Analisa Harga Satuan Upah Bahan & Alat

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 248

LAST UPDATE : 24 JANUARI 2018

COST
ITEM SATUAN SAT HARGA SAT
CODE

Pintu Frameles 12mm tempered +accssesoris Dorna 80 unit 11,500,000

Curtain wall rangka mulion + kaca clear 8 mm powder coating + silicone m2 875,000

ACP Satandar Seven DAIHATSU Rangka Hollo besi + Silicone ( merah + putih ) m2 945,000

Kosen Aluminium 3'' powder coating putih + silicone putih m1 145,000

Pintu swing rangka aluminium atas kaca bawah spandrel + Accssesoris pcs 3,850,000

Jendela casment + kaca + kunci + silicone pcs 925,000

Kaca 6 mm clear terpasang m2 250,000

Kaca 8 mm clear terpasang m2 350,000

Kaca 10 mm clear terpasang m2 450,000

Kaca Tempered 12 mm m2 800,000

Pintu framles accessoris dorma BTS 75 pcs 8,500,000

Gypsum ex. Jayaboard

Plafond Gypsum 9 mm terpasang m2 105,000

Plafond Gypsum 12 mm Terpasang m2 135,000

List Shadowline ml 18,000


Box 25 x 25 ml 105,000

Partisi 9 mm rangka double m2 240,000

Flexi aerodinamis Acrilik 10 mm, + Stiter orakal tranlvtion + Lampu LED include trapml 1,200,000

Pintu HPL 240x85x4 unit 3,000,000


Lemari Multuplek t = 12 mm lapis Tacon warna abu-abu p=250, l=60, t=60 unit 6,250,000
Lemari Multuplek t = 12 mm lapis Tacon warna abu-abu p=250, l=40, t=120 unit 6,250,000
Lemari Multuplek t = 12 mm lapis Tacon warna abu-abu p=200, l=60, t=60 unit 5,000,000
Lemari Multuplek t = 12 mm lapis Tacon warna abu-abu p=200, l=40, t=120 unit 5,000,000

Partisi cubicelltoilet
uk 2100x980x50 3,150,000
uk 2100x1000x50 3,150,000
uk2100x480x50 1,500,000
uk2100x160x50 5,000,000

Paving 4.8 KT-400 Abu (Termasuk topi uskup) /m2 85,000


Paving Warna KT-400 /m2 110,000

Kanstein 15x25x40 /m1 65,000


Harga : JAKARATA
KETERANGAN

Sobccont. Karjo
Pak Yanto. 0877 8133 7076

Bisa nego
Pak Mulyadi 081389910486

PT. Focon indonesia


Bpk. Ir. Andre Hadi Wijaya
Hp. 085100236499 / 08155105399
32500
PEKERJAAN ARSITEKTUR
PT. ASTRA INTERNATIONAL TBK - DSO

LAST UPDATE : 24 JANUARI 2017


COST
CODE ITEM SATUAN SAT HARGA SAT

Material alam

Material Tanah Merah m3 95,000


Material Batu Kali Belah m3 140,000
Material Abu batu m2 110,000
Material Split 1/2 m3 315,000
Material Split 2/3 m3 315,000
Material Base cose m3 200,000
Material Sirtu m3 165,000
Material Sirdas m3 70,000
Material Tanah Urug m3 95,000
Material Parir Urug m3 85,000
Material Pasir Beton m3 275,000
2005 Material Pasir Pasang m3 155,000
2008 Material Bata Merah bh 700
Material Batako bh 4,000
Hable/celcone m3 600,000
Multiplek 12 mm m2
Triplek 4 mm 122x244 m2 62,500
Triplek 6 mm 122x244 m2 76,500
Triplek 9 mm 122x244 m2 155,000
Triplek 12 mm 122x244 m2 195,000
Triplek 16 mm 122x244 m2 265,000
Kayu -/m3 3,500,000
Plastik Cor m2 3,000 Terbaru
Paku kayu kg 25,000
Paku beton kg 45,000
Material pondasi Beton abadi prima PT. Karya Pondasi
Mini Pile 200 x 200 mm m1 95,455 90,000
Pemancangan + Handing + Las joint m1 35,000
Mob Demob Alat pancang Unit 50,000,000 25,000,000

Material readymix PT. DUTA BANGSA MANDIRI PT. MERAK JAYABETON


Readymix K250 m3 850,000 685,000
Readymix K300 m3 900,000 715,000
Readymix K400 m3 1,050,000 775,000
Integral/m3 = 2,5 liter m3 928,125
Water Stop 26 m 2,970,000
Pompa IHI LONG BOOM 4 Sewa 4 jam 3,500,000
Pompa IHI LONG BOOM 8 Sewa 8 jam 4,000,000
Pompa STANDART 4 Sewa 4 jam 3,000,000
Pompa STANDART 8 Sewa 8 jam 3,500,000
Harga Terbaru 24 J
Material pembesian 8,727 8,727
Besi Ulir (Deform) D 10mm kg 9,600
Besi Ulir (Deform) D 13mm kg 9,000
Besi Ulir (Deform) D 16mm kg 9,000
Besi Ulir (Deform) D 19mm kg 9,000
Besi Polos Ø 8mm kg 9,000
Besi Polos Ø 10mm kg 9,000
Besi Polos Ø 12mm kg 9,000
Besi Polos Ø 16mm kg 9,000
Besi Polos Ø 19mm kg 9,000
Wiremash M6 m2 34,380 389,865
Wiremash M7 m2 46,769 530,357
Wiremash M8 m2 66,492 754,014
Wiremash M10 m2 99,732 1,130,960
Kawat Bendrat kg 20,000

2016 Material semen ( up date terakhir : 24 JANUARI 2017 )


Tiga Roda @40 kg zak 50,000
AM100 cement waterproofing ( 1 ltr + 1.5 kg ), ( Cairan + Bubuk ) ltr mix 94,739 165,000
MU-200 @40 kg ( acian beton / skim coat ) zak 168,500
Semen ex. Sika Grout - 215 @ 25 kg/zak zak 145,000
Nad Keramik MU kg 19,500
Waterprofing membrane m2 200,000
10,080
1,120
Material baja
- Wide Flange (WF) Harga terbaru 24 Januari 2018
WF 150x75x5x7 kg 12,513 12,600
WF 200x100x5,5x8 kg 12,513 12,600
WF 250x125x6x9 kg 12,513 12,600
WF 300x150x6,9x9 kg 12,513 12,600
- Besi Kanal C / Lip Channel (CNP)
CNP 100x50x20x1,6 kg 12,513 12,600
CNP 100x50x20x2,3 kg 12,513 12,600
CNP 100x50x20x3,2 kg 12,513 12,600
CNP 125x50x20x2,3 kg 12,513 12,600
CNP 125x50x20x3,2 kg 12,513 12,600
CNP 150x50x20x2,3 kg 12,513 12,600
CNP 150x50x20x3,2 kg 12,513 12,600
CNP 150x65x20x2,3 kg 12,513 12,600
CNP 150x65x20x3,2 kg 12,513 12,600
CNP 200x75x20x3,2 kg 12,513 12,600
- Besi Kanal / Channel (UNP)
UNP 5 (50x38x5) kg 12,513
UNP 10 (100x50x5) kg 12,513
UNP 12 (120x55x6) kg 12,513
UNP 15 (150x75x6,5) kg 12,513
UNP 20 (200x80x7,5) kg 12,513
- Besi Siku / Angel Bars
Siku 30x30x3 kg 12,513
Siku 40x40x3 kg 12,513
Siku 40x40x4 kg 12,513
Siku 40x40x5 kg 12,513
Siku 50x50x4 kg 12,513
Siku 50x50x5 kg 12,513
Siku 50x50x6 kg 12,513
Siku 60x60x5 kg 12,513
Siku 60x60x6 kg 12,513
Siku 70x70x6 kg 12,513
Siku 70x70x7 kg 12,513
- Besi Plat Hitam
1,2 x 1200 x 2400 mm kg 12,513
1,4 x 1200 x 2400 mm kg 12,513
2 x 1200 x 2400 mm kg 12,513
3 x 1200 x 2400 mm kg 12,513
3,2 x 1200 x 2400 mm kg 12,513
4 x 1200 x 2400 mm kg 12,513
5 x 1200 x 2400 mm kg 12,513
8 x 1200 x 2400 mm kg 12,513
10 x 1200 x 2400 mm kg 12,513
12 x 1200 x 2400 mm kg 12,513
16 x 1200 x 2400 mm kg 12,513
- Besi Palt Strip
3 x 20 mm kg 12,600
6,2 x 38 mm kg 12,600
Angkur baut Ø 12 mm, L=600 mm ( ST.41 ) bh 35,000
Angkur baut Ø 16 mm, L=600 mm ( ST.41 ) bh 65,000
Angkur baut Ø 19, L=600 mm ( ST.41 ) bh 95,000
Baut Ø 12mm ( A.325 ) bh 7,500
Baut Ø 16mm ( A.325 ) bh 10,500
Baut Ø 19mm ( A.325 ) bh 12,500
Turnbuckle Ø 16 mm bh 73,500
Turnbuckle Ø 19 mm bh 88,000
Dynabolt Ø 19mm bh

2026 Material keramik, granite, marmer ( up date terakhir : 27 FEBRUARI 2015 )


Keramik uk. 60x60cm type Grey Stone Unpolished ex. Granito m2 212,960
Homogenous tile uk. 60x60cm type Grey Stone Unpolished ex. Granito m2 212,960
Granite tile uk. 60x60cm type Grey Stone Polished ex. Granito m2 242,000
Granite tile uk. 60x60cm type Salsa Crystal Black Polished ex. Granito m2 300,960
1 Keramik uk. 40x40cm type Abu-abu ex. Roman m2 78,000
2 Keramik uk. 40x40cm type White G 447106 ex. Roman m2 110,000
Keramik uk. 60x60cm type Nordik Hitam ex. Niro Granit m2 226,800
3 Keramik uk. 20x20cm type ex. Roman Venere Mocha Type G220503 m2 95,000
4 Keramik uk. 20x40cm type Serenity White W40106 ex. Roman m2 110,000
Allia HY-H2002 PT White smorth (20x20) m2 121,800
Verona BA-PA6001SSSSerpegieante White Pol (30x60) m2 128,016
HARGA GAIAMARU VINYL TILE Lebar x Panjang ( 184 mm x 950 mm) Type GMR Vinyl Flm2 185,000
Lem Kuning Crona 171 Sheet Solvent Based 10 Kg kg 47,000
HPL tipe Premier White ex Taco lbr 275,000
Floor Hardener kg 35,000 2,600
ANTISOL E 125, ex. Sika 20kg/20lt 712,000 15,600
Material dinding 47,467 9,493
Gypsum Board 9 mm uk. 1200×2400 lbr 80,000
Gypsum Board 12 mm uk. 1200×2400 lbr 96,000
Gypsum Board 9 mm uk. 1200×2400 – wet area lbr 115,000
Gypsum Board 13 mm uk. 1200×2400 – wet area lbr 174,000
GRC Versaboard 9mm lbr 150,000
Compound 20 kg sak 90,000
Hollow Galvanis 2x4x0.35 – 4 m btg 22,000
Hollow Galvanis 4x4x0.35 – 4 m btg 29,000
Hollow Meni 2x4x0.30 – 4 m btg 18,000
Hollow Meni 4x4x0.30 – 4 m btg 23,000
Clip Hollow 2×4 bh 800
Clip Hollow 4×4 bh 1,000
Tie rod 6 mm – 1 m bh 4,000
U Clamp Hollow 4×4 btg 1,500
Ramset + Mesiu set 2,000
TextileTape roll 10,000
Screw 700 pcs dus 75,000
Wall Angle Galvanis – 3 m btg 12,000
Shadow line – 3 m btg 25,000

Pintu PVC 800x1900 unit 950,000

2027 Material cat


Sealer interior Pail 851,000
ltr 42,550
Cat emulsion ex. Jotun Majestix Base Mate A Pail 1,350,000
ltr 67,500
Cat Acrylic Emultion Paint ex. Mowilex E100 Pail 1,250,000
ltr 62,500
Sealer exterior Pail 851,000
ltr 42,550
Super White ( ex. ICI Dulux) Pail 1,250,000
ltr 62,500
Kansai F Talit Hella Grey (zinc chromate primer ltr 51,900
Kansai Super White ltr 53,900

Teknokote white Pail 851,000


ltr 42,550
Putih ( ex Mowilex) minyak ltr 45,000
Tiner ltr 12,500
Kuas 2'' bh 8,000
Kuas 4'' bh 16,000
Roll 4'' bh 17,500
Roll 10'' bh 45,000

2035 Material sanitair ( up date terakhir : 23 NOVEMBER 2017 )


Closet Duduk ex. TOTO type SW660J unit 2,750,000 6,850,000
Closet Jongkok type CE 6 ex. Toto unit 720,000
Jet Washer ex. TOTO type TX403SB unit 399,840
Paper Holder ex. TOTO type TX703AESV1 unit 550,000
Urinal ex. TOTO type U57M unit 2,486,400
Partisi Urinal ex. TOTO type A100 unit 1,243,200
Floor Drain ex. TOTO type TX1DB unit 474,400
Hand Dryer ex. TOTO type TYC322WF unit 4,872,000
Wastafel ex. TOTO type LW641NJ unit 5,960,640 3,000,000
Kran Wastafel ex. TOTO type TX115LESN unit 1,537,200
Tempat Sabun + tatakan ex. TOTO type TS125R unit 404,880
Tempat Sabun + tatakan ex. TOTO type TX706AES unit 318,360
Kran ex. TOTO type T23BQ13N unit 350,000
Kran ex. TOTO type TX 115 LESBR unit 500,000
Kran tipe Y 20 X ex San-Ei unit 75,000
Kran Sink ex. TOTO type T 30 AR 13 V 7 ( N ) unit 715,000
Kloset jongkok ex. TOTO type CE9 unit 3,200,400
Fixed Shower Head ex. TOTO type TS422S unit 1,503,600
Fixed Shower Head ex. TOTO type TX421SGNC unit 898,800
Gantungan Pakaian ex. TOTO type TS118WSB unit 165,480
FRP u/ saringan lemak ( fiber glass) unit 1,500,000
Kitchen set ex. Royal type clara unit 585,000
2036 Material atap
Zelltech
ZT-01B Al-Bubble-Al, 350 gr/m2. t=4mm, uk. 1.2mx40m=48m2, roll 2,304,000
m2 48,000
ZT-01BF Al-FR Bubble-Al, 350 gr/m2. t=4mm, uk. 1.2mx40m=48m2, roll 2,448,000
m2 51,000
ZT-04BBF Al-FR Big Bubble-Al, 430 gr/m2. t=8mm, uk. 1.2mx30m=36m2, roll 2,494,800
m2 69,300
ZT-01BFW Al-FR Bubble-Al Woven, 390 gr/m2. t=4mm, uk. 1.2mx40m=48m2, roll 2,798,400
m2 58,300
ZT-02BFW Al-EPE Foam-Al Woven, 385 gr/m2. t=5mm, uk. 1.2mx30m=36m2, roll 2,304,000
m2 64,000
ZT-05BBR Al-FR Bubble-Al Woven, 490 gr/m2. t=8mm, uk. 1.2mx30m=36m2, roll 2,890,800
m2 80,300
Accessories
Metalized Tape Uk=9.6mm x 45 m roll 40,000
m1 889
Zincalume Strip Uk= 5cm x 40 m roll 230,000
m1 5,750
Skylight fiberglass anti UV
Type Ultra 2400 gsm t - 1,5mm ex. Alsynite m1 228,000 205,200
m2 202,920
Penutup Atap Ex. Jaido metal
Zink aluminium USR t=0.45 mm, ex. Jaindo Metal m1 103,640
Lebar efekitif 1.005 m2 103,640

ULT-7 tebal 0.45 mm BMT, LEBAR efektif 890 m1 80,300 Ex Utomodeck


m2 90,225

Nok Atap m1 103,640


Zink aluminium USR t=0.45 mm, ex. Jaindo Metal Lebar eff= 1219 mm m2 103,640

Cladding UKS
Zincalume Type UKS 0,45mm ex. Jaindo Metal Industries m1 29,528
Lebar efektif 266mm m2 147,638

2037 Material Luar


Paving block K-400 termasuk topi uskup {1 m2=43 pcs, -/m2 85,000

Buis beton ex. Lisa Concrete Indonesia K-350


Uk 30 x 1.25 Klas L. Witera bh 224,000
Uk 40 x 1.25 Klas L. Witera bh 336,000
Uk 60 x 1.25 Klas L. Witera bh 700,300
Saluran Type U- DITCH
U- Dicth uk. 500 mm x 1200 bh 588,000
Tutup U- Dicth Dia. 640 x 132 x 600 HD bh 196,000
Tutup U- Dicth Dia. 940 x 142 x 600 HD bh 333,000

Polycarbonate Twinlite uk. 2,1 m x 11,8 m t=5 mm roll 2,495,000


m2 100,686
Matt ex 3M m2 56,000
Acrilic t=12mm (1200x2400) lbr 1,750,000
flexi + Sticker Transclucent col Daihatsu red 3M Schochcal TP. 3214 Carmine m1 300,000

2038 Material Pintu


Pintu Framles 12 mm Tempered +accessories ex. Dorna BTS 80 - 53 NM (EN 6) Unit 11,500,000
Curtain Wall rangka mulion + Kaca clear 8 mm powder coating + silicon m2 875,000
ACP Standar Daihatsu rangka hollo besi + silicon (merah dan putih) m2 900,000
Kusen alumunium 3" Powder coating white silicon putih m1 145,000
Pintu swing rangka alumunium atas kaca bawah spandrel pcs 3,800,000
Jendela casment +kaca + kunci + silicon pcs 925,000
Kaca 6 mm terpasang m2 250,000
Kaca 8 mm terpasang m2 350,000
Kaca Tempered 12 mm m2 800,000
Pintu Framless Accessoris dorna BTS 75 pcs 8,500,000

ACP ex. Seven QS-3111 Red tebal alumunium = 0.5mm, uk. 1220x4820mm m2 385,000 2,263,954
ACP ex. Seven QS-3103 White tebal alumunium = 0.5mm, uk. 1220x4820mm m2 385,000 2,263,954

ACP ex. Seven QS-3111 Red tebal alumunium = 0.3mm, uk. 1220x4820mm m2 280,000 1,646,512
ACP ex. Seven QS-3103 White tebal alumunium = 0.3mm, uk. 1220x4820mm m2 280,000 1,646,512

Hollow alumunium 40x40x2 P=6 m' m1 37,500


Hollow alumunium 20x40x2 P=6 m' m1 30,833
Siku 1cmx1cm m1 10,833
Skerup (1 kotak 100 bh) ktk 52,500
Spond lbr 225,000
Sealand bh 35,000

Material Alat
Sewa Stamper Kuda 295,000
Sewa Stamper Kodok 295,000
Sewa Vibrator 295,000
Sewa Trowel 295,000
Sewa Beton Cutter 695,000
Sewa Chain Saw 295,000
Sewa Mesin Poles Lantai 395,000
Sewa Mesin Poles Dinding 395,000
Sewa Mesin Blower Listrik 225,000
Sewa Katrol / Chainhoist 750,000
Sewa Mortar Spray ?
Sewa Bor Dinding 345,000
Sewa Mesin Las 450,000
Sewa Aluminium Cutter 295,000
Sewa Baby Roller 495,000
Sewa Bar Bender per Bulan 4,500,000
Sewa Genset 750,000
Sewa Bar Cutter per Bulan 4,500,000
Sewa Scaffolding 45,000
Sewa Mesin Bongkar 345,000
Gerinda Beton / Lantai 345,000
Sewa Jack Hammer 245,000
Sewa Molen 345,000
HARGA UPDATE
HARGA KOSONG
HARGA LAMA
Harga : PASURUAN

KETERANGAN

sirdas 80000
95000-100000

Supplier Pak Japon

ya Pondasi
sebelum PPn

RAK JAYABETON

114230.769230769 -/m1

Harga terbaru 06 April 2018


9,650 PPn
8,685 sebelum PPn harga terima dilo - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn - 300
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn

di terima di tempat

1 kg 4 m2

11280

Harga terbaru 06 April 2018 Harga sebelum PPN


13,750 PPn 11954.5454545 11,455
12,513 sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
Berat CNP 150x65x3.2x6 = 40.56 kg
sebelum PPn 11954.5454545 11,455 6.76
sebelum PPn 11954.5454545 11,455 516600
sebelum PPn 11954.5454545 11,455 341230.9091
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455
sebelum PPn 11954.5454545 11,455

sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn

sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn

sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn
sebelum PPn 63,900
sebelum PPn

sebelum PPn
sebelum PPn
44,300
63,900
83,500
4,400
7,200
10,800
83,700
98,400

170368
42592 0.2
sebelum diskon 40% 170368 266,200
sebelum diskon 40% 212960 266,200
sebelum diskon 40% 193600 302,500
sebelum diskon 40% 240768 376,200

0.16
Discont 36% PT. Sehati Abadi 102312 145,000
Discont 36% PT. Sehati Abadi 107533.44 152,400 sales.projectsby@romanceramic.com

Sobkont Sugianto 0822 1132 2656


1 Pail = 20 liter Harga Mitra 10

1 Pail = 20 liter

1 Pail = 20 liter

1 Pail = 20 liter

1 Pail = 20 liter

1 Pail = 22.5 liter 38,682


4,835

Surya Pertiwi, Discount 36%, exclude PPN 2520000 3,000,000

Surya Pertiwi, Discount 36%, exclude PPN 399840 476,000


Surya Pertiwi, Discount 36%, exclude PPN 425880 507,000
Surya Pertiwi, Discount 36%, exclude PPN 2486400 2,960,000
Surya Pertiwi, Discount 36%, exclude PPN 1243200 1,480,000
Surya Pertiwi, Discount 36%, exclude PPN 344400 410,000
Surya Pertiwi, Discount 36%, exclude PPN 4872000 5,800,000
Surya Pertiwi, Discount 36%, exclude PPN 5960640 7,096,000
Surya Pertiwi, Discount 36%, exclude PPN 1537200 1,830,000
Surya Pertiwi, Discount 36%, exclude PPN 404880 482,000
Surya Pertiwi, Discount 36%, exclude PPN 318360 379,000
Surya Pertiwi, Discount 36%, exclude PPN 381360 454,000

Surya Pertiwi, Discount 36%, exclude PPN 240240 286,000


Surya Pertiwi, Discount 36%, exclude PPN 3200400 3,810,000
Surya Pertiwi, Discount 36%, exclude PPN 1503600 1,790,000
Surya Pertiwi, Discount 36%, exclude PPN 898800 1,070,000
Surya Pertiwi, Discount 36%, exclude PPN 165480 197,000
1,500,000
CV. Linggojati Utama

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa

Harga belum PPN PT. Cellcius Indoperkasa


0.2
discont 30% PT. Alderon Patam Indonesia 228000 285000

PT. Jaindo Metal Industries


discont 30%

Harga belum PPN PT. Otomodect


0.2

diskont 30% PT. Jaindo Metal Industries 82912 129550


0.07

diskont 17.5% PT. Jaindo Metal Industries 29527.5 31750

Harga belum PPN PT. Focon Indonesia Ir. Andre Hp. 085100236499, 08155105399

PT. Lisa Concrete Indonesia. Surabaya


Harga termasuk transport, belum termasuk penurunan

12 29 60763.88889

Sobcont Bpk. Karjo

/Lembar 1220x4820 {harga 27,5 dolar/m2} PT. SEVEN SURABAYA JAYA


/Lembar 1220x4820 Komp. Pergudangan Sinar Gedangan F6 - F7 Gemurung, Gedangan, Sidoarjo - 61254
Telp : 031-8915737 ; 031-8916447 ; 031-8910041 ; 031-8910048 ; 031 – 8917422 ; 031-8917423
/Lembar 1220x4820 {harga 20 dolar/m2} Fax : 031-8915790
/Lembar 1220x4820 Email : marketingsevensurabaya@yahoo.co.id
WA 081333222062
A/N AGUNG HUDI
; 031-8917423
DATA DAFTAR HARGA SATUAN UPAH BORONGAN PEKERJAAN
LOCO DKI JAKARTA DAN SEKITARNYA
PT. SURYACENDRA PURAMEGAH
MANDOR :
LAST UPDATE : JUNI 2015 ( HARGA TERBARU )
COST
CODE ITEM SATUAN SAT

I UPAH HARIAN PEKERJAAN


1 Upah harian mandor hari
2 Upah harian wakil mandor hari
3 Upah harian tukang gali hari
4 Upah harian tukang bobok hari
5 Upah harian tukang batu hari
6 Upah harian tukang keramik hari
7 Upah harian tukang kayu bekisting hari
8 Upah harian tukang kayu halus hari
9 Upah harian tukang besi hari
10 Upah harian tukang cor hari
11 Upah harian pembantu tukang/knek hari

