Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

A B C

LEGEND:
INSTALLED CCTV
25

90
00 26 NOT YET INSTALLED
90
0 0 27

DIESEL TANK
PLINTH AT S.F.L.-1.350
90
00 28
DIESEL TANK bottom level refer to structural drawing
all plinth in diesel are 200mm (H) at level -1.350
finish floor level in diesel tank will be MW-01 50mm thk at level F.F.L. -1.300

DIESEL TANK
DIESEL TANK
DIESEL TANK bottom level refer to structural drawing DIESEL TANK RM A
LG Q 01
60 m²
90
00 29
all plinth in diesel are 200mm (H) at level -1.350
finish floor level in diesel tank will be MW-01 50mm thk at F.F.L. -1.300
DIESEL TANK RM B
LG Q 02
60 m²
100
WAL 0X3
L
OPE
00(

NIN
H)

90
00 30
1 017/07/2021 ISSUED FOR APPROVAL
100
PIPE TRENCH 600(W)x1200(D)
WAL
PLINTH AT S.F.L.-1.350 L
0X3
OPE00(
H)
NING

allPLINTH AT S.F.L.+0.450
plinth in LPG container are 200mm (H) at level +0.4500
finish floor level in LPG container will be MW-01 50mm thk at F.F.L. +0.400

90
00 31
PIPE TRENCH 600(W)x1200(D)

PIPE TRENCH 1000(W)x1200(D)


UNDERGROUND LPG CONTAINER
LPG CONTAINERS
LG Q 03
62 m²
Rev. Date (D/M/Y) Description
all plinth in diesel are 200mm (H) at level -1.350
DIESEL AND LPG PIPES IN PIPE finish floor level in diesel tank will be MW-01 50mm thk at F.F.L. -1.300
TRENCH
PLINTH AT S.F.L.+0.450
INTERNAL CLEARANCE 1500(L)x1500(W)x800(H)
DIESEL TANK
DIESEL TANK RM C PLINTH ATDIESEL
S.F.L.-1.350
TANK bottom level refer to structural drawing
LG Q 04
UNDER GROUND LPG CONTAINERS
LPG containers bottom level refer to structural drawing 58 m²

PIPE TRENCH 1000(W)mmX1200mm(D)

DIESEL TANK

PIPE TRENCH 1000(W)x1200(D)


PLINTH AT S.F.L.-1.350
C03 *CRF-0027

DIESEL TANK RM D
LG Q 05
60 m²
DIESEL TANK
DIESEL TANK bottom level refer to structural drawing

all plinth in diesel are 200mm (H) at level -1.350


finish floor level in diesel tank will be MW-01 50mm thk at F.F.L. -1.300 PIPE TRENCH 1000(W)x1200(D)

#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY

00
A

90
TEL/FAX : (+632) 655-1111 LOCAL 813
follo
w

TEL : (+632) 655-9164


this 402

00
she seto 5

B
arw ut
all for

90
the

General Contractor

0
C

0
90
S

D
00
90

T Aedas (Macau) Lda


21
Avenida Xian Xing Hai No.105 Centro Golden
00

90
90

U 00
22
Dragon 7 andar D, Nape, Macao
90
T +853 2875 5530
00

00
23
90

V
90
00
F +853 2875 5531
24 AP
00

macau@aedas.com
90

UP
DN
FRO
M
GF
90

12200
00
00

6 th Floor, Paseo Center,


follo
w
90

this 402

X
she seto 5
arw ut
all for
the

3.500 AQ 3.500 8757 Paseo de Roxas Avenue, Salcedo


00

Village, Makati City, 1227, Philippines


90

9000
3.500
0
3.50 AR
CA
T +632 867 8615
0

220 0
0
90

0
Z 240
3.5
F +632 840 4384
CCTV 01

90
00

9000
200

00
0
FS CA'
information@casasarchitects.com
39 WAT
00

0 CU ER
M
180
90

TA

AA NK 0
AS

90
C03
0

00
*CRF-0050
6
3.77 CB
260

00

9000
FS

3.5
00

39 W

Architect
0 CU AT
90

ER

AB M TA
93 01 M P &

NK
O M

160

90
RAMP UP
LG NK RO P PU

+4.230

3.5
3.93%

00
AT
TA KU

CB'
MAR

0

10 B

FLOOR ACCESS TO TANK ABOVE

00
+3.600
AC

GLASS PARTITION ENCLOSURE


(REFER TO TYPICAL DETAIL FOR WATER TANK)
FOR DISABLE PLATFORM
00

156 PS-07 +3.550 10300MM(W) x 2100MM(H) SECURITY SHUTTER

9000
90

+3.700
AC +3.380 1A- DW-01
REFER TO SECURITY CONSULTANT SPECIFICATION,
CONSULTING, INC.

