Professional Documents
Culture Documents
001 BOQ of Civil Works - Case Study
001 BOQ of Civil Works - Case Study
Item
Total excavation
2 Loading system
Concrete
Steel structure
Architecture
Concrete floor
Foundation earthwork (mechanical
excavation)
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Cushion
Steel structure
steel hopper
衬板
Architecture
Anti-canopy
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Cushion
Steel structure
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Underground box top plate
Equipment foundation
Chusion
Steel structure
Steel hopper
Liner
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
3 SAF system
Concrete
Independent foundation
Foundation beam
Concrete floor
Chusion
Steel structure
Gutter
Rail
Architecture
Concrete floor
Earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Independent foundation
Foundation beam
Equipment foundation
Cushion
Steel structure
Gutter
Architecture
Concrete floor
Earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Foundation beam
Cable trench
Steel structure
Architecture
Concrete floor
Floor area
Concrete
Foundation beam
Cushion
Steel structure
Architecture
Concrete floor
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Cushion
Steel structure
Architecture
Concrete floor
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Foundation of steel cheminey
Fan foundation
Cushion
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Fan foundation
Cushion
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
De-duster for proportioning station
3.2.3
SAF gas
Concrete
Fan foundation
Cushion
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
Concrete
Foundation beam
Equipment foundation
Cushion
Steel structure
Architecture
Concrete floor
Foundation earthwork
Earthwork excavation
Earthwork filling
Earthwork transportation
5 Electrode casing workshop
Concrete
Equipment foundation
Lump Buldings
6 Laboratory building
Concrete
Equipment foundation
Lump Buldings
Concrete
Equipment foundation
Lump Buldings
Concrete
Equipment foundation
Lump Buldings
9 Oxygen bus
Concrete
Equipment foundation
Lump Buldings
Concrete
Concrete
Lump Buldings
Cable gallery, support and platform
Plant roads
Plant wall
Function & Specification Classification Unit
Mechancial 土 m3
Structural form: steel structure enclosed workshop, main light section steel arch
frame, and welded steel beam.
Subtotal
Subtotal
Q345 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Outer plate 0.6mm thick single layer color profiled steel plate 建 m2
250 thick C20 concrete with double-layer and bidirectional Φ 8@150 200 thick
建 m2
gravel cushion
Subtotal
土 m3
土 m3
土 m3
Subtotal
Subtotal
Q235 钢 t
Q235 钢 t
Subtotal
土 m3
土 m3
土 m3
Subtotal
Subtotal
Q235 钢 t
Q345 钢 t
Subtotal
土 m3
土 m3
土 m3
One set
Subtotal
C30 waterproof grade S6. Reinforcement 140kg / m3 Concrete m3
Subtotal
Q235 钢 t
Q235 钢 t
Q235 钢 t
Subtotal
土 m3
土 m3
土 m3
Subtotal
C30 reinforcement content 80kg / m3 土 m3
Subtotal
Q345 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q345 钢 t
43kg 钢 t
Q235 钢 t
Q235 钢 t
Outer plate 0.6mm thick single layer color profiled steel plate 建 m2
Outer plate 0.5mm thick single layer color profiled steel plate 建 m2
建 m2
建 m2
250 thick C20 concrete with double-layer and bidirectional Φ 8@150 200 thick
建 m2
gravel cushion
Subtotal
土 m3
土 m3
土 m3
Steel structure enclosed workshop, main steel bent frame, lattice steel column
and welded steel beam. The crane tonnage is 100t A7 with single slope
drainage and cornice elevation of 26m
Subtotal
Subtotal
Q345 t
Q235 t
Q235 钢 t
Q235 钢 t
Q235 t
Q345 t
43kg t
Q235 t
Q235 t
m2
Outer plate 0.7mm thick single layer color profiled steel plate 建 m2
Outer plate 0.6mm thick single layer color profiled steel plate 建 m2
建 m2
建 m2
250 thick C20 concrete with double-layer and bidirectional Φ 8@150 200 thick
建 m2
gravel cushion
Subtotal
土 m3
土 m3
土 m3
Subtotal
Q235 t
m2
The height of the second floor is 3.3 and the top is 6.6 m2
Structural form: steel structure enclosed workshop, main body light portal frame,
welded steel beam
Subtotal
Subtotal
Q345 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Outer plate 0.6mm thick single layer color profiled steel plate 建 m2
The outer plate is 0.6mm thick single-layer color profiled steel plate, and the inner
建 m2
plate is 0.4mm
Outer plate 0.5mm thick single layer color profiled steel plate 建 m2
The outer plate is 0.5mm thick single-layer color profiled steel plate, and the inner
建 m2
plate is 0.4mm
250 thick C20 concrete with double-layer and bidirectional Φ 8@150 200 thick
建 m2
gravel cushion
建 m2
Subtotal
土 m3
土 m3
土 m3
Structural form: steel structure workshop, main body light portal frame, welded
steel beam.