II UPAH BORONGAN PEKERJAAN STRUKTUR


A PEKERJAAN PERSIAPAN
1 Upah borongan pasang bouwplank m1
2 Upah borongan direksi keet 1 lantai m2
3 Upah borongan direksi keet 2 lantai m2
4 Upah borongan gudang & loss kerja m2
5 Upah borongan buat toilet sementara + septitank m2
6 Upah borongan bedeng pekerja m2
7 Upah borongan pagar seng sementara rangka kayu + pondasi m1
8 Upah borongan pasang partisi sementara plywood + cat m2
B PEKERJAAN PONDASI TIANG
1 Upah borongan pancang kayu dolken dia. 8 ~ 10 cm ttk
2 Upah borongan bobok & stek pondasi borepile s/d dia 60 cm ttk
3 Upah borongan bobok & stek pondasi borepile s/d dia 40 cm ttk
4 Upah borongan bobok & stek pondasi borepile s/d dia 30 cm ttk
5 Upah borongan bobok & stek pondasi tiang pancang s/d dia 50 cm ttk
6 Upah borongan bobok & stek pondasi tiang pancang s/d dia 30 cm ttk
7 Upah borongan bobok & stek pondasi tiang pancang s/d dia 25 cm ttk
8 Upah borongan bobok & stek pondasi tiang pancang s/d dia 20 cm ttk
9 Mobilisasi dan dimobilisasi alat pancang ls
10 Upah borongan pengelasan pancang ttk
11 Upah borongan pancang dan handing m1
12 Upah borongan handing m1
C PEKERJAAN BOBOKAN
1 Upah borongan bobok dinding bata 1/2 batu m2
2 Upah borongan bobok lantai beton s/d tebal 10 cm m2
3 Upah borongan bobok lantai beton s/d tebal 10 - 20 cm m2
4 Upah borongan bobok keramik lantai termasuk screed dibawahnya m2
5 Upah borongan bobok konstruksi balok beton, pondasi beton dll. m3
6 Upah borongan bobok konstruksi beton struktur dak & tangga m3
7 Upah borongan buang puing bekas bobokan sejauh max = 20 m m3
8 Upah borongan bobok plafon , rangka termasuk buang max = 20m m2
9 Upah borongan bongkar pintu & jendela termasuk buang max = 20m m2
10 Upah borongan bongkar sanitair termasuk buang max = 20m unit
D PEKERJAAN TANAH
1 Upah borongan stripping tanah s/d tebal 10 cm incl buang max = 20m m2
2 Upah borongan galian tanah biasa s/d 1.5 m (manual) m3
3 Upah borongan galian tanah biasa 1.5 s/d 3 m (manual) m3
4 Upah borongan galian tanah cadas s/d 1.5 m (manual) m3
5 Upah borongan galian tanah cadas 1.5 s/d 3 m (manual) m3
6 Upah borongan urugan kembali m3
7 Upah borongan buang tanah bekas galian max 20 m m3
8 Upah borongan buang tanah bekas galian lebih dari 20 m m3
9 Upah borongan perataan & pemadatan m2
10 Upah borongan urugan pasir t = 10 cm jarak max 20 m + pemadatan m2
11 Upah borongan urugan sirtu t = 20 cm jarak max 20 m + pemadatan m2
Upah borongan urugan basecouse t = 20 cm jarak max 20 m + pemadatan m2
12 Perapian galian Excavator m2
E PEKERJAAN STRUKTUR BETON & BAJA
1 Upah borongan lantai kerja / screed m2
2 Upah borongan loss formwork bataco m2
3 Upah borongan pasang & bongkar bekisting kolom m2
4 Upah borongan pasang & bongkar bekisting dinding plat m2
5 Upah borongan pasang & bongkar bekisting balok dan plat lantai m2
6 Upah borongan pasang & bongkar bekisting relat lantai m1
7 Upah borongan pasang & bongkar bekisting tangga m2
8 Upah borongan pasang & bongkar sloof pondasi m2
9 Upah borongan transport bekisting ketinggian 1 lt m2
10 Upah borongan pasang perancah / support m2
11 Upah borongan pasang scaffolding m2
12 Upah borongan bongkar scaffolding m2
13 Upah borongan pasang besi tulangan complete manual kg
14 Upah borongan pasang besi tulangan complete manual, Pile Cap kg
15 Upah borongan pasang besi tulangan complete manual, Tie Beam kg
16 Upah borongan pasang besi tulangan complete manual, kolom Lt.1 &2 kg
17 Upah borongan pasang besi tulangan complete manual, balok Lt.2 & atap kg
18 Upah borongan pasang besi tulangan complete manual, plat Lt.1 kg
19 Upah borongan pasang besi tulangan complete manual, plat Lt.2 kg
20 Upah borongan pasang besi tulangan complete manual, tangga kg
21 Upah borongan pasang besi tulangan complete dengan bar cutter/bending kg
22 Upah borongan pasang besi wiremesh incl. kaki ayam m2
23 Upah borongan transport besi ketinggian 1 lt kg
24 Upah borongan pasang bondek + shear connector + support m2
25 Upah borongan cor readymix dengan pompa m3
26 Upah borongan cor readymix dengan pompa ( Pile Cap ) Lt.1 m3
27 Upah borongan cor readymix dengan pompa ( Tie Beam ) Lt.1 m3
28 Upah borongan cor readymix dengan pompa ( Kolom ) Lt.1 m3
29 Upah borongan cor readymix dengan pompa ( Kolom ) Lt.2 m3
30 Upah borongan cor readymix dengan pompa ( Balok ) Lt.2 m3
31 Upah borongan cor readymix dengan pompa ( Balok ) Lt.Atap m3
32 Upah borongan cor readymix dengan pompa ( Plat ) Lt.1 m3
33 Upah borongan cor readymix dengan pompa ( Plat ) Lt.2 m3
34 Upah borongan cor readymix dengan pompa ( Plat ) Lt.Atap m3
35 Upah borongan cor readymix dengan pompa ( Tangga showroom ) m3
36 Upah borongan cor readymix manual max jarak 20 m m3
37 Upah borongan cor sitemix m3
38 Upah borongan finish beton halus ( trowel ) m2
39 Upah borongan pasangan batu kali m3
40 Upah borongan pasangan batu kali expose m3
41 Upah borongan fabrikasi dan erection struktur konstruksi baja kg
42 Upah borongan cat konstruksi baja zinchromate + finish kg
43 Upah borongan pasang plastik cor m2
44 Upah borongan tangga beton unit
III UPAH BORONGAN PEKERJAAN FINISHING
A PEKERJAAN PASANGAN DINDING
1 Upah borongan pasangan bata 1/2 batu m2
Upah borongan pasangan bata 1/2 batu + kolom & balok praktis m2
2 Upah borongan pasangan bata 1 batu m2
3 Upah borongan pasangan dinding bataco m2
4 Upah borongan pasangan dinding celcon/hebel m2
5 Upah borongan kolom praktis & ringbalk dinding m1
6 Upah borongan plaster t = 2.5 cm ( pasir + semen ) m2
7 Upah borongan plaster t = 1.5 cm ( drymix/MU ) m2
8 Upah borongan acian dinding m2
9 Upah borongan tali air / benangan / profil dinding m1
13 Upah borongan Braben/ Kamprot m2
14 Upah borongan pasang plint keramik + tali air semua ukuran m1
B PEKERJAAN PASANGAN LANTAI
1 Upah borongan waterproofing coating m2
2 Upah borongan screeding lantai t = 5cm m2
3 Upah borongan pasang keramik lantai s/d 20x20 m2
10 Upah borongan pasang keramik dinding s/d 20x20 m2
11 Upah borongan pasang keramik dinding 30x30 s/d 60x60 m2
12 Upah borongan pasang dinding granite m2
4 Upah borongan pasang keramik lantai 30x30 s/d 60x60 m2
5 Upah borongan pasang lantai marmer incl. polish m2
6 Upah borongan pasang lantai granite m2
7 Upah borongan bikin groove m1
8 Upah borongan pasang skirting keramik / granite m1
9 Upah borongan pasang skirting kayu m1
10 Upah borongan pasang skirting aluminium m1
C PEKERJAAN PASANGAN PARTISI & CEILING & PINTU
1 Upah borongan pasang partisi gysum rangka single hollow m2
2 Upah borongan pasang partisi gysum rangka double hollow m2
3 Upah borongan pasang partisi gysum rangka metal furing m2
4 Upah borongan pasang ceiling plywood rangka kayu m2
5 Upah borongan pasang ceiling gypsum flat rangka hollow m2
6 Upah borongan pasang ceiling gypsum flat rangka metal furing m2
7 Upah borongan pasang ceiling gypsum/acoustic tile rangka tie lay on m2
8 Upah borongan pasang ceiling gypsum/acoustic tile rangka tie semi concealed m2
9 Upah borongan pasang ceiling gypsum/acoustic tile rangka tie concealed m2
10 Upah borongan pasang drop ceiling gypsum m1
11 Upah borongan pasang list kayu m1
12 Upah borongan pasang list cornice gypsum m1
13 Upah borongan pasang list aluminium m1
14 Upah borongan lubang ceiling incl. perkuatan ( 1x1m2 ) unit
15 Upah borongan fabrikasi dan pasang kusen aluminium untuk jendela m1
16 Upah borongan fabrikasi dan pasang kusen aluminium untuk pintu m1
17 Upah borongan pasang daun jendela aluminium ( 1 x 0.8 ) unit
18 Upah borongan pasang daun pintu kayu/aluminium/panel ( 2.15 x 0.9 ) unit
19 Upah borongan pasang kaca s/d t = 6mm m2
20 Upah borongan pasang kaca diatas t = 6mm m2
21 Upah borongan pasang kaca frameless s/d t = 6mm m2
22 Upah borongan pasang kaca frameless diatas t = 6mm m2
23 Upah borongan pasang sealent kaca m1
24 Upah borongan pasang pintu kaca frameless1 daun complete dgn assesories unit

D PEKERJAAN PENGECATAN
1 Upah borongan cat dinding ( emulsion base ) m2
2 Upah borongan cat Plafond m2
3 Upah borongan cat ceiling ( emulsion base ) m2
4 Upah borongan cat ceiling ( luar ) m2
5 Upah borongan cat kusen kayu/besi ( minyak ) m1
6 Upah borongan cat kusen kayu ( duco ) m1
7 Upah borongan cat kusen kayu ( melamine ultran ) m1
8 Upah borongan cat pintu kayu / besi ( minyak ) m2
9 Upah borongan cat pintu kayu ( duco ) m2
10 Upah borongan cat pintu kayu ( melamine ultran ) m2
11 Upah borongan cat rangka kayu ( minyak ) m2

E PEKERJAAN INTERIOR
1 Upah borongan pasang partisi wall system formwell laminated m2
2 Upah borongan pasang back drop m2
3 Upah borongan pasang pintu formwell 1 daun complete dng assesories unit
4 Upah borongan pasang edging sudut system wall finish duco m1
5 Upah borongan pasang plin lantai stainless steel m1
6 Upah borongan pasang credenza ( 60 x 85 ) m1
7 Upah borongan pasang credenza ( 60 x 90 ) m1
8 Upah borongan pasang credenza ( 50 x 90 ) m1
9 Upah borongan pasang full hight cabinet m2
10 Upah borongan pasang Meja counter SA finish duco unit
11 Upah borongan pasang Meja kasir finish HPL formwell unit
12 Upah borongan pasang Meja kasir finish duco unit
13 Upah borongan pasang Meja kerja adm ( 70x140x75 ) finish HPL formwell unit
14 Upah borongan pasang Meja samping (50x110x72 ) finish HPL formwell unit
15 Upah borongan pasang Meja bulat kaca laminated dia. 60cm unit
16 Upah borongan pasang Work Station 1 meja unit
17 Upah borongan pasang Kursi tunggu SA ( 3 kursi + 1 meja ) unit
18 Upah borongan cat duco plywood/kayu bidang lebar m2
19 Upah borongan cat melamine ultran plywood/kayu bidang lebar m2

F PEKERJAAN LAIN-LAIN
1 Upah borongan rangka kuda-kuda, gording & usuk kayu m3
2 Upah borongan pasang lisplank kayu 2 susun m1
3 Upah borongan pasang atap genteng inlc. reng m2
4 Upah borongan pasang atap zincalume m2
5 Upah borongan pasang insulation atap m2
6 Upah borongan pasang insulation dinding m2
7 Upah borongan pasang nok genteng inlc. Karpus m1
8 Upah borongan pasang nok/flashing/capping zincalume m1
9 Upah borongan pasang lisplank zincalume m2
10 Upah borongan pasang cladding zincalume m2
11 Upah borongan pelubangan roof drain titik
12 Upah borongan pasang & bikin talang datar zincalume m1

13 Upah borongan pasang sanitair Closet jongkok unit


13 Upah borongan pasang sanitair Closet duduk unit
14 Upah borongan pasang sanitair Urinal unit
15 Upah borongan pasang sanitair Partisi Urinal unit
16 Upah borongan pasang sanitair Bath Tub unit
17 Upah borongan pasang sanitair Wastafel unit
18 Upah borongan pasang sanitair Floor Drain unit
19 Upah borongan pasang sanitair Paper Holder / Tempat Tissue unit
20 Upah borongan pasang sanitair Kran dinding unit
21 Upah borongan pasang sanitair Hand Dryer unit
22 Upah borongan pasang sanitair Tempat Sabun unit
23 Upah borongan pasang sanitair Jet Washer unit
24 Upah borongan pasang sanitair Shower spray unit
25 Upah borongan pasang sanitair Shower head unit
26 Upah borongan pasang sanitair Shower mixer unit
27 Upah borongan pasang sanitair Towel bar/ Gantungan handuk unit
28 Upah borongan pasang sanitair Robe Hook unit
29 Upah borongan pasang sanitair Grab bar unit
30 Upah borongan pasang sanitair Kitchen Sink unit

G PEKERJAAN AREA LUAR

31 Upah borongan pasang kansteen / car stopper m1


32 Upah borongan pasang paving blok m2
33 Upah borongan pasang batu/koral alam dinding m2
34 Upah borongan pasang batu/koral alam lantai m2
35 Upah borongan pasang kawat duri m1
36 Upah borongan pasang kawat razor m1
36 Upah borongan tanam rumput m2
37 Upah borongan saluran buis beton dia. 30 m1
38 Upah borongan saluran buis beton dia. 50 m1
39 Upah borongan saluran buis beton dia. 80 m1
40 Upah borongan saluran buis beton dia. 100 m1
41 Upah borongan saluran buis beton dia. 150 m1
42 Upah borongan saluran box culvert uk. 40x40 m1
43 Upah borongan saluran box culvert uk. 50x50 m1
44 Upah borongan saluran box culvert uk. 60x60 m1
45 Upah borongan saluran box culvert uk. 80x80 m1
46 Upah borongan saluran box culvert uk. 100x100 m1
47 Upah borongan saluran box culvert uk. 120x120 m1
48 Upah borongan saluran box culvert uk. 150x150 m1
49 Upah borongan saluran U-ditch uk. 30 cm m1
50 Upah borongan saluran U-ditch uk. 40 cm m1
51 Upah borongan saluran U-ditch uk. 50 cm m1
52 Upah borongan saluran U-ditch uk. 60 cm m1
53 Upah borongan saluran U-ditch uk. 80 cm m1
54 Upah borongan saluran U-ditch uk. 100 cm m1
55 Upah borongan saluran U-ditch uk. 120 cm m1
56 Upah borongan saluran buis beton dia. 150 m1
57 Upah borongan saluran buis beton dia. 150 m1
58 Upah borongan saluran buis beton dia. 150 m1
59 Upah borongan saluran buis beton dia. 150 m1
41 Upah borongan saluran batu kali m3
42 Upah borongan saluran batu bata plester aci dan finishing tanggulan m1
43 Upah borongan pekerjaan bak kontrol/sumpit uk. 40x40x60 unit
44 Upah borongan pekerjaan bak kontrol/sumpit uk. 60x60x60 unit
45 Upah borongan pekerjaan bak kontrol/sumpit uk. 80x80x80 unit
46 Upah borongan pekerjaan bak kontrol/sumpit uk. 100x100x100 unit
47 Upah borongan pekerjaan bak kontrol/sumpit uk. 120x120x120 unit
48 Upah borongan pekerjaan bak kontrol/sumpit uk. 150x150x150 unit
49 Upah borongan pekerjaan sumur resapan dia.80 kedalaman 3 meter unit
50 Upah borongan pekerjaan sumur resapan dia.100 kedalaman 3 meter unit
51 Upah borongan pekerjaan sumur resapan dia.120 kedalaman 3 meter unit
52 Upah borongan pekerjaan sumur resapan dia.150 kedalaman 3 meter unit
53 Upah borongan koral sikat m2
54 m1
55 m1
56 m1
57 m1
BONGKARAN
Pembuangan
Bobokan
Notice
1. Tidak termasuk transport tenaga
2. Tidak termasuk Mess/ bedeng tenaga
3. Sistem pembayar/ Opname per 2 minggu
4. Perlengkapan Safety dan Asuransi tenaga ditanggung pemberi tugas
5. Item yang belum termasuk penawaran dsesuaikan dilapangan
6.Tidak termasuk turun material
(………………………………………..)
Andi Japon Pph 5%
HARGA SAT SPESIFIKASI
( Rp )

1 hari = 8 jam kerja


130,000 200,000 ( 1 jam istirahat )
115,000 150,000 lembur 2 jam = 1/2 hari
90,000 100,000
160,000 170,000
100,000 100,000
125,000 145,000
90,000 125,000
125,000 150,000
90,000 135,000
85,000 100,000
75,000 100,000

10,000 25,000
120,000 125,000
120,000 135,000
145,000 125,000
350,000 550,000
120,000 125,000
25,000 25,000
35,000 45,000

22,500 25,000
130,000 -
90,000 -
70,000 -
75,000 -
60,000 -
50,000 -
40,000 40,000
30,000,000 30,000,000
40,000 40,000
40,000 40,000
5,000 5,000

30,000 35,000
100,000 150,000
120,000 175,000
40,000 65,000
750,000 875,000
750,000 875,000
50,000 65,000
35,000 40,000
45,000 65,000
75,000 150,000

17,500 17,500
65,000 75,000
65,000 80,000
75,000 95,000
75,000 105,000
40,000 45,000
50,000 65,000
65,000 75,000
5,000 7,500
5,000 6,500
6,500 8,500
7,500 9,500
65,000 80,000

15,000 21,500
20,000 28,500
50,000 95,000
50,000 75,000
50,000 75,000
10,000 10,000
90,000 90,000
50,000 50,000
- - ditambah 7.5%
12,500 17,500
12,500 16,500
10,000 10,000
1,300 1,650 manual
1,300 1,650 manual
1,300 1,650 manual
1,300 1,650 manual
1,300 1,650 manual
1,300 1,650 manual
1,300 1,650 manual
1,300 1,750 manual
1,300 1,350
10,000 15,500
ditambah 7.5%
28,500 35,000
60,000 75,000
60,000 75,000
60,000 75,000
60,000 165,000 manual
60,000 180,000 manual
60,000 75,000
60,000 75,000
60,000 75,000
60,000 75,000
60,000 75,000
85,000 165,000
100,000 175,000
225,000 265,000
12,000 22,000
100,000 175,000
125,000 165,000
5,500 6,500
1,250 1,600
650 950
3,000,000 5,000,000
30,000 40,000
60,000 75,000
60,000 70,000
20,000 35,000
21,780 29,500
35,000 40,000
21,000 35,000
21,000 30,000
13,000 27,500
11,000 18,500
25,000 35,000
25,000 35,000

30,000 35,000
15,000 20,000
75,000 65,000
60,000 80,000
60,000 70,000
60,000 95,000
45,000 70,000
- 150,000
45,000 80,000
12,500 23,500
25,000 30,000
17,500 17,500
17,500 17,500

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

15,000 18,000
18,000 20,000
15,000 19,500
18,000 21,000
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

850,000 -
135,000 -
32,500 -
10,000 15,000 8,250,000
5,000 10,000

15,000 19,000
17,500 25,000
17,500 27,500
10,000 10,000
35,000 70,000

150,000 150,000
230,000 250,000
230,000 250,000
230,000 250,000
350,000 650,000
200,000 250,000
50,000 50,000
30,000 30,000
30,000 30,000
30,000 75,000
75,000 75,000
30,000 30,000
75,000 75,000
- -
- -
30,000 30,000
- -
- -
150,000 350,000

60,000 -
37,500 -
85,000 -
55,000 -
8,500 40,000
6,000 30,000
-
40,000 40,000 Belum termasuk galian
60,000 60,000 Belum termasuk galian
100,000 70,000 Belum termasuk galian
100,000 80,000 Belum termasuk galian
110,000 80,000 Belum termasuk galian
30,000 Belum termasuk galian
40,000 Belum termasuk galian
50,000 Belum termasuk galian
65,000 Belum termasuk galian
75,000 Belum termasuk galian
90,000 Belum termasuk galian
105,000 Belum termasuk galian
70,000 Belum termasuk galian
80,000 Belum termasuk galian
90,000 Belum termasuk galian
90,000 Belum termasuk galian
100,000 Belum termasuk galian
120,000 Belum termasuk galian
120,000 Belum termasuk galian
Belum termasuk galian
Belum termasuk galian
Belum termasuk galian
Belum termasuk galian
850,000
95,000
350,000
500,000
1,050,000
1,500,000
2,500,000
3,000,000
2,000,000
9,000,000
11,000,000
12,000,000
23,000
230,000,000 semua
300,000,000 semua
Jakarta , DESEMBER 2014
Dibuat oleh

Djuremi
HARGA JAKARTA
1

TAHUN 2014 / 2015

130000
115000
90000
160000
100000
125000
90000
125000
90000
85000
75000

Mandor Andik Porwodadi 32500


165000
165000
145000
350000
145000
35000
35000

22500
130000
90000
70000
75000
60000
50000
Mandor Andik Porwodadi 40000
Subcont pancang
Subcont pancang
Subcont pancang
Subcont pancang

27500
75000
120000
35000
750000
750000
50000
35000
45000
75000

17500
75000
110000
110000
135000
37500
50000
65000
27500
8500
15000

65000

16500
25500
62500
72500
62500
22500
90000
52500
0
12500
12500
12500
1180
1180
1180
1268.5
1298
1180
1268.5
1268.5
1080
13250

28500
70000
70000
70000
70000
70000
70000
70000
70000
70000
70000
85000
100000
175000
10000
100000
125000

1500
28500
56000
57000

21780
27500
21175
21175
19360
14000
16000

17500
15000
30000
45000
55000
55000
32500
0
32500
12500
27500
17500
17500

12500
22500
12500
22500

850000
135000
32500

60000
Mandor Pak Adnan 27500

40000

200000
230000
230000
230000
350000
200000
50000
30000
30000
30000
75000
30000
75000

30000

150000

60000
37500
85000
55000
8500
6000
Pembuangan bekas bongkaran ketempat pembuangan serta ijin pembuangan
Meliputi beton dinding bata, pondasi beton dan batu kali juga paving.
HARGA JAKARTA

AHUN 2014 / 2015


15.33333
serta ijin pembuangan
juga paving.
Tarif Perhitungan TPL & CAR

0.0027 10,000,000,000 27,000,000


after PPN
Tarif Perhitungan

< 100,000,000 = 0.0024 100,000,000


100,000,000 - 500,000,000 = 0.0019 400,000,000
500,000,000 - 1,000,000,000 = 0.0015 500,000,000
1,000,000,000 - 5,000,000,000 = 0.0012 5,000,000,000
5,000,000,000 - ………………….. = 0.001 10,000,000,000

total nilai proyek = 1,000,000,000 dibulatkan


240,000
760,000
750,000
6,000,000
10,000,000
1,750,000
1,800,000
Tarif Perhitungan PA ( Personal Accident )

Owner 0 0.004 110,000,000 - -


MK 2 0.0104 110,000,000 2,288,000 2,288,000

2,288,000
SCHEDULE MOBILISASI PERSONEL STAFF

PROYEK : PROYEK RENOVASI MEZANIEN BENGKEL CABANG MALANG


PEMILIK PROYEK : PT. ASTRA INTERNASIONAL TBK - DSO
KONTRAKTOR : PT. KARYA GUNA MULIA
NOMER SPK/SI : xxx
PERIODE PELAKSANA: 120 hari kalender - ( 4 bulan )

Jumlah STATUS RENCANA KERJA


NO. NAMA JABATAN
KEPEGAWAIAN TGL MULAI

1 Nama Project Manager 0


2 Nama Site Manager (Sipil Arsitek & MEP) 2 kontrak
3 Nama QC 0 kontrak
4 Nama Spv Sipil Arsitek & MEP 2 kontrak
5 Nama Security 0 kontrak harian
6 Nama Harian 2 kontrak harian
7 Nama Surveyor 1 kontrak
8 Nama Pembantu Surveyor 0 kontrak
9 Nama Gudang+Logistik (Sipil Arsitek & MEP) 1 kontrak
10 Nama Admin 1 kontrak
11 Nama Mekanik 1 kontrak
12 Nama K3 0 kontrak
13 Nama Drafter (Sipil Arsitek & MEP) 2 kontrak

Biaya Perumahan / Penginapan Staff Proyek


- Kontrak rumah
- Listrik, air
- Pembantu
- Perlengkapan rumah
- Consumable bulanan
- Sewa motor
- Sewa mobil
Biaya Pengobatan
Biaya ATK , Fotocopy & Cetak Film, dll
Biaya Rutin Kantor Proyek ( tlp )
Biaya Perjalanan Staff Kantor Pusat
Biaya Konsumsi Ringan Kantor Proyek
Biaya Ceremony , Selamatan , dll
Biaya Entertainment
Biaya Lain2

Penginapan pekerja Subkon ACP dan Kaca


Penginapan pekerja Subkon Interior
Pengiriman Container 2x
RENCANA KERJA JUMLAH BIAYA
TGL SELESAI BULAN GAJI TUNJANGAN UTUM LEMBUR TOTAL

4 13,500,000 1,200,000 -
4 10,000,000 750,000 86,000,000
0 9,000,000 750,000 -
4 7,000,000 750,000 62,000,000
4 1,500,000 750,000 -
4 3,053,500 750,000 30,428,000
2 7,000,000 750,000 15,500,000
4 4,000,000 750,000 -
4 4,500,000 750,000 21,000,000
4 6,000,000 750,000 27,000,000
4 4,500,000 750,000 21,000,000
4 7,500,000 750,000 -
4 4,500,000 750,000 42,000,000

15,000,000 Asumsi 1 Tahun sewa rumah


4,000,000
5,000,000
6,500,000
4,000,000
6,000,000
6,500,000
5,000,000
2,000,000
3,750,000
10,000,000
6,000,000
6,700,000
9,600,000
10,000,000

1,500,000 50% KGM, 50% Subkon


1,500,000 50% KGM, 50% Subkon
- 50% KGM, 50% Subkon

TOTAL-2 103,050,000
Shopdrawing dan Laporan tiap minggu
TOTAL 1 & 2 439,178,000 9,880,000 449,058,000

250,000,000 SMC di BQ ( Persiapan )


sisa SMC 256,090,500 sebar ke harga satuan

539,178,000

439,178,000

-
TOTAL LOKAL KETERANGAN
CUTI TRANSPORT

3,750,000 3,750,000 1,200,000


2,850,000 88,850,000 900,000
- - -
3,000,000 65,000,000 900,000
-
30,428,000
3,000,000 18,500,000 900,000
- - -
3,000,000 24,000,000 900,000
3,000,000 30,000,000 900,000
3,000,000 24,000,000 -
- - -
3,000,000 45,000,000 900,000
329,528,000 6,600,000 336,128,000

poran tiap minggu


DAFTAR ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
PROYEK RENOVASI SHOWROOM DSO MALANG, JAWA TIMUR
PAKET PEKERJAAN STRUKTUR, ARSITEKTUR & MEP
PT. KARYA GUNA MULIA
Schedule pelaksanaan : 120 hari ( 4 bulan )

~ PEKERJAAN PERSIAPAN

1 Mobilisasi & Demobilisasi Material & Tenaga Kerja per

~ Biaya Mobilisasi Subkon


1 Mobilisasi tenaga ( 60 orang tukang Mandor Sipil ) 45.00 org x Rp 150,000 = Rp
2 Mobilisasi tenaga ( 15 orang tukang MEP ) 15.00 org x Rp 150,000 = Rp
3 Mobilisasi Alat kerja dan kelengakapan 1.00 ls x Rp 10,000,000 = Rp
3 Mobilisasi Material 1.00 ls x Rp 9,500,000 = Rp

JUMLAH = Rp
DIBULATKAN= Rp

2 Pagar sementara seng H=3,6 m fin oil paint + rangka + pintu per
rangka kayu + seng gelombang + dicat ( baru )
1 Seng ( uk.180x240 cm ) 2.50 lmbr x Rp 95,000 = Rp
2 Kaso 5/7 cm, kayu kalimantan 4.90 m' x Rp 16,250 = Rp
3 Pengecatan 4.32 m2 x Rp 9,500 = Rp
4 Paku 0.20 kg x Rp 25,000 = Rp
5 upah ( pasang + bongkar ) 1.90 m2 x Rp 25,000 = Rp
JUMLAH = Rp
JUMLAH =

DIBULATKAN= Rp

3 Pelindung area pekerjaan dengan jaring, partisi , dsb per


1 Jaring Pengaman 1.10 m2 x Rp 15,000 = Rp
2 upah ( pasang + bongkar ) 1.10 m2 x Rp 7,500 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

4 Keamanan, biaya preman & koordinasi / sosialisasi ( Resmi dan Tidak Resmi ) per
1 Security Proyek 3 orang + Kordinator Keamanan 4.00 bln x Rp 8,000,000 = Rp
2 Koordinasi Keamanan Aparat Polsek / Koramil 4.00 bln x Rp 2,500,000 = Rp
3 Koordinasi LSM, RT & RW 4.00 bln x Rp 500,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

5 Sumber air kerja (dengan jet pump) berikut peralatan penunjang per
1 Air kerja ( Pengadaan pompa Jet Pump ) 1.00 Ls x Rp 2,500,000 = Rp
2 Instalasi pipa PVC 50.00 ml x Rp 50,000 = Rp
3 Komsumsi Air kerja 0.00 bln x Rp 1,500,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

6 Pengadaan sumber listrik kerja (dengan gen set) berikut peralatan penunjang per
1 Sewa Genset 30 KVA 0.00 bln x Rp 2,500,000 = Rp
2 Bahan Bakar solar (1 liter / jam ) 720.00 ltr x Rp 12,000 = Rp
3 Operator 4.00 bln x Rp 500,000 = Rp

JUMLAH = Rp
DIBULATKAN = Rp

7 Peralatan komunikasi (telepon, HT, dll) per


1 Biaya Telephone Site 4.00 Ls x Rp 1,500,000 = Rp
1 pengadaan Pesawat HT 2.00 uit x Rp - = Rp
2 Pengadaan 1 Unit Mesin Fax 1.00 unit x Rp ex. Project = Rp
3 Pengadaan 1 Unit Telephone 1.00 unit x Rp ex. Project = Rp
4 Biaya wifi 4.00 bln x Rp 350,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

8 Asuransi CAR, ASTEK, K3 & TPL per


1 CAR & TPL 1.00 Ls x Rp 18,000,000 = Rp
2 PA 1.00 Ls x Rp 2,288,000 = Rp
3 ASTEK 1.00 Ls x Rp 6,000,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

9 Pembersihan lapangan termasuk membuang sampah keluar per


1 Pakai tenaga harian 2 orang @50.000, / hari 120.00 hr x Rp 80,000 = Rp
2 Buang sampah keluar proyek 1 bulan 4x 30.00 rit x Rp 150,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

10 Pembuatan gambar kerja (shop drawing) & gambar terlaksana ( as built drawing ) per
1 Gambar Shop drawing rangkap 2 @60 lmbr 300.00 lbr x Rp 7,500 = Rp
2 As Buid Drawing rangkap 2 @60 lmbr 300.00 lbr x Rp 7,500 = Rp
3 Dokumen Aproval Material 450.00 lbr x Rp 7,500 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

11 Laporan Progres pekerjaan dilengkapi dengan dokumen photo , setiap minggu per
2 Dokumentasi 4.00 bln x Rp 250,000 = Rp
3 Progress Report setiap bulan 4.00 bln x Rp 250,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp

12 Peralatan Pengaman dan APD (sepatu boot, helm, fire extinguiser , dsb) per
1 Helm Proyek 35.00 bh x Rp 45,000 = Rp
2 Sepatu Proyek Safety Shoes 15.00 set x Rp 650,000 = Rp
3 Sepatu Boot pekerja 35.00 set x Rp 95,000 = Rp
4 Safety belt 3.00 set x Rp 250,000 = Rp
5 P3K ( obat2an ) 1.00 Ls x Rp incl.SMC = Rp
6 Alat pemadam kebakaran ex.Ganebo @3 kg 3.00 bh x Rp 250,000 = Rp
( Isi Ulang APAR ) JUMLAH = Rp
DIBULATKAN = Rp

13 Peralatan penunjang pekerjaan (scafolding dll.) per


1 Scaffolding 215.00 m2 x Rp 95,000 = Rp
JUMLAH = Rp
DIBULATKAN = Rp
Ls

6,750,000
2,250,000
10,000,000
9,500,000

28,500,000 / Ls
28,500,000 / Ls

m2

237,500 4.32
79,625
41,040
5,000
47,500
410,665 / 4.32 m2
95,061 / m2
228,147 / ml
230,000 / ml

Lumpsum
16,500
8,250
24,750 / Ls
25,000 / Ls

Ls
32,000,000
10,000,000
2,000,000
44,000,000 / Ls
44,000,000 / Ls

Ls
2,500,000
2,500,000
-
5,000,000 / Ls
5,000,000 / Ls

Ls
-
8,640,000
2,000,000

10,640,000 / Ls
10,600,000 / Ls

Ls
6,000,000
-

1,400,000 Pulsa, modem


7,400,000 / Ls
7,400,000 / Ls

Ls
18,000,000
2,288,000
6,000,000
26,288,000 / Ls
27,000,000 / Ls

Ls
9,600,000
4,500,000
14,100,000 / Ls
14,100,000 / Ls

Ls
2,250,000
2,250,000
3,375,000
7,875,000 / Ls
7,880,000 / Ls

Ls
1,000,000
1,000,000
2,000,000 / Ls
2,000,000 / Ls

Lumpsum
1,575,000
9,750,000
3,325,000
750,000
incl.SMC
750,000
32,300,000 / Ls
32,300,000 / Ls

Lumpsum
20,425,000
20,425,000 / Ls
20,500,000 / Ls
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PROYEK SHOWROOM, KANTOR & BENGKEL DAIHATSU - PASURUAN
PAKET PEKERJAAN STRUKTUR, ARSITEKTUR & MEP
KONTRAKTOR : PT KARYA GUNA MULIA

ANALISA PEKERJAAN SIPIL

Pasang Bouwplank

1 Kebutuhan Uraian Koef Sat

Material Kayu 0.010 -/m3


Paku kayu 0.038 kg

Alat Alat bantu 1.000 ls

Upah Ongkos Pasang 1.000 m¹


JUMLAH / ml
PEMBULATAN / ml

Pembersihan Lahan

2 Kebutuhan Uraian Koef Sat

Material Biaya pengangkutan (sewa kendaraan/hari) 0.011 Unit

Alat Alat
> Cangkul 0.020 bh
> Lingis Ø 19 0.009 bh
> sekop 0.013 bh
> Rolli 0.010 bh
> Karung 0.250 bh
> Parang/Arit/Mesin potong 0.006 bh
> Lain-lain 1.000 bh

Upah Upah 1.000 m²


JUMLAH / m²
PEMBULATAN / m²

Bongkar Dinding ½ Bata

4 Kebutuhan Uraian Koef Sat

Alat Alat
> Bodem 10 kg 0.020 bh
> Pahat 0.018 bh
> Gerinda Potong 0.020 bh
> Lain-lain, Sarung tanggan dan masker 0.053 bh
Upah Upah 1.030 m²
JUMLAH / m²
PEMBULATAN / m²

Bongkar Dinding 1 Bata

5 Kebutuhan Uraian Koef Sat

Alat Alat
> Bodem 10 kg 0.025 bh
> Pahat 0.029 bh
> Gerinda Potong 0.022 bh
> Lain-lain, Sarung tanggan dan masker 0.053 bh

Upah Upah 1.030 m²


JUMLAH / m²
PEMBULATAN / m²

Mengupas plesteran t=3 cm, / M2

6 Kebutuhan Uraian Koef Sat

Alat Alat
> Palu 5 kg 0.020 bh
> Pahat 0.017 bh
> Lain-lain, Sarung tanggan dan masker 0.018 bh

Upah Upah 1.030 m²


JUMLAH / m²
PEMBULATAN / m²

Bongkar lantai keramik/marmer / M2

7 Kebutuhan Uraian Koef Sat

Alat Alat
> Palu 5 kg 0.020 bh
> Pahat 0.017 bh
> Lain-lain, Sarung tanggan dan masker 0.018 bh

Upah Upah 1.030 m²


JUMLAH / m²
PEMBULATAN / m²
Bongkaran Kusen Kayu Eksisting

Upah Bongkar Kusen 15.000 Unit

Tiang Pancang uk. 20x20 cm L= ± 15 M dari tanah existing


dengan Jacking Pile System
(termasuk Biaya Pemancangan dan penyambungan)

Tiang Pancang uk. 20x20 cm L= 15M (atau sampai dengan tanah 1.000 ML
keras), dengan Jacking Pile System

Pemancangan 15 (6+6+3) 15.000 ML


Penyambungan 2.000 ML
Pengangkatan 15.000 ML

Bobok dan potong kepala pancang.


