6 26.110
19.4
10.496
0
10 . 3
GL

22.3 .0
26 25.922
109. . 52
PPRRTT 10 . 2
10 . 2

17.4
PRT PRT

8.1689.089 10 . 3
P R T 9. 6 10 . 3
10 . 3 P R T
BPGRNT 25.689
9.091

19.00
19.6
10
9. .9 3
13.3 16.7 26.811
10.3 20.7
PP RR TT
10 . 3

NOT UNDER PHASE 1


10
9. .8 3 BG N
PP RR TT

13.4
10 . 3
BG N

19.2 25.8
10 . 3
GL
17.7
0
2 2 25.5 .0

SCOPE OF WORKS
.0
21.6
26.9 25
0

17.0
22.4 26.7

SITE
20.0

0
27.1
21.8 25.7

BOU
10.4 26.3 0
13.5 GL
26.8 .0
13.7 24
10 . 3
GL

NDA
10 . 3
26.0
25.9
B G N 9.109. 3

21.9
P PR TR T

22.0
109.. 39
BPGRNT 10 . 3
PRT

22.3

RY
GL
10 . 3
10 . 3 P R T
P R9.T 7
10 . 3
PP RR TT
10.8 GL 22.9
15.1 23.4

22m
9. .9 3
10

15.4 BS
109. . 83 P R T
BPGRNT
10 . 3
PRT

12.2
109.. 68 10 .6
P PR TR T P R T

12.2 23.8
21.3

WIDE
22.3 23.0 22.8
23.0
1211. . 25 12 . 2
PRT PRT

GL
12 . 2
PRT

GL PTK
10 . 4
GL

11 . 8
GL 22.2

7m W
GL
12 . 3 1112. 5. 3
P R T12 . 3 P R T 12 . 2
PRT BTPS

ASP
BG N

FUTU
10 . 4
BG N

20.3 22.8 22.5


12 . 3
PRT

IDE E
1112. . 83 12 . 2
12 . 3
BP GR NT GL

19.0
PRT

GL
11 .. 38
12
BP GR NT

20

RE R
.0
20.1
15.6

XIST
12 . 4
GL
15.5
BG N

21.9 23.4

O
12 . 3
TP
21.6 21.2

AD
18.0
23.00

ING R
GL
20.6 22.6 0
0
1.