90
150 PD RC HANGER WALL ABOVE
STAIR AT ABOVE 205

00
MEP UP
FIRETECH, FIRE PROTECTION SYSTEMS
(BOTTOM LEVEL +4.025) 176
+3.500 +3.350 LG F 01
DEMOUNTABLE FLOOD DOOR SYSTEM
UP 144
-01
REFER TO SECURITY CONSULTANT SPECIFICATION
CC

RAMP UP
213
5 m² ENGINEERS CONSULTANTS

0
CCTV 10
PS-16 PD - DP METAL GUARD RAIL 1100MM(H) A.F.F.L.

7.10%
AU
168
225 WC 1A BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY
00

ENTRANCE FLOOR MAT

280
158
LG F 02a SECURITY MAIN STAFF TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667
90

2 m² BUNKER
+3.600
AD 131
240 LG F 02
ENTRANCE

90
UP

C03 SECURITY LG F 03
+3.550

9000
*CRF-0050 21 m²

00
DEMOUNTABLE FLOOD DOOR SYSTEM

140
AC 244
DN
FRO
VESTIBULE 100 m²
UP
FES-13
M
REFER TO SECURITY CONSULTANT
M
CD
GF
51

3.5
9 CU AKE- LOW HEADROOM 152 LG F 04 INTERVIEW
SPECIFICATION
M UP (BOTTOM LEVEL +4.650) A1
A1
252
C03 *CRF-0027 7.97% 109 m² ROOM

0
WAT 5900MM (W) x 4100MM(H) LG F 11
TUV Rheinland Philippines, Inc.

00
ER 145
(2HRS FIRE SHUTTER) MGR 2 16 m²
TUV Rheinland R
0

R3 UP
AC TA
0

-1P
-1P RC HANGER WALL ABOVE LG F 11b MGR 3

AV AV
NK 271
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.
90

M
51
9 CU AKE- +3.330 PD

AE 134 6 m² LG F 11c
-1P

Precisely Right.
-1P

90
M UP TRANSFORMER ROOM MGR 1 4 m²
R3

277
WAT 1231 Makati City, Philippines

00
WC LG F 11a
ER
LG E 01
+3.700 LG F 10
MGR 4
TA
NK 121 182 215
285 86 m²
4 m²
PD 7 m² LG F 11d
CE
9000

MGR 5 7 m²

MEP Engineer
-15
-15

199 LG F 11e
R3
R3

291
-1P

116
-1P
00

6 m²
R3
+3.320
A3
A3

R3

19
AC -1P
-1P
+2.000
90

51 M 195 R1
R1 298 RECEPTION 1
+2.000
AF 9 CU AK 109 R3 -2-2 SECURITY WC

90
E- -14
-14 RC Parapet Wall LG F 12
M UP 223
+1.900 UP LG H 01b
+1.950

00
1100MM(H) A.F.F.L. 311 40 m²

AW
23 WAT 186
3 m²
ER A3
CE'