Upah borongan bobok & stek pondasi tiang pancang uk. 20x20 cm 1.000 bh
Alat bantu 1.000 bh
Buang puing bongkar max 20 m ( 20x20 cm, tinggi = 50 cm ) 0.020 m3

Urugan Tanah Merah Super


Pengadaan Tanah Merah Super 1.100 m3
Upah perataan 1.000 m2
Pemadatan + CBR > 8% ( per layer 250mm ) 1.000 m2

Pek Galian
Pek.Galian Tanah s/d 1,5 m
Upah Galian tanah 1.000 m3
Alat bantu 1.000 ls

Pek.Galian Tanah 1.5 s/d 3 m


Upah Galian tanah 1.000 m3
Alat bantu 1.000 ls

Urugan tanah kembali+ pemadatan


Upah urug kembali 1.000 m3
Pemadatan 1.000 m3
Alat stamper 0.024 hr

Buang tanah sisa galian (di dalam site)


Buang tanah bekas galian max 20 m
Upah 1.000 m3
Alat bantu 1.000 ls

Buang tanah bekas galian lebih dari 20 m


Upah 1.000 m3
Alat bantu 1.000 ls

Perataan & pemadatan tanah


Upah 1.000 m2
Alat stamper 0.010 m2

Urugan Pasir dipadatkan


Urugan pasir padat 10 cm
Pasir urug 1.100 m3
Upah 8.333 m2
Alat stamper 0.024 m2

Urugan pasir padat 10 cm


Pasir urug 0.110 m3
Upah 1.000 m2
Alat stamper 0.012 hr

Urugan sirtu dibawah lantai T. 20 cm , termasuk pemadatan


sirtu 1.100 m3
Upah 5.000 m2
Alat stamper 0.024 hr

Urugan Sirtu 25 cm dan Pemadatan + CBR > 30%


sirtu 1.100 m3
Upah 3.333 m2
Alat stamper 0.024 hr

Urugan Sirtu 30 cm dan Pemadatan + CBR > 30%


sirtu 1.100 m3
Upah 3.333 m2
Alat stamper 0.024 hr

Urugan Kerikil 2/3 ,dipadatkan t = 50 cm


Kerikil / split 2/3 1.050 m3
Upah 2.000 m2
Alat stamper 0.024 hr

Urugan Mac Adam ,dipadatkan t = 20 cm + CBR > 80%


Mac Adam 1.250 m3
Pemadatan dengan Alat Vibro Roller 1.000 m2
Upah 1.000 m3

Urugan Koral,dipadatkan t = 25 cm
Koral 1.050 m3
Upah 4.000 m2
Alat stamper 0.024 hr

Pondasi Paving, Urugan Limestone + pemadatan, t = 25 cm


Limestone 1.050 m3
Pemadatan dengan Alat Vibro Roller 1.000 m2
Upah 1.000 m3

Urugan Abu batu,dipadatkan t = 5 cm


Abu batu 1.100 m3
Upah 20.000 m2
Alat stamper 0.024 hr
Urugan Basecouse ,dipadatkan t = 15 cm
Bascouse 1.150 m3
Upah 6.667 m2
Alat stamper 0.024 hr

Lantai kerja
Lantai kerja 1 : 3 : 5, t = 5 cm
Pasir beton 0.468 m3
Split 0.630 m3
Semen @40 kg 3.550 sak
Alat bantu molen 0.057 hr
Upah 20.000 m2

Lantai kerja 1 : 3 : 5, t = 5 cm
Pasir beton 0.023 m3
Split 0.032 m3
Semen @40 kg 0.178 sak
Alat bantu molen 0.002 hr
Upah 1.000 m2

Beton Site Mix K-250 1 : 2 : 3


Pasir beton 0.500 m3
Split 0.611 m3
Air 0.580 m3
Semen @40 kg 11.863 sak
Adimixture 1.050 ltr
Alat bantu ( Molen, ember, arco ) 1.000 ls
Upah 1.100 m3
Over Head 1.000 ls

34.560
8.970
Platic cor
Platic cor 1.050 m2
Upah 1.000 m2

Bekisting Structure loss formwork batako adukan 1 : 5


Batako 13.000 bh
Pasir pasang 0.016 m3
Semen @40 kg 0.121 sak
Alat bantu (ember, cangkul, dll) 1.000 ls
Alat bantu molen 0.020 hr
Upah pasang 1.000 m2
Pondasi Batu kali , campuran spesi 1 : 4
Batu kali / Batu belah 15 / 20 cm 1.250 m3
Pasir pasang 0.520 m3
Semen @40 kg 1.563 sak
Alat bantu 1.000 ls
Langsir batu kali 1.000 m3
Upah 1.000 m3

Pasangan Batu kosong per m3


Batu kali / Batu belah 15 / 20 cm 1.250 m3
Pasir pasang 0.550 m3
Alat bantu 1.000 ls
Langsir batu kali 1.000 m3
Upah 1.000 m3

Bekisting Structure Lantai, multipleks t = 12 mm


Relat plat Lantai satu (1.5 x pakai), Elevasi 0.0 m
Multipleks 12 mm 0.100 lbr
Kayu 0.014 m3
Paku 10 0.039 kg
Mould Oil 0.030 ltr
Upah, Bekisting multipleks + solar + bongkar + perapihan 0.400 m2

Bekisting multipleks 12 mm + stoot werk untuk Plat Lantai 1 (sisi samping) (1.5 x pakai), Elevasi +0.0 m
Multipleks 12 mm 0.500 lbr
Kayu 0.011 m3
Paku 0.174 kg
Mould Oil 0.150 ltr
Upah, Bekisting multipleks + solar + bongkar + perapihan 2.000 m2

Plat Tangga Lantai satu (1..5 x pakai), Elevasi +0.0 m


Multipleks 12 mm 0.500 lbr
Kayu 0.011 m3
Paku 0.174 kg
Mould Oil 0.150 ltr
Alat Bantu (scaffolding ) 2.083 m2
Upah, Bekisting multipleks + solar + bongkar + perapihan 2.000 m2
Relat plat Lantai dua (1.5x pakai), Elevasi +. 3.8 m
Multipleks 12 mm 0.100 lbr
Kayu 0.002 m3
Paku 10 0.035 kg
Mould Oil 0.030 ltr
Upah, Bekisting multipleks + solar + bongkar + perapihan 0.500 m2

Bekisting multipleks 12 mm + stoot werk untuk Plat Lantai 2 (sisi samping) (1.5 x pakai), Elevasi +0.0 m
Multipleks 12 mm 0.500 lbr
Kayu 0.011 m3
Paku 0.174 kg
Mould Oil 0.150 ltr
Upah, Bekisting multipleks + solar + bongkar + perapihan 2.000 m2

Plat Lantai dua (1.5 x pakai), Elevasi +. 3.8 m


Multipleks 12 mm 0.500 lbr
Kayu 0.049 m3
Paku 0.434 kg
Mould Oil 0.150 ltr
Alat Bantu (scaffolding ) 2.083 m2
Upah, Bekisting multipleks + solar + bongkar + perapihan 1.500 m2

20.800 0.06
0.150 ###
8.667 0.16
Bekisting Retaining Wall Lantai (Lisplank penahan tanah) (1.5 x pakai), Elevasi +. 0.00 m
Multipleks 12 mm 0.500 lbr
Kayu 0.019 m3
Paku 10 0.030 kg
Mould Oil 0.250 ltr
Alat Bantu support ( kayu kaso 4/6 ) 0.021 m3
Upah, Bekisting multipleks + solar + bongkar + perapihan 2.000 m2

Plat Lantai tiga (1.5 x pakai), Elevasi +. 7.6 m per m2


Multipleks 12 mm 0.500 lbr
Kayu 0.011 m3
Paku 0.174 kg
Mould Oil 0.150 ltr
Alat Bantu (scaffolding ) 2.083 m2
Upah, Bekisting multipleks + solar + bongkar + perapihan 2.000 m2
Relat plat Lantai atap (1,5 x pakai), Elevasi +. 12.35 m
Multipleks 12 mm 0.100 lbr
Kayu 0.002 m3
Paku 10 0.035 kg
Mould Oil 0.030 ltr
Upah, Bekisting multipleks + solar + bongkar + perapihan 0.500 m2

Plat Lantai atap (1.5 x pakai), Elevasi +. 12.35 mm per m2


Multipleks 12 mm 0.500 lbr
Kayu 0.011 m3
Paku 0.174 kg
Mould Oil 0.150 ltr
Alat Bantu (scaffolding ) 2.083 m2
Upah, Bekisting multipleks + solar + bongkar + perapihan 2.000 m2

Bekisting Structure Kolom, Multipleks t = 12 mm


Bekisting Kolom Lantai satu ( 1.5 x Pakai ), Elevasi +. 0.0 m per m2
Kolom 40x40 cm, tinggi 4 m
Multipleks 12 mm 3.200 lbr
Kayu 5/7 0.169 m3
Paku 1.875 kg
Mould Oil 0.500 ltr
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.140 m3
Upah, Bekisting Phenol Film + solar + bongkar + perapihan 12.800 m2

6.667

Bekisting Kolom Lantai satu KBJ1 & KBJ3 ( 1.5 x Pakai ), Elevasi +. 0.0 m per m2
Kolom 35 x 25 cm, tinggi 4 m
Multipleks 12 mm 1.350 lbr
Kayu 5/7 0.123 m3
Paku 1.875 kg
Mould Oil 0.500 ltr
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.140 m3
Upah, Bekisting Phenol Film + solar + bongkar + perapihan 12.800 m2

Bekisting Kolom Lantai dua ( 1.5 x Pakai ), Elevasi +. 3.8 m per m2


Kolom 15x20 cm, tinggi 4 m
Multipleks 12 mm 1.800 lbr
Kayu 5/7 0.105 m3
Paku 0.563 kg
Mould Oil 0.500 ltr
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.055 m3
Upah, Bekisting Phenol Film + solar + bongkar + perapihan 5.600 m2

Area Bengkel
KBJ3 Bekisting Kolom Padestal ( 1.5 x Pakai ), Elevasi +. 0.00 m per m2
Kolom 35x25 cm, tinggi 1.5 m
Multipleks 12 mm 1.200 lbr
Kayu 5/7 0.092 m3
Paku 1.875 kg
Mould Oil 0.500 ltr
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.144 m3
Upah, Bekisting Phenol Film + solar + bongkar + perapihan 2.400 m2

KBJ4 Bekisting Kolom Padestal ( 1.5 x Pakai ), Elevasi +. 0.00 m per m2


Kolom 20x30 cm, tinggi 1.5 m
Multipleks 12 mm 1.000 lbr
Kayu 5/7 0.083 m3
Paku 1.875 kg
Mould Oil 0.500 ltr
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.108 m3
Upah, Bekisting Phenol Film + solar + bongkar + perapihan 2.000 m2

Bekisting Structure Balok, multipleks t = 12 mm


Bekisting Structure BALOK Lantai Satu ( 1.5 x Pakai ), Elevasi +. 0.0 m
balok 25x60 panjang 7 m
Multipleks 12 mm 5.075 lbr
Kayu 5/7 0.441 m3
Paku 0.360 kg
Mould Oil 0.300 ls
Upah, Bekisting multipleks + solar + bongkar + perapihan 20.300 m2

Bekisting Structure BALOK Lantai Dua ( 1.5 x Pakai ), Elevasi +. 4 m


balok 30x50 panjang 6 m
Multipleks 12 mm 3.900 lbr
Kayu 5/7 0.190 m3
Paku 0.900 kg
Mould Oil 0.300 ls
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.269 m3
Upah, Bekisting multipleks + solar + bongkar + perapihan 18.200 m2
Bekisting Structure BALOK Lantai Tiga ( 1,5 x Pakai ), Elevasi +. 4 m
balok 25x50 panjang 6 m
Multipleks 12 mm 3.750 lbr
Kayu 5/7 0.172 m3
Paku 0.900 kg
Mould Oil 0.300 ls
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.235 m3
Upah, Bekisting multipleks + solar + bongkar + perapihan 14.820 m2

Bekisting Structure BALOK Lantai Atap ( 2 x Pakai ), Elevasi +. 12.35 m


balok 20x55 panjang 7.8 m
Multipleks 12 mm 2.573 lbr
Kayu 5/7 0.223 m3
Paku 0.360 kg
Mould Oil 0.300 ls
Alat Bantu support ( kayu kaso 4/6 ) dan Skapoding 0.134 m3
Upah, Bekisting multipleks + solar + bongkar + perapihan 13.300 m2

Formdeck t= 0.75 ex. Union Metal + Shear Connector dia 10-500 mm + + Support u/ Plat :
Lantai 2
Perancah/ Scaffolding 1.000 m2
balok kayu 8/12 untuk bekesting ( dudukan ) 0.005 m3
Floordeck t = 0.75 mm W =1000 ex. Union Metal 1.050 m2
Upah pasang bondek lengkap 1.000 m2
Shear connector, besi D-13 mm, L = 1 m 0.520 bh

Besi tulangan
Pembesian Lantai Satu, Elevasi +. 0.00 m
Besi beton 1.050 kg
Kawat bendrat 0.015 kg
Alat bantu 1.000 ls
Upah fabrikasi & pasang 1.000 kg

Pembesian Lantai dua, Elevasi +. 3.80 m


Besi beton 1.050 kg
Kawat bendrat 0.015 kg
Alat bantu 1.000 ls
Upah fabrikasi & pasang 1.000 kg

Pembesian Lantai Tiga, Elevasi +. 7.6 m


Besi beton 1.050 kg
Kawat bendrat 0.015 kg

Upah fabrikasi & pasang 1.000 kg

Pembesian Lantai Atap, Elevasi +. 12.35 m


Besi beton 1.050 kg
Kawat bendrat 0.015 kg
Upah fabrikasi & pasang 1.100 kg

Besi wiremesh
Wiremesh M4
Wiremesh M4 1.050 m2
Kawat bendrat 0.020 kg
Alat Bantu 1.000 Ls
Upah incl kaki ayam 1.000 m2

Wiremesh M5
Wiremesh M5 1.050 m2
Kawat bendrat 0.020 kg
Alat Bantu 1.000 Ls
Upah incl kaki ayam 1.000 m2

Wiremesh M6
Wiremesh M6 1.050 m2
Kawat bendrat 0.020 kg
Alat Bantu 1.000 Ls
Upah incl kaki ayam 1.000 m2

Wiremesh M7
Wiremesh M7 1.050 m2
Kawat bendrat 0.020 kg
Alat Bantu 1.000 Ls
Upah incl kaki ayam 1.000 m2

Wiremesh M8
Wiremesh M8 2.050 m2
Kawat bendrat 0.055 kg
Alat Bantu 1.000 Ls
Bangku penyanga wiremesh atas dan bawah setiap jarak 60 cm 0.490 kg
Upah incl kaki ayam 2.000 m2
Corner Guard -/1 kolom
Siku 50x50x5 18.384 kg
Stek besi beton dia 10mm 2.560 kg
Upah fabrikasi, cat dasar 20.944 kg
Cat dasar zinckhromat ex Kansai Finish kuning hitam 20.944 kg

Ramp beton finish alur di cutter jarak 15 cm ( pasang garis sirsan ) - L8'
Mata grinda 5'' 0.143 bh
Masker 0.200 bh
Gerinda 0.008 unit
Alat bantu 1.000 ls
Upah + Buangan bekas beton 1.000 ml

Beton Readymix K400


Beton Readymix K400 untuk struktur Lt. satu, Elevasi +0.0 m ( Cor Readymix Dengan Pompa )
Beton K400 ( Readymix ) 1.030 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Integral 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3

Beton Readymix K400 untuk struktur Lt. satu , Elevasi +0.0 m ( Cor Readymix Tanpa Pompa, Manual )
Beton K400 ( Readymix ) 1.030 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Integral 1.000 m3
Upah tanpa pompa + gosok & perataan 1.000 m3

Beton Readymix K300 untuk struktur ( Cor Readymix Dengan Pompa )


Beton K300 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3

Beton Readymix K300 untuk struktur ( Cor Readymix Tanpa Pompa, Manual )
Beton K300 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah tanpa pompa + gosok & perataan 1.000 m3

Beton Readymix K300 untuk struktur Lt. Tiga, Elevasi +7.6 m ( Cor Readymix Dengan Pompa )
Beton K300 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3

Beton Readymix K300 untuk struktur Lt. Atap, Elevasi +. 12.35 m ( Cor Readymix Dengan Pompa )
Beton K300 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3

PEKERJAAN TANGGA BETON UTAMA


Galian Tanah Pondasi 0.300 m3
Urugan pasir t=10 cm 0.075 m3
Plastik cor 1.500 m2
Bekisting plat tangga 19.380 m2
Bekisting trap tangga 6.600 m2
Pembesian
Stek besi dibalok 35.360 kg
stek besi dibalok lt. 2 35.360 kg
Besi plat tangga 182.716 kg

D8-200 7.488 kg
D10-100 165.120 kg
D13-200 253.436 kg
2-D19 26.640 kg
Beton t=150 mm 4.626 kg
Alat bantu stager 15.000 m2
Upah 1.000 unit

TANGGA BETON ENTRANCE


Galian Tanah Pondasi 8.400 m3
Urugan pasir t=10 cm 0.840 m3
Plastik cor 14.040 m2
Pondasi Batu kali ad 1 : 4 5.775 m3
Bekisting Playwod 11.160 m2
Pembesian
D8-200
D10-100 311.808 kg
D13-200
2-D16 73.008 kg
Beton t=150 mm 4.293 m3
Alat bantu stager 1.000 ls
Upah 1.000 unit

Beton Readymix K250


Beton Readymix K250 untuk struktur Lt. satu, Elevasi +0.0 m ( Cor Readymix Dengan Pompa )
Beton K250 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3

Beton Readymix K250 untuk struktur Lt. satu , Elevasi +0.0 m ( Cor Readymix Tanpa Pompa, Manual )
Beton K250 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 m3
Overhead site (doket) 1.000 m3
Upah tanpa pompa + gosok & perataan 1.000 m3

Beton Readymix K250 untuk struktur Lt. Dua , Elevasi +. 3.8 m ( Cor Readymix Dengan Pompa )
Beton K250 ( Readymix ) 1.050 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3

Beton Readymix K250 untuk struktur Lt. Dua , Elevasi +. 3.8 m ( Cor Readymix Tanpa Pompa, Manual )
Beton K250 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah tanpa pompa + gosok & perataan 1.000 m3

Beton Readymix K250 untuk struktur Lt. Atap , Elevasi +. 7.6 m ( Cor Readymix Dengan Pompa )
Beton K250 ( Readymix ) 1.025 m3
Tools / Pompa 1.000 m3
Alat bantu vibrator 1.000 hr
Overhead site (doket) 1.000 m3
Upah dengan pompa + gosok & perataan 1.000 m3
Analisa Baja Structure

Pengecatan baja profile dengan cat finish ex Kansai F Talit Light Grey KF-28
Cat finish ex ex Kansai F Talit Light Grey KF-28 0.015 ltr
Thinner 0.018 ltr
Upah 1.000 kg

Baja WF 350x175x7x11 mm
Baja WF 350x175x7x11 mm 1.050 kg
Upah fabrikasi, cat dasar & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material ( penurunan material on site ) 1.000 kg

Baja WF 300x150x6.5x9mm
Baja WF 300x150x6.5x9mm 1.050 kg
Upah fabrikasi, cat dasar & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material ( penurunan material on site ) 1.000 kg

Baja WF 250x125x6x9 mm
Besi profil WF 250x125x6x9 mm 1.050 kg
Upah fabrikasi, cat dasar & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material ( penurunan material on site ) 1.000 kg

Baja WF 200x100x5.5x8 mm
Besi profil WF 200x100x5.5x8 mm 1.050 kg
Upah fabrikasi, cat dasar & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material ( penurunan material on site ) 1.000 kg

Baja WF 150x75x5x7 mm
Besi profil WF 150x75x5x7 mm 1.050 kg
Upah fabrikasi, cat dasar & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja UNP 150x75x6.5x10 mm


Baja UNP 150x75x6.5x10 mm 1.050 kg
Upah fabrikasi, cat dasar & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja siku L50x50x5 mm


Besi profil siku L50x50x5 mm 1.050 kg
Upah fabrikasi & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja CNP 150x50x20x2.3 mm


Besi profil C 200x50x20x3.2 mm 1.050 kg
Upah fabrikasi & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja Plat t = 8 mm
Besi Plat t = 8 mm 1.050 kg
Upah fabrikasi & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja Plat t = 10 mm
Besi Plat t = 10 mm 1.050 kg
Upah fabrikasi & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja Plat t =12 mm


Besi Plat t = 12 mm 1.050 kg
Upah fabrikasi & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg

Baja Checker Plate 4 mm


Besi Plat t = 12 mm 1.050 kg
Upah fabrikasi & erection 1.000 kg
Cat dasar zinckhromat ex Kansai ( material ) 0.010 kg
Mob & demob material 1.000 kg
Hollow 20x40x2 mm
Hollow 20x40x2 mm 1.050 ml
Cat dasar zinckhromat ex Kansai ( material ) 1.000 ml
Upah fabrikasi & erection 1.000 ml

Hollow 40x40x2.3 mm
Hollow 40x40x2.3 mm 1.050 ml
Cat dasar zinckhromat ex Kansai ( material ) 1.000 ml
Upah fabrikasi & erection 1.000 ml

Turn buckle dia. 19 mm


Turn buckle dia. 16 mm 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Turn buckle dia. 16 mm


Turn buckle dia. 16 mm 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Baut HTB dia. 22 mm


Baut HTB + mur dia. 22 mm ( A.325 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Baut HTB dia. 19 mm


Baut dia. 19 mm ( A.325 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Baut HTB dia. 16 mm


Baut dia. 16mm ( A.325 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Baut HTB dia. 12 mm


Baut dia.12mm ( A.325 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh
Baut Hitam dia 12 , untuk gording
Baut Hitam dia 12 , untuk gording 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Angkur baut dia. 25 mm, L=600 mm ( ST.41 )


Angkur baut Æ 25 mm, L=600 mm ( ST.41 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Angkur baut dia. 22 mm, L=600 mm ( ST.41 )


Angkur baut Æ 22 mm, L=600 mm ( ST.41 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Angkur + mur baut dia. 19 mm, L=600 mm ( M20 )


Angkur baut dia.19 mm, L=600 mm ( M20 ), baut double + 2 ring 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Angkur baut dia.16 mm, L=600 mm ( ST.41 )


Angkur baut Æ 16 mm, L=600 mm ( ST.41 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Angkur baut dia.13 mm, L=200 mm ( ST.41 )


Angkur baut Æ 16 mm, L=600 mm ( ST.41 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh

Angkur baut dia.12 mm, L=600 mm ( ST.41 )


Angkur baut Æ 16 mm, L=600 mm ( ST.41 ) 1.000 bh
Upah pasang 1.000 bh
Mob & demob material 1.000 bh
Semen grouting bawah plat kolom ex Combextra GP t=2,5 cm
Semen grouting ex Combextra GP 80.000 zak
Upah 1.000 m3

Trekstang dia. 12 mm p= 1.4 m


Besi dia 12mm 1.246 kg
Baut dia 12mm + ring 4.000 bh
Bubut 2 depan belakang 1.000 ls
cat dasar dan finish 1.246 kg
Alat bantu 1.000 ls
upah 1.000 kg

Ikatan Angin dia. 16 mm


Besi dia 16 1.030 kg
Plat kupingan t=8mm 0.268 kh
Baut dia 16 0.107 bh
cat dasar dan finish 1.000 kg
Alat Bantu 1.000 ls
upah 1.000 kg

Canopy Depan ( Showroom Outdoor ) Gambar IS-32


Rangka Baja
- Konsol UNP 200 x 100 1248.380 kg
Gording UNP 100x50 176.967 kg
Rangka Listplank UNP 200 x 100 336.700 kg
Trekstang dia. 12 mm 21.307 kg
Ikatan Angin dia. 16 mm + turn buckle 49.770 kg
Base plate, Plat Sambung, Stiffener 274.969 kg
Baut-Baut HTB
- Baut M 16 mm 48.000 bh
- Baut gording M 12 mm 96.000 bh
Anchor Bolt
- Anchor Bolt dia. 22 mm 48.000 bh
Semen grouting bawah plat kolom ex Combextra GP t=25 mm 12.000 bh
Pengecatan dengan Zinchromate 2108.092 kg
- 1 lapis dengan zinchromate ex ICI 60 micron
- 2 lapis dengan cat finishing ex Kansai Paint Ftalith Light Grey KF - 28

87.010 m1

CNP 100x50x20x2.3 44.560 kg


Baut HTB A321 5.000 bh
Besi Beton dia 12mm 5.352 kg
Alat bantu 1.000 ls
Upah fabrikasi & erection 49.912 kg
Cat dasar zinckhromat ex Kansai ( material ) 49.912 kg
Mob & demob material 1.000 Unit

Hand Railing Pipa besi Ø 2 ' fin. Cat duco


Salmon Silver ex Danagloss
Isian : Pipa Ø 10 ( 4 jalur ) finish cat duco
Tiang Pipa besi Ø 8 finish cat duco
Tiang tegak plat 8mm, L = 50mm finish cat duco
Plat + angkur baut
( lengkap terpasang + asesories )

Hand Railling Pipa Ø 2'' 6.000 m1


Tiang Pipa Ø 2''
Pembagi pipa Ø 1'' 24.000 m1
Tiang tegak Plat 8mm, L = 50mm 4.000 m1
Plat 5 mm 4.000 bh
Dyna Bolt M10 16.000 bh
Finising Cat 6.000 m2
Upah 1.000 ls

Penutup atap, zinc-aluminium gelombang type spandek t=0,45 mm


tanpa Galvalume 0.45mm tct, type USR + aksesories
Galvalume 0.45mm tct, type USR t=0,45 mm 1.100 m2
Material bantu ( 3.5% ) 1.000 m2
Upah pasang 1.000 m2

