Work plan is to work on 2 tanks riser But because of malfunction in fuseable plugs
because of availability of 2 scaffolds - with and following production and saftey
3 PTW for cable trays on tank riser total 4 PTW , so 1 PTW for tank 1 is issued to instruction to stop the work , there is delay
close PTW of tank 14 and move the scaffold to move from tank 14 to tank 1 , as tank 2
5 PTW to tank 1 and start work there riser activity is on going