0
21.8
GL
GL
19.5 GL 2

21.00

O AD
22.00
12 . 3
GL

0
21.5

.0
20.8
GL

21
12 . 3
B G N 1112. . 93

15.9 21.3
19.9 20.3
PPRRTT
12 . 3

16.0 19.5
B G N 11 . 8
PRT

GL ASP 0
19.6 .0
20

0
12 . 3
P R11T . 7
12 . 3

.0
PPRRTT

16.7 GL
13.2

2
12 . 3
1211. . 37P R T

21.6
12 . 3

17.4
B PG NR T 1211. . 37 P R T

2
12 . 3 PPRRTT
PRT

14.2 GL

SITE
20.2 22.5
13
14 . 1 14

22.3
.1

GL
12 . 4
GL PRT PRT
1413. . 16

.0
PP RR TT

20.3
0
14 . 2

GL 21.5 0
GL

1 9.0
14 . 3
PRT 1314. . 83

21.3 GL
BOU
14 . 3 PPRRTT
BG N

19.9 GL
14 . 3
PRT
14.3
20.7 22.2
GL
14 . 3 1413. . 39
PP RR TT

PTK
PRT
13
14 .. 83
PB RG TN
NDA
14 . 3 19.9 20.4
GL
GL

21.8
17.5 21.7
RY
20.1 0
14 . 4
BG N

GL
18.0
14.3 17.5
21.2
20.1
GL

20.5
GL 0
20.8 20.2
GL 19.9 GL 17.0 C4 26-01-2024 LKS POST 100% IFC SUBMISSION NO. 3
14.3 16.722
21.2
14 . 3

C1 13-10-2023 LKS 100% IFC SUBMISSION


B G N 1314. . 93
PPRRTT

21.6
14 . 3
BG N 1314. . 93
PPRRTT

16.656
REV DATE CHKD DESCRIPTION
14 . 3

16.6
1413. . 38 P R T
PPRRTT14 . 3

15.1
PRT
1413. . 48 14 . 4
P PR TR T P R T

BG N
14
13 .. 38
14 . 3 PPRRTT
1413. 3. 8 17.8 18.7 PTK
18.4 20.0
PPRRTT

21.2 21.1 20.5 21.7 16.4


16.4
16.2
14 . 6
GL

16 . 2
JL N
DC2
1516. . 42
16 . 2 P P16
R TR. T2
P R T JL N

16 . 3
GL

0
16.0
20.2 20.4
19.0

GL
1516. . 74
16 . 4PPRRTT
BG N

21.0 21.5
17

BS 20.1
.0 0

15.8
21 . 1
20

BS

GL

NDP 18.9 GH
.00

21.0

RW2 750)
18.6 20.4
22.0 PLN
16 . 4
JL N

21.2
16.5
21.0
GA
16 . 5

(~10
JL N

16 . 4
16.4 20.5
FPR

COWORKING GB

(1~2m
BG N

GL
BC
20.8
21.6 GC 20.8
DC1
C4 20.5
18

0
15.0 14.939

OFFICE & THE

HIGH
.00

21.3
1516. . 84

20.5
16 . 4 PP RR TT
PRT

14.819
21.5
G1

) RW
50 0
18.7

ACADEMY
16 . 4
GL
19.9
18.4 14.6
14.6
16.4
16.5
G2

3 (2~
14.6ASP ASP

(~19
15.9GL
20.3
1 21.4 G3 GL
17.2
GL
GL

3m H
RW
100% IFC SUBMISSION
20.6 14.3

710)
18.9 20.7 21.3
18.8
21.3 RL +16.00

IGH)
16.318.3 18.2
21.5 21.4
G4 21.1 14.1
PTK
PTK 21.7 14.00 Quantity Surveyor

21.0
20.4
21.7 21.2200mm THK RC WALL GL 20.8

50 0
16 . 4 1516. . 93
B G N PPRRTT 18 . 2

21.2 21.2
G5
BS

20.4 20.3 21 152 BEACH ROAD

0
16 . 4

21.3
.0
GL

#27-05/08 THE GATEWAY EAST,

(~16 HIGH)
20.223.3 0
G6 20.8

50 0
17.8 21.0 SIGAPORE 189721
RL +15.30 21.3 13.5 13.408 T:+65 6496 6300
18.0 GL

530)
14.9

m
23.1 21.5 G7 15.8 GL
Security Consultant

(3~4
22.9 GL
20.3 20.8
GL 18.9
16 . 4
JL N

GL
16 COLLYER QUAY

RW4
13.0 #22 01/02 INCOME@RAFFLES,
16 . 4

RW6 (0.2~3.5m HIGH)


JL N

16 . 4

21.7 0

0
SIGAPORE 049318
1615
JL. .N48 . 4
PPRRTT 16PRT 16 . 4
JL N

23.0 22.8

20.0
2
1.