Penutup atap, Skylight fiberglass anti UV


Type Ultra 2400 gsm t - 1,5mm ex. Alsynite
Type Ultra 2400 gsm t - 1,5mm ex. Alsynite 1.100 m2
Material bantu ( 3.5% ) 1.000 m2
Upah pasang 1.000 m2

Glass wool density 24 kg/m3, t=2" ex. ASIA PASIFIC


Glass wool density 24 kg/m3, t=2" ex. ASIA PASIFIC 1.050 m2
Upah pasang 1.000 m2

Roof mesh 50x50, wire dia. 1,63 mm


Roof mesh 50x50, wire dia. 1,63 mm 1.050 m2
Upah pasang 1.000 m2

Insulation ZT-01B Al-Bubble-Al, 350 gr/m2


ZT-01BF Al-FR Bubble-Al, 350 gr/m2. t=4mm 1.100 m2
Metalized Tape Uk=9.6mm 0.500 m1
Zincalume Strip Uk= 5cm 0.500 m1
Upah pasang 1.000 m2

Finishing Listplank Zink aluminium BJLS 45 t=0.45 mm, ex. Fumira type A735

Zincalume tct =0.45 mm, ex. ex. Fumira type A735 1.100 m2
Accesorries ( 5% ) 1.000 ls
Upah pasang 1.000 m2

Nok atap Zinc Alumunium


Nok atap Zink aluminium USR t=0.45 mm. lbr = 40 cm 1.100 ml
Material bantu ( 5% ) 1.000 ls
Upah pasang 1.000 ml

Steel Flashing, Pertemuan Atap dengan dinding, t = 0.45 mm , ( lbr bahan = 1219 mm, 3x tekukan )
Steel Flashing t = 0.45 mm , lbr = 80 cm 1.050 ml
Material bantu ( 5% ) 1.000 ls
Upah pasang 1.000 ml

Finishing Lisplank, UKS, t = 0.45 mm , ( lbr bahan = 266 mm ) / m2


Zincalume Type UKS 0,45mm , lbr = 26.6 cm 1.050 m2
Material bantu ( 5% ) 1.000 ls
Upah pasang 1.000 ml
Steel Flashing, Pertemuan Talang dengan Listplank, t = 0.45 mm , ( lbr bahan = 450 mm, 3x tekukan )
Steel Flashing t = 0.45 mm , lbr = 122 cm 1.050 ml
Material bantu ( 5% ) 1.000 ls
Upah pasang 1.000 ml

Fiber Lux, tebal 1,5 mm ex. ALKA type LT-7 type Clear + aksesories
Fiber Lux, tebal 1,5 mm ex. ALKA type LT-7 type Clear + aksesories 1.050 m2
Material bantu ( 7% ) 1.000 ls
Upah pasang 1.000 m2

Talang Zink Alum 0.50 mm penggantung plat


strip 50x5, L max 50 cm, Fabrikasi / Bending Material dilakukan di Pabrik
Talang Zink Alum 0.50 mm, Lebar 550 mm, h = 150 mm 1.050 m2
Besi plat strip 50x5 , per- 30 cm, fin. Cat 4.550 ml
Material bantu ( Paku, dinabolt ) ( 3.5% ) 1.000 ls
Upah + Pabrikasi dan pelubangan 1.000 m2

1.560
4.333

Talang Zink Alum 0.50 mm penggantung plat


strip 50x5, L max 40 cm, Fabrikasi / Bending Material dilakukan di Pabrik
Talang Zink Alum 0.50 mm, Lebar 400 mm, h = 150 mm 0.950 m2
Besi plat strip 40x4 , per- 30 cm, fin. Cat 4.117 ml
Material bantu ( Paku, dinabolt ) ( 3.5% ) 1.000 ls
Upah + Pabrikasi dan pelubangan 1.000 m2

1.560
4.333

Talang FRP Alum 3 mm penggantung plat


strip 50x5, L max 50 cm, Fabrikasi / Bending Material dilakukan di Pabrik
Talang FRP 3 mm, Lebar 500 mm, h = 450 mm 1.260 m2
Besi plat strip 40x4 , per- 30 cm, fin. Cat 6.760 ml
Material bantu ( Paku, dinabolt ) ( 3.5% ) 1.000 ls
Upah Pasang + Mob demo tenaga 1.000 m1

1.560
4.333

Roof Drain PVC dia 6"


Rood drain ex.lokal dia. 6" 1.000 bh
Upah Pasang 1.000 bh
Roof Drain PVC dia.4"
Roof Drain PVC dia.4" 1.000 bh
Upah Pasang 1.000 bh

Roof Drain PVC dia.2,5"


Roof Drain PVC dia.2,5" 1.000 bh
Upah Pasang 1.000 bh

Alumunium Composite Panel ex. SEVEN, 4 mm PVDF, alumunium 0.5 mm berikut rangka dan acessories
utk Canopy Depan, type QS 3103 colour White

Aluminium Composite Panel ex. Seven. t=0.5 mm pvdf, berikut rangka 1.000 m2
dan Accessories warna White unt bgn tampak depan / frame Curtain Wall

utk Aerodinamis, type QS 3103 colour White

a Aluminium Composite Panel ex. Seven. t=0.5 mm pvdf, berikut rangka 45.000 m2
dan Accessories warna White unt bgn tampak depan / frame Curtain Wall
b Acrilic t=10 mm 50.000 m1
c flexi + Sticker Transclucent col Daihatsu red 3M Schochcal TP. 3214 C 25.000 m1
d Plat strip t=5mm 25.000 m1
e Kawat putih 15.000 kg
f Besi beton dia 8mm 21.725 kg
g Alat bantu Skaffolding, 84.600 ls
h Upah 25.000 m1

0.250

Pekerjaan ACP
ACP ex. SEVEN PVDF t=0.5mm 1.050 m2
Rangka Hollow Alumunium/Galpanis 20x40x2mm 1.750 m1
Siku braket 10x10x2mm 0.200 m1
Spond uk. 0.1x1.2 m 4.000 m1
Sealand 4.000 m1
Skrup 0.200 ktk
Alat Bantu dan Skaffolding 2.100 m2
Upah Pasang 1.000 m2

Waterproofing, Cement base type AM 100 3 x Coating ex AM untuk :


Waterproofing, Cement base type AM 100 3 x Coating ex AM 1.000 m2
Alat Bantu 1.000 m2
Upah 1.000 m2

Waterproofing membrane, TORCHING SYSTEM, t=3 mm, type


SBS Polymer ex. SOPRALEN/AXTER/Trend HS + Screed, t = 5 cm +
Wiremesh M – 5 1 layer untuk Atap dak beton

Waterproofing membrane, TORCHING SYSTEM, t=3 mm, type 1.000 m2


SBS Polymer ex. AXTER
Screeding t = 5 cm 1.000 m2
Wiremesh M – 5 1 layer 1.000 m2

Pas dinding 1/2 bata 1 : 5 ( incl. kolom praktis )


a Batu bata 70.000 bh
Pasir pasang 0.040 m3
Semen @40 kg 0.205 zak
Alat bantu 1.000 ls
Upah 1.000 m2
kolom & balok praktis 0.667 ml

Pas dinding 1/2 bata 1 : 3 ( incl. kolom praktis )


b Batu bata 70.000 bh
Pasir pasang 0.064 m3
Semen portland 0.288 zak
Alat bantu 1.000 ls
Upah 1.000 m2
kolom & balok praktis 0.667 ml

Kolom Praktis Beton Site Mix K175 ( uk.15x15 cm )


Beton Site Mix 1 : 2 : 3 0.023 m3
Pembesian 1.688 kg
Bekisting 0.300 m2

Bekisting Kolom Praktis ( 2 x Pakai ) per m2


Kolom 15x15 cm, tinggi 3 m
plywood t = 9 mm 0.313 lbr
Kayu 5/7 0.006 m3
Paku 1.250 kg
Mould Oil 0.500 ltr
Upah, Bekisting + solar + bongkar + perapihan 3.600 m2
Plesteran dinding 1 : 4
Pasir Pasang 0.020 m3
Semen @40 kg 0.046 sak
Material & alat bantu 1.000 ls
Upah 1.000 m2

Plesteran dinding 1 : 2
Pasir Pasang 0.027 m3
Semen @40 kg 0.107 sak
Material & alat bantu 1.000 ls
Upah 1.000 m2

Acian dinding 1 : 3 t=1.5mm


Semen @40 kg 0.088 zak
Material & alat bantu 1.000 ls
Upah 1.000 m2
Tali Air / Sudutan / Benangan (Asumsi dalam 9m2 sudutan 12m1) 1.333 m1

Acian dinding beton 1 : 3


Semen @40 kg 0.194 zak
Material & alat bantu 1.000 ls
Upah 1.000 m2
Tali Air / Sudutan / Benangan (Asumsi dalam 9m2 sudutan 12m1) 1.333 m1

Finishing Cat dinding Bata


Cat dasar 1.000 m2
Mowilex E100 2 x 1.000 m2
Kuas 0.050 bh
roll 0.033 bh
Alat bantu stager dan stik 1.000 ls
upah pekerjaan 1.000 m2

Finishing Cat dinding Partisi Gypsum


Cat dasar 1.000 m2
Mowilex E100 2 x 1.000 m2
Kuas 0.050 bh
roll 0.033 bh
Alat bantu stager dan stik 1.000 ls
upah pekerjaan 1.000 m2

Finishing Cat Plafond Gypsum


Cat dasar 1.000 m2
Jotun Majestix Base Mate A 1.000 m2
Kuas 0.050 bh
roll 0.033 bh
Alat bantu stager dan stik 1.000 ls
upah pekerjaan 1.000 m2

Finishing Cat dinding Bata bagian Luar


Cat dasar 1.000 m2
Mowilex E100 2 x 1.000 m2
Kuas 0.050 bh
roll 0.033 bh
Alat bantu stager dan stik 1.000 ls
upah pekerjaan 1.000 m2

Finishing Cat dinding Bata Cat Minyak


Putih ( ex Mowilex) minyak 1.000 m2
Kuas 0.050 bh
roll 0.033 bh
Alat bantu stager dan stik 1.000 ls
upah pekerjaan 1.000 m2

Cat minyak hitam Putih

Teknokote white 1.000 m2


Kuas 0.050 bh
roll 0.033 bh
Alat bantu 1.000 ls
upah pekerjaan 1.000 m2

1 Untuk kansteen beton keliling ex. TEKNOKOTE 0.400 Lebar


- In Out 3.140 m2
- Tanda jalur 0.225 m2
- Border line putih : parkir motor 0.050 ml
- Border Line putih 10 cm 0.100 ml
- Border merah 40 cm 0.400 ml
- Tipe huruf P 0.100 ml
- Tipe huruf universal 76, Angka 1 ~... 0.050 ml
- Tulisan : Customer Parking, Employee Parking, Motor Cycle Park 0.150 ml
Parkir stock dll

Screeding untuk leveling lantai , t = 3 cm


Pasir pasang 0.034 m3
Semen @40 kg 0.156 sak
Alat bantu molen 0.002 hr
Upah 1.000 m2

Lapisan screed pelindung waterproofing , t = 5 cm


Pasir pasang 0.057 m3
Semen @40 kg 0.156 sak
Alat bantu molen 0.002 hr
Upah 1.000 m2

Lantai Homogeneous Tile 60x60cm Crystal Blck Polish ex. Granito


Homogeneous Tile 60x60cm Crystal Blck Polish ex. Granito 1.080 m2
Semen @40 kg 0.166 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Homogeneous Tile 60x60cm Crystal Greystone ex. Granito Polished


Homogeneous Tile 60x60cm Crystal Greystone ex. Granito Polished 1.080 m2
Semen @40 kg 0.166 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Homogeneous Tile 60x60cm Crystal Greystone ex. Granito unPolished


Homogeneous Tile 60x60cm Crystal Greystone ex. Granito unPolished 1.080 m2
Semen @40 kg 0.166 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Homogeneous Tile 60x60cm type Nordik Hitam ex. Niro Granit
Homogeneous Tile 60x60cm type Nordik Hitam ex. Niro Granit 1.080 m2
Semen @40 kg 0.166 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Homogeneous Tile 20x20cm Allia ex. Wisma Sehati


Homogeneous Tile 20x20cm Allia ex. Wisma Sehati 1.030 m2
Semen @40 kg 0.166 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Keramik 40x40 cm, ex. Roman type Chrysant Brown


Keramik 40x40 cm, ex. Roman type Chrysant Brown 1.030 m2
Semen @40 kg 0.166 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik 40x40 cm colour white ex. Roman (type G447106)


Keramik 40x40, type G447106 vivaz bianco ex. Roman 1.100 m2
Semen @40 kg 0.195 zak
Pasir pasang 0.100 m3
Semen MU408 @1 kg ( nat keramik ) 0.400 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Keramik Roman 30x30 cm, type G337106


Keramik 40 x 40 cm, ex Roman type G337106 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik 30 x 30 cm ex. Roman type G337403 Granity Smoke


Keramik uk. 30x30 ex. Roman type Granity Smoke 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai T. Wudhu Ex. Roman 20x20 cm ex. Roman Venere Mocha Type G220503
Keramik Roman 20x20 cm ex. Roman Venere Mocha Type G220503 1.100 m2
Semen @40 kg 0.195 zak
Pasir pasang 0.100 m3
Semen MU408 @1 kg ( nat keramik ) 0.400 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Plint Homogenous Tile uk. 10x60cm Crystal Blck Polish ex. Granito
Homogenous Tile 60x60cm Crystal Blck Polish ex. Granito 0.120 bh
upah potong 120.000 cm
Semen @40 kg 0.023 zak
Pasir pasang 0.008 m3
Semen MU408 @1 kg ( nat keramik ) 0.043 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Plint Homogenous Tile uk. 10x60cm Crystal Greystone ex. Granito Polished
Homogenous Tile 60x60cm Crystal Blck Polish ex. Granito 0.120 bh
upah potong 120.000 cm
Semen @40 kg 0.023 zak
Pasir pasang 0.008 m3
Semen MU408 @1 kg ( nat keramik ) 0.043 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Plint Homogenous Tile uk. 10x60cm Crystal Greystone ex. Granito unPolished
Homogenous Tile 60x60cm Crystal Blck Polish ex. Granito 0.120 bh
upah potong 120.000 cm
Semen @40 kg 0.023 zak
Pasir pasang 0.008 m3
Semen MU408 @1 kg ( nat keramik ) 0.043 kg
Alat bantu 1.000 ls
Upah 1.000 m2

0.180
Plint Homogenous Tile uk. 15x60cm Crystal Greystone ex. Granito Polished
Homogenous Tile 60x60cm Crystal Greystone Polish ex. Granito 0.180 bh
upah potong 120.000 cm
Semen @40 kg 0.023 zak
Pasir pasang 0.008 m3
Semen MU408 @1 kg ( nat keramik ) 0.043 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Plint Keramik Tile uk. 10x40 cm


Keramik 40x40, ex. Roman type. G.447106 White 0.286 bh
upah potong 120.000 cm
Semen @40 kg 0.034 zak
Pasir pasang 0.013 m3
Semen MU408 @1 kg ( nat keramik ) 0.065 kg
Alat bantu 1.000 ls
Upah 1.000 m2

0.04

Plint Keramik Tile uk. 10x40 cm


Keramik 40 x 40 cm, ex Roman type G337106 0.167 bh
upah potong 120.000 cm
Semen @40 kg 0.034 zak
Pasir pasang 0.013 m3
Semen MU408 @1 kg ( nat keramik ) 0.065 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Plint Keramik Tile uk. 10x20cm Allia ex. Wisma Sehati


Keramik 10x20cm Allia ex. Wisma Sehati 0.104 bh
upah potong 100.000 cm
Semen @40 kg 0.034 zak
Pasir pasang 0.013 m3
Semen MU408 @1 kg ( nat keramik ) 0.065 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Plint Keramik Tile uk. 10x30 cm


Keramik uk. 30x30 ex. Roman type Granity Smoke 1.300 bh
upah potong 90.000 cm
Semen @40 kg 0.034 zak
Pasir pasang 0.013 m3
Semen MU408 @1 kg ( nat keramik ) 0.065 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Lantai Beton Exposed Finishing Epoxy Green ex Propan ( 500 mikron )


Lantai Beton Exposed Finishing Epoxy Green ex Propan 1.000 m2
( 500 mikron )
GAIAMARU VINYL TILE Lebar x Panjang ( 184 mm x 950 mm)
Vinyl tile tipe 1215 Ex. Gaia Maru 1.040 m2
Lem kuning (solvent base adhesive) 0.150 kg
Perataan dan acian plat lantai 1.000 m2
Alat Bantu Upah Pasang 1.000 ls
Upah pasang 1.000 m2

Lantai Flour Hardener Finished COLORCONcrete


3kg /m2 warna natural ex. CHICHIBU
Flour Hardener 3kg /m2 warna natural ex. CHICHIBU 6.000 kg
Antisole E 125, ex. Sika 1.000 m2
Alat Bantu trowel 0.063 jam
Upah 1.000 m2

Stailess Steel hairline


Solid Square 1 x 1 cm 1.000 m1
Alat 1.000 ls
Upah pasang 1.000 m1

Steel Greating - overhoul


Steel Greating WA 225 Tipe Plain ex. Webforge 1.000 m1
Bagian pendukung 1.000 ls
Alat bantu 1.000 ls
Upah pasang 1.000 m1

Keramik dinding 20x40 cm, Roman type W40106 Serenity white


Keramik 20x40 cm, Roman ttype W40106 Serenity white 1.030 m2
Semen @40 kg 0.195 zak
Pasir pasang 0.100 m3
Semen MU408 @1 kg ( nat keramik ) 0.400 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik Dinding Homogenous Tile ( 300x600 ) tipe Perlindo / BAPA


Keramik Dinding uk. ( 300x600 ) mm Homogenous Tile tipe Perlindo / 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik dinding uk. 30x30 cm ex. Asia Tile White


Keramik dinding uk. 30x30 cm ex. Asia Tile White 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik dinding 30 x 30 cm, ex Roman type G337106


Keramik Roman 30 x 30 cm, ex Roman type G337106 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik dinding Ex. Roman 20 x 25 cm, ex Roman ype W22106 colour White
Keramik 20 x 25 cm, ex Roman type W22106 colour White 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Keramik 20 x 20 cm ex. Roman type W25106 White


Keramik uk. 20x20 ex. Romantype W25106 White 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Pengadaan & Pemasangan granit Hitam Nero Absuluto


Granite Hitam Nero Absuluto 1.100 m2
Semen MU 450/400 1.000 m2
Semen Sikatop 107 1.000 m2
Upah pasang 1.000 m2
Upah coating 1.000 m2
Top Granit Hitam, ujung luar di beveled untuk
penutup dinding bgn atas / lining sekat Urinoir Toilet & Meja Washtafel
Pengadaan & Pemasangan granit Hitam Nero Absuluto 1.100 m2

Top Granit Hitam, ujung luar di beveled untuk


Penutup sisi atas / lining dinding belakang kloset
Pengadaan & Pemasangan granit Hitam Nero Absuluto 1.100 m2

Canopy polycarbonate
twinlight polycarbonat ex. Intek t = 2 mm 1.030 m2
Accesorries ( 5% ) 1.000 ls
Upah pasang 1.000 kg

Dinding Polycarbonate t=2 mm + Rangka Hollow 40 x 40 Fin. Cat Duco warna putih
Dinding Polycarbonate t=2 mm 1.000 m2
Rangka Hollow 40 x 40 Fin. Cat Duco warna putih 1.000 m2
Upah pasang 1.000 m2

Kolom Showroom - D6, Finish HPL tipe Premier White ex Taco ( Full Top Plafond )
Plesteran bidang kolom ad 1 : 2 6.720 m2
Multiplek 12 mm 2.333 lbr
HPL tipe Premier White ex Taco 6.720 m2
Lem Kuning Crona 171 Sheet Solvent Based 10 Kg 2.300 kg
Paku beton 1.000 ktk
Alat bantu 1.000 ls
Upah Pasang 6.720 m2

Kolom Showroom - D6, Finish ACP ex. Seven White QC 3111


Plesteran bidang kolom ad 1 : 2 6.720 m2
Rangka Hollo 20x40x2.3 28.000 m1
ACP ex. Seven white QS 3111 9.000 m2
List U stanless mirorr uk. 1cm, setiap jarak 120 cm 8.000 m1
Dyna Bold M8 1.000 ktk
Alat bantu 1.000 ls
Upah Pasang 9.000 m2
Plint Stainless stell Hairline 100 mm, Kolom Showroom - D6
Plint lantai stainless steel hairline 100 mm 1.030 ml
Backing plin Multiplek 9 mm 0.500 ml
Alat Bantu 1.000 ls
Upah Pasang 1.600 ls

Kaca Glass t=8 mm + Structural Frame Black Mullion ex. Alexindo +


Powder Coating Phillip White
Kaca Glass t= 8 mm + Structural Frame Black Mullion ex. Alexindo + 1.020 m2

Clear Glass, t=12 mm + assesories, ex Asahimas


- Lantai 1 : tampak depan, samping & belakang
Tampak depan 1.100 m2
Tampak Samping 1.100 m2
Tampak belakang 1.100 m2

Cover transam dengan Acrilyc ( 13 titik )


box acrylik uk180 x 17 x 15 cm 4.000 unit
Box acrylik uk 90 x 17 x 15 cm 9.000 unit

Type 01, ( 5600 x 4720 )mm - Jndl kcp 8mm, 27.440 m2

Type 02, ( 1000 x 3580 )mm - Jndl kcp 8mm, 3.580 m2

Type 03, ( 3200 x 3000 )mm - Jndl kcp 8mm, 2.288 m2


Pintu Framless 2 daun kc tempered 12m , handle pipa Ø 1.5" st. steel 2.000 unit
floor hinge + asesories ex. Dorma hairline & mirror, uk.(2350x1500x2)

Type 04, ( 4600 x 3000 )mm - Jndl kcp 8mm, 2 unit 15.180 m2
Type 05, ( 6100 x 1500 )mm - Jndl kcp 8mm 9.150 m2

Type 08, ( 800 x 2360 )mm - Jndl kcp 8mm, 2.030 m2

Type 07, ( 21200 x 4700 )mm - Jndl kcp 8mm, 94.940 m2


Pintu Frameless 2 daun kc tempered 12m , handle pipa Ø 1.5" 2.000 unit
st. steel hairline & mirror, floor hinge + asesories ex. Dorma

Portal Merah rangka baja 30x30 cm fin ACP merah t. 4mm PVDF Ex Seven
- ACP ex. Saven red 11.273 m2
- Plat t = 8 mm 7.850 kg
- CNP 150x50x20x2.3 mm 77.376 kg
- Hollo 40x40x2.3 51.600 ml
- Angkur dia 13 mm 5.000 bh
- Upah pasang 1.000 ls

Type 09, ( 1600 x 2800 )mm - kc tempered 12mm, p 1 kc tempered 12mm


handle pipa Ø 1.5" st. steel hairline & mirror, floor hinge + asesories ex. Dorma 1.000 unit
- Kaca Tempered 12 mm (bagian atas dan samping 1.995 m2

Entrance Showroom
- Rangka besi Hollow
- Aluminium Composite Panel ex. Seven. t=0.5 mm, warna White

- Rangka besi Hollow 53.942 m2


berikut rangka dan Accessories warna White unt bgn tampak depan / frame Curtain Wall

Entrance Service
- Rangka besi Hollow
- Aluminium Composite Panel ex. Seven. t=0.5 mm, warna White

- Rangka besi Hollow 39.265 m2


berikut rangka dan Accessories warna White unt bgn tampak depan / frame Curtain Wall
Partisi Gypsum t=9 mm ex. Jayaboard berikut Rangka Hollow 40x40, t=0.4 mm, area Office.
Full partisi, h = 3 m
Gypsum 9 mm ex. Jayaboard 2.000 m2
rangka hollow 40/40mm t = 0,4 mm 2.000 m2

Gypsum t=9 mm ex Jayaboard + Rangka Hollow 4x4 cm t=0.4 mm & penggantung


(termasuk pelubangan untuk lampu )
Gypsum 9 mm ex. Jayaboard 1.000 m2
Rangka Hollow 4x4 cm t=0.4 mm 1.000 m2
Kompon 0.250 ml
Cat Finish 1.000 m2
Alat Bantu steger 1.000 ls
Upah 1.000 m2

Gypsum t=12 mm ex Jayaboard + Rangka Hollow 4x4 cm t=0.4 mm & penggantung


(termasuk pelubangan untuk lampu )
Gypsum 12 mm ex. Jayaboard 1.000 m2
Rangka Hollow 4x4 cm t=0.4 mm 1.000 m2
Kompon 0.250 ml
Cat Finish 1.000 m2
Alat Bantu steger 1.000 ls
Upah 1.000 m2

Gypsum t=10 mm Wet Area ex Jayaboard + Rangka Hollow 4x4 cm t=0.4 mm & penggantung
(termasuk pelubangan untuk lampu )
Gypsum 10 mm ex. Jayaboard WET Area 1.000 m2
Rangka Hollow 4x4 cm t=0.4 mm 1.000 m2
Kompon 0.250 ml
Cat Finish 1.000 m2
Alat Bantu steger 1.000 ls
Upah 1.000 m2

GRC t=9 mm + Rangka Hollow 4x4 cm t=0,8mm & penggantung


(termasuk pelubangan untuk lampu )
GRC 9 mm ex. 1.000 m2
Rangka Hollow 4x4 cm t=0,8 mm 1.000 m2
Kompon 0.250 ml
Cat Finish 1.000 m2
Alat Bantu steger 1.000 ls
Upah 1.000 m2

Drop ceilling t = 300 mm SA


Gypsum 9 mm ex. Jayaboard 0.440 ml
Rangka Hollow 4x4 cm t=0.4 mm 1.100 ml
Kompon 0.125 ml
Cat Finish 1.000 m2
Alat Bantu steger 1.000 ls
Upah 1.000 m2

Drop ceilling t = 200 mm Penerimaan Service


Gypsum 9 mm ex. Jayaboard WET Area 0.330 ml
Rangka Hollow 4x4 cm t=0.4 mm 1.100 ml
Kompon 0.125 ml
Cat Finish 1.000 m2
Alat Bantu steger 1.000 ls
Upah 1.000 m2

Tempat Lampu diatas SA - ' Lampu Piano ' berikut peletakan


Acrylic dan finishing gypsum dalam kotak lampu
Gypsum 9 mm ex. Jayaboard WET Area 1.500 m2
Rangka Hollow 4x4 cm t=0.4 mm 12.000 ml
Acrilik 5mm putih susu 0.075 m2
Cat Finish 1.500 m2
Kompon 0.250 ml
Alat Bantu steger 1.000 ls
Upah 1.500 m2

Tempat Lampu diatas SA - ' Lampu Piano ' berikut peletakan


Acrylic dan finishing gypsum dalam kotak lampu
Gypsum 9 mm ex. Jayaboard 6.600 m2
Rangka Hollow 4x4 cm t=0.4 mm 16.500 ml
Acrilik 5mm putih susu 14.300 m2
Main T Stainless 22.967 ml
Cat Finish 6.600 m2
Kompon 10.000 ml
Alat Bantu steger 2.000 ls
Upah 6.600 m2

List alumunium U uk. 1x1 cm untuk plafond gypsum


List alumunium U uk. 1x1 cm untuk plafond gypsum 1.000 ml
Exposed Ceiling w/ Touch Up fin. Ex. DULUX White
perapihan dak beton dengan semen acian 1.000 m2
Cat emulsi warna Putih ex. Dulux 1.000 m2

Plafond Aluminium Composite Panel t=0.5 mm + rangka & Penggantung


utk : Canopy Service Reception, Loading Unloading
Plafond Aluminium Composite Panel t=0.5 mm + rangka 1.000 m2
& Penggantung

Closet Duduk type type CW 821 J/SW 821 JP, AVANTE ex. TOTO

Closet Duduk type type CW 821 J/SW 821 JP, AVANTE ex. TOTO 1.000 unit
Alat bantu 1.000 ls
Upah pasang 1.000 unit

Closet Jongkok type CE 7 ex. Toto

Closet Jongkok type CE 6 ex. Toto 1.000 unit


Alat bantu 1.000 ls
Upah pasang 1.000 unit

Paper Holder ex TOTO TX 703 AESV 1

Paper Holder ex TOTO TX 703 AESV 1 1.000 unit


Alat bantu 1.000 ls
Upah pasang 1.000 unit

Floor Drain TX1BN ex. Toto

Floor Drain TX1BN ex. Toto 1.000 unit


Alat Bantu 1.000 ls
Upah pasang 1.000 unit

Closet Jongkok ex. TOTO type CE 7

Closet Jongkok ex. TOTO type CE 7 1.000 unit


Alat Bantu 1.000 ls
Upah pasang 1.000 unit
Lavatory ex. TOTO type LW 642 CJ, TX 115 LESN, THX 1A - 5N, TX 263 SV1 (x2), TX 710 L

Lavatory ex. TOTO type LW 642 CJ, TX 115 LESN, THX 1A - 5N 1.000 unit
TX 263 SV1 (x2), TX 710 L
Alat Bantu 1.000 ls
Upah pasang 1.000 unit

Hand Dryer ex. TOTO Type HD 4000 M

Hand Dryer ex. TOTO Type HD 4000 M 1.000 unit


Upah pasang 1.000 unit

Shower Spray ex. TOTO type TX 403 SNS (black)