120
PD
A3

12 28 TA 212
NK
101 153 UP LOADING
R3

3.5
-1P
-1P BAY WC

RAMP UP 1:12
33 172 208 LG H 01a RECRUITMENT
97 GGWW

0
16 332 100 100 100MM(H) CONCRETE CURB OFFICE
9000

CCTV 02
4 m²

00
164 ENTRY GATE HEIGHT TO LG F 13
+2.000 LOADING BAY AC PLANTROOM

90
21 335
38 90 MATCH WITH TURNSTILE 111 m²
191 278 +1.200 SECURITY LG F 09

00
26 157 260
+2.000/ 1.150 LG H 01 224 m²
1:10

CF
42
+1.150 / +0.900 19 m² BOH CORRIDOR +2.000
UP

84 183
GGGF

ELV EL GTR VESTIBULE


GF

1:10

123 255
MP

LG J 24
AX
44
C03
OM

LG F 07 LG F 08 LG F 08a
OM

LG F 06
*CRF-0048 +1.950 / 1.150
RA

UP

31 DN FROM GF UP
35 m²
FR

77
146 177 279 STAIR AT ABOVE C03 *CRF-0050 21 m² 14 m² 13 m² 5 m²
MP

3 UP
250
METAL GUARD RAIL (BOTTOM LEVEL +4.650)
RA

36
A3

A4
A3

A4

72 135 276 1100MM(H) A.F.F.L. 100


FES 16

90
5 40 FES-19 PS-18
9000

00
163 318
TBD BOH AREA
A4
A4 128 238 261 AC
RAMP UP 1:15 VESTIBULE UNIFORM
CF'
1 E.L.+ 2.10 m
8 CARGO LIFT PLANTROOM
GG

A1

LG J 02a CONVEYOR
A1

C1
C1 65 154
LG J 01 OPENING REFER TO UNIFORM
C03
TO
A1 TO

106 235
11 RC Parapet Wall RECEIVING OFFICE *CRF-0050 CROWN BOH
138 m² 3 m² LG J 03 CONVEYOR DETAILS

100
R3 E.L.+ 2.10 m
A1

E.L.+ 2.10 m

BO LG 84
E1

2
60 1100MM(H) A.F.F.L. 117 149 251 -1-1P 322 340 m²
P 500

3.5
H M m²
Slots

224

CO 04
AY
NK

RR
+2.000 +2.000 TELEPHONE & SMART

31

0
TA

299

90
110 249
C03

ID
15 54

00
*CRF-0050 SERVICES CENTRE
ER

OR
321 LOADING BAY E1

00
7
M AT

+2.100 +1.950
500

+2.000/ 1.150 133 Slots

LG H 02 PS-05 LG K 05
W

20
+1.200 VESTIBULE

Structural Engineer
209

CG
108 241 294
1995 m² MEP 62 m²
13 ORM

E1

406 418 429 446 460 472


LG K 03a
+2.050
500
5 CU

LG J 03a
9000

Slots

319 VESTIBULE LOCKER ROOM


ST

25 124

10
85 198
E.L.+ 2.10 m +1.150 METAL GUARD RAIL 1000
E.L.+ 2.10 m LG J 17a LG J 02 8 m²
500
E1
6 m²
EXIT
A4
A4 91
229 5 m² 635 m² Slots

VVIP BOH
119 1100MM(H) A.F.F.L. PASSAGEWAY
A2
A2 193 301 320 E.L.+ 1.10 m VESTIBULE E1
LIFT LOBBY
30
+1.100

RAMP 1:12
14 99 6200MM(W) x 3600MM(H) UP VESTIBULE 500
1A- LS -16 LG K 08
LG H 06b Slots
LG K 02 HR OFFICE

90
221 SECURITY SHUTTER RAMP UP 1:12 LG J 16 GTR PANTRY 88 m² HOT WATER
35 7 m² 19 m² STORE
RC HANGER WALL ABOVE +1.100/ 0.900 16 m² LG J 17

00
A1

18 PLANT ROOM
A1

107 LG J 21c
AZ EL
39
C2
C2
82 180
211
303
BOHEMIA BOH
E.L.+ 2.10 m UP
13 m² MGR
LG J 21b
13 m²
LG K 01f
31 m²
LG K 03
261 m²
CG'

CCTV 09
E1

STORM WATER STORAGE 24 88 113 175 11 m² 500 VESTIBULE


TANK & PUMP ROOM LG A 02 300 326 RCV BAY VESTIBULE Slots
POTABLE WATER STORAGE
377 382 388 405 411 417 423 432 440 447 455 466 1A- LS -03 LG K 07

TENANT LIFT LOBBY


6 m² LG H 03 LG H 06a TANK & PUMP ROOM
A1

200
A1

LG A 01 29 95 122 1A- LS -01 WARDROBE E1

12 m²
9000

080
159 m² UP 166
C1
C1 197 m² 10 m² LG J 22
500
Slots LG K 04
ELV 269

LG J 04
305 325 EL PROCUREMENT 176 m²

3.5
C03 39 m²

90
35 m²
LG A 03 34 132 196 E1

METAL GUARD RAIL *CRF-0027 LG J 18 +2.000 1A- LS -04


A3

500

SEWAGE TREATMENT OFFICE


A3

105 500 505 514 Slots

12 m²
+1.100

00
PS-15 UP
13 m²

0
50 1100MM(H) A.F.F.L. PLANT ROOM LG J 21 MEETING
1A- LS -02

18
+1.950

CCTV 03
CH
187 270
C2
C2 111 147
306 324 ELV LG H 06 109 m² ROOM 10 UP
6
A2
A2
LG G 04 FES-20
378 381 387 404 410 416 422 431 439 448 456 465
+1.100/ 0.900 347 m² LG J 21a
LMCP

RAMP UP 1:10

RAMP UP 1:10
CARGO LIFT
CABINET VESTIBULE
BA 9
56
A2
A2
118 155

165 242
268
23 m²

+1.200
20 m² D1 D1 D1 D1 D1 HR OFFICE
LG K 01
VP
LG K 01a
LG K 03b
6 m²
MGR 4
LG K 10d
PIT
45 63 14 m²
310 331 2200MM(W) x 2550MM(H) BOH CORRIDOR 523 m²
130 360 373 C03 MGR 3 19 m²
+1.150 *CRF-0050 ACC. WC +2.000 LIFT

90
(2HRS FIRE SHUTTER) LG M 04 JANITOR PS-01
00

13 267 501 506 515


69 236 1A- LP -01 1A- LP -02 LG J 11 DIR 1 LG K 10c
+2.000 RC HANGER WALL ABOVE 3184 m² LG J 13
9000

00
RUBBER DOCK BUMPER
90

C1
C1 143 PD MGR 2 12 m² MGR 5
+1.950
AG 17 48 307 327 ENTRY GATE HEIGHT TO 7 m² 4 m² LG K 01b
181 FEFER TO SPECIFICATION
53 78
151
194
228 265
CARPARK
LG B 02 304 328
EL
LG G 05
14 m²
359 372
CARPARK
LIFT LOBBY
WC
LG G 03a
13 m²
+2.000/ 1.150 REMOVABLE METAL
GUARD RAIL
502 507 516 ELV
LG J 19
13 m²
MATCH WITH TURNSTILE BOH CORRIDOR
LG M 04
3184 m²
+2.000
13 m²
DIR 2 STORM WATER TANK
135 CUM
LMCP
CABINET
GAMING
LG K 10b
MGR 1 12 m²
LG K 10e
13 m²
MGR 6
CH'
22 ELV
+1.950 LG K 01c LG K 10a