22.3 T:+65 6227 2038


0
0

19.5 SINGAPORE@CONTROLRISKS.COM

20.8 12.6 Structural Consultant


22.9 20.6 21.0 20.8
GL

0
17.4

.0
22.8

19
GL

15

0
12.304

.0
20.7

.0
19.9 16.7

12
0
17.2
21.0

= EXCAVATION
)
HIGH

.00
0

16 . 5
JL N 22 . 0
16 . 4 TP
JL N

18
20.5
16 . 4
BG N

Architectural Consultant
16 . 4

GL 20.3
JL N 16 . 4
(1.1m

JL N

14.0
16 . 3

17.2 11.562
JL N

21.6 22.820.4
23.0 GL GL 16.5
GL
GL AWP PTE LTD

0
RL +15.30 16.7 22.5 19.8

0
143 CECIL STREET

0
RW1

.0
GL 11.2

.0
17 10.851 #12-00 GB BUILDING

11
RW5 380)
13.00
16 . 4
BG N 16 . 3
TP

19.7 16.4 Y8 SINGAPORE 069542

= LEAN CONCRETE

(~38
21.1
SFL 16.30 16.7
16.3Y7 T: +65 63376777

(5m
16 . 0 20.4 F: +65 63396956

DC 1 BUILDING
JL N

GL
16 . 215 . 5

12.00
PRT PRT

W:awparchitects.com
16

16 . 0

HIGH
16 . 0 JL N
JL N
7.5

.0

16 . 0

E:awp000000@awparchitects.com
JL N
20

Y6
0

17.9
m

22.8
15 . 41515. . 56
P R T PPRRTT
19

REF. NO. 199400898R


.0

GL
W

)
16.00
0
ID

.00

architecture interior design masterplanning


E

11.00
15 . 215
15 . 1
P R TPPRR. TT2

16.5
EX

15.5 16.4 18.6


17

17.4
15 . 9

M&E Consultant
GL

16.1

= REINFORCEMENT BAR
IS

GL
GL GL 16.5
.00

19.4 GL
TI N

15 . 5
GL

GL
Y5 15.9
G
RO

15.6
X1
AD

GL RL +15.30
X2 8.679

50 0
17.1
15 . 3
GL

RW3 2550)
9.912 Y4 8.7
X316.2
17.2
18

GL

(~1
GL
.0

(3m
18.8 17.1 16.9 Singapore | t: +65 6408 3389 | www.red-eng.com | singapore@red-eng.com
X4
0

15.3 15.6
8.459
15 . 2 1515. . 12
P R T PPRRTT

GL GL
17.0

HIGH
8.132 Public Internal Restricted Confidential
15 . 2

X5
GL

= CASTING OF PLATE
10.460 18.1 17.0
Y3
X6

)
17.1 Client :
17.6 17.1
15.6 GL
GL 8.00
X7
15 . 0

15.4
GL

PT DATA CENTER FIRST NONGSA ONE


10.694 GL 18.0 17.0
Y2 7.858 NONGSA DIGITAL PARK
10.916 X8 17.1 Y1 16.6
16.5
JALAN HANG LEKIU KM 2
SITE 00
1

.
RW

11.002 TELUK MATA IKAN NONGSA


BOU 17.9 17
15 . 0

15
PGR

15.3 17.1 16.7


10.753 .0
0 GL 15.4
NDA X9 BATAM, 29466
1

GL 17.0
14 17.8
RW

15.5
RY
14.4
GL

.00 17.1
12
.00
13
.00 GL
X10 500 500 7.6
INDONESIA

= CASTING OF WALL
10.700
11.0 14.7
11 0 PTK 16.00 15.00
.0
11.130 15.1
0
11.090 10.8
GL 14.8 14.00 7.303
GL GL
13.00
MAIN CONTRACTOR :
10.435 10.3 7.0 7.059
GL 12.00
6.7 7.442
9.9 11.00 6.4 7.317
H)
RW5 (5m HIG
GL
7.308
9.785 7.143
(MAX. 7m) (~9575)
8.9 6.903
10.735 9.441
7.7
8.00 7.1 RW77.0 6.9 6.8
7.143 7.096
8.3 6.883 6.550 6.736
BS 7.1
8.488 PTK
10.168
10.170
7.00

9.852 7.0
9.7 0 Project
9.263 7.494 6.595 6.656 7.381
8.480
PTK
6.835 PROJECT SUNSHINE -
7.236
DATA CENTRE BUILDING 1
Title

N RETAINING WALL PLAN RETAINING WALL PLAN

0m 6.0m Designed Checked Drawn Rev


30m 60m
HD LKS ACE
Scale Date Created C4
1:600 MARCH 2024

SCALE 1: 600 Dwg No.

BAT01-SRI-01-EX-SHD-STR-1001
A1 Project No. Company Phase Level Doc Type Package Seq No.

You might also like