Shower Spray ex. TOTO type TX 403 SNS (black) 1.000 unit
Upah pasang 1.000 unit

Fixed Shower Head tipe TX 422 S + TX 421 SCNC ex. TOTO

Fixed Shower Head tipe TX 422 S + TX 421 SCNC ex. TOTO 1.000 unit
Alat Bantu 1.000 ls
Upah pasang 1.000 unit

Soap holder ex. TOTO type TS 125 R

Soap holder ex. TOTO type TS 125 R 1.000 unit


Upah pasang 1.000 unit

Kran air tipe T 23 BQ 13 N ex.Toto

Kran air tipe T 23 BQ 13 N ex.Toto 1.000 unit


Alat bantu 1.000 ls
Upah pasang 1.000 unit

Kran ex. TOTO type T 30 AR 13 V 7 ( N ) untuk Kitchen Sink

Kran ex. TOTO type T 30 AR 13 V 7 ( N ) untuk Kitchen Sink 1.000 unit


Alat Bantu 1.000 ls
Upah pasang 1.000 unit

Kran ex. TOTO type T 30 AR 13 V 7 ( N ) untuk Wastafel

Kran ex. TOTO type TX 115 LESBR ex Toto 1.000 unit


Alat Bantu 1.000 ls
Upah pasang 1.000 unit

Kran ex. Tipe Y 20 X) untuk Janitor

Kran tipe Y 20 X ex San-Ei 1.000 unit


Alat Bantu 1.000 ls
Upah pasang 1.000 unit

Meja Wastafel Top Table Granite Alam Nero Assoluto ex. Italy uk. 60x190 cm
p = 190 cm, l = 60 cm

Meja Wastafel Top Table 1.900 ml


Top Table Granite Alam Black ex.Nero Absoluto 1.935 m2

Meja Wastafel Top Table Granite Alam Nero Assoluto ex. Italy uk. 60x190 cm
p = 190 cm, l = 60 cm

Meja Wastafel Top Table 1.900 ml


Top Table Granite Alam Black ex.Nero Absoluto 1.935 m2

Pengadaan & pemasangan Granite Alam Nero Assoluto ex. Italy


spesi pasir + semen

Granite Alam Nero Assoluto ex. Italy 1.250 m2


Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

Luas Meja Wastafel

Cermin Frame/Beveled t=6 mm uk.80x110 cm Diatas Wastafel


P=190 cm, L=120
Cermin t= 6 mm 2.400 m2
Upah gosok mesin 6.400 ml
upah beveled 2 cm 6.400 ml
pin 8.000 bh
Ongkos pasang cermin 2.400 m2
Sealand 2.000 bh
material bantu 0.025
Overhead 0.050

Rangka Cermin diatas Wastafel


Multiplek t = 18 mm Dudukan cermin 2.000 lbr
Rangka Hollow 40x40x2,3 cm 8.400 ml
Paku beton 3'' 0.200 kg
Alat bantu 1.000 ls
Upah 5.760 m2

Cermin Frame/Beveled t=6 mm uk.165x110 cm Full Body


Cermin t= 6 mm 2.200 m2
Upah gosok mesin 5.500 ml
upah beveled 2 cm 5.500 ml
pin 6.000 bh
Ongkos pasang cermin 2.200 m2
Plywood 18 mm 1.000 lmbr
Sealand 2.000 bh
material bantu 0.025 %
fabrikasi & Instalasi 1.000 unit
Overhead 0.050 %

Meja pantry beton finish keramik 20x20 cm, l=80 cm, p=2,5 m

Meja Wastafel beton T=10 cm, 2.500 ml


Alat Bantu 1.000 ls
finish keramik 20x20 cm 2.625 m2

Urinal U57M lengkap terpasang

Urinal U57M 1.000 unit


Alat bantu 1.000 ls
Upah pasang 1.000 unit
Urinal Partisi A100 lengkap terpasang

A100 1.000 unit


Alat bantu 1.000 ls
Upah pasang 1.000 unit

Kitchen set ex. Royal type Clara lengkap terpasang


Dimensi P=900 cm, L=505 cm, T=154 cm
Kitchen Sink 1 lubang ex-ROYAL type Clara SB-78 1.000 unit
FRP u/ saringan lemak ( fiber glass) 1.000 unit
Alat bantu 1.000 ls
Upah pasang 1.000 unit

Gantungan Pakaian
Gantungan Pakaian ex. TOTO type TS118WSB 1.000 bh
Alat Bantu 1.000 ls
Upah 1.000 bh

PEKERJAAN FINISHING TANGGA

Handrail S.Steel Hollow 40 x 60 & Tiang S.Steel Hollow 40 x 60 +


+ Palang S.Steel Hollow 20 x 20 lengkap dengan angkur dia. 8 mm.

Handrail S.Steel Hollow 40 x 60 & Tiang S.Steel Hollow 40 x 60 + 1.000 ml


+ Palang S.Steel Hollow 20 x 20 lengkap dengan angkur dia. 8 mm.

PEKERJAAN LAIN-LAIN

Karpet Utk R.Musholla t= 1 cm, Kualitas sajadah,ending rapi.


Karpet lantai roll ex.Rainbow type Spring / Trojen / Ventur 1.050 m2
underlayer 1.050 m2
Upah pasang carpet + layer 1.000 m2

Matting/ Keset ( Warna Standard Auto 2000 ex. 3M ) uk. 100x40 cm


Matting/ Keset ex. 3M 0.460 m2
Upah pasang 0.460 m2

PEKERJAAN KOSEN, PINTU & JENDELA

Type P1 (2480x2450 mm) untuk Pintu Entrance Utama


- Tempered Glass, t=12 mm, Frameless
- Alluminium composite panel
- Accessories
* Pull Handel Stainless Steel Hairline,Hollow 40x40,H=150 cm,d=4 mm ex. SOLID
* Floor Hinge ex. DORMA type BTS 84 (EN 6)
* Top, bottom & corner lock Patch ex. DORMA

~ ACP ( cover Portal )


Alluminium composite panel ex.Seven + Rangka hollow 7.986 m2

~ Pintu Kaca Frameless Tempered 12 mm ( Double Swing )


Kaca 12mm tempered 4.356 m2
GMK 12.760 m1
Sealent 12.760 ml
Coak samping 6.000 pcs
bor 4.000 pcs
Pull Handel Stainless Steel Hairline,Hollow 40x40,H=150 cm,d=4 mm 2.000 set
Floor Hinge ex. DORMA type BTS 84 (EN 6) 2.000 set
Top Patch type PT 20 ex. DEKSON 2.000 set
Bottom Patch type PT 10 ex. DORMA 2.000 set
Corner Lock type PT 30 ex. DORMA 2.000 set
Door Stopper type Stainless Steel ex. DORMA 2.000 set
Material support 0.025
Fabrikasi dan installasi Pintu 2.000 unit
Overhead 0.050

Type P1A (1980x3600 mm) untuk Pintu Entrance Samping


- Tempered Glass, t=12 mm, Frameless
- Accessories
* Pull Handel Stainless Steel Hairline,Hollow 40x40,H=150 cm,d=4 mm
* Floor Hinge ex. DORMA type BTS 84 (EN 6)
* Top, bottom & corner lock Patch ex. DORMA

Kaca 12mm tempered 7.128 m2


GMK 19.920 m1
Sealent 19.920 ml
Coak samping 6.000 pcs
bor 4.000 pcs
Pull Handel Stainless Steel Hairline,Hollow 40x40,H=150 cm,d=4 mm 2.000 set
Floor Hinge ex. DORMA type BTS 84 (EN 6) 2.000 set
Bottom Patch type PT 10 ex. DORMA 2.000 set
Corner Lock type PT 30 ex. DORMA 2.000 set
Door Stopper type Stainless Steel ex. DORMA 2.000 set
Door Stopper type Stainless Steel ex. DEKSON 2.000 set
Material support 0.025
Fabrikasi dan installasi Pintu 2.000 unit
Overhead 0.050
Type PK1 (900x2400 mm) untuk Pintu Kabeng, R. Karu, gudang sparepart
- Frame alluminium, kaca clear tebal 6mm + sticker sandblast
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 5.700 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 6.360 ml
Kaca clear t =6 mm 2.160 m2
GMK 6.360 m1
Sealent 6.360 ml
Sticker Sandblast 1.080 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Overhead 0.050

Type P2 (900x2400 mm) untuk Pintu, R. MPR


- Tempered Glass, t=12 mm, Frameless
- Accessories
* Pull Handel Stainless Steel Hairline,Hollow 40x40,H=60 cm
* Floor Hinge ex. DORMA type BTS 84 (EN 6)
* Top, bottom & corner lock Patch ex. DORMA

Kaca 12mm tempered 2.160 m2


GMK 6.600 m1
Sealent 6.600 ml
Coak samping 3.000 pcs
bor 2.000 pcs
Pull Handel Stainless Steel Hairline,Hollow 40x40,H=60 cm 1.000 set
Floor Hinge ex. DORMA type BTS 84 (EN 6) 1.000 set
Bottom Patch type PT 10 ex. DORMA 1.000 set
Corner Lock type PT 30 ex. DORMA 1.000 set
Door Stopper type Stainless Steel ex. DORMA 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Material support 0.025
Fabrikasi dan installasi Pintu 2.000 unit
Overhead 0.050

Type PK2 (900x2700 mm) untuk Pintu Smoking area, Admin, R. Karu
- Frame alluminium, kaca clear tebal 6mm + sticker sandblast
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 6.300 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 6.960 ml
Kaca clear t =6 mm 2.430 m2
GMK 6.960 m1
Sealent 6.960 ml
Sticker Sandblast 2.430 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Overhead 0.050

Type AD1 (uk. 950 x 2430 mm) utk Gudang


- Frame alluminium, daun pintu rangka Playwod t=2,4, triplek, laminate, list stainless steel
- Accessories
* Door handle (push pull)
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 6.000 ml


multiplex 16 mm 2.000 lbr
hpl Arborate 2.000 lbr
metal Laminate Hairline ex. Wilson Art Brus Alu 0.300 lbr
Lem Kuning Crona 171 Sheet Solvent Based 1.150 lbr
plat SS HL, t=5 mm 10.400 ml
Contact glue 1.000 kg
Edging pvc 6.800 m1
nat s/s 5 mm 3.200 m1
kaca T= 6 mm 0.240 m2
Gosok mesin 2.200 ml
Sealent 2.200 ml
Lover dari kayu lapis hpl 1.000 unit
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type PU1 (850x2700 mm) untuk Pintu Jendela Gendong (600x2300)


- Frame alluminium, daun pintu rangka Playwod t=2,4, triplek, laminate, list stainless steel
- Accessories
* Door handle (push pull)
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 9.150 ml


multiplex 16 mm 2.000 lbr
hpl Arborate 2.000 lbr
Lem Kuning Crona 171 Sheet Solvent Based 1.150 lbr
Contact glue 1.000 kg
Edging pvc 6.400 m1
nat s/s 5 mm 3.200 m1
kaca T= 6 mm 1.380 m2
Gosok mesin 2.200 ml
Sealent 2.200 ml
Lover dari kayu lapis hpl 1.000 unit
Sticker Sandblass 1.080 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type 11, ( 600 x 1250 )mm - p 1 dn plat besi fin cat ( engsel sendok ). PINTU SHAFF
- Plat besi t=2mm 23.550 kg
- Rangka Pintu hollow 40x40x2.3 3.700 ml
- Kusen hollow 40x40x2.3 4.200 ml
- Engsel 2'' 2.000 bh
- Handle 1.000 bh
Upah Pasang 1.000 unit

Type ADW1 (uk 1500 x 2430 mm) utk R. Ganti Mekanik, R. Istirahat Mekanik, Dapur dan R. Makan
- Frame alluminium, kaca clear tebal 6mm
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 10.450 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 7.000 ml
Kaca clear t =6 mm 12.000 m2
GMK 16.740 m1
Sealent 16.740 ml
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Overhead 0.050
Type PK1 (1750 x 2150 mm) untuk Pintu jendela jungkit akses bengkel ke showroom
- Frame alluminium, kaca clear tebal 6mm
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 8.100 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 7.000 ml
Frame Jendela, Alumunium powder coating, ex. Alexindo 3.900 ml
Kaca clear t =6 mm 4.680 m2
GMK 8.040 m1
Sealent 8.040 ml
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Overhead 0.050

Type 23, ( 1900 x 1500 )mm - jndl kc tempered 12mm R. Kasir


- Kaca Tempered 12 mm 2.850 m2
- Pelubangan 4.000 bh
- Accessoris 1.000 ls
- Ongkos pasang pintu 1.000 unit

Type 23, ( 1900 x 1500 )mm - jndl kc tempered 12mm R. Kasir


- Kaca Tempered 12 mm 2.700 m2
- Pelubangan 4.000 bh
- Accessoris 1.000 ls
- Ongkos pasang pintu 1.000 unit

Type 11a, ( 3400 x 2100 )mm - jndl kc tempered 12mm Toilet


- Kaca Tempered 12 mm 7.140 m2
- Pelubangan 4.000 bh
- Sticker Sandblase 7.140 bh
- Accessoris 1.000 ls
- Ongkos pasang pintu 1.000 unit
Type 11b, ( 1000 x 2100 )mm - jndl kc tempered 12mm Toilet
- Kaca Tempered 12 mm 2.100 m2
- Pelubangan 4.000 bh
- Sticker Sandblase 2.100 bh
- Accessoris 1.000 ls
- Ongkos pasang pintu 1.000 unit

Type 11c, ( 2400 x 2100 )mm - jndl kc tempered 12mm Toilet


- Kaca Tempered 12 mm 5.040 m2
- Pelubangan 4.000 bh
- Sticker Sandblase 5.040 bh
- Accessoris 1.000 ls
- Ongkos pasang pintu 1.000 unit

Type 11d, ( 1600 x 2100 )mm - jndl kc tempered 12mm Toilet


- Kaca Tempered 12 mm 3.360 m2
- Pelubangan 4.000 bh
- Sticker Sandblase 3.360 bh
- Accessoris 1.000 ls
- Ongkos pasang pintu 1.000 unit

Type PU3 (1700x2400 mm) untuk Pintu R. Sales, R. Rapat


- Frame alluminium, daun pintu rangka blackboard t=2,4, triplek, laminate, list stainless steel
- Accessories
* Cylinder dead lock ex Dekkson
* Door handle ex dekkson
* Door closer ex dekkson
* Butt hinges

Kusen Alumunium powder coating putih 3", ex. Alexindo 6.500 ml


multiplex 16 mm 4.000 lbr
hpl Arborate 4.000 lbr
Contact glue 2.000 kg
Edging pvc 13.200 m1
nat s/s 5 mm 17.520 m1
Ongkos pasang pintu 2.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 2.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 2.000 set
Door Closer type TS 68 ex DORMA 2.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 3.000 set
Casement & Friction Stay ex. DEKSON 2.000 set
Door Stopper type Stainless Steel ex. DEKSON 3.000 set
Over head 0.050

Type AD2 (uk. 800 x 2430 mm) utk Toilet


- Frame alluminium, daun pintu rangka blackboard t=2,4, triplek, laminate, list stainless steel
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 5.700 ml


multiplex 16 mm 2.000 lbr
hpl Arborate 2.000 lbr
plat SS HL, t=5 mm 10.400 ml
Contact glue 1.000 kg
Edging pvc 6.600 m1
nat s/s 5 mm 8.760 m1
Ongkos pasang pintu 1.000 unit
Lover dari kayu lapis hpl 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type PVC (700x2000 mm) untuk Pintu Toilet


- Frame alluminium, daun pintu PVC ex platindo
- Accessories
* Door handle
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 4.700 ml


pintu PVC ex platindo 1.000 unit
Upah pasang daun pintu 1.000 unit

Type 22, ( 8750 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
kc tempered 12mm, pin S/S Hairline
- Partisi Gypsum 23.250 m2
- Kaca Tampered 12 mm 1.000 unit
- Papan t=1 cm 0.015 m3
- Cat dinding partisi 46.500 m2

Type 24 ( 5000 x 3000 )mm - Gypsum 9mm, rangka hollow, finish


cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
kc tempered 12mm, pin S/S Hairline
p 1 dn double multiplek 6mm fin HPL Canadian Maple
ex Arborite Pearl, plat st. steel hairline 5mm, door closer ex Dorma
- Partisi Gypsum 9.240 m2
- Kaca Tampered 12 mm 1.000 unit
- Papan t=1 cm 0.008 m3
- Cat dinding partisi 18.480 m2
- Pintu panel lapis hpl Alur stailess 1.000 unit
- Ambalan Loket 1.000 unit

Type 25 ( 5400 x 3000 )mm - Gypsum 9mm, rangka hollow, finish


cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
kc tempered 12mm, pin S/S Hairline
p 1 dn double multiplek 6mm fin HPL Canadian Maple
ex Arborite Pearl, plat st. steel hairline 5mm, door closer ex Dorma
- Partisi Gypsum 14.040 m2
- Papan t=1 cm 0.011 m3
- Cat dinding partisi 28.080 m2
- Pintu panel lapis hpl Alur stailess 1.000 unit

Type 26, ( 3100 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
+ lubang loket,
- Partisi Gypsum 9.300 m2
- Papan t=1 cm 0.006 m3
- Cat dinding partisi 18.600 m2
- Ambalan Loket 1.000 unit

Type 27, ( 3550 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
- Partisi Gypsum 10.500 m2
- Papan t=1 cm 0.007 m3
- Cat dinding partisi 21.000 m2

Type 28, ( 4500 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
p 1 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
plat st. steel hairline 5mm, door closer ex Dorma, jndl kcp 6mm lapis sticker
p 1 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
kcp 6mm, door closer ex Dorma,
- Partisi Gypsum 6.900 m2
- Papan t=1 cm 0.009 m3
- Cat dinding partisi 13.800 m2
- Pintu panel lapis hpl Alur stailess 2.000 unit

Type 29, ( 2450 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
- Partisi Gypsum 7.350 m2
- Papan t=1 cm 0.005 m3
- Cat dinding partisi 14.700 m2

Type 30, ( 4200 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
p 1 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
plat st. steel hairline 5mm, door closer ex Dorma, jndl kcp 6mm lapis sticker
p 1 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
kcp 6mm, door closer ex Dorma,
- Partisi Gypsum 9.300 m2
- Papan t=1 cm 0.008 m3
- Cat dinding partisi 18.600 m2
- Pintu panel lapis hpl Alur stainless 1.000 unit

Type 31, ( 3200 x 3000 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
- Partisi Gypsum 9.600 m2
- Papan t=1 cm 0.005 m3
- Cat dinding partisi 19.200 m2

Type 15 (3800 x 2150 mm) untuk Pintu Jendela Gendong (600x2300) dan Loket
- Frame alluminium, daun pintu rangka Playwod t=2,4, triplek, laminate, list stainless steel
- Accessories
* Door handle (push pull)
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 15.800 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 6.700 ml
Frame Loket, Alumunium powder coating, ex. Alexindo 2.600 ml
Kaca clear t =6 mm 4.320 m2
GMK 16.740 m1
Gosok mesin 2.200 ml
Sealent 2.200 ml
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type 17 (1100 x 2150 mm) untuk Pintu Jendela Gendong (600x2300) dan Loket
- Frame alluminium, daun pintu rangka Playwod t=2,4, triplek, laminate, list stainless steel
- Accessories
* Door handle (push pull)
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 5.400 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 6.700 ml
Kaca clear t =6 mm 2.580 m2
GMK 5.940 m1
Gosok mesin 4.000 ml
Sealent 4.000 ml
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type 14, ( 2000 x 2150 )mm - p 2 dn besi hitam


4.300 m2
cat besi swadaya mesh # 50x50 mm, Ø 4.08mm di las
type 228 ex swadaya mesh , plat t. 1,2 mm fin, cat putih

Type 16, ( 2600 x 2150 )mm, ( 1250 x 1250 )mm - p 1 dn sliding besi hitam
ø 2 + plat strip 2 cm, , fin. cat besi swadaya mesh # 50x50 mm, 5.590 m2
Ø 4.08mm di las type 228 ex swadaya mesh , plat t. 1,2 mm fin, cat putih
box + rel ex Henderson
jndl besi hitam ø 2"+ plat strip 2 cm fin. cat besi, swadaya mesh
# 50x50 mm, Ø 4.08mm di las, type 228 ex swadaya mesh

Type 18, ( 900 x 2150 )mm - p 1 dn besi hitam ø 2 + plat strip 2 cm, , fin. 1.935 m2
cat besi swadaya mesh # 50x50 mm, Ø 4.08mm di las
type 228 ex swadaya mesh , plat t. 1,2 mm fin, cat putih

Type 19, ( 1600 x 2150 )mm - p 1 dn besi hitam ø 2 + plat strip 2 cm, , fin.
cat besi swadaya mesh # 50x50 mm, Ø 4.08mm di las 3.440 m2
type 228 ex swadaya mesh , plat t. 1,2 mm fin, cat putih
jndl besi hitam ø 2"+ plat strip 2 cm fin. cat besi, swadaya mesh
# 50x50 mm, Ø 4.08mm di las, type 228 ex swadaya mesh
Type 20, ( 5000 x 2150 )mm - p 2 dn besi hitam ø 2 + plat strip 2 cm, , fin. 7.770 m2
cat besi swadaya mesh # 50x50 mm, Ø 4.08mm di las
type 228 ex swadaya mesh + fibre sisi luar
, plat t. 1,2 mm fin, cat putih
jndl besi hitam ø 2"+ plat strip 2 cm fin. cat besi, swadaya mesh
# 50x50 mm, Ø 4.08mm di las, type 228 ex swadaya mesh

Type 01 (1200x1600 mm) untuk Pintu Gudang tool Area Bengkel


- Sliding door, frame alluminium fin powder coating
- Clear float glass 6mm
- Accessories
* Door handle ex dekkson
* Butt hinges

Kusen Alumunium powder coating putih 3", ex. Alexindo 5.600 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 11.200 ml
Kaca clear t =6 mm 1.800 m2
GMK 5.600 m1
Sealent 5.600 ml
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Casement & Friction Stay ex. DEKSON 1.000 set
Overhead 0.050

Type 02 (500 x 2150 mm) untuk BV


- Frame alluminium, daun jendela
- Accessories

Kusen Alumunium powder coating putih 3", ex. Alexindo 5.700 ml


Ongkos pasang pintu 1.000 unit
kaca 6 mm 1.380 m2
Sealent 5.800 ml
Gosok mesin 5.800 ml
Ongkos pasang 1.380 m2
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Over head 0.050

Type BV1 (uk. 650 x 450 mm) untuk Toilet


- Frame alluminium, daun jendela
- Accessories

Kusen Alumunium powder coating putih 3", ex. Alexindo 2.600 ml


kaca 6 mm 0.350 m2
Sealent 5.800 ml
Gosok mesin 5.800 ml
Ongkos pasang 0.350 m2
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Over head 0.050

Type AW-2 (uk. 1350 x 1530 mm) utk R. Ganti Mekanik, R. Istirahat Mekanik, Dapur dan R. Makan
- Frame alluminium, daun jendela
- Accessories

Kusen Alumunium powder coating putih 3", ex. Alexindo 7.500 ml


kaca 6 mm 3.100 m2
Sealent 5.800 ml
Gosok mesin 5.800 ml
Ongkos pasang 3.100 m2
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Over head 0.050

Type 05 (1700x2700 mm) untuk Pintu dan jendela gendong sandblas


- Frame alluminium, daun pintu rangka blackboard t=2,4, triplek, laminate, list stainless steel
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 9.300 ml


multiplex 16 mm 2.000 lbr
hpl Arborate 2.000 lbr
Contact glue 1.000 kg
Edging pvc 6.600 m1
Kaca 6 mm 2.160 m2
nat s/s 5 mm 8.760 m1
Sticker sandblas 0.845 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050
Dinding partisi Gypsum 9mm 1.100 m2
Cat dinding partisi 2.200 m2

Type 06 (2600x2700 mm) untuk Pintu dan jendela gendong sandblas


- Frame alluminium, daun pintu rangka blackboard t=2,4, triplek, laminate, list stainless steel
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 9.300 ml


multiplex 16 mm 2.000 lbr
hpl Arborate 2.000 lbr
Contact glue 1.000 kg
Edging pvc 6.600 m1
Kaca 6 mm 3.360 m2
nat s/s 5 mm 8.760 m1
Sticker sandblas 0.845 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050
Dinding partisi Gypsum 9mm 1.600 m2
Cat dinding partisi 3.200 m2

Type 07 - ( 2600 x 2700 )mm - Gypsum 9mm, rangka hollow, finish


cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
Dinding partisi Gypsum 9mm 7.540 m2
Cat dinding partisi 15.080 m2
Ongkos pasang 7.540 m2

Type 12 - ( 3800 x 2700 )mm - Gypsum 9mm, rangka hollow, finish


cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
Dinding partisi Gypsum 9mm 11.020 m2
Cat dinding partisi 22.040 m2
Ongkos pasang 11.020 m2

Type 08 (8900x2700 mm) untuk Pintu dan jendela gendong sandblas


( 8900 x 2700 )mm - Gyps( 8900 x 2700 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm,cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
jndl kcp 6mm lapis stickerjndl kcp 6mm lapis sticker

Kusen Alumunium powder coating putih 3", ex. Alexindo 10.000 ml


Kaca 6 mm 2.160 m2
Sticker sandblas 0.845 m2
Ongkos pasang pintu 1.000 unit
Over head 0.050
Dinding partisi Gypsum 9mm 21.590 m2
Cat dinding partisi 43.180 m2
Type 09, ( 11700 x 2700 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
p 2 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
plat st. steel hairline 5mm, door closer ex Dorma
p 1 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
kcp 6mm, door closer ex Dorma, jndl kcp 6mm lapis sticker
- Pintu double swing HPL 1.000 unit
- Pintu swing panel lapis HPLdan jendela kaca sandblas 1.000 unit
- Dinding partisi Gypsum 9mm 24.840 m2
- Cat dinding partisi 49.680 m2

Type 10, ( 11000 x 2700 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
p 2 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
plat st. steel hairline 5mm, door closer ex Dorma
jndl kcp 6mm lapis sticker
- Pintu double swing HPL 1.000 unit
- Pintu swing panel lapis HPLdan jendela kaca sandblas 1.000 unit
- Dinding partisi Gypsum 9mm 22.075 m2
- Cat dinding partisi 44.150 m2

Type 11, ( 3800 x 2700 )mm - Gypsum 9mm, rangka hollow, finish
cat tembok, papan t= 1cm, 2 lapis dipasang di dlm partisi
p 1 dn double multiplek 6mm fin HPL Canadian Maple ex Arborite Pearl
plat st. steel hairline 5mm, door closer ex Dorma
jndl kcp 6mm lapis sticker
- Pintu swing panel lapis HPLdan jendela kaca sandblas 1.000 unit
- Dinding partisi Gypsum 9mm 6.480 m2
- Cat dinding partisi 12.960 m2

Type JB1 (uk.3600x5560 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 42.200 ml


kaca 6 mm 20.016 m2
Sealent 66.000 ml
Gosok mesin 66.000 ml
Ongkos pasang 20.016 m2
Type JB1' (uk.2700x5560 mm)
- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 35.740 ml


kaca 6 mm 15.012 m2
Sealent 62.400 ml
Gosok mesin 62.400 ml
Ongkos pasang 15.012 m2

Type JB2 (uk.3600x6800 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 52.000 ml


kaca 6 mm 24.480 m2
Sealent 83.200 ml
Gosok mesin 83.200 ml
Ongkos pasang 24.480 m2

Type JB2' (uk.2700x6800 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 40.700 ml


kaca 6 mm 18.360 m2
Sealent 62.400 ml
Gosok mesin 62.400 ml
Ongkos pasang 18.360 m2

Type JB3 (uk.3600x5580 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm - exclude pintu

Kusen Alumunium powder coating putih 3", ex. Alexindo 43.200 ml


kaca 6 mm 17.658 m2
Sealent 68.200 ml
Gosok mesin 68.200 ml
Ongkos pasang 17.658 m2
Type JB3' (uk.2700x5500 mm)
- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm - exclude pintu

Kusen Alumunium powder coating putih 3", ex. Alexindo 35.500 ml


kaca 6 mm 12.420 m2
Sealent 49.200 ml
Gosok mesin 49.200 ml
Ongkos pasang 12.420 m2

Type JB4 (uk.3600x6980 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm - exclude pintu

Kusen Alumunium powder coating putih 3", ex. Alexindo 53.800 ml


kaca 6 mm 22.698 m2
Sealent 93.800 ml
Gosok mesin 93.800 ml
Ongkos pasang 22.698 m2

Type JB4' (uk.2700x6980 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm - exclude pintu

Kusen Alumunium powder coating putih 3", ex. Alexindo 44.120 ml


kaca 6 mm 16.416 m2
Sealent 60.600 ml
Gosok mesin 60.600 ml
Ongkos pasang 16.416 m2

Type JB5 (uk.3600x2250 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 18.450 ml


kaca 6 mm 8.100 m2
Sealent 25.200 ml
Gosok mesin 25.200 ml
Ongkos pasang 8.100 m2
Type JB5' (uk.2700x2250 mm)
- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 14.400 ml


kaca 6 mm 6.075 m2
Sealent 18.900 ml
Gosok mesin 18.900 ml
Ongkos pasang 6.075 m2

Type JB6 (uk.3600x6800 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm - exclude pintu