Subtotal
Q345 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Q235 钢 t
Subtotal
Outer plate 0.6mm thick single layer color profiled steel plate 建 m2
250 thick C20 concrete with double-layer and bidirectional Φ 8@150 200 thick
建 m2
gravel cushion
Subtotal
土 m3
土 m3
土 m3
Subtotal
C30 reinforcement content 70kg / m3 Concrete m3
Subtotal
土 m3
土 m3
土 m3
Subtotal
Subtotal
土 m3
土 m3
土 m3
Subtotal
Subtotal
土 m3
土 m3
土 m3
Subtotal
Concrete m3
Concrete m3
Concrete m3
Concrete m3
Concrete m3
Subtotal
钢 t
钢 t
Subtotal
建 m2
建 m2
Subtotal
土 m3
土 m3
土 m3
Subtotal
Subtotal
Steel portal frame. Two 5T electric single beam cranes with 7.5m rail bottom, LK =
13.5, with equipment foundation inside ㎡
15m × 6m; single storey brick concrete structure with cornice elevation of 3.9m ㎡
Subtotal
Subtotal
Reinforced concrete frame structure, one floor above ground. 370 brick wall
m2
enclosure. All steel members shall be painted. Cornice elevation 5m
Subtotal
Subtotal
The reinforced concrete column roof is enclosed by brick walls, and the roof is
m2
made of trapezoidal steel roof truss with a cornice of 12m
Subtotal
Subtotal
18m × 54m; portal steel frame. Two 5T electric single beam cranes with 7.5m rail ㎡
bottom, LK = 16.5, with equipment foundation inside
Subtotal
Subtotal
Reinforced concrete frame structure, one floor above ground. 370 brick wall
m2
enclosure. All steel members shall be painted. Cornice elevation 5m
Subtotal
Subtotal
Q235 t
Concrete m
Q335 t
1,614,567
36,986 19 719,593
29,827 20 609,880
8,064 35 285,094
22,724,680
0 9,544,662
792 2,597,760
57 27,500 1,554,636
8 28,500 214,822
58 26,500 1,533,853
4 20,500 75,338
2 32,000 60,301
16 23,500 370,125
9,281 2,784,394
4,209 42 178,293
3,667 43 155,974
542 35 19,166
9,655,908
1,124 3,293,377
48 900 43,470
184 5,719,011
28 32,000 903,948
53 31,000 1,644,956
79,200
40 2,000 79,200
13,736 564,320
6,868 42 290,942
4,255 43 180,983
2,613 35 92,394
1,581,116
109 321,016
30 3,020 89,898
41 3,020 124,858
34 3,020 102,740
4 900 3,519
49 1,174,010
3 32,000 88,310
46 23,500 1,085,700
2,044 86,090
1,022 42 43,294
928 43 39,460
94 35 3,336
1,942,994
326 912,752
29 3,020 87,900
53 1,980 103,950
9 900 7,681
33 908,840
7 32,000 222,828
14 31,000 439,534
8 20,500 159,424
4 23,500 87,053
2,934 121,401
1,467 42 62,144
1,029 43 43,774
438 35 15,483
45,326,218
43,166,590
28,992,143
1,780 4,063,817
789 2,240 1,767,933
31 3,150 97,657
70 900 62,853
4 28,500 108,029
11 26,500 300,811
44 26,500 1,159,067
2 20,500 40,898
10 32,000 306,432
4 32,000 114,912
13 32,000 403,200
11 23,500 246,750
6,700 2,075,837
5,203 42 220,390
3,632 43 154,503
1,570 35 55,521
6,927,866
994 2,237,894
23 3,150 73,671
98 3,020 295,385
29 900 25,878
50 27,500 1,361,817
