RINA Cert 4x12cbm GUVEN Radio Remote Control Grab QUO-0000073955-N2K - IR8..

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 1 of 8

1. Reference Section
Purchase Order: QUO-0000073955-N2K RINA Job ID: GVN008-001
Inspection Notification: 14.11.2023 Customer Reference: N/A
Main Vendor: N/A Main Vendor Location: N/A
Manufacturer: GUVEN GRAB & MACHINE Manufacturer Location: Nazım Hikmet Cad. 536 Sok.
INC. No: 9 41420 Gebze, Kocaeli,
Turkey
Vendor sub-order No.: SIF.23.RC.101
Name of Person Company / Position & Contact Details
Other key Attendees: Ergin Dindar RINA Inspector
Müjdat Yılmaz Production Chief
Equipment / Material: 12 cbm Radio Remote Control Grabs
Inspection Activities
Stage/Intermediate Final Dispatch / Shipment
Performed:
Next Visit Date/s: N/A

2. Overall Result of inspections

X SATISFACTORY
UNSATISFACTORY N/A
PENDING ITEMS(S) N/A
PUNCHLIST RAISED PL No.: None
NCR RAISED NCR No.: None
IRN ISSUED IRN No.: N/A

CUSTOMER ACTION REQUIRED YES NO


If yes, provide details here:

QUALITY FINDINGS (not subject to an NCR being raised, corrected at the time of Inspection)
The final quality dossier is available and reviewed by the RINA Inspector.

3. Time & Expenses Expenditure


Time
DATE WORK TRAVEL DISTANCE
HOURS HOURS
15.11.2023 3 3 140 km

Expenses
DATE TYPE COST CURRENCY DESCRIPTION
None

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 2 of 8

4. Documents Section
Detail all the applied Customer, Vendor docs and International Codes & Standards referenced

Document Number Rev. Title Code Status


EN ISO 9606-1 2017 Qualification testing of welders – Fusion welding -
Specification and qualification of welding procedures for metallic
EN ISO 15614 2017
materials -- Welding procedure test
-

5. Presented Quantities

Presented Rejected Accepted Qty. for


P.O./Tag Item Item Description Ordered
This Visit This Visit This Visit Release
12 cbm Radio Remote
SIF.23.RC.101 4 4 0 4 4
Control Grabs

6. Details of Inspection & Test Instruments Used

Equipment Name Manufacturer Serial No. / ID No. Next Calibration

Vernier Caliper Mitutoyo EMS151887 13.02.2024


Steel Tape Measure Starline EMS151884 13.02.2024

7. Detailed Results of Inspections


Summary table of the inspection activities performed & results

QCP / ITP Step Inspection Activity Result

1 Documentation Controls Accept Reject Pending


2 Visual Controls Accept Reject Pending
3 Dimensional Controls Accept Reject Pending
4 Performance Test Accept Reject Pending

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 3 of 8

Detailed results of inspections (QCP/ITP Activity No., Inspection Performed including quality findings)

Grab Number 1-2-3-4

Serial Number RC.23.239 - RC.23.240 - RC.23.241 - RC.23.242


Capacity 12 Cbm
Design RRCG-12-5
E. Weight 8700 kgs
SWL 15,3 Tons
Color Signal Blue (RAL 5005)
EN 10025-2 2004 S275JR
Steel Plates EN 10025-2 2019 S235JR+N
EN 10025-2 2019 S355J2+N
Side Lips Grade 25 mm Bruxite 500 HB
Bottom Lips Grade 30 mm Bruxite 500 HB
Shell Grade 10-12 mm
Mechanism Gr. 10-50 mm
Arms 8 mm
Wire Ropes 30 mm L:10,5 + 10,5 m

Documentation Controls;
Documentation control was carried out on the presented documents. Quality control and assurance certificates were controlled
and reviewed during the inspection period.
Material certificates were presented as soft copies by the manufacturer. The certificates were reviewed and were found
sufficient.
Dimensional & final control reports were presented and reviewed for related manufacturing.
The volumetric capacity calculation report was reviewed and was found as calculated via computer.
The required welded manufacturing documents which are WPQR, WPS and WQT (welder certificates) were reviewed in the
quality dossier as soft copies and certificates were found sufficient.
Calibration certificates were reviewed for measurement gauges and the certificates were found valid.

Result: Satisfactory

Visual Controls;
The visual controls were carried out on produced items.

Material surfaces, weld seams and workmanship were controlled visually. It was observed that produced items were painted,
weld seams were controlled over the paints, and any visual defect was not observed. Several coating defects were observed
on the grabs. It was notified to the manufacturer that the required touch-up repairs are required on the related surfaces.

Result: Satisfactory

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 4 of 8

Dimensional Controls:
Dimensional controls were carried out on produced items. Technical drawing of grabs was presented by the manufacturer
and relevant controls were carried out in accordance with technical drawing. It was observed that the measured results were
found in tolerances as per the technical drawing.

Result: Satisfactory

Performance Test:
Performance tests were carried out by the manufacturer during the inspection period. Grabs were controlled as on/off positions
manually and the results were found as sufficient.

After the performance test, hydraulic hoses and cylinders were checked visually for leakage. It was observed hydraulic hoses
were preserved. No leakage or deformation was observed on hoses and cylinders.

Result: Satisfactory

Load Test:
Load tests were carried out by the manufacturer during the inspection period. Grab was lifted by fastening 27 tons of concrete
blocks for 5 minutes. After the load test grab was visually checked and deformation was not observed on the grab. All
components and grab were found in good condition.

Result: Satisfactory

8. HSE
Check and comment on results (as applicable)

X Any Incidents
PPE in Use
HSE Induction Given
Child Labour Seen
Poor Working Conditions
Unfair / Forced Labour
Waste Recycling Practiced
Other

9. Attachments Section
Document Number Rev. Title
- - Quality Dossier for RC.23.239- RC.23.240- RC.23.241- RC.23.242 grabs

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 5 of 8

10. Pictures Section

Description: Dimensional Control Description: Dimensional Control

Description: Dimensional Control Description: Dimensional Control

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 6 of 8

Description: Dimensional Control Description: Dimensional Control

Description: Dimensional Control Description: Dimensional Control

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 7 of 8

Description: Performance Test Description: Performance Test

Description: Performance Test Description: Performance Test

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

Customer: GUVEN GRAB


ZPORT OPERADORES PORTUARIOS
Project:
LTDA
Report No.: QUO-0000073955-N2K_IR81
Inspector/s: Ergin Dindar

Visit Date/s: 15.11.2023


Inspection Report Report Date: 30.11.2023 Page 8 of 8

Description: Load Test Description: Load Test

Description: Load Test Description: Load Test

Place: Istanbul Date: 30.11.2023

Inspector Signature and Stamp

Report Reviewed by:


Name: Melis Mutlu Title: Project Coordinator Date: 30.11.2023

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01