Kusen Alumunium powder coating putih 3", ex. Alexindo 49.300 ml


kaca 6 mm 22.050 m2
Sealent 77.800 ml
Gosok mesin 77.800 ml
Ongkos pasang 22.050 m2

Type J0 1 (uk.2700x5710 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 36.340 ml


kaca 6 mm 15.417 m2
Sealent 55.920 ml
Gosok mesin 55.920 ml
Ongkos pasang 15.417 m2

Type J0 2 (uk.2700x16520 mm)


- Kosen Alumunium powder Coating snow white 3"x1 1/4", d=3 mm ex. Alexindo
- Jendela Kaca Mati, Clear Float Glass ex Asahimas t=6 mm

Kusen Alumunium powder coating putih 3", ex. Alexindo 49.560 ml


kaca 6 mm 52.864 m2
Sealent 116.800 ml
Gosok mesin 116.800 ml
Ongkos pasang 52.864 m2

Type PJ5 (1500x2400 mm) untuk Pintu R. ADH, R. Kacab


- Frame alluminium, daun pintu rangka blackboard t=2,4, triplek, laminate, list stainless steel
- Accessories
* Cylinder dead lock ex Dekkson
* Door handle ex dekkson
* Door closer ex dekkson
* Butt hinges

Kusen Alumunium powder coating putih 3", ex. Alexindo 9.200 ml


multiplex 4 mm 2.000 lbr
rangka kayu 8.400 m1
hpl Arborate 2.000 lbr
Contact glue 1.000 kg
Edging pvc 6.600 m1
nat s/s 5 mm 8.760 m1
Ongkos pasang pintu 1.000 unit
kaca 6 mm 1.380 m2
Sealent 5.800 ml
Gosok mesin 5.800 ml
Ongkos pasang 1.380 m2
sticker sandblast 0.660 m2
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type PK2 (982x2400 mm) untuk Pintu Smoking area, Admin, R. Karu Area Bengkel
- Frame alluminium, kaca clear tebal 6mm + sticker sandblast
- Accessories
* Cilinder dead lock ex dekkson
* Butt Hinge

Kusen Alumunium powder coating putih 3", ex. Alexindo 6.300 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 6.960 ml
Kaca clear t =6 mm 2.430 m2
GMK 6.960 m1
Sealent 6.960 ml
Sticker Sandblast 2.430 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Overhead 0.050
Type PU2 (910x2700 mm) untuk Pintu Gudang tool Area Bengkel
- Frame alluminium, daun pintu rangka blackboard t=2,4, triplek, laminate, list stainless steel
- Accessories
* Cylinder dead lock ex Dekkson
* Door handle ex dekkson
* Door closer ex dekkson
* Butt hinges

Kusen Alumunium powder coating putih 3", ex. Alexindo 7.220 ml


multiplex 4 mm 2.000 lbr
rangka kayu 9.040 m1
hpl Arborate 2.000 lbr
Contact glue 1.000 kg
Edging pvc 7.220 m1
nat s/s 5 mm 3.680 m1
kaca T= 5 mm 0.249 m2
sticker sandblast 0.249 m2
Gosok mesin 2.420 ml
Sealent 2.420 ml
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Over head 0.050

Type PG2 (1200x2400 mm) untuk Pintu Gudang tool Area Bengkel
- Sliding door, frame alluminium fin powder coating
- Clear float glass 6mm
- Accessories
* Door handle ex dekkson
* Butt hinges

Kusen Alumunium powder coating putih 3", ex. Alexindo 6.000 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 8.080 ml
Kaca clear t =6 mm 1.800 m2
GMK 5.400 m1
Sealent 5.400 ml
plat alumuium 1.080 m2
Ongkos pasang pintu 1.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 1.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 1.000 set
Door Closer type TS 68 ex DORMA 1.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 1.500 set
Casement & Friction Stay ex. DEKSON 1.000 set
Door Stopper type Stainless Steel ex. DEKSON 1.000 set
Overhead 0.050
Type PJ1 (pintu : 900x2400 mm; jendela : 900x1500mm) untuk Pintu gudang oli bekas
- Rangka hollow, daun pintu steel plate tebal 2mm
- Swadaya mesh 5x5 dia 3,2mm
- Accessories
* handle
* hinges
* engsel

Type PJ1 (pintu : 900x2400 mm; jendela : 900x1500mm) 4.560 m2


- Rangka hollow, daun pintu steel plate tebal 2mm
- Swadaya mesh 5x5 dia 3,2mm
- Accessories : handle, hinges, engsel 1.000 set

Type PJ2 (pintu : 1800x2400 mm; jendela : 2x900x1500mm) untuk Pintu overhoul basah
- Rangka hollow, daun pintu steel plate tebal 2mm
- Swadaya mesh 5x5 dia 3,2mm
- Accessories
* handle
* hinges
* engsel

Type PJ2 (pintu : 1800x2400 mm; jendela : 2x900x1500mm) 9.120 m2


- Rangka hollow, daun pintu steel plate tebal 2mm
- Swadaya mesh 5x5 dia 3,2mm
- Accessories : handle, hinges, engsel 1.000 set

Type PG1 (2400x2400 mm) untuk Pintu R. genset, R. Pompa


- Rangka hollow, daun pintu steel plate tebal 2mm
- Swadaya mesh 5x5 dia 3,2mm
- Accessories
* handle
* hinges
* engsel

Type PG1 (2400x2400 mm) 5.760 m2


- Rangka hollow, daun pintu steel plate tebal 2mm
- Swadaya mesh 5x5 dia 3,2mm
- Accessories : handle, hinges, engsel 1.000 set

Type PJ3 (pintu : 1800x2400 mm; jendela : 900x1500mm) untuk Pintu overhoul kering Area Bengkel
- Sliding door, frame alluminium fin powder coating
- Clear float glass 6mm
- Accessories
* Door handle ex dekkson
* Butt hinges

Kusen Alumunium powder coating putih 3", ex. Alexindo 9.900 ml


Frame Pintu, Alumunium powder coating, ex. Alexindo 16.160 ml
Kaca clear t =6 mm 4.050 m2
GMK 14.400 m1
Sealent 14.400 ml
plat alumuium 1.620 m2
Ongkos pasang pintu 2.000 unit
Door Handle type LHTR 016 SS ex. DEKSON 2.000 set
Lock case type 8585 SN & cylinder DC 60 mm SN ex. DEKSON 2.000 set
Door Closer type TS 68 ex DORMA 2.000 set
Hinges type S/S PSS 4x3x3 mm 4BB ex. DEKSON, 3 bh / pintu 3.000 set
Casement & Friction Stay ex. DEKSON 2.000 set
Door Stopper type Stainless Steel ex. DEKSON 2.000 set
Overhead 0.050

Curtain Wall, Clear Glass t= 8 mm, Frame Alumunium powder Coating snow white
3"x 1 1/4", d=3 mm ex. Alexindo + assesories, ex Asahimas

Curtain Wall, Clear Glass t= 8 mm, Frame Alumunium powder Coating 1.000 m2
snow white 3"x 1 1/4", d=3 mm ex. Alexindo + assesories, ex Asahimas

Shoop front, Frame Alumunium powder Coating snow white


3"x 1 1/4", d=3 mm kombinasi kaca mati t = 6 mm ex. Alexindo + assesories, ex Asahimas

Shoop front, Frame Alumunium powder Coating snow white 1.000 m2


3"x 1 1/4", d=3 mm kombinasi kaca mati t = 6 mm ex. Alexindo + assesories, ex Asahimas

PEKERJAAN POS JAGA

POS JAGA ( 7.5 m2 ) Gambar : IS-45

A STRUKTUR

- Pondasi batu kali


Galian tanah pondasi batu kali 18.400 m3
Pemadatan tanah 16.000 m2
Urug kembali bekas galian 10.000 m3
Buang bekas galian 8.400 m3
Pasir urug t = 10 cm 1.600 m3
Pondasi Batu kosong 0.800 m3
Pondasi Batu kali 5.400 m3
Cerucuk bambu 20.000 ml
Sloof diatas batu kali Uk 15/20 20.000 ml
Pasangan angkur Dia 10, L = 1 m - incl. cor beon 7.000 bh

- Diding Bata
Pas.dinding bata ( incl. kolom & ringbalok praktis ) 44.550 m2
plester dinding 89.100 m2
acian dinding 89.100 m2
cat dinding luar ex,Dulux weatherside 44.550 m2
cat dinding dalam ex. Mowilex E-100 44.550 m2

- Lantai
Pemadatan tanah 16.000 m2
Pasir urug t = 10 cm 1.600 m3
Beton Sitemix K175 ( B0 ), t = 10 cm 0.800 m3
Keramik ex.Roman 30x30 cm putih 16.000 m2

- Atap Beton
Plat Lantai atap Beton K225, t = 10 cm 1.600 m3
Besi dia. 8-200 ( 2 layer ) 280.000 kg
Kawat ayam ( besi dia.13 mm, L = 0.4 m ) 28.000 kg
Bekisting lantai atap 16.000 m2
Waterproofing membran + screed 28.960 m2
Balok beton PB2 & PB3 ( 15/30 cm ), Beton K-225 0.720 m3
Besi tul. Utama 5D13, sengkang dia. 8-150 123.276 kg
Bekesting balok 7.840 m2
Pipa PVC downpipe dia-2" 12.000 ml
Roof drain dia-3" 4.000 bh

- Pintu & Partisi kaca


- Pintu Kaca t=8 mm, kusen alumunium 3" YKK ( uk. 80x215 cm )
- Kusen Alumunium powder coating 3" x 1 1/4" ex. Alexindo 5.100 ml
- Frame Pintu aluminum ex. Alexindo 2.5" 5.900 ml
- Kaca polos 6 mm 1.505 m2
- Gosok mesin 5.700 ml
- Sealent 5.700 ml
- Ongkos pasang 1.505 m2
- Acesorries pintu 1.000 set

- Partisi kaca frameles 6 mm


- Kaca polos 6 mm 3.650 m2
- Gosok mesin 11.500 ml
- Sealent 11.500 ml
- Ongkos pasang 3.650 m2

- Stop kontak & Lampu


Stop kontak + Instalasi 3.000 ttk
Lampu + instalasi 3.000 unit

- Planter Box
Box tanaman, tinggi = 40 cm ( pas.bata, plester + aci ) 3.480 m2
Plester + aci 6.960 m2
Tanah merah subur 0.560 m3
Tanaman 1.400 m2

m 3.6

3.6
m

PEKERJAAN SALURAN

Saluran + Steel grating ( Type WA 255 ex Webforge termasuk dudukan siku


area bworkshop & PDS Stall

Galian tanah, H = 80 cm 0.115 m3


Pemadatan tanah 0.460 m2
Urugan kembali 0.050 m3
Buang bekas galian 0.065 m3
urugan pasir t = 10 cm 0.046 m3
Plastik cor 0.260 m2
Beton K225, t = 3 cm 0.014 m3
Bekesting 0.460 m2

Steel grating ( Type WA 255 ex Webforge termasuk dudukan siku 1.000 ml


upah pasang 1.000 ml

PEKERJAAN PAVING BLOCK HALAMAN & OUT DOOR DISPLAY

Paving t = 8 cm Natural, K - 400 ex. ConBlock Indonesia termasuk topi uskup

Paving blok 8 cm ex. Conblok Indonesia 1.050 m2


upah pasang 1.000 m2

Abu batu T=7cm

Abu batu T=7cm 1.000 m2


upah pasang 1.000 m2

Kansteen 20x40x60 ex. Conblok Indonesia

Kansteen 20x40x60 ex. Conblok Indonesia 1.000 ml


screed 0.290 m2
upah pasang 1.000 ml

PEKERJAAN SALURAN DAN BAK KONTROL

Saluran Tertutup ex. Dusapun, Type ST1 , ukuran B =500, H = 500 mm x 1250 mm

Galian tanah 0.902 m3


Pemadatan tanah 1.128 m2
Urugan kembali 0.197 m3
Buang bekas galian 0.706 m3
urugan pasir t = 10 cm 0.113 m3
U-Ditch Beton Precast U-Ditch w = 700 ex. Dusaspu, L = 1.2 m 1.000 bh
Alat bantu 1.000 ls
Upah Penurunan 1.000 bh
Upah pasang 1.200 ml

Tertutup ex. Dusapun, Type ST1 , ukuran L =640 P = 600 T=132 mm tutup beton bertulang
Tutup beton Precast ( uk.80x60 cm ) Light Duty 2.000 bh
Alat Bantu 1.000 ls
Upah Penurunan 1.000 bh
Upah pasang 1.000 ml

Tertutup ex. Dusapun, Type ST1 , ukuran L =940 P = 600 T=142 mm tutup beton bertulang
Tutup beton Precast ( uk.80x60 cm ) Light Duty 2.000 bh
Alat Bantu 1.000 ls
Upah Penurunan 1.000 bh
Upah pasang 1.000 m1
Saluran buis beton BB2 dia 300 mm. P=1250 mm ( dengan tulangan ) ex. Dusapun

Galian tanah 0.752 m3


Pemadatan tanah 0.940 m2
Urugan kembali 0.164 m3
Buang bekas galian 0.588 m3
urugan pasir t = 10 cm 0.094 m3
Buis Beton Precast dia 300 mm ( dengan tulangan ) ex. Dusapun 1.000 ml
plester sambungan 0.540 m2
Upah penurunan 1.000 bh
Alat Bantu Kerja 0.540 m2
Upah pasang 1.000 ml

Saluran buis beton BB2 dia 400 mm. P=1250 mm ( dengan tulangan ) ex. Dusapun

Galian tanah 0.752 m3


Pemadatan tanah 0.940 m2
Urugan kembali 0.164 m3
Buang bekas galian 0.588 m3
urugan pasir t = 10 cm 0.094 m3
Buis Beton Precast dia 400 mm ( dengan tulangan ) ex. Dusapun 1.000 ml
plester sambungan 0.540 m2
Upah penurunan 1.000 bh
Alat Bantu Kerja 0.540 m2
Upah pasang 1.000 ml

Saluran buis beton BB2 dia 600 mm. P=1250 mm ( dengan tulangan ) ex. Dusapun

Galian tanah 0.752 m3


Pemadatan tanah 0.940 m2
Urugan kembali 0.164 m3
Buang bekas galian 0.588 m3
urugan pasir t = 10 cm 0.094 m3
Buis Beton Precast dia 600 mm ( dengan tulangan ) ex. Dusapun 1.000 ml
plester sambungan 0.540 m2
Upah penurunan 1.000 bh
Alat Bantu Kerja 0.540 m2
Upah pasang 1.000 ml
Saluran terbuka uk. Lebar 60 cm tinggi 90 cm bahan beton
bertulang (Rasio besi 125 kg/m3) pinggir jalan raya/depan (provisional)

Galian tanah 0.700 m3


Pemadatan tanah 0.700 m2
Urugan kembali 0.270 m3
Buang bekas galian 0.430 m3
urugan pasir t = 10 cm 0.070 m3
Plastik cor 0.600 m2
Beton K225, t = 10 cm 0.270 m3
Bekesting 3.600 m2
Wiremesh M6 - 1 layer 2.700 m2
Top Cover cor Sitemix, lebar 60 cm 1.000 ml

Top Cover cor Sitemix, lebar 60 cm

Beton Sitemix K225, t = 12 cm 0.072 m3


Bekesting 0.912 m2
Besi beton 4.680 kg

Pipa PVC ex. Rucika dia. 4" kelas AW

Galian tanah 0.250 m3


Urugan kembali 0.250 m3
Pipa PVC ex. Rucika dia. 4" kelas AW 4.000 ml
Acesoories, Socket AW 1.000 bh
Lem 1.000 ls
Upah pasang 4.000 ml

Bak Kontrol uk. 750x750x750 mm + Tutup Grill Siku 40x40x4

Galian tanah 1.560 m3


Pemadatan tanah 1.350 m2
Buang bekas galian 1.560 m3
urugan pasir t = 10 cm 0.094 m3
Plastik cor 1.350 m2
Beton Sitemix K225, t = 12 cm, lantai & dinding beton + tutup beton 0.577 m3
Bekesting 2.624 m2
Wiremesh M8 - 1 layer 4.610 m2
Tutup Grill Siku 40x40x4 1.000 bh
Alat bantu 1.000 ls
Upah 1.000 Unit

Bak Kontrol uk. 500x500x500 mm + Tutup Grill Siku 40x40x4

Galian tanah 0.380 m3


Pemadatan tanah 0.037 m2
Buang bekas galian 0.380 m3
urugan pasir t = 10 cm 0.096 m3
Plastik cor 10.000 m2
Beton Sitemix K225, t = 12 cm, lantai & dinding beton + tutup beton 0.273 m3
Bekesting 3.216 m2
Wiremesh M8 - 1 layer 1.920 m2
Tutup Grill Siku 40x40x4 2.000 bh
Alat bantu 1.000 ls
Upah 1.000 Unit

Pekerjaan Sumur Resapan (buis beton dia. 100 cm ex. lokal+penutup beton,
dilengkapi lapisan ijuk, koral, pasir, sesuai gambar, H=6 m )

Galian tanah H = 3,35 m 6.566 m3


Pemadatan tanah 1.960 m2
Buang bekas galian 4.606 m3
Lapisan batu koral t = 30 cm 0.300 m3
Ijuk, t = 15 cm 0.150 m3
Pas.batu bata ( ganjalan lubang ) 0.500 m2
Lapisan pasir urug lbr = 25 cm, H = 315 cm 0.600 m3
Buis beton dia.100 cm ex.lokal 3.350 ml
upah pasang buis beton dia.100 cm 1.000 ls
Tutup/ cover, Beton K225, t = 15 cm + pembesian 1.000 bh
Material bantu 5% 1.000 ls

0.500

m1

Pek Galian tanah biasa s/d 3 m


Upah Galian tanah 1.000 m3

Ijuk, t = 20 cm
Ijuk t = 20 cm 1.250 m2
Upah 1.000 Ls
Lapisan batu koral
Lapisan batu koral 1.100 m3
Upah 1.000 m3

PEKERJAAN OIL TRAP & SAND TRAP

Oil Trap + Sand Trap (sesuai gbr)


Pipa PVC Class AW , Ex Wavin, Termasuk Klem, Hanger, Support
- Ukuran 453x181x150 cm

Galian tanah 15.212 m3


Pemadatan tanah 9.507 m2
Buang tanah galian 15.212 m3
Urugan pasir t = 10 cm 0.951 m3
Plastik cor 9.507 m2
Beton K225, tebal dinding, lantai & plat atas = 15 cm 6.215 m3
Besi wiremesh M-8 ( 1 layer ) 44.288 m2
Bekesting 36.088 m2
Tutup, Besi plate 1.5 mm + cat 4.338 m2
Siku 40x40x4 mm ( rangka tutup ) 27.720 ml
Siku 40x40x4 mm ( dudukan tutup ) 27.720 ml

Pipa PVC ex. Wavin dia. 2" kelas AW

Galian tanah 0.250 m3


Urugan kembali 0.250 m3
Pipa PVC ex. Wavin dia. 2" kelas AW 4.000 ml
Acesoories, Socket AW 1.000 bh
Lem 1.000 ls
Upah pasang 4.000 ml

PEKERJAAN LAIN-LAIN

Tiang Bendera Stainless Steel tinggi 9 m' (1 tiang) Gbr. IS-52

Pondasi Tiang, uk.200x50x56 cm


Galian tanah 1.093 m3
Pemadatan tanah 1.540 m2
Buang tanah galian 1.093 m3
Urugan pasir t = 10 cm 0.231 m3
Lantai kerja t = 5 cm 0.077 m2
Beton 0.560 m3
Begisting multipleks 2.800 m2
Besi Beton 70.000 kg
Finish keramik ex.Roman 30x30 cm 2.000 m2

Tiang Bendera ( 1 unit )


Pipa st. steel hairline Ø 4" , tinggi = 9 m 2.000 set
termasuk baut penahan, rel / katrol, tali, kaitan, dll. 1.000 Ls

Akssessoris tiang bendera 1.000

Tiang Umbul -Umbul Steel tinggi 6 m' (1 tiang) Gbr. IS-52

Pondasi Tiang, uk.20x20x56 cm


Galian tanah 0.073 m3
Pemadatan tanah 0.200 m2
Buang tanah galian 0.376 m3
Urugan pasir t = 10 cm 0.231 m3
Lantai kerja t = 5 cm 0.077 m2
Beton 0.450 m3
Begisting multipleks 0.700 m2
Besi Beton 33.750 kg
Finish keramik ex.Roman 30x30 cm 2.000 m2

Tiang Bendera ( 1 unit )


Pipa st. steel Ø 3" , tinggi = 6.5 m 6.500 ml

Bak sampah 3 Ruang dengan pintu, ukuran 450x150x150 cm (sesuai gambar)

- Pondasi Batu Bata


Galian tanah 3.600 m3
Pemadatan tanah 6.000 m2
Buang tanah galian 3.600 m3
Pondasi Batu Bata 2.340 m3

- Diding Bata
Sloof uk. 15/20 3.600 ml
Pas.dinding ( incl. kolom & ringbalok praktis ) 19.860 m2
plester dinding 39.720 m2
dinding finish keramik 20x20 ex. Roman 39.720 m2

- Lantai
Plastik cor 6.750 m2
Plat lantai beton sitemix 1 : 2 : 3, t = 20 cm 1.350 m3
Lantai finish keramik 20x20 ex. Roman 6.750 m2
- Pintu besi 3 bh
Pintu plat besi t = 2mm, uk.80x110 cm ( 3 bh ) 3.000 bh

- Penutup Atap
Plat besi t = 2mm, uk.150x150 cm ( 3 bh ) 3.000 bh

Pondasi Bored Pile untuk Tiang Pipa ID Tower uk.T=15 m ; L=3 m


Tiang pipa besi dia 10” fin Cat Duco Silver, pondasi beton

Pengeboran Diameter 40 Cm ( 8 titik), L = 3 m 24.000 m'


Pembuangan tanah / lumpur 6.029 m3
Upah pemasangan besi beton berikut material besi 422.016 kg
Beton K-300; Slump 18+/-2 cm ( 8 titik) 3.014 m3
Cement Bentonite ( 8 titik ) 3.014 m3

Galian tanah 1.297 m3


Pemadatan tanah 1.995 m2
Buang tanah galian 1.297 m3
Urugan pasir t = 10 cm 0.200 m3
Lantai kerja t = 5 cm 0.100 m2
Beton alas, ukuran. 265x50x50 cm 0.663 m3
Begisting multipleks 3.150 m2
Besi Beton 99.375 kg
Angkur baut dia.22 16.000 bh

Tiang pipa besi dia 10” ( vertikal 30.000 ml


Finish Cat Duco Silver 30.000 ml
Tiang pipa besi dia 8” ( horisontal ) 7.500 ml
Finish Cat Duco Silver 7.500 ml
Base plat t = 15 mm, fin. cat ex. Kansai 58.650 kg
Plat sirip t = 12 mm, fin. cat ex. Kansai 67.810 kg
Semen Grouting 2.000 bh

Besi siku 40.40.4 finish cat OP model tiger map ( uk.650x35 cm )

Grill , besi Plat 40.4 mm per 30 mm + cat finish 92.336kg /m2


Besi siku L40x40x4 mm + cat finish, dudukan grill 13.700 ml

Saluran gutter dng ending siku + deck connector 6 m di area workshop


lebar = 30 cm
Galian tanah 0.120 m3
pemadatan 0.300 m2
Buang tanah galian 0.120 m3
Urugan pasir t = 10 cm 0.030 m3
Beton sitemix K225 + tutup beton 0.090 m3
Bekesting 1.200 m2
besi beton 6.750 kg

Bak Cuci Mesin di Ruang Overhaul, lengkap dengan Lubang Sumpit ( uk. 475x200 cm )

~ Dinding Bata
Pas.dinding bata ( incl. kolom & ringbalok praktis ) 34.875 m2
plester dinding 69.750 m2
acian dinding 69.750 m2
cat dinding ex.Vinilex putih, H = 160 cm 52.875 m2
cat minyak dinding H = 150 cm 16.875 m2
Meja beton t = 10 cm 2.000 ml
finish meja beton,keramik 20x20 ex. Roman 5.000 m2
Kran air ex.lokal 2.000 bh

~ Lantai
Plastik sheet cor 9.500 m2
Lantai beton t = 12 cm 9.500 m2
Finish Lantai Epoxy 9.500 m2
Steel grating ( ex Webforge lbr = 80 cm, termasuk dudukan siku ) 2.000 ml
upah pasang 1.000 ml
Pipa PVC ex. Wavin dia. 2" kelas AW 4.000 ml
Floor drain ex.lokal 1.000 bh
Tanggulan bata, fin, plester + aci 2.000 ml

Lubiing Pit

Galian tanah 19.341 m3


pemadatan 11.052 m2
Buang tanah galian 19.341 m3
Plastik cor 11.052 m2
Beton sitemix K225 4.822 m3
Bekesting 24.850 m2
besi beton 361.620 kg

Lantai keramik uk.30x30 cm ex.Roman 7.980 m2


Dinding keramik uk.30x30 cm ex.Roman 24.850 m2
Besi siku L50x50x5 mm + cat finish 5.700 ml
lampu Balk 1x36 watt 4.000 unit
Instalasi lampu Balk dengan kabel NYM 4.000 titik

Saluran air buis beton dia 40” ( dia. 100 cm )


Galian tanah, H = 350 cm 5.250 m3
Pemadatan tanah 1.200 m2
Urugan kembali 0.785 m3
Buang bekas galian 4.465 m3
urugan pasir t = 10 cm 0.120 m3
Buis Beton Precast dia. 100 cm ex. Lokal, L = 1 m ( tanpa tulangan ) 1.000 ml
plester sambungan 0.314 m2
Upah pasang 1.000 ml

Saluran air buis beton dia 40” ( dia. 100 cm )

Galian tanah, H = 150 cm 1.920 m3


Pemadatan tanah 1.200 m2
Urugan kembali 0.785 m3
Buang bekas galian 1.135 m3
urugan pasir t = 10 cm 0.120 m3
Buis Beton Precast dia. 100 cm ex. Lokal, L = 1 m ( tanpa tulangan ) 1.000 ml
plester sambungan 0.314 m2
Upah pasang 1.000 ml

Rangka baja untuk menara air ( Incl. Pondasi )


Menara Air ukuran 2,5M x1,2M x 3,5M
Rangka siku 75.75.6 & 50.50.5
Handrail pipa 1,5" & 1" + Ladder
Fin. Cat minyak silver

~ Pondasi
Galian tanah pondasi 2.484 m3
Pemadatan tanah 2.160 m2
Urugan kembali 1.224 m3
Buang bekas galian 1.260 m3
urugan pasir t = 10 cm 0.216 m3
Lantai kerja t = 5 cm 0.108 m3
Beton K-250 1.260 m3
Besi beton 138.600 kg
Bekesting 10.800 m2
Angkur Baut Dia. 19 mm 24.000 bh

~ Struktur Baja Menara Air


Besi siku L75x75x6 mm + cat finish 83.018 ml
Handrail pipa 1,5" + Ladder + cat finish 21.400 ml
Handrail pipa 1" + Ladder+ cat finish 14.800 ml
Plat bordes t = 3.2 mm + cat finish 4.680 m2
Base Plat t = 16 mm 0.540 m2
Plat conection ( 15% ) 1.000 Ls
Grouting dasar kolom t - 25 mm 6.000 bh
Pekerjaan kolam ikan koi ( uk. 595 cm x 280 cm )
Pondasi, dinding batubata, plester aci, beton lantai dasar kolam, keramik lantai maupun dinding
ex. Roman termasuk waterproofing dan finishing dinding dgn batu candi.
- Struktur beton plat lantai dan dinding t=12cm tulangan M5-2layer , termasuk pek tanah
- Lapisan water proffing coating non toxid ex fosfrog
- Keramik 20x20 ex. Essenza Black Orchild untuk lantai , dinding
- Batu Andesit u/ bag Topping
- Water pump dan instalasinya
- Filter dan instalasinya

- Struktur beton plat lantai t=12cm tulangan M5-1 layer 1.999 m3


- Dinding batubata 10.500 m2
- Plester + aci 21.000 m2
- Lapisan water proffing coating ex.AM100 27.160 m2
- Keramik 20x20 ex. Essenza Black Orchild untuk lantai , dinding 27.160 m2
- Batu Andesit u/ bag Topping 5.250 m2
- Water pump dan instalasinya 1.000 unit
- Filter dan instalasinya 1.000 unit

Batu candi/Andesit u/ bag Topping


Batu Andesit 1.030 m2
Semen @40 kg 0.137 zak
Pasir pasang 0.051 m3
Semen MU408 @1 kg ( nat keramik ) 0.260 kg
Alat bantu 1.000 ls
Upah 1.000 m2

PEKERJAAN PAGAR

Pekerjaan Batu Kali l=80cm, t=80cm + aanstamping h=10cm + galian + urugan tanah

Galian tanah pondasi batu kali 0.920 m3


Pemadatan tanah 0.800 m2
Urug kembali bekas galian 0.530 m3
Buang bekas galian 0.390 m3
Pasir urug t = 10 cm 0.080 m3
Pondasi Batu kosong 0.040 m3
Pondasi Batu kali 0.270 m3
Pasangan angkur Dia 10, L = 1 m - incl. cor beon 0.333 bh

Pagar pasangan dinding batu bata t = 270 cm termasuk kolom dan balok
praktis, diplester luar dalam, dalam dicat weatherseald