HANDWASH
IN
1A- LS -15

900

900
LG G 03 LG K 10f
A6

58 358 374 STORE


A6

86
A6

16664 m² EXIT PASSAGEWAY


A6

202 LG J 09 13 m²
264
32 m² 459 LOADING 13 m² 12 m²
167 436
LG H 23 CONVENIENT LG K 09c

BB
27
92
CAB

PLATFORM 16 m² MALE CHANGING FEMALE CHANGING DIR 3 MGR 7


135 m² STORE 16 m²

90
C1
C1 LG K 10g

060
00

214 EMPTY BOTTLE LG H 07 ROOM ROOM LG K 01d

Project Manager
68 178
32
GREASE LG J 08 13 m² MGR 8

00
262
STORAGE 319 m² LOW HEADROOM LG J 10 LG J 12 12 m²
90

3.5
302 323
A6

AH
61 m² MGR 1
A6

C03 5700MM(W) x 2700MM(H) "B-SECTION" RUBBER CONTAINER STORE 1A- LS -06

CH"
227 LG H 04a (BOTTOM LEVEL +4.750) 107 m² 105 m²
74 C1
C1 190
*CRF-0050 426 434 445 450 458 468 HR MEETING LG K 09a LG K 10h
(2HRS FIRE SHUTTER) DOCK BUMPER DISINFECT
TRASH
+2.000 LG N 53 GAMING LOYALTY

0
VESTIBULE
21 m²
+2.000 ROOM 13 m²
A3
A3
A6

PD
9000

VESTIBULE
A6

37 94 339 351 354 364 370 391 396 401 RC HANGER WALL ABOVE ROOM 12 m²

27
266 11 m² MARKETING OFFICE
A4
A4
81
197
237
309 330 C1
C1 C1
C1 ROOM
LG H 04 +1.950
LG H 14a
4 m² LG N 23a LG J 15a +2.000 LG K 01e
LG K 09
MGR 9
LG K 10j
41
A1
A1 A1 376
403 419 DRY GARBAGE 64 m² 10 m² +1.950 5 m² 1A- LS -05
8 m²
FILING ROOM
138 m² 13 m²
A1

A4
A4 210 263 STORAGE 24-60 LMCP MGR 2 MGR 10
308 329 RECEIVING AREA
24-60 24-60 24-60 24-60 24-60

GTR LG K 12a INTERNATIONAL

24-48
43 FOOD

24-42
LG H 04b

24-48
WALK-IN FREEZER & CABINET LG K 09b ESCALATOR PIT ABOVE LG K 10k
S

243 LG J 15
GA TANK

LG H 10 EL GTR

11
00 R MA
00

125 220 25 m² CONTAINERS 10 m² (BOTTOM LEVEL +4.550) MARKETING OFFICE 13 m²


CHILLER
50 WA CINE

DRY STORE

24-48
.

C3
C3 12 m²

24-48
LS

23 m² LG H 13 LG H 14 13 m²

BC
24-42 24-42

LG K 10

00
90

338 350 355 363 369 392 397 400 427 435 444 449 457 467 LG H 19

AJ
LG H 21
,0 TE

R1-2
R1-2 21 m² 17 m² LG N 24 MEETING
P. UP LL/

47 R1-2
R1-2 23 m² 345 m²

0
136

24-48
40 m² 113 m² ROOM 1
CA KE MA

314 GW
GW GW
GW WET GARBAGE GTR 24-60 24-60 24-60 24-60 24-60
24-42 24-42
MA S/

turnstile

254

3.7 CJ

24-48
FLOWER WAREHOUSE &

24-60
LG H 15 BEVERAGE STORE CASINO MAINTENANCE LG K 11
=2

COOLER
DC

SUNTRUST HOME
24-60 24-60 24-60 24-60 24-60 turnstile

52 148 WALK-IN FREEZER &

24-48
230 ROOM RECEIVING HYGIENE LAB BEVERAGE

24-60
A6

14 m² LG N 25 TEAM DINING ROOM 38 m²

24-42
A6

LG H 04c
112 FLOWER CHILLER
03

24-60
24 m² LG H 16 24-42 24-48 24-48
LG H 20 LG N 23 47 m² CHILLER LG N 02 LG J 23

24-48
9000

57 A5
A5 A2
A2
239 A2
A2 38 m² CHILLER 51 m² LG H 22 8 m² LG N 25a TRAINING ROOM 1 TRAINING ROOM 2 TRAINING ROOM 3
984 m² 98 m²