5 28,500 136,458
14 26,500 376,013
10 26,500 263,647
1 20,500 20,449
21 32,000 663,936
4 32,000 114,912
5 32,000 168,000
5 23,500 123,375
4,080 1,339,413
2,911 121,951
1,467 42 62,150
1,217 43 51,759
227 35 8,042
1,638,946
481 1,515,071
33 3,150 103,509
24 3,150 75,962
1 28,475 No fireproof paint
1 20,500 28,475
105 95,400
48 800 38,160
3,933,391
219 492,786
2,500
2,500
33 3,150 102,797
3,280
20 900 17,902
26 27,500 723,231
3 28,500 74,953
15 26,500 385,655
18 26,500 466,291
2 20,500 43,050
1 32,000 21,039
6 23,500 148,050
0 23,500 54
4,553 1,407,844
0 600 0
0 625 0
4,047 170,438
2,024 42 85,720
1,834 43 78,028
189 35 6,689
1,674,244
161 337,761
17 900 15,301
27 716,192 No fireproof paint
13 27,500 368,184
1 28,500 38,157
7 26,500 192,827
2 20,500 32,288
0 32,000 10,711
3 23,500 74,025
1,362 475,670
3,434 144,622
1,717 42 72,724
1,560 43 66,349
157 35 5,550
2,159,628
999,607
345 709,331
40 2,110 84,189
17 2,110 36,334
41 900 37,029
6,887 290,276
3,444 42 145,873
3,155 43 134,186
289 35 10,217
318,425
109 222,327
21 2,110 43,424
10 2,110 21,269
65 2,240 146,059
13 900 11,575
2,279 96,098
1,140 42 48,277
1,048 43 44,594
91 35 3,228
841,596
285 586,682
21 2,110 43,424
12 2,110 24,371
36 900 32,024
6,045 254,914
3,023 42 128,044
2,785 43 118,469
238 35 8,400
5,142,551
1,474 3,991,801
15 3,150 48,461
71 3,150 223,852
75 2,760 205,874
76 3,020 228,312
12 2,500 31,033
51 3,150 160,745
66 900 59,694
8 248,659
5 27,500 127,699
4 32,000 120,960
1,662 564,040
20 5,000 100,000
8,170 338,051
3,642 42 154,294
3,297 43 140,263
1,230 35 43,493
3,355,620
210 388,500
768 2,967,120
2,271,375
158 291,375
495 1,980,000
1,239,084
105 207,900
258 1,031,184
158 291,375
626 2,503,440
347,522
21 38,850
21 1,850 38,850
77 308,672
27,564,182
722 1,335,182
26,229,000
288 30,000 8,625,000
110,109,239
6,881,827
0
79,200
57,240
270,113
223,852
205,874
31,033
160,745
100,000
2,658,240
308,880
1,980,000
1,031,184
2,503,440
308,672
9,918,472
100,190,767
6,261,923
Concrete
C15 C20 C30, 60 C30, 50 C30, 70 C30, 80 C30, 120 C30, 140 C30, 150
3,769
652
424
48
30
41
34
4
29
132
104
53
9
789
31
412
478
70
724
206
23
525
113
98
29
1,010
424
33
24
166
33
20
1,315
144
17
669
40
17
246
41
21
10
65
13
21
12
217
36
187
15
105
76
408
299
66
210
158
105
158
21
722
352 7,488 1,200 1,268 120 2,021 478 2,441 583
Earthwork
792
4,209
3,667
542
6,868
4,255
2,613
1,022
928
94
1,467
1,029
438
5,203
3,632
1,570
1,467
1,217
227
2,024
1,834
189
1,717
1,560
157
3,444
3,155
289
1,140
1,048
91
3,023
2,785
238
108
71
75
12
51
3,642
3,297
1,230
792 317 7,680 28,407 35,224
6,818
17,060
1,498
18,558
Item Unit Qty. Rate Total
Foundations earthwork
Earthwork excavation m3 34,202 42 1,448,852
Liner Ton 8
Liner Ton 8
890
Steel work