Pas.dinding bata ( incl. kolom & ringbalok praktis ) 2.700 m2


plester dinding 5.400 m2
acian dinding 5.400 m2
dicat weatherseald 5.400 m2

Pekerjaan frame poster u/ iklan uk. 290 x 540 cm termasuk rangka dan alat bantu lainnnya
terpasang

Pekerjaan Frame Poster ( uk. 290 cm x 540 cm )


- Hollo 40x40x2.3 303.324 kg
- Hollo 20x40x2.3 76.842 kg
- Pengecatan dengan cat finish ex. FTALIT 731 Super White 380.166 kg
- Katrol 2.000 bh
- Kawat Sling 40.000 ml
- ACP Seven White 53.440 m2
- Upah Pasang ACP 32.000 m2
- Alat bantu Skaffolding 30.000 m2

2.4 m' Pasang Pagar Panel (6 jalur)


panel 6.000 bh
Upah Bongkar 1.000 rit
upah kerja 2.400 ls

1 m' Pasang Panel (6 jalur)

1 bh Kolom Panel dg 10 shap doble


Kolom beton 1.000 bh
beton k 250 0.122 m3
Upah Bongkar 1.000 rit
upah kerja 1.000 ls

1 m' Pasang Pagar Panel (6 jalur)

1m Pasang Kawat Duri 4 jalur


kawat duri 1 m'
pengecatan 1 m'
upah kerja 1 ls
ASURUAN

Jumlah
Harga Satuan Jumlah Bahan Jumlah Upah Jumlah Alat Jumlah Total
Material

Rp 3,500,000 Rp 35,000 Rp 35,000 m³


Rp 25,000 Rp 950 Rp 950 kg

Rp 1,000 Rp 1,000 Rp 1,000 ls

Rp 10,000 Rp 10,000 Rp 10,000 m¹


JUMLAH / ml Rp 35,950 Rp 10,000 Rp 1,000 Rp 46,950 / m¹
PEMBULATAN / ml Rp 36,000 Rp 10,000 Rp 1,000 Rp 47,000 / m¹

Jumlah
Harga Satuan Jumlah Bahan Jumlah Upah Jumlah Alat Jumlah Total
Material
100
Rp 450,000 Rp 4,737 Rp 4,737 Unit

Rp 100,000 Rp 2,000 Rp 2,000 bh 2


Rp 85,000 Rp 739 Rp 739 bh 1
Rp - Rp - bh
Rp - Rp - bh
Rp - Rp - bh
Rp 75,000 Rp 484 Rp 484 bh 1
Rp 500 Rp 500 Rp 500

Rp 11,500 Rp 11,500 Rp 11,500


JUMLAH / m² Rp 4,737 Rp 11,500 Rp 3,723 Rp 19,960 / m²
PEMBULATAN / m² Rp 4,800 Rp 11,500 Rp 3,800 Rp 20,000 / m²

Jumlah
Harga Satuan Jumlah Bahan Jumlah Upah Jumlah Alat Jumlah Total
Material
10

Rp 95,000 Rp 1,900 Rp 1,900 bh 1 0.200


Rp 45,000 Rp 818 Rp 818 bh 1 0.1818
Rp 35,000 Rp 700 Rp 700 bh 1 0.200
Rp 5,500 Rp 293 Rp 293 bh 1
Rp 11,500 Rp 11,845 Rp 11,845
JUMLAH / m² Rp - Rp 11,845 Rp 3,712 Rp 15,557 / m²
PEMBULATAN / m² Rp - Rp 11,900 Rp 3,800 Rp 15,600 / m²

Jumlah
Harga Satuan Jumlah Bahan Jumlah Upah Jumlah Alat Jumlah Total
Material
10 Contoh Volume Pekerjaa

Rp 95,000 Rp 2,375 Rp 2,375 bh 1 0.25


Rp 45,000 Rp 1,286 Rp 1,286 bh 1 0.2857143
Rp 35,000 Rp 778 Rp 778
Rp 5,500 Rp 293 Rp 293 bh 1

Rp 13,000 Rp 13,390 Rp 13,390


JUMLAH / m² Rp - Rp 13,390 Rp 4,732 Rp 18,122 / m²
PEMBULATAN / m² Rp - Rp 13,400 Rp 4,800 Rp 18,200 / m²

Jumlah
Harga Satuan Jumlah Bahan Jumlah Upah Jumlah Alat Jumlah Total
Material
10

Rp 95,000 Rp 1,900 Rp 1,900 bh 1 0.2


Rp 45,000 Rp 750 Rp 750 bh 1 0.1666667
Rp 10,000 Rp 182 Rp 182 bh 1 0.182

Rp 22,900 Rp 23,587 Rp 23,587


JUMLAH / m² Rp - Rp 23,587 Rp 2,832 Rp 26,419 / m²
PEMBULATAN / m² Rp - Rp 23,600 Rp 2,900 Rp 26,500 / m²

Juml
Harga Satuan Jumlah Bahan Jumlah Upah Jumlah Alat Jumlah Total ah
Mate
rial 10

Rp 95,000 Rp 1,900 Rp 1,900 bh 1 0.2


Rp 45,000 Rp 750 Rp 750 bh 1 0.1666667
Rp - Rp - Rp - bh 1 0.182

Rp 22,900 Rp 23,587 Rp 23,587


JUMLAH / m² Rp - Rp 23,587 Rp 2,650 Rp 26,237 / m²
PEMBULATAN / m² Rp - Rp 23,600 Rp 2,700 Rp 26,300 / m²
Rp 95,000 Rp 1,425,000

JUMLAH Rp 1,425,000 / ml
PEMBULATAN Rp 1,425,000 / ml

ml

Rp 90,000 Rp 90,000

JUMLAH Rp 90,000 / ml
PEMBULATAN Rp 90,000 / ml

Rp 35,000 Rp 525,000
Rp - Rp -
Rp - Rp -
JUMLAH Rp 525,000 / 15 ml
PEMBULATAN Rp 525,000 / 15 ml
Rp 35,000 / ml

titik
Rp 40,000 Rp 40,000
Rp 14,000 Rp 14,000 0
Rp 50,000 Rp 1,000 24
JUMLAH Rp 55,000 / ttk
PEMBULATAN Rp 55,000 / ttk

m2
Rp 95,000 Rp 104,500
Rp 5,000 Rp 5,000
Rp 16,250 Rp 16,250

JUMLAH Rp 125,750 / m3
PEMBULATAN Rp 126,000 / m3

m3

Rp 75,000 Rp 75,000
Rp 1,500 Rp 1,500
JUMLAH Rp 76,500 / m3
PEMBULATAN Rp 77,000 / m3

Rp 80,000 Rp 80,000
Rp 1,500 Rp 1,500
JUMLAH Rp 81,500 / m3
PEMBULATAN Rp 82,000 / m3

m3
Rp 45,000 Rp 45,000
Rp 15,000 Rp 15,000
Rp 295,000 Rp 7,024
JUMLAH Rp 67,024 / m3
PEMBULATAN Rp 68,000 / m3

m3

Rp 50,000 Rp 50,000
Rp 1,500 Rp 1,500
JUMLAH Rp 51,500 / m3
PEMBULATAN Rp 52,000 / m3

Rp 65,000 Rp 65,000
Rp 1,500 Rp 1,500
JUMLAH Rp 66,500 / m3
PEMBULATAN Rp 67,000 / m3

m2
Rp 5,000 Rp 5,000
Rp 295,000 Rp 2,810
JUMLAH Rp 7,810 / m2
PEMBULATAN Rp 7,800 / m2

m3
Rp 155,000 Rp 170,500
Rp 6,500 Rp 54,167
Rp 295,000 Rp 7,024
JUMLAH Rp 231,690 / m3 M2
PEMBULATAN Rp 232,000 / m3 23200

m2
Rp 155,000 Rp 17,050
Rp 5,000 Rp 5,000
Rp 295,000 Rp 3,512
JUMLAH Rp 25,562 / m2
PEMBULATAN Rp 26,000 / m2

m3
Rp 165,000 Rp 181,500
Rp 8,500 Rp 42,500
Rp 295,000 Rp 7,024
JUMLAH Rp 231,024 / m3
PEMBULATAN Rp 232,000 / m3

m3
Rp 165,000 Rp 181,500
Rp 8,500 Rp 28,333
Rp 295,000 Rp 7,024
JUMLAH Rp 216,857 / m3
PEMBULATAN Rp 217,000 / m3

m3
Rp 165,000 Rp 181,500
Rp 23,500 Rp 78,333
Rp 295,000 Rp 7,024
JUMLAH Rp 266,857 / m3
PEMBULATAN Rp 267,000 / m3

m3
Rp 315,000 Rp 330,750
Rp 6,500 Rp 13,000
Rp 295,000 Rp 7,024
JUMLAH Rp 350,774 / m3
PEMBULATAN Rp 351,000 / m3

m3
Rp 171,000 Rp 213,750
Rp 9,500 Rp 9,500
Rp 40,000 Rp 40,000
JUMLAH Rp 263,250 / m3
PEMBULATAN Rp 263,000 / m3

m3
Rp 315,000 Rp 330,750
Rp 10,625 Rp 42,500
Rp 295,000 Rp 7,024
JUMLAH Rp 380,274 / m3
PEMBULATAN Rp 380,000 / m3

m3
Rp 155,000 Rp 162,750
Rp 9,500 Rp 9,500
Rp 5,000 Rp 5,000
JUMLAH Rp 177,250 / m3
PEMBULATAN Rp 177,000 / m3

m3
Rp 110,000 Rp 121,000
Rp 5,000 Rp 100,000
Rp 295,000 Rp 7,024
JUMLAH Rp 228,024 / m3
PEMBULATAN Rp 228,000 / m3
m3
Rp 225,000 Rp 258,750
Rp 9,500 Rp 63,333
Rp 295,000 Rp 7,024
JUMLAH Rp 329,107 / m3
PEMBULATAN Rp 329,000 / m3

m3
Rp 155,000 Rp 72,540
Rp 315,000 Rp 198,450
Rp 50,000 Rp 177,500
Rp 345,000 Rp 19,714
Rp 21,500 Rp 430,000
JUMLAH Rp 898,204 / m3 m2
PEMBULATAN Rp 899,000 / m3 44950

m2
Rp 155,000 Rp 3,627 0
Rp 315,000 Rp 9,923
Rp 50,000 Rp 8,875
Rp 345,000 Rp 821
Rp 21,500 Rp 21,500
JUMLAH Rp 44,746 / m2
PEMBULATAN Rp 44,800 / m2

m3
Rp 275,000 Rp 137,500 aktual 0.52
Rp 315,000 Rp 192,500 aktual
Rp 50,000 Rp 29,000
Rp 50,000 Rp 593,171 175
Rp 45,000 Rp 47,250
Rp 19,000 Rp 19,000 5130000
Rp 265,000 Rp 291,500
Rp 22,269 Rp 22,269 6,012,539
JUMLAH Rp 1,332,190 / m3
PEMBULATAN Rp 1,333,000 / m3

m2
Rp 3,000 Rp 3,150
Rp 650 Rp 650
JUMLAH Rp 3,800 / m2
PEMBULATAN Rp 3,800 / m2

m2
Rp 4,000 Rp 52,000
Rp 155,000 Rp 2,496 volume pasir 15%
Rp 50,000 Rp 6,062
Rp 100 Rp 100
Rp 345,000 Rp 6,845 Rp 1,026,786
Rp 28,500 Rp 28,500
JUMLAH Rp 96,002 / m2
PEMBULATAN Rp 97,000 / m2

m3
Rp 200,000 Rp 250,000
Rp 155,000 Rp 80,600
Rp 50,000 Rp 78,125 Rp 63 ###
Rp 1,000 Rp 1,000 ###
Rp 25,000 Rp 25,000
Rp 100,000 Rp 100,000
JUMLAH Rp 534,725 / m3
PEMBULATAN Rp 535,000 / m3 275

Rp 200,000 Rp 250,000
Rp 155,000 Rp 85,250
Rp 1,000 Rp 1,000
Rp 25,000 Rp 25,000
Rp 100,000 Rp 100,000
JUMLAH Rp 461,250 / m3
PEMBULATAN Rp 462,000 / m3

ml
Rp 155,000 Rp 15,500 46500
Rp 3,500,000 Rp 49,000 ### 0.014
Rp 25,000 Rp 965 2894 49000
Rp 2,500 Rp 75 225 2.5
Rp 50,000 Rp 20,000 40000
JUMLAH Rp 85,540 / 1.5 m2 ### 112500
JUMLAH Rp 85,540 / ml
PEMBULATAN Rp 86,000 / ml

m2
Rp 155,000 Rp 77,500
Rp 3,500,000 Rp 39,375
Rp 25,000 Rp 4,340
Rp 2,500 Rp 375
Rp 50,000 Rp 100,000
JUMLAH Rp 221,590 / 1.5 m2
JUMLAH Rp 147,727 / m2
PEMBULATAN Rp 148,000 / m2

m2
Rp 155,000 Rp 77,500
Rp 3,500,000 Rp 39,375
Rp 25,000 Rp 4,340
Rp 2,500 Rp 375
Rp 45,000 Rp 93,750
Rp 55,000 Rp 110,000
JUMLAH Rp 325,340 / 1.5 m2
JUMLAH Rp 162,670 / m2
PEMBULATAN Rp 163,000 / m2
ml
Rp 155,000 Rp 15,500
Rp 3,500,000 Rp 7,875
Rp 25,000 Rp 868
Rp 2,500 Rp 75
Rp 55,000 Rp 27,500
JUMLAH Rp 51,818 / 1.5 m2
JUMLAH Rp 34,545 / ml
PEMBULATAN Rp 35,000 / ml

m2
Rp 155,000 Rp 77,500
Rp 3,500,000 Rp 39,375
Rp 25,000 Rp 4,340
Rp 2,500 Rp 375
Rp 55,000 Rp 110,000
JUMLAH Rp 231,590 / 1.5 m2
JUMLAH Rp 154,394 / m2
PEMBULATAN Rp 154,000 / m2

m2
Rp 155,000 Rp 77,500 51667
Rp 3,500,000 Rp 171,967 ###
Rp 25,000 Rp 10,851 7234
Rp 2,500 Rp 375 250
Rp 45,000 Rp 93,750 62500
Rp 55,000 Rp 82,500 55000
JUMLAH Rp 436,942 / 1.5 m2
JUMLAH Rp 291,295 / m2 ###
PEMBULATAN Rp 292,000 / m2

ml
Rp 155,000 Rp 77,500 51667
Rp 3,500,000 Rp 67,375 44917
Rp 25,000 Rp 750 500
Rp 2,500 Rp 625 417
Rp 3,500,000 Rp 73,500 49000
Rp 50,000 Rp 100,000 66667
JUMLAH Rp 319,750 / m2
JUMLAH Rp 213,167 / m2 ###
PEMBULATAN Rp 214,000 / m2

Rp 155,000 Rp 77,500
Rp 3,500,000 Rp 39,375
Rp 25,000 Rp 4,340
Rp 2,500 Rp 375
Rp 45,000 Rp 93,750
Rp 60,500 Rp 121,000 upah naik 10%
JUMLAH Rp 336,340 / 1.5 m2
JUMLAH Rp 224,227 / m2
PEMBULATAN Rp 225,000 / m2
ml
Rp 155,000 Rp 15,500
Rp 3,500,000 Rp 7,875
Rp 25,000 Rp 868
Rp 2,500 Rp 75
Rp 60,500 Rp 30,250
JUMLAH Rp 54,568 / 1.5 m2
JUMLAH Rp 36,379 / ml
PEMBULATAN Rp 36,400 / ml

Rp 155,000 Rp 77,500
Rp 3,500,000 Rp 39,375
Rp 25,000 Rp 4,340
Rp 2,500 Rp 375
Rp 45,000 Rp 93,750
Rp 66,550 Rp 133,100 upah naik 10%
JUMLAH Rp 348,440 / 1.5 m2
JUMLAH Rp 232,294 / m2
PEMBULATAN Rp 232,000 / m2

Rp 155,000 Rp 496,000 51667


Rp 3,500,000 Rp 590,450 61505
Rp 25,000 Rp 46,875 4883
Rp 2,500 Rp 1,250 130
Rp 3,500,000 Rp 490,000 51042
Rp 95,000 Rp 1,216,000 ### 3
JUMLAH Rp 2,840,575 / (4*4*0.4/1,5) m2 0.0105
JUMLAH Rp 246,578 / m2
PEMBULATAN Rp 247,000 / m2

Rp 155,000 Rp 209,250 21797


Rp 3,500,000 Rp 431,200 44917
Rp 25,000 Rp 46,875 4883
Rp 2,500 Rp 1,250 130
Rp 3,500,000 Rp 490,000 51042
Rp 50,000 Rp 640,000 66667 3
JUMLAH Rp 1,818,575 / (4*4*0.4/2) m2 0.0105
JUMLAH Rp 189,435 / m2
PEMBULATAN Rp 190,000 / m2

Rp 155,000 Rp 279,000 8.8888889


Rp 3,500,000 Rp 368,725 1
Rp 25,000 Rp 14,063
Rp 2,500 Rp 1,250
Rp 3,500,000 Rp 193,200
Rp 104,500 Rp 585,200 3
JUMLAH Rp 1,441,438 / (4*0,15*2+0,2*2)/2) m2 0.0105
JUMLAH Rp 257,400 / m2
PEMBULATAN Rp 258,000 / m2

Rp 155,000 Rp 186,000 23250 11625


Rp 3,500,000 Rp 320,950 40119
Rp 25,000 Rp 46,875 5859
Rp 2,500 Rp 1,250 156
Rp 3,500,000 Rp 504,000 63000
Rp 104,500 Rp 250,800 31350 3
JUMLAH Rp 1,309,875 / (2*1.5*0.4+2*0.25*1.5/2) m2 0.0105
JUMLAH Rp 272,891 / m2 ###
PEMBULATAN Rp 280,000 / m2

Rp 155,000 Rp 155,000 19375 9687.5


Rp 3,500,000 Rp 291,550 36444
Rp 25,000 Rp 46,875 5859
Rp 2,500 Rp 1,250 156
Rp 3,500,000 Rp 378,000 47250
Rp 104,500 Rp 209,000 26125 3
JUMLAH Rp 1,081,675 / (2*1.5*0.4+2*0.25*1.5/2) m2 0.0105
JUMLAH Rp 270,419 / m2 ###
PEMBULATAN Rp 280,000 / m2

m2

Rp 155,000 Rp 786,625 14
Rp 3,500,000 Rp 1,543,500
Rp 25,000 Rp 9,000
Rp 2,500 Rp 750
Rp 50,000 Rp 1,015,000 11
JUMLAH Rp 3,354,875 / ((0.6+0.25+0.6)*7)*2 m2
JUMLAH Rp 220,353 / m2
PEMBULATAN Rp 221,000 / m2

m2

Rp 155,000 Rp 604,500 44286


Rp 3,500,000 Rp 663,950 48641
Rp 25,000 Rp 22,500 1648
Rp 2,500 Rp 750 55
Rp 3,500,000 Rp 940,800 68923
Rp 55,000 Rp 1,001,000 73333
JUMLAH Rp 3,233,500 / 18.20 m2
JUMLAH Rp 259,095 / m2 ###
PEMBULATAN Rp 260,000 / m2
m2

Rp 155,000 Rp 581,250 ###


Rp 3,500,000 Rp 600,250
Rp 25,000 Rp 22,500
Rp 2,500 Rp 750
Rp 3,500,000 Rp 823,200
Rp 55,000 Rp 815,100
JUMLAH Rp 2,843,050 / 14.82 m2
JUMLAH Rp 252,716 / m2
PEMBULATAN Rp 253,000 / m2

m2

Rp 155,000 Rp 398,802
Rp 3,500,000 Rp 780,325
Rp 25,000 Rp 9,000
Rp 2,500 Rp 750
Rp 3,500,000 Rp 470,400
Rp 60,500 Rp 804,650
JUMLAH Rp 2,463,927 / 14.82 m2
JUMLAH Rp 185,258 / m2
PEMBULATAN Rp 185,000 / m2

Rp 12,500 Rp 12,500
Rp 4,500,000 Rp 21,600
Rp 123,000 Rp 129,150
Rp 35,000 Rp 35,000
Rp 12,700 Rp 6,604
JUMLAH Rp 204,854 / m2
PEMBULATAN Rp 204,900 / m2

kg
Rp 9,600 Rp 10,080
Rp 25,000 Rp 375
Rp 500 Rp 500
Rp 1,650 Rp 1,650
JUMLAH Rp 12,605 / kg
PEMBULATAN Rp 12,700 / kg

kg
Rp 9,600 Rp 10,080
Rp 25,000 Rp 375
Rp 500 Rp 500
Rp 1,650 Rp 1,650
JUMLAH Rp 12,605 / kg
PEMBULATAN Rp 12,700 / kg

kg
Rp 9,600 Rp 10,080
Rp 25,000 Rp 375

Rp 1,650 Rp 1,650
JUMLAH Rp 12,105 / kg
PEMBULATAN Rp 13,000 / kg

kg
Rp 9,600 Rp 10,080
Rp 25,000 Rp 375
Rp 1,815 Rp 1,997
JUMLAH Rp 12,452 / kg
PEMBULATAN Rp 13,000 / kg

m2
Rp 10,325 Rp 10,841
Rp 20,000 Rp 400
Rp 500 Rp 500
Rp 4,250 Rp 4,250
JUMLAH 2 Rp 15,991 / m2
PEMBULATAN Rp 16,000 / m2

m2
Rp 10,325 Rp 10,841
Rp 20,000 Rp 400
Rp 500 Rp 500
Rp 4,250 Rp 4,250
JUMLAH 2 Rp 15,991 / m2
PEMBULATAN Rp 16,000 / m2

m2
Rp 34,380 Rp 36,099
Rp 20,000 Rp 400
Rp 500 Rp 500
Rp 4,250 Rp 4,250
JUMLAH 2 Rp 41,249 / m2
PEMBULATAN Rp 41,200 / m2

m2
Rp 46,769 Rp 49,107
Rp 20,000 Rp 400
Rp 500 Rp 500
Rp 4,250 Rp 4,250
JUMLAH 2 Rp 54,257 / m2
PEMBULATAN Rp 54,300 / m2
48500.882
m2
Rp 66,492 Rp 136,308
Rp 25,000 Rp 1,375 ###
Rp 1,000 Rp 1,000
Rp 12,700 Rp 6,228
Rp 15,500 Rp 31,000
JUMLAH 2 Rp 175,911 / m2 2 layer
PEMBULATAN Rp 176,000 / m2

Rp 12,513 Rp 230,030 57507


Rp 9,000 Rp 23,040 5760
Rp 6,500 Rp 136,136 34034
Rp 2,700 Rp 56,549 14137
JUMLAH 2 Rp 445,755 / kolom
PEMBULATAN Rp 112,000 / titik/perbatang siku 1sudut ###

Rp 40,000 Rp 5,714
Rp 3,000 Rp 600
Rp 250,000 Rp 2,000
Rp 2,500 Rp 2,500
Rp 13,500 Rp 13,500
JUMLAH 2 Rp 24,314 / ml
PEMBULATAN Rp 25,000 / ml
Rp 100,000 / m2

m3
Rp 1,050,000 Rp 1,081,500
Rp 87,500 Rp 87,500 sewa pompa beton = 4.000.000,- / hari
Rp 4,000 Rp 4,000 sewa vibrator = 300.000,- / hari
Rp 2,000 Rp 2,000 37500 -/ jam
Rp 46,406 Rp 46,406 3125 -/12 m3
Rp 60,000 Rp 60,000 92813
JUMLAH Rp 1,281,406 / m3 ###
PEMBULATAN Rp 1,281,000 / m3

m3
Rp 1,050,000 Rp 1,081,500
Rp - Rp -
Rp 4,000 Rp 4,000
Rp 2,000 Rp 2,000
Rp 46,406 Rp 46,406 0
Rp 100,000 Rp 100,000
JUMLAH Rp 1,233,906 / m3
PEMBULATAN Rp 1,234,000 / m3

m3
Rp 900,000 Rp 922,500
Rp 87,500 Rp 87,500 sewa pompa beton = 4.000.000,- / hari
Rp 4,000 Rp 4,000
Rp 2,000 Rp 2,000
Rp 60,000 Rp 60,000
JUMLAH Rp 1,076,000 / m3
PEMBULATAN Rp 1,076,000 / m3

m3
Rp 900,000 Rp 922,500
Rp - Rp -
Rp 4,000 Rp 4,000
Rp 2,000 Rp 2,000
Rp 100,000 Rp 100,000
JUMLAH Rp 1,028,500 / m3
PEMBULATAN Rp 1,030,000 / m3

m3
Rp 900,000 Rp 922,500
Rp 87,500 Rp 87,500
Rp 4,000 Rp 4,000
Rp 2,000 Rp 2,000
Rp 66,000 Rp 66,000
JUMLAH Rp 1,082,000 / m3
PEMBULATAN Rp 1,082,000 / m3

m3
Rp 900,000 Rp 922,500
Rp 87,500 Rp 87,500
Rp 4,000 Rp 4,000
Rp 2,000 Rp 2,000
Rp 72,600 Rp 72,600
JUMLAH Rp 1,088,600 / m3
PEMBULATAN Rp 1,089,000 / m3

Rp 67,000 Rp 20,100
Rp 232,000 Rp 17,400
Rp 3,800 Rp 5,700
Rp 292,000 Rp 5,658,960
Rp 292,000 Rp 1,927,200

Rp 12,700 Rp 95,098
Rp 12,700 Rp 2,097,024
Rp 12,700 Rp 3,218,637
Rp 12,700 Rp 338,328
Rp 1,084,000 Rp 5,014,855
Rp 45,000 Rp 675,000
Rp 3,000,000 Rp 3,000,000
JUMLAH Rp 22,068,302
PEMBULATAN Rp 22,070,000 /unit

Rp 67,000 Rp 562,800
Rp 232,000 Rp 194,880
Rp 3,800 Rp 53,352
Rp 411,000 Rp 2,373,525
Rp 292,000 Rp 3,258,720

Rp 12,700 Rp 3,959,962
Rp 12,700 Rp 927,202
Rp 1,084,000 Rp 4,653,612
Rp 15,000 Rp 15,000
Rp 1,304,348 Rp 1,304,348
JUMLAH Rp 17,303,400
PEMBULATAN Rp 17,310,000 /unit

m3
Rp 850,000 Rp 871,250
Rp 87,500 Rp 87,500 sewa pompa beton = 4.000.000,- / hari
Rp 15,000 Rp 15,000
Rp 50,000 Rp 50,000 ###
Rp 60,000 Rp 60,000
JUMLAH Rp 1,083,750 / m3
PEMBULATAN Rp 1,084,000 / m3

m3
Rp 850,000 Rp 871,250
Rp - Rp -
Rp 15,500 Rp 15,500 ###
Rp 50,000 Rp 50,000
Rp 165,000 Rp 165,000
JUMLAH Rp 1,101,750 / m3
PEMBULATAN Rp 1,102,000 / m3

m3
Rp 790,000 Rp 829,500
Rp 87,500 Rp 87,500 sewa pompa beton = 4.000.000,- / hari
Rp 15,000 Rp 15,000 ###
Rp 50,000 Rp 50,000 ###
Rp 165,000 Rp 165,000
JUMLAH Rp 1,147,000 / m3
PEMBULATAN Rp 1,147,000 / m3

m3
Rp 850,000 Rp 871,250
Rp - Rp -
Rp 15,500 Rp 15,500
Rp 50,000 Rp 50,000
Rp 181,500 Rp 181,500
JUMLAH Rp 1,118,250 / m3
PEMBULATAN Rp 1,118,000 / m3

m3
Rp 790,000 Rp 809,750
Rp 87,500 Rp 87,500 sewa pompa beton = 4.000.000,- / hari
Rp 15,000 Rp 15,000
Rp 50,000 Rp 50,000
Rp 181,500 Rp 181,500
JUMLAH Rp 1,143,750 / m3
PEMBULATAN Rp 1,144,000 / m3
kg
Rp 105,800 Rp 1,588 2 lapis 1 ltr = 5 m2
Rp 12,500 Rp 225 campuran = 1 ltr cat finish + 1.5 ltr thinner
Rp 850 Rp 850
JUMLAH Rp 2,663 / kg
PEMBULATAN Rp 2,700 / kg

kg
Rp 12,600 Rp 13,230
Rp 6,500 Rp 6,500 Upah harga baru Farokhi
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,880 / kg
PEMBULATAN Rp 19,900 / kg
17400
kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 19,800 / kg

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 19,800 / kg

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 19,800 / kg

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 20,000 / kg

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 20,000 / kg

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 20,000 / kg

kg
Rp 12,600 Rp 13,230
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,880 / kg
PEMBULATAN Rp 20,000 / kg 61000