24-48
LG H 16a LG K 13 LG K 14 LG K 15

24-60
120 161 293 40 m²
24-42 24-42

C1
C1 C2
C2 25 m²

24-42
+2.000

24-48

24-42

24-60

24-60
R1 24-42

12 m²
24-48 24-48 24-60 24-60 24-60 24-60 24-60

N.SOILED 84 m²
-2-2 STAFF CARPARK SECURITY VESTIBULE 97 m² 93 m²
K

C3
C3
+2.000
AN

24-48
LMCP
A2

24-48
R3
R3 LINEN STORE 24-60
A2

67 129 169

90
BUNKER
LS RT

ENTRANCE LG H 15a
24-42 24-42

-1-1P A4
A4 EGG,DAIRY. SCHEDULING OFFICE
+1.950

040
A4
A4 JAN F.WC 1250MM(W) x 2800MM(H)

24-60
24-60

AC PLANTROOM C03 CABINET


GA TE

P LG M 23 LG H 18
292 LG M 22 5 m²
+2.000 *CRF-0050 LG K 12
+2.000
0 WA

00
)

LG M 07 LG M 08 (1HR FIRE SHUTTER) CHILLER


+1.950 / 1.150
LE

LG H 17 66 m²

24-60
turnstile

73 140
AB
,0 W

16 m² 14 m² 3 m² 14 m² RC HANGER WALL ABOVE LG N 26 50 m²

CK
20 RA

179
OT

turnstile

BD C2
C2 284 67 m²
+1.950 +1.950
(P
L

27 m²

0
24-42
P. RA

R3-15
R3-15

80 CHEF'S
NK
=1

R3
CA NT

24-42 24-42 24-60

WINDOW

24-60
-1-1P
TA
CE

OFFICE STORE
G)

VEG. MGR 1 MGR 2


+2.100 P
+2.000
24-42 24-60

DEVELOPERS, INC.
IN

24-60

24-60
LS R

192 REFRIGATION
347 BMS ROOM & LG N 02d COUNTER JAN
TE

UP
MEP
SH

24-48 24-60
CHILLER LG N 31 LG P 25a LG P 25b
WA

LU

& AC GARDE MANGER LG P 19

24-60
89 CALL CENTER 24-60

LG N 28a VEG. / FRUIT 9 m² 9 m² ENTRY GATE HEIGHT TO LG P 41 12 m² 17 m²


(F

137
+1.950

UV
GA

162 CARPENTER LIFT


+2.050
0, STIC

201 UP
GENERAL STORE PD LG M 25 C03
A3
A3

LG N 30 4 m²
9000

24-60
LG M 24 MATCH WITH TURNSTILE
NK

COMPRESSOR 8 m²
NUMBER OF CAR PARKING - LG : 611 PREP. AREA
0

24-60

LG M 09 20 m² PIT *CRF-0050
ME
00

LG M 02 GENERAL
TA

LMCP STORE

4.240
20 m² 23 m² 24-60
34 m² M.WC F.WC
CA LLDO

98 344 24-42 24-42 24-60

LG N 28 ROOM WALK-IN CHILLER


24-60 24-48 24-48 24-48

334
+2.000 81 m² BOH CORRIDOR CABINET
R
=6

FREEZER

24-60
215 m² LG N 02e

24-60

24-60
GA WATE

C3
C3 LG N 32 LG N 34a LG P 18 LG P 20 STRATEGY CHANNEL CASINO
MA
P.

APOLLO LOBBY 36 m² FILING

24-60
FES-22 STO. MGR M.WC LG M 04 24-60

LG N 27 FRUIT TEAM DINING MEETING


BO 16 m² RECEPTION 2 MEETING
LS

+2.000

LIFT
102 E.L.+ 2.10 m
ENGINEERING 13 m²
24-60

18 m²
24-60
LIFT PANTRY 28 m² 30 m² MARKETING OFFICE CUSTOMER SERVICES
00 IC

+1.950 H CO M.WC STORE


24-60

ROOM 3
GW
GW

LG M 03 LG M 06 3184 m² 44 m² CHILLER DISPATCH KITCHEN MGR 4 MGR 3


0, ST

79 A6
A6 346 OFFICE DISPATCH LG RRIDO PIT F. WC LG P 17a LG P 17b ROOM 2 LG P 25 LG P 26
=6 ME

1500MM(H) LG N 02c LG P 17e

24-60

24-60
0

12 m² 13 m² LG N 28b CHILLER POT WASHING LG N 34 LG P 17d LG P 25d LG P 25c

24-60
UP RAMP UP 1:20 STORM CHILLER N LG P 17c
P. DO

LG M 10 +1.950 33 03 R LIF LG N 02b 34 m² 21 m² 59 m² 440 m²

PIT
226
NK

87 19 m² LG N 30a LG N 33 LOW PARTITION 127 m² T PIT 13 m² 39 m² 36 m² 11 m² 15 m²


CA LL

WATER TANK LG N 28c 27 m²

24-36

)
LS TA

R1-2
R1-2

BE
LE

15 m²

24-60

24-60
77 m² PD
MA

A5
A5

24-60
17 m²

24-48
C3
C3

LIFT
SPRAY PD
AB

24-60

18 m²
GA AGE

T PIT
135 CUM 18 m²
24-48

PD
+2.000 PD
24-60
OT

HANDWASH
.