SAF Building Plant & Building Including Roofing Ton 450
Raw Material Handling System, Building Structure Ton 150
Site fabrication of Raw Material Hoppers, Chute Etc. Ton 75
Fume extraction System Structure Ton 125
Site Fabrication Duct, Support & Stack etc, Ton 90
30,000 26,700,000
21,837,500
1,008,909,692
1,002,777,323
1 SAF Building Plant & Building Including Roofing MT 450
Fume extraction System Structure & Its Equipment’s Bag House, Heat MT
5 Exchanger, ID Fan 350
6 Material Handling System MT 40
7 Fume Extraction System MT 180
8 Pump House MT 80
9 Electrical Sub-station Equipment MT 50
Total 2,335
earth works
Concrete works
Steel works
Ereection works
Arc and lumbsum buldings
External lines, roads and walls of the whole plant
Electrical scoop
Total Cost
7,000 3,150,000
7,000 3,920,000
7,000 1,750,000
7,000 2,625,000
7,000 2,450,000
7,000 280,000
7,000 1,260,000
7,000 560,000
7,000 350,000
16,345,000
4,500,484
9,094,200
21,837,500
16,345,000
10,008,416
27,564,182
6,000,000
95,349,782
5,959,361
16.78
Bulding area No of Man
1 Accomedation Camp
Clinic
Office
Electricity
Water Supply
Water well
RO Plant
Water Tank storage
Water distrubition Pipes
7,538 6,442,048
227 158,331
1,535 929,346
2,972 1,822,290
0 1,810,790
1,200,000
2 250,000 500,000 250,000
1 1,000,000 1,000,000 500,000
2 250,000 500,000 250,000
2,000 200 400,000 200,000
850,000
1 500,000 500,000 250,000
2 250,000 500,000 250,000
2,000 350 700,000 350,000
#REF!
Equipmen
Equip. Rate/day Rate/hours
Earth Work Eq
1 Dozer 13000 1,300
3 Loader 5000 500
4 jack hammer 6000 600
4 Excavator 6000 600
2 Grader 14000 1,400
5 R.compactor 30 Ton Dynamic Load 3000 300
6 Soil Screens 1000 100
7 Powder Screens 1000 100
8 Water Tanker 7000 700
9 Dump Truck for 12 KM 6000 600
10 Dump Trailer 7000 700
Service Equ
12 Boom truck 700 70
13 Crain 75 2500 250
14 Treehandler 900 90
15 Lowbed 1200 120
16 Flatbed 800 80
17 Freshwater Tank 700 70
18 Sewage water Tank 800 80
19 Fuel tank 500 50
20 Survice car 400 40
21 JCB 800 80
22 Popcat 350 35
23 Buss 600 60
24 Man lift 350 35
25 Power Tools 200 20
26 Survaying instruments 300 30
27 Metal detector 200 20
Totals of equi/equi oberator
Equipment
production rate/hours Cost/unite No of Equp Volume of work
Earth Work Equipment
250 5.20 2 83,627
90 5.56 7 180,393
7 85.71
26.4 22.73 10 77,204
120 11.67 1 3,000
60 5.00
90 1.11
90 1.11
240 2.92
26.4 22.73
60 11.67
Service Equipment
sarvice equip. 3
sarvice equip. 14
sarvice equip. 6
sarvice equip. 4
sarvice equip. 4
sarvice equip. 3
sarvice equip. 3
sarvice equip. 5
sarvice equip. 5
sarvice equip. 4
sarvice equip. 4
sarvice equip. 7
sarvice equip. 1
sarvice equip. 6
sarvice equip. 6
sarvice equip. 6
101 344,224
7.12
No of hours cost of eq.
