Automatic PO:
Generally, in Industries daily 100s of PR's will be created automatically with MRP run
program. PO's will be created with reference to PR automatically in the system. But following are pre
requisite for automatic PO's.
1. In material master, select automatic PO
2. For this material maintained suitable or fixed vendor in quota arrangements (First Priority)
or Source List or Contracts or Info record.
3. In selected Vendor master records also select automatic PO Indicator.
4. For this material and Vendor Combination maintain Info record to pick the price to
automatic PO. (Automatic PO T Code ME59N)
5. It requires we can define back ground setting job for automatic PO process in (T Code SM36).