BOOTH DRY STORE


00 OR

93 MAIN KITCHEN CORRIDOR HS


(P

PAINT STO. MGR 1 MGR 2 MEETING

26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,


ESCALATOR PIT ABOVE

LIF M 30
STORP
5, ST

345

LIF
BOH CORRIDOR LG M 11a LG N 34b POT WASHING STO
LS NK

248 LG N 01 FIREMAN'S MGR 5

PIT
LG M 11b LG M 10a PANTRY MGR
0

LG
259 274 283 289 LG M 10b LMCP ROOM 4
=4 E

+1.950

T LO
LG
LIFT PIT

(BOTTOM LEVEL +4.550)


GA TA

CONSULTATION
G)

N E
P. FIR

LG M 04 LG N 34c
0, WA MA

70 10 m² LG M 10c 320 m² 9 m² LIFT LOBBY LG P 25e LG P 28a LG P 26d


IN

9 m²
.

139 171 184 207 219 234 VEG. SANITIZING


R

12 m² 12 m² CABINET LG P 27

31
NE

30 m² 05
SH

1B- LS -01 ROOM


CA LL

00 TE

3184 m² 8 m²

BBY

T PIT
MEAT DISPATCH 12 m² 5 m² MGR 1
P. STIC CI

9 m² LG N 04 1B- LS -03
+2.000 12 m²
MA

24-42 24-60 24-60 24-60

LIFT PIT
LU

AREA LEGAL UP


9000

21-36

29 m²
CA ME TER/

MEAT / POULTRY

24-60

24-60
343 LG P 23a
0

(F

297 333
WM

LG N 35 SEAFOOD PREP. CHILLER BAKING 36 m² STAFF OFFICE LG P 26a

LIF
64 100 CHILLER FINANCE OFFICE
LS NK
DO EA

PAINTER 10 m² PS-02
sieve

PASTRY

24-48
STORMWATER ELV AREA LG N 37d BAKERY 13 m²
=3

+1.950

24-48
EL ROOM TEAM DINING
GA TA
TH

31 m² LOUNGE MGR LG P 23 INTERNAL AUDIT


0, WA MA

LG N 37a LG P 17

PD
CCTV 08
LG M 11 1B- LS -02 CHILLER MEETING

Uptown Bonifacio, Fort Bonifacio, Taguig City 1634


.

STORAGE TANK LG N 39
R
NE

83 LG M 16 LG M 17 LG N 37 21 m² C03 LG N 40 KITCHEN (DISH WISHING)


00 TE

CHOCOLATE LG N 06 LG P 23b 13 m² OFFICE

24-48
GTR

24-48
29 m² 1B- LS -04
24-48

298 m² MGR 2
P. STIC CI

59 342 421 461 473 34 m² GENERAL *CRF-0050 35 m²


24-60 24-60 24-42 24-60
430 438 451 470 LG N 43a ROOM 7

020
LG M 01 17 m²
CA ME TER/

13 m² 96 m² 38 m² LG N 02a
A4
A4

ROOM
24-48

LG M 14 SEAFOOD DISPATCH 15 m² 12 m² LG P 28
0

24-48
1A- LS -07 1A- LS -08 WORKSHOP
24-48 24-48

LG P 26b

24-48
11 m² LG N 43b LG P 31

24-48
185 m² MEAT / POULTRY

BF 62 m²

24-60
1000

DO EA

24-60
76 138 170 185 206 218 233 247 258 275 280 290 R1-2
R1-2 10 m² LG M 12 MEAT / SEAFOOD CHILLER 24-48 24-48 24-48
62 m² 13 m²
=3

MGR
TH

CHILLER 26 m² LMCP

SBF
10 m²
GA NK

R3-14
R3-14 SANITIZING AREA LG N 37e
00 E MA

LIGHT 132 m² LG N 37b LG P 22a


.
TA

ICE-CREAM COMPLIANCE MGR CABINET

24-60
LS

R3-1P
R3-1P

LIFT LOBBY

24-60
NE

71 GW
GW 348 362 383 BULB STO. LG N 36 11 m² S.SOILED PD MGR 3

0
P. STOR CI

BAKERY CHILLER 12 m²

24-48

24-48
29 m² ROOM PD PRINT ROOM OFFICE LG P 30a
AG

LG M 15 -6-6P

PD
CA E TER/

ELECTRICIAN HOT PRODUCTION PASTRY IT & S LINEN STORE LG P 26c


0

24-48 24-60
61 30 m²
51
29 m² R2
R2 LG M 18a
+2.000 CLEAN VESTIBULE DRY STORE LG N 42 LG N 43c LG P 17k LG P 22 MEETING 14 m²

24-42

24-42
LG M 18 LG N 43
5,

24-60

GTR KITCHEN STORE


FIR EA

HANDYMAN ENGINEERING GTR LG N 11 13 m²

2148
15 m² LINEN STORE SEAFOOD MEETING ROOM 6 ELV EL
=4

LG N 08a LG N 41 16 m²
TH

C03 VESTIBULE LG N 08 LG N 38 28 m² DISPATCH 11 m² CLINIC MGR 1 MGR 2 MGR 3 MGR 4 9 m² 50 m² ENTERTAINMENT


*CRF-0050 +2.000 37 m² /KFI STO. 13 m² BAKERY FREEZE LG N 09
LG N 10
24-60 24-60

48 m² LG P 32 LG P 33
+1.950 LG M 27 GTR CHILLER 5 m² F.WC ROOM 5 LG P 29 GTR

2148
LG P 21 LG P 17fLG P 17g LG P 17h LG P 17j OFFICE VESTIBULE

OWNER/DEVELOPER
LG M 14a
9000

R3 A5
A5 478 LG M 12a LG M 26 52 m² LG N 07 LG N 37c 13 m² 61 m² 13 m² CHILLER 30 m² LG P 24 37 m² 15 m² 10 m²