Total period 300
335 434,859 1.11502262302
2,004 1,002,185 6.681232378
0 0 0
2,924 1,754,643 9.74801831058
25 35,000 0.08333333333
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 20 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 0
0 0
0 0
0 0
0 0 63
5,288 3,226,687
5,288 3,226,687
0
direct & Indi
Titel Month Salary
Project Manger+car 46,000
Construction Manager+car 25,000
Manager Level
D.c.c 6,000
Planning and Scheduling Engineer 8,000
Cost Control Engineer 8,000
Control Level
Carpenter 5,000
Steel Fixer 5,000
Masoun 5,000
Fence Tec. 5,000
Tecnition Level
Helpers 3,500
Labours Level
Profit 108,041,543
Tota value of Project
BOQ Value 342,181,387
339,963,015
0
direct & Indirect manpower
Year Package Rate/hours No of Man
639,860 213 1
347,750 116 1
278,200 93 1
278,200 93 1
278,200 93 1
278,200 93 1
236,470 79 2
83,460 28 2
111,280 37 1
111,280 37 1
111,280 37 1
111,280 37 4
153,010 51 1
153,010 51 4
111,280 37 1
111,280 37 1
153,010 51 3
139,100 46 3
125,190 42 3
69,550 23 1
69,550 23 2
69,550 23 3
69,550 23 2
69,550 23 2
69,550 23 2
69,550 23 1
69,550 23 1
69,550 23 1
69,550 23 1
69,550 23 3
69,550 0 241
69,550 0 52
69,550 23 3
48,685 16 20
48,685 16 3
48,685 16 3
48,685 16 6
48,685 16 3
400
3rd party
Rate/hours manhours each
75 1,132
75 784
234,139,844
108,041,543 46%
Period of work/day No of Hours cost of Manhour
1,218 12,180 2,597,832
1,218 12,180 1,411,865
1,218 12,180 1,129,492
1,218 12,180 1,129,492
1,218 12,180 1,129,492
1,218 12,180 1,129,492
1,218 24,360 1,920,136
10,447,801 10
1,218 24,360 677,695
1,218 12,180 451,797
1,218 12,180 451,797
1,218 12,180 451,797
1,218 48,720 1,807,187
1,218 12,180 621,221
1,218 48,720 2,484,882
1,218 12,180 451,797
1,218 12,180 451,797
7,849,969 17
1,188 35,640 1,817,759
1,188 35,640 1,652,508
1,188 35,640 1,487,257
784 7,840 181,757
1,188 23,760 550,836
1,188 35,640 826,254
6,516,371 17
119 2,380 55,176
119 2,380 55,176
119 2,380 55,176
119 1,190 27,588
119 1,190 27,588
119 1,190 27,588
119 1,190 27,588
1,218 36,540 847,119
1,132 2,728,120 0
1,188 617,760 0
1,188 35,640 826,254
0 1,949,255 321
1,188 237,600 3,855,852
1,188 35,640 578,378
1,132 33,960 551,114
1,188 71,280 1,156,756
1,218 36,540 592,983
6,735,083 35
4,311,460 33,498,479
25 50 121,800
25 25 30,450
25 25 30,450
25 25 30,450
25 100 487,200
25 25 30,450
25 100 487,200
25 25 30,450
25 25 30,450