STUDIO TYPE‐A
1 LIVING AREA CH1 75 1 75 9.9 106.56 0.70 0.60
STUDIO TYPE‐B
1 LIVING AREA CH1, D11 75, 11 1, 1 86 13.2 142.08 0.61 0.60
9 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.67 39.50 0.66 0.63
PRESIDENTIAL SUITE‐A
1 LIVING AREA CH1 75 1 75 11.38 122.49 0.61 0.60
7 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 4.84 52.10 0.50 0.63
PRESIDENTIAL SUITE‐B
1 LIVING AREA CH1 75 1 75 11.55 124.32 0.60 0.60
8 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.6 38.75 0.67 0.63
PRESIDENTIAL SUITE‐C
1 LIVING AREA CH1 75 1 75 13.52 145.53 0.52 0.60
7 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 5.64 60.71 0.43 0.63
2BHK TYPE‐A
1 LIVING AREA CH1 75 1 75 12.04 129.60 0.58 0.60
6 TOILET (ENTRANCE) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.47 37.35 0.70 0.63
9 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.2 34.44 0.75 0.63
2BHK TYPE‐B
1 LIVING AREA CH1 75 1 75 12.04 129.60 0.58 0.60
6 TOILET (ENTRANCE) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.47 37.35 0.70 0.63
9 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.2 34.44 0.75 0.63
2BHK TYPE‐C
1 LIVING AREA CH1 75 1 75 11.89 127.98 0.59 0.60
9 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 4.5 48.44 0.54 0.63
2BHK TYPE‐D
1 LIVING AREA CH1 75 1 75 11.87 127.77 0.59 0.60
6 COMMON TOILET D4, D5, D8 10, 10, 6 1, 1, 1 26 3.4 36.60 0.71 0.63
10 TOILET (BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.99 42.95 0.61 0.63
3BHK TYPE‐A
1 LIVING AREA CH1 75 1 75 11.55 124.32 0.60 0.60
8 COMMON TOILET D4, D5, D8 10, 10, 6 1, 1, 1 26 3.68 39.61 0.66 0.63
Lighting Power Density Calculation
12 TOILET (MASTER BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.69 39.72 0.65 0.63
8 COMMON TOILET D4, D5, D8 10, 10, 6 1, 1, 1 26 3.68 39.61 0.66 0.63
12 TOILET (MASTER BED ROOM) D4, D5, D8 10, 10, 6 1, 1, 1 26 3.69 39.72 0.65 0.63
GROUND FLOOR
1 PARKING, DRIVEWAY & RAMP L1 36 101 3636 2703 29095.09 0.12 0.11
BASEMENT‐3
1 PUMP ROOM L3 49 7 343 87.2 938.62 0.37 0.73
BASEMENT‐2
1 FAN ROOM-03 (MAKE UP) L3 49 5 245 50.5 543.58 0.45 0.73
BASEMENT‐1
1 ETS ROOM L1 36 8 288 130 1399.32 0.21 0.73
10 PARKING, DRIVEWAY & RAMP L1 36 117 4212 3771 40591.04 0.10 0.11
PODIUM‐4
1 ELECTRICAL ROOM L2 49 1 49 6 64.58 0.76 0.71
6 PARKING, DRIVEWAY & RAMP L1 36 145 5220 4240 45639.36 0.11 0.11
PODIUM‐3
1 ELECTRICAL ROOM L2 49 1 49 6 64.58 0.76 0.71
6 PARKING, DRIVEWAY & RAMP L1 36 145 5220 4240 45639.36 0.11 0.11
PODIUM‐2
1 ELECTRICAL ROOM L2 49 1 49 6 64.58 0.76 0.71
6 PARKING, DRIVEWAY & RAMP L1 36 145 5220 4240 45639.36 0.11 0.11
PODIUM‐1
1 ELECTRICAL ROOM L2 49 1 49 6 64.58 0.76 0.71
6 PARKING, DRIVEWAY & RAMP L1 36 145 5220 4240 45639.36 0.11 0.11
5 WORK ZONE BUSINESS CENTRE D1, CH1 11, 75 11, 1 196 53.5 575.87 0.34 1.00
12 ETS & CHILLED WATER PUMP ROOM L4 49 13 637 82.6 889.11 0.72 0.73
13 FIRE & DOMESTIC GRP TANK ROOM L4 49 8 392 65.5 705.04 0.56 0.73
12 ETS & CHILLED WATER PUMP ROOM L4 49 13 637 82.6 889.11 0.72 0.73
13 FIRE & DOMESTIC GRP TANK ROOM L4 49 8 392 65.5 705.04 0.56 0.73