24-48

24-48
-1P
-1P A1
A1 A2
A2 C2
C2 LG N 42a LG N 15 15 m² 12 m² 12 m² 12 m² 12 m² LG P 30 LG P 34 LG P 34a
+2.000/ 1.150 6 m² 14 m² 28 m² LG N 43d

2148
11 m² 24-42 24-48

28 m² 24-60 24-60 24-60 24-60

10 m²
24-60 24-48

29 m² CONSULTATION 25 m² 14 m²
10 m² 31 m² 8 m²
EL VESTIBULE 1250MM(W) x 2400MM(H) DISPATCH VESTIBULE JAN ROOM
M.WC ACC. WC
R3-1P
R3-1P

STORE 3 LMCP ESCALATOR PIT ABOVE LMCP LMCP

BG LG C 01 LMCP LG N 07a (1HR FIRE SHUTTER) CHILLER LG N 09a LG N 14 LG P 21a


ESCALATOR PIT ABOVE LG N 13 LG N 12
2000

LG M 29 CABINET (BOTTOM LEVEL +4.550) CABINET CABINET


9 m² 46
21 m²
CABINET C03 *CRF-0050
4 m² RC HANGER WALL ABOVE LG N 38a C03 *CRF-0050 5 m² (BOTTOM LEVEL +4.550) 3 m² 20 m² 6 m²
11 m²
R3 9 m²
-1P
SBG 49
-1P MGR 1 DIR 1 DIR 3 CASINO
379 386 394 402 408 415 428 442 454 469
103 114 127 142 160 174 189 204 217 232 245 257 273 282 288 295 313 316 341 353 356 366 371 C1
C1 LG P 36a IT & S MEETING LG P 13b 1A- LS -14 LG P 13d WORKSHOP
MEP
LAD
ELV EL NURSING 12 m² MEETING
ROOM DIVISION RECEPTION ROOM 8 VP OFFICE 12 m² 13 m² LG P 35
09

ROOM 9
LAD

96
LG M 28 BOH
08
LAD
LG N 20 LG N 21 ROOM DIR 2
1A- LS -11 1A- LP -07 SECURITY BUNKER OFFICE LG P 38d LG P 39 LG P 13a CASINO 190 m²
07

55
17 m² LIFT LOBBY LG M 20a EMERGENCY TRANSPORTATION HSP 9 m² 6 m² LG N 49 MGR 2 LG P 37 LIFT LOBBY LG P 13c
479 1A- LS -09 1A- LS -10 LG P 36 23 m² 48 m² 19 m² DIR 4
526 531 535 542 546 548 552 557 561 565 572 576 581 585 589
LAUNDRY RM
LAD

OFFICE STORE 2 LG P 36b 26 m² 12 m²


9000

62 LG M 21 22 m² WC
06 LAD
01

DIR 6 21 m² 168 m² LG P 14 LG P 13e


LG N 44
92
30 m² LG M 20b LG N 16 LAD
02
LG N 45 LG N 48a F&B OPS 11 m² 27 m² 13 m²
1A- LS -12 1A- LP -08

Project Title
54 m²
104 115 126 141 159 173 188 203 216 231 246 256 272 281 287 296 312 315 340 352 357 365 368 CARPARK 48 m² 40 m² OFFICE
+2.000 5
A5
A5

A5
A5

66
PS-12 UP 8 m² LAD 12 m²

BH
05

385 393 398 407 414 425 437 453 464 482 LIFT LOBBY LG N 48 DIR 5
380
+2.000 DIR 5 IT & S
2600

+1.950 CASINO
LAD
1
LG M 20
2 3 4 04

RESERVATIONS & 49 m² CASINO PRINT ROOM LG P 13f


0

000
LG N 48b STORE 1
489 56 m² PD MANAGEMENT OFFICE LIFT LOBBY C03 OFFICES
0
LAD
04

LG P 36c 14 m²
*CRF-0050
90
527 532 536 543 547 549 553 558 562 566 573 577 582 586 590 12 m² LG P 38a

SBH LG N 46 LG P 10 LG P 13
75
MGR 21 m² 10 m² DIR 6
499 510 52 m² DIR 4 40 m² 393 m²
+2.000 UP
R2-5P(R)
R2-5P(R)

OUT IN LG N 44a EXIT PASSAGEWAY LG N 48c MGR LG P 13g


A1
A1 A1
A1

0
PS-03 PS-04 UP

+2.000/ 1.150 A3
A3
12 m² LG N 47 12 m² 1A- LS -13 LG P 38b 13 m²
71
Westside City Phase 1 - Site B
C2
C2 C1
C1 35 m² EXIT PASSAGEWAY 14 m²
A1
A1 A1
A1
9000

C1
C1 LG P 16
VP OFFICE DIR 1 DIR 2 DIR 3 HSP STORE 4 61 m²
C2
C2 C2
C2

BJ 222 253 286 317 LG N 19d LG N 19c LG N 19b LG N 19a LG P 42 IT & S


A1
A1 C1
C1 HSP STORE 3 OFFICE
19 m² 12 m² 12 m² 12 m² 12 m² GTR VESTIBULE 2
59
336 337 349 361 367 375 412 420 443 A1
A1 A3
A3 LG N 50 LG P 38
12 m² LG P 40 LG P 40a
LMCP IT & S 232 m²
20 m² 15 m²
463 475 CABINET WORKSHOP

SBJ 384 389 BOH CORRIDOR


00
511
390 395 399 521 580 593 LG N 51 LG P 38c

90
480 484 486 530 541 569
409 413 424 433 441 556
13 m² 40 m²
488 491 493
494 AC PLANTROOM
600 BRIDGE COLUMN REFER
MGR 1
+2.000

Bagong Nayong Pilipino Entertainment


496 498 MGR 2 LG P 15
452 462 471 474 476 477 LG N 19f LG N 19e 181 m² SITE A DESIGN
504 509 513
9000

518 520 523


524 529 534
538 540 545 551 555 560 563 568 571
575 579 584 588 592 595
599
12 m² 12 m² +1.950
481 483 485 HSP & F&B OFFICES
LG N 19 MGR 3

70
487 490 492
164 m² LG N 19g
495 497
2
596 597 598 11 m²
59
SBK
503 508 512

City, Paranaque City


517 519 522 587 591 594
574 578 583

62'
525 528 533 564 567 570
537 539 544 550 554 559

CCTV 04 CCTV 07
LOW HEADROOM
(SOFFIT LEVEL +5.300)
LOW HEADROOM
(SOFFIT LEVEL +5.050)

CCTV 05 CCTV 06 LOW HEADROOM


(SOFFIT LEVEL +5.150) LOW HEADROOM
(SOFFIT LEVEL +5.200)
LOW HEADROOM
(SOFFIT LEVEL +4.950)
69
61'
Status
(ISSUED FOR APPROVAL)
1000

Discipline
69'
EXTRA LOW VOLTAGE
Drawing Title
53 CCTV LOCATION
9000 9000 9000 14400 9000 7600 9500 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000 9000

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 S53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68

SITE DEV'T PLAN SHEET 1 OF 2


17/07/2021 10:00:00 am

Drawn by Checked by Approved by


GSD JC GSC
Scale Issue Date Rev.
As indicated @ A3 JUL 17, 2021 1
Drawing Number

GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNCITY GROUP Ltd.
A B C

1 017/07/2021 ISSUED FOR APPROVAL

Rev. Date (D/M/Y) Description

#20 N. DOMINGO STREET, BRGY. VALENCIA, QUEZON CITY


TEL/FAX : (+632) 655-1111 LOCAL 813
TEL : (+632) 655-9164

General Contractor

Aedas (Macau) Lda


Avenida Xian Xing Hai No.105 Centro Golden
Dragon 7 andar D, Nape, Macao
T +853 2875 5530
F +853 2875 5531
macau@aedas.com

6 th Floor, Paseo Center,


8757 Paseo de Roxas Avenue, Salcedo
Village, Makati City, 1227, Philippines
T +632 867 8615
F +632 840 4384
information@casasarchitects.com

Architect
CONSULTING, INC.
FIRETECH, FIRE PROTECTION SYSTEMS
ENGINEERS CONSULTANTS
BASEMENT-1, MAKATI CINEMA SQUARE PASONG TAMO STREET, MAKATI CITY
TEL NOS. 8811-1777 8811-1778 E-MAIL ADDRESS nbf@globelines.com.ph FAX. NO. 8844-3667

CCTV 01 TUV Rheinland TUV Rheinland Philippines, Inc.


R

CCTV 09
G/F La Fuerza Bldg. 1, Don Chino Roces Ave.
Precisely Right.
1231 Makati City, Philippines

MEP Engineer

Structural Engineer

Project Manager

SUNTRUST HOME
DEVELOPERS, INC.
26th Floor, Alliance Global Tower, 36th St Cor, 11th Av.,
Uptown Bonifacio, Fort Bonifacio, Taguig City 1634
OWNER/DEVELOPER

Project Title
Westside City Phase 1 - Site B
Bagong Nayong Pilipino Entertainment
City, Paranaque City
Status
(ISSUED FOR APPROVAL)
Discipline
EXTRA LOW VOLTAGE
Drawing Title
CCTV INSTALLED

SHEET 1 OF 2
17/07/2021 10:00:00 am

Drawn by Checked by Approved by

CCTV 10 GSD JC GSC


Scale Issue Date Rev.
As indicated @ A3 JUL 17, 2021 1
Drawing Number

GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE CLIENT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY SUNCITY GROUP Ltd.

You might also like