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 20,000 / kg

kg
Rp 12,513 Rp 13,138
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 19,788 / kg
PEMBULATAN Rp 20,000 / kg

kg
Rp 13,388 Rp 14,058
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 20,708 / kg
PEMBULATAN Rp 21,000 / kg

kg
Rp 15,397 Rp 16,166
Rp 6,500 Rp 6,500
Rp - Rp -
Rp 150 Rp 150
JUMLAH Rp 22,816 / kg
PEMBULATAN Rp 23,000 / kg
ml
Rp 24,500 Rp 25,725 ### 26283.333
Rp 6,500 Rp 6,500
Rp 15,000 Rp 15,000
JUMLAH Rp 47,225 / ml
PEMBULATAN Rp 48,000 / ml

ml
Rp 34,583 Rp 36,313 ### 34583.333
Rp 6,500 Rp 6,500
Rp 15,000 Rp 15,000
JUMLAH Rp 57,813 / ml
PEMBULATAN Rp 58,000 / ml

bh
Rp 88,000 Rp 88,000
Rp 10,000 Rp 10,000
Rp 750 Rp 750
JUMLAH Rp 98,750 / bh
PEMBULATAN Rp 99,000 / bh 98400

bh
Rp 73,500 Rp 73,500
Rp 10,000 Rp 10,000
Rp 750 Rp 750
JUMLAH Rp 84,250 / bh
PEMBULATAN Rp 84,000 / bh 83700

bh
Rp 16,000 Rp 16,000
Rp 1,000 Rp 1,000
Rp 200 Rp 200
JUMLAH Rp 17,200 / bh
PEMBULATAN Rp 17,200 / bh

bh
Rp 12,500 Rp 12,500
Rp 1,000 Rp 1,000
Rp 50 Rp 50
JUMLAH Rp 13,550 / bh
PEMBULATAN Rp 13,600 / bh 10800

bh
Rp 10,500 Rp 10,500
Rp 1,000 Rp 1,000
Rp 200 Rp 200
JUMLAH Rp 11,700 / bh 0.625
PEMBULATAN Rp 11,700 / bh 7200 15.875

bh
Rp 7,500 Rp 7,500
Rp 1,000 Rp 1,000
Rp 200 Rp 200
JUMLAH Rp 8,700 / bh 4400
PEMBULATAN Rp 8,700 / bh

bh
Rp 7,500 Rp 7,500
Rp 1,000 Rp 1,000
Rp 200 Rp 200
JUMLAH Rp 8,700 / bh
PEMBULATAN Rp 8,700 / bh

bh
Rp 80,275 Rp 80,275
Rp 17,500 Rp 17,500
Rp 1,500 Rp 1,500
JUMLAH Rp 99,275 / bh
PEMBULATAN Rp 99,300 / bh

bh
Rp 115,000 Rp 115,000
Rp 30,000 Rp 30,000
Rp 1,500 Rp 1,500
JUMLAH Rp 146,500 / bh
PEMBULATAN Rp 146,500 / bh

bh
Rp 95,000 Rp 95,000 PT.Cipta Baja Jaya Indo Jkt 1.905
Rp 30,000 Rp 30,000
Rp 1,000 Rp 1,000
JUMLAH Rp 126,000 / bh
PEMBULATAN Rp 126,000 / bh 83500

bh
Rp 45,000 Rp 45,000 2
Rp 17,500 Rp 17,500
Rp 1,500 Rp 1,500
JUMLAH Rp 64,000 / bh
PEMBULATAN Rp 64,000 / bh 63900

bh
Rp 45,000 Rp 45,000 2
Rp 17,500 Rp 17,500
Rp 1,500 Rp 1,500
JUMLAH Rp 64,000 / bh
PEMBULATAN Rp 64,000 / bh

bh
Rp 26,500 Rp 26,500 2
Rp 17,500 Rp 17,500
Rp 1,500 Rp 1,500
JUMLAH Rp 45,500 / bh
PEMBULATAN Rp 45,500 / bh 44300
m3
Rp 145,000 Rp 11,600,000
Rp 1,111,000 Rp 1,111,000 upah per-unit = Rp.100.000,-

JUMLAH Rp 12,711,000 / m3
PEMBULATAN Rp 12,711,000 / m3

Rp 9,600 Rp 11,962
Rp 3,500 Rp 14,000
Rp 8,000 Rp 8,000
Rp 2,600 Rp 3,240
Rp 500 Rp 500 Rp 37,701
Rp 16,000 Rp 16,000

JUMLAH Rp 53,701 / kg
PEMBULATAN Rp 53,800 / kg

Rp 9,600 Rp 9,888
Rp 15,000 Rp 4,026
Rp 15,000 Rp 1,603
Rp 2,600 Rp 2,600
Rp 1,500 Rp 1,500 Rp 19,616
Rp 10,000 Rp 10,000

JUMLAH Rp 29,616 / kg
PEMBULATAN Rp 29,700 / kg

Gambar IS-32 Ls

Rp 19,900 Rp 24,842,762
Rp 19,900 Rp 3,521,643
Rp 19,900 Rp 6,700,330 per-jarak 1 m, tinggi = 50 cm
Rp 26,069 Rp 555,442
Rp 25,273 Rp 1,257,837
Rp 19,900 Rp 5,471,874

Rp 11,700 Rp 561,600
Rp 8,700 Rp 835,200

Rp 146,500 Rp 7,032,000
Rp 175,000 Rp 2,100,000
Rp 2,700 Rp 5,691,849

JUMLAH Rp 58,570,537 / Ls
PEMBULATAN Rp 58,570,500 / Ls

Rp 12,513 Rp 557,557 4
Rp 45,500 Rp 227,500 1
Rp 9,000 Rp 48,168
Rp 1,500 Rp 1,500
Rp 5,000 Rp 249,560
Rp 2,700 Rp 134,762
Rp 2,450 Rp 2,450
JUMLAH Rp 1,221,497
PEMBULATAN Rp 1,222,000
Rp 204,000 /m2

Rp 76,667 Rp 460,000
Rp -
Rp 41,667 Rp 1,000,000
Rp 41,667 Rp 166,667
Rp 20,000 Rp 80,000
Rp 7,500 Rp 120,000
Rp 45,000 Rp 270,000
Rp 524,167 Rp 524,167
JUMLAH Rp 2,620,833 / 6 m1
JUMLAH Rp 436,806 /m1
PEMBULATAN Rp 437,000 /m1

m2

Rp 119,186 Rp 131,105 net, exclude PPN


Rp 12,515 Rp 12,515
Rp 15,000 Rp 15,000
JUMLAH Rp 158,619 / m2
PEMBULATAN Rp 159,000 / m2
Rp 202,920 Rp 223,212
Rp 7,102 Rp 7,102
Rp 15,000 Rp 15,000
JUMLAH Rp 245,314 / m2
PEMBULATAN Rp 246,000 / m2

m2
Rp 11,417 Rp 11,988
Rp 3,500 Rp 3,500 Farokhi
JUMLAH Rp 15,488 / m2
PEMBULATAN Rp 15,500 / m2

m2
Rp 15,722 Rp 16,508
Rp 3,000 Rp 3,000 Farokhi
JUMLAH Rp 19,508 / m2
PEMBULATAN Rp 19,500 / m2

m2
Rp 51,000 Rp 56,100
Rp 889 Rp 444
Rp 5,750 Rp 2,875
Rp 10,000 Rp 10,000
JUMLAH Rp 69,419 / m2
PEMBULATAN Rp 70,000 / m2

ml

Rp 119,186 Rp 131,105
Rp 6,555 Rp 6,555
Rp 13,500 Rp 13,500
JUMLAH Rp 151,160 / ml
PEMBULATAN Rp 152,000 / ml

ml
Rp 103,640 Rp 114,004
Rp 5,700 Rp 5,700 47800
Rp 15,000 Rp 15,000 Farokhi
JUMLAH Rp 134,704 / ml
PEMBULATAN Rp 135,000 / ml

ml
Rp 103,640 Rp 108,822 Suplier : Kepuh Kencana
Rp 5,441 Rp 5,441
Rp 15,000 Rp 15,000 Farokhi
JUMLAH Rp 129,263 / ml
PEMBULATAN Rp 130,000 / ml

ml
Rp 147,638 Rp 155,019 Suplier : Kepuh Kencana
Rp 11,626 Rp 11,626
Rp 17,500 Rp 17,500 Farokhi
JUMLAH Rp 184,146 / m2
PEMBULATAN Rp 185,000 / m2

ml
Rp 147,638 Rp 155,019 Suplier : Kepuh Kencana
Rp 7,751 Rp 7,751
Rp 9,000 Rp 9,000 Farokhi
JUMLAH Rp 171,770 / ml
PEMBULATAN Rp 171,800 / ml

m2
Rp 29,263 Rp 30,726
Rp 2,048 Rp 2,048
Rp 9,500 Rp 9,500 Farokhi
JUMLAH Rp 42,275 / m2
PEMBULATAN Rp 42,300 / m2

ml

Rp 103,640 Rp 108,822 terpasang


Rp 27,500 Rp 125,125 16 per-jarak 40 cm
Rp 8,188 Rp 8,188
Rp 70,000 Rp 70,000
JUMLAH Rp 312,135 / ml 4.239
JUMLAH Rp 312,135 / ml 10833.333
PEMBULATAN Rp 313,000 / ml 12333.333

ml

Rp 103,640 Rp 98,458 terpasang


Rp 14,000 Rp 57,633 16 per-jarak 40 cm
Rp 5,463 Rp 5,463
Rp 70,000 Rp 70,000
JUMLAH Rp 231,555 / ml 4.239
JUMLAH Rp 231,555 / ml 10833.333
PEMBULATAN Rp 232,000 / ml 12333.333

ml

Rp 350,000 Rp 441,000 terpasang


Rp 14,000 Rp 94,640 16 per-jarak 40 cm
Rp 18,747 Rp 18,747
Rp 38,500 Rp 38,500
JUMLAH Rp 554,387 / 6 ml 4.239
JUMLAH Rp 554,387 / ml 10833.333
PEMBULATAN Rp 555,000 / ml 12333.333

bh
Rp 250,000 Rp 250,000
Rp 100,000 Rp 100,000
JUMLAH Rp 350,000 / bh
PEMBULATAN Rp 350,000 / bh
bh
Rp 450,000 Rp 450,000
Rp 90,000 Rp 90,000
JUMLAH Rp 540,000 / bh
PEMBULATAN Rp 540,000 / bh

bh
Rp 400,000 Rp 400,000
Rp 90,000 Rp 90,000
JUMLAH Rp 490,000 / bh
PEMBULATAN Rp 490,000 / bh

m2

Rp 900,000 Rp 900,000

JUMLAH Rp 900,000 / m2
PEMBULATAN Rp 900,000 / m2

Rp 280,000 Rp 12,600,000

Rp 60,764 Rp 3,038,194
Rp 300,000 Rp 7,500,000
Rp 32,500 Rp 812,500
Rp 15,000 Rp 225,000
Rp 9,000 Rp 195,525
Rp 50,000 Rp 4,230,000
Rp 250,000 Rp 6,250,000
JUMLAH Rp 34,851,219 / m2
PEMBULATAN Rp 800,000 / m2

Rp 280,000 Rp 294,000
Rp 30,833 Rp 53,958
Rp 10,833 Rp 2,167
Rp 11,250 Rp 45,000
Rp 7,000 Rp 28,000
Rp 52,500 Rp 10,500
Rp 45,000 Rp 94,500
Rp 125,000 Rp 125,000

JUMLAH Rp 653,125 / m2
PEMBULATAN Rp 654,000 / m2

m2
Rp 165,000 Rp 165,000 Aplikator : Karya Sukses Mandiri
Rp 1,500 Rp 1,500
Rp 13,500 Rp 13,500
JUMLAH Rp 180,000 / m2
PEMBULATAN Rp 180,000 / m2

m2

Rp 200,000 Rp 200,000 Aplikator : Karya Sukses Mandiri

Rp 32,500 Rp 32,500
Rp 16,000 Rp 16,000
JUMLAH Rp 248,500 / m2
PEMBULATAN Rp 248,500 / m2

m2
Rp 700 Rp 49,000
Rp 155,000 Rp 6,200
Rp 50,000 Rp 10,250
Rp 1,500 Rp 1,500 ###
Rp 60,000 Rp 60,000
Rp 64,600 Rp 43,067
JUMLAH Rp 170,017 / m2
PEMBULATAN Rp 170,000 / m2

m2
Rp 700 Rp 49,000
Rp 155,000 Rp 9,920
Rp 50,000 Rp 14,400
Rp 1,500 Rp 1,500
Rp 60,000 Rp 60,000 (Upah Japon)
Rp 64,600 Rp 43,067
JUMLAH Rp 177,887 / m2
PEMBULATAN Rp 177,900 / m2

ml
Rp 850,000 Rp 19,125
Rp 12,700 Rp 21,431
Rp 80,300 Rp 24,090
JUMLAH Rp 64,646 / ml
PEMBULATAN Rp 64,600 / ml

Rp 195,000 Rp 60,938
Rp 3,500,000 Rp 22,050
Rp 20,000 Rp 25,000
Rp 2,500 Rp 1,250
Rp 50,000 Rp 180,000 3
JUMLAH Rp 289,238 / (0.15*4*3)/ 2 m2 0.0105
JUMLAH Rp 80,344 / m2
PEMBULATAN Rp 80,300 / m2

m2
Rp 155,000 Rp 3,100
Rp 50,000 Rp 2,300
Rp 1,000 Rp 1,000
Rp 35,000 Rp 35,000
JUMLAH Rp 41,400 / m2
PEMBULATAN Rp 41,400 / m2

Rp 155,000 Rp 4,185
Rp 50,000 Rp 5,325
Rp 1,000 Rp 1,000
Rp 35,000 Rp 35,000
JUMLAH Rp 45,510 / m2
PEMBULATAN Rp 45,500 / m2

m2
Rp 50,000 Rp 4,375
Rp 1,000 Rp 1,000
Rp 27,500 Rp 27,500
Rp 18,500 Rp 24,667
JUMLAH Rp 57,542 / m2
PEMBULATAN Rp 58,000 / m2

TOTAL PLESTER Rp 99,400 / m2

m2
Rp 50,000 Rp 9,722 120x240 850000
Rp 1,000 Rp 1,000 70833.333
Rp 27,500 Rp 27,500 0.4166667
Rp 18,500 Rp 24,667 29513.889
JUMLAH Rp 62,889 / m2
PEMBULATAN Rp 63,000 / m2

Rp 5,319 Rp 5,319
Rp 8,929 Rp 8,929
Rp 16,000 Rp 800
Rp 17,500 Rp 583
Rp 1,000 Rp 1,000
Rp 18,000 Rp 18,000
JUMLAH Rp 34,631 / m2
PEMBULATAN Rp 35,000 / m2

Rp 4,728 Rp 4,728
Rp 7,813 Rp 7,813
Rp 16,000 Rp 800
Rp 45,000 Rp 1,500
Rp 1,000 Rp 1,000
Rp 20,000 Rp 20,000
JUMLAH Rp 35,840 / m2
PEMBULATAN Rp 36,000 / m2

Rp 4,728 Rp 4,728
Rp 8,438 Rp 8,438
Rp 16,000 Rp 800
Rp 45,000 Rp 1,500
Rp 1,500 Rp 1,500
Rp 19,500 Rp 19,500
JUMLAH Rp 36,465 / m2
PEMBULATAN Rp 37,000 / m2

Rp 5,319 Rp 5,319
Rp 8,438 Rp 8,438
Rp 16,000 Rp 800
Rp 17,500 Rp 583
Rp 1,000 Rp 1,000
Rp 21,000 Rp 21,000
JUMLAH Rp 37,140 / m2
PEMBULATAN Rp 38,000 / m2

Rp 8,983 Rp 8,983
Rp 16,000 Rp 800
Rp 17,500 Rp 583
Rp 1,000 Rp 1,000
Rp 18,000 Rp 18,000
JUMLAH Rp 29,367 / m2
PEMBULATAN Rp 30,000 / m2

Rp 42,550 Rp 42,550
Rp 16,000 Rp 800
Rp 17,500 Rp 583
Rp 15,000 Rp 15,000
Rp 20,000 Rp 20,000
JUMLAH Rp 78,933 / m2
PEMBULATAN Rp 79,000 / m2

Lebar Rp 31,600 /ml


Rp 249,000 /bh
Rp 17,775 /bh
Rp 3,950 /ml
Rp 7,900 /ml
Rp 31,600 /ml
Rp 7,900 /ml
Rp 3,950 /ml
Rp 11,850 /ml
m2
Rp 155,000 Rp 5,347 0
Rp 50,000 Rp 7,813
Rp 345,000 Rp 821
Rp 15,000 Rp 15,000
JUMLAH Rp 28,981 / m2
PEMBULATAN Rp 29,000 / m2 48333.333

m2
Rp 155,000 Rp 8,913 0
Rp 50,000 Rp 7,813
Rp 345,000 Rp 821
Rp 15,000 Rp 15,000
JUMLAH Rp 32,546 / m2
PEMBULATAN Rp 32,500 / m2 54166.667

m2
Rp 278,667 Rp 300,960
Rp 50,000 Rp 8,290 Rp 7
Rp 155,000 Rp 7,905 Rp 0
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 392,720 / m2
PEMBULATAN Rp 393,000 / m2

m2
Rp 224,074 Rp 242,000
Rp 50,000 Rp 8,290
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 333,760 / m2
PEMBULATAN Rp 334,000 / m2

m2
Rp 197,185 Rp 212,960
Rp 50,000 Rp 8,290
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 304,720 / m2
PEMBULATAN Rp 305,000 / m2

m2
Rp 210,000 Rp 226,800
Rp 50,000 Rp 8,290
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 318,560 / m2
PEMBULATAN Rp 319,000 / m2

m2
Rp 121,800 Rp 125,454
Rp 50,000 Rp 8,290
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 75,000 Rp 75,000
JUMLAH Rp 222,214 / m2
PEMBULATAN Rp 223,000 / m2

m2
Rp 78,000 Rp 80,340
Rp 50,000 Rp 8,290
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 172,100 / m2
PEMBULATAN Rp 173,000 / m2

m2
Rp 110,000 Rp 121,000
Rp 50,000 Rp 9,750
Rp 155,000 Rp 15,500
Rp 19,500 Rp 7,800 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 224,550 / m2
PEMBULATAN Rp 225,000 / m2

m2
Rp 78,000 Rp 80,340
Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 170,660 / m2
PEMBULATAN Rp 170,700 / m2

m2
Rp 57,851 Rp 59,587
Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 149,907 / m2
PEMBULATAN Rp 149,900 / m2

m2
Rp 95,000 Rp 104,500
Rp 50,000 Rp 9,750
Rp 155,000 Rp 15,500
Rp 19,500 Rp 7,800 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 75,000 Rp 75,000
JUMLAH Rp 213,050 / m2
PEMBULATAN Rp 214,000 / m2

ml
Rp 300,960 Rp 36,115 1 Dus = isi 3 buah
Rp 80 Rp 9,600
Rp 50,000 Rp 1,142
Rp 155,000 Rp 1,317
Rp 19,500 Rp 844
Rp 83 Rp 83
Rp 30,000 Rp 30,000
JUMLAH Rp 79,102 / ml
PEMBULATAN Rp 79,100 / ml

ml
Rp 242,000 Rp 29,040 1 Dus = isi 3 buah
Rp 80 Rp 9,600
Rp 50,000 Rp 1,142 80666.667
Rp 155,000 Rp 1,317 26888.889
Rp 19,500 Rp 844
Rp 83 Rp 83
Rp 30,000 Rp 30,000
JUMLAH Rp 72,027 / ml
PEMBULATAN Rp 72,000 / ml

ml
Rp 212,960 Rp 25,555 1 Dus = isi 3 buah
Rp 80 Rp 9,600
Rp 50,000 Rp 1,142 70986.667
Rp 155,000 Rp 1,317 23662.222
Rp 19,500 Rp 844
Rp 83 Rp 83
Rp 30,000 Rp 30,000
JUMLAH Rp 68,542 / ml
PEMBULATAN Rp 69,000 / ml

ml
Rp 212,960 Rp 38,333 1 Dus = isi 3 buah
Rp 80 Rp 9,600
Rp 50,000 Rp 1,142
Rp 155,000 Rp 1,317 70986.667
Rp 19,500 Rp 844 11831.111
Rp 83 Rp 83
Rp 30,000 Rp 30,000
JUMLAH Rp 81,319 / ml
PEMBULATAN Rp 82,000 / ml

ml
Rp 110,000 Rp 31,429 1 Dus = isi 6 buah
Rp 80 Rp 9,600
Rp 50,000 Rp 1,713
Rp 155,000 Rp 1,976
Rp 19,500 Rp 1,266
Rp 83 Rp 83
Rp 30,000 Rp 30,000
JUMLAH Rp 76,067 / ml
PEMBULATAN Rp 77,000 / ml

ml
Rp 78,000 Rp 13,000 1 Dus = isi 6 buah
Rp 80 Rp 9,600
Rp 50,000 Rp 1,713 13000
Rp 155,000 Rp 1,976
Rp 19,500 Rp 1,266
Rp 83 Rp 83
Rp 30,000 Rp 30,000
JUMLAH Rp 57,638 / ml
PEMBULATAN Rp 58,000 / ml

ml
Rp 121,800 Rp 12,667 1 Dus = isi 25 buah
Rp 80 Rp 8,000
Rp 50,000 Rp 1,713 25
Rp 155,000 Rp 1,976
Rp 19,500 Rp 1,266
Rp 83 Rp 83
Rp 25,000 Rp 25,000
JUMLAH Rp 50,706 / ml
PEMBULATAN Rp 50,800 / ml

ml
Rp 5,527 Rp 7,185 1 Dus = isi 25 buah
Rp 80 Rp 7,200
Rp 50,000 Rp 1,713
Rp 155,000 Rp 1,976
Rp 19,500 Rp 1,266
Rp 83 Rp 83
Rp 25,000 Rp 25,000
JUMLAH Rp 44,424 / ml
PEMBULATAN Rp 44,400 / ml

m2
Rp 100,000 Rp 100,000 Aplikator : PT.Propan Raya
JUMLAH Rp 100,000 / m2
PEMBULATAN Rp 100,000 / m2

Rp 185,000 Rp 192,400
Rp 47,000 Rp 7,050
Rp 63,000 Rp 63,000
Rp 2,000 Rp 2,000
Rp 58,500 Rp 58,500
JUMLAH Rp 322,950 / m2
PEMBULATAN Rp 323,000 / m2

Rp 15,600 Rp 93,600
Rp 9,493 Rp 9,493
Rp 295,000 Rp 18,438 ###
Rp 22,000 Rp 22,000
JUMLAH Rp 143,531 / m2
PEMBULATAN Rp 144,000 / m2

Rp 50,000 Rp 50,000
Rp 1,000 Rp 1,000
Rp 14,000 Rp 14,000
JUMLAH Rp 65,000 / m2
PEMBULATAN Rp 65,000 / m2

Rp 450,000 Rp 450,000
Rp 150,000 Rp 150,000
Rp 10,000 Rp 10,000
Rp 140,000 Rp 140,000
JUMLAH Rp 750,000
PEMBULATAN Rp 750,000

m2
Rp 110,000 Rp 113,300 Net
Rp 50,000 Rp 9,750
Rp 155,000 Rp 15,500
Rp 19,500 Rp 7,800 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 216,850 / m2
PEMBULATAN Rp 217,000 / m2

Rp 128,016 Rp 131,856 Net


Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 222,176 / m2
PEMBULATAN Rp 223,000 / m2

m2
Rp 49,000 Rp 50,470 Net
Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 140,790 / m2
PEMBULATAN Rp 140,800 / m2

m2
Rp 57,851 Rp 59,587 Net
Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 149,907 / m2
PEMBULATAN Rp 149,900 / m2

m2
Rp 61,818 Rp 63,673 Net
Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 70,000 Rp 70,000
JUMLAH Rp 153,993 / m2
PEMBULATAN Rp 154,000 / m2

m2
Rp 95,000 Rp 97,850 Net
Rp 50,000 Rp 6,850
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,065 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 50,000 Rp 50,000
JUMLAH Rp 168,170 / m2
PEMBULATAN Rp 168,200 / m2

m2
Rp 1,500,000 Rp 1,650,000
Rp 50,000 Rp 50,000
Rp 35,000 Rp 35,000
Rp 500,000 Rp 500,000
Rp 40,000 Rp 40,000
JUMLAH Rp 2,275,000 / m2
PEMBULATAN Rp 2,275,000 / m2 ###

ml

Rp 2,275,000 Rp 2,502,500

JUMLAH Rp 2,502,500 / ml
PEMBULATAN Rp 2,503,000 / ml

ml

Rp 2,275,000 Rp 2,502,500

JUMLAH Rp 2,502,500 / ml
PEMBULATAN Rp 2,503,000 / ml

m2
Rp 100,686 Rp 103,707
Rp 5,185 Rp 5,185
Rp 15,000 Rp 15,000 polycarbonat 5 mm = Rp.2.025.000,- / lmbr
JUMLAH Rp 123,892 m2 81719.128
PEMBULATAN Rp 124,000 m2

m2
Rp 124,000 Rp 124,000
Rp 185,000 Rp 185,000
Rp 30,000 Rp 30,000

JUMLAH Rp 339,000 m2
PEMBULATAN Rp 339,000 m2

Rp 86,450 Rp 580,944
Rp 195,000 Rp 455,000
Rp 275,000 Rp 1,848,000
Rp 47,000 Rp 108,100
Rp 45,000 Rp 45,000
Rp 5,000 Rp 5,000
Rp 250,000 Rp 1,680,000
JUMLAH Rp 4,722,044 m2
PEMBULATAN Rp 703,000 m2

Rp 86,450 Rp 580,944 64549


Rp 35,000 Rp 980,000 ###
Rp 385,000 Rp 3,465,000 ###
Rp 33,500 Rp 268,000 29778
Rp 65,000 Rp 65,000 7222
Rp 216,000 Rp 216,000 24000
Rp 250,000 Rp 2,250,000 ###
JUMLAH Rp 7,824,944 m2
PEMBULATAN Rp 870,000 m2 ###

Rp 172,500 Rp 177,675 ###


Rp 155,000 Rp 77,500 48438
Rp 2,000 Rp 2,000 1250
Rp 25,000 Rp 40,000 25000
JUMLAH Rp 297,175 m2
PEMBULATAN Rp 186,000 m2 ###

Rp 889,000

m2

Rp 875,000 Rp 892,500 Subkon : Karjo

JUMLAH Rp 892,500 / m2
PEMBULATAN Rp 892,500 / m2

Ls

Rp 650,000 Rp 715,000
Rp 650,000 Rp 715,000
Rp 650,000 Rp 715,000

JUMLAH Rp 2,145,000 / Ls
PEMBULATAN Rp 2,145,000 / Ls

Ls
Rp 1,080,000 Rp 4,320,000 Aplikator : Decolaser
Rp 540,000 Rp 4,860,000

JUMLAH Rp 9,180,000 / Ls
PEMBULATAN Rp 9,180,000 / Ls

Rp 892,500 Rp 24,490,200

JUMLAH Rp 24,490,200 / m2
PEMBULATAN Rp 24,500,000 / m2

Rp 892,500 Rp 3,195,150

JUMLAH Rp 3,195,150 / m2
PEMBULATAN Rp 3,200,000 / m2

Rp 892,500 Rp 2,042,040
Rp 11,500,000 Rp 23,000,000

JUMLAH Rp 25,042,040 / m2
PEMBULATAN Rp 25,050,000 / m2

Rp 892,500 Rp 13,548,150
JUMLAH Rp 13,548,150 / m2
PEMBULATAN Rp 13,550,000 / m2

Rp 892,500 Rp 8,166,375

JUMLAH Rp 8,166,375 / m2
PEMBULATAN Rp 8,170,000 / m2

Rp 892,500 Rp 1,820,000

JUMLAH Rp 1,820,000 / m2
PEMBULATAN Rp 1,820,000 / m2

Rp 892,500 Rp 84,733,950 Subkon : Karjo


Rp 11,500,000 Rp 23,000,000 4
###
JUMLAH Rp 107,733,950 / m2
PEMBULATAN Rp 107,800,000 / m2
Rp 119,400,000
###
Rp 385,000 Rp 4,340,028 Subkon : Karjo
Rp 20,000 Rp 157,000
Rp 20,000 Rp 1,547,520
Rp 58,000 Rp 2,992,800
Rp 45,500 Rp 227,500
Rp 2,316,212 Rp 2,316,212
JUMLAH Rp 11,581,060 / m2
PEMBULATAN Rp 11,600,000 / m2

Rp 11,500,000 Rp 11,500,000 Subkon : Karjo


Rp 800,000 Rp 1,596,000

JUMLAH Rp 13,096,000 / m2
PEMBULATAN Rp 13,100,000 / m2

Ls

Rp 210,000 Rp 11,327,820 Subkon : PT.Sarana Alumunium / PT. Seni jepara Glass


Curtain Wall discount 15%
JUMLAH Rp 11,327,820 / Ls
PEMBULATAN Rp 11,327,800 / Ls

Ls

Rp 210,000 Rp 8,245,650 Subkon : PT.Sarana Alumunium / PT. Seni jepara Glass


Curtain Wall discount 15%
JUMLAH Rp 8,245,650 / Ls
PEMBULATAN Rp 8,245,700 / Ls

m2

Rp 61,750 Rp 123,500 Subkon : GBU


Rp 33,250 Rp 66,500
JUMLAH Rp 190,000 / m2
PEMBULATAN Rp 190,000 / m2

m2

Rp 40,000 Rp 40,000 Subkon : GBU


Rp 43,050 Rp 43,050
Rp 25,000 Rp 6,250
Rp - Rp -
Rp 2,500 Rp 2,500
Rp 20,000 Rp 20,000
JUMLAH Rp 111,800 / m2
PEMBULATAN Rp 112,000 / m2

m2

Rp 80,000 Rp 80,000 Subkon : GBU


Rp 86,100 Rp 86,100
Rp 25,000 Rp 6,250
Rp - Rp -
Rp 1,500 Rp 1,500
Rp 25,000 Rp 25,000
JUMLAH Rp 198,850 / m2
PEMBULATAN Rp 199,000 / m2

m2

Rp 57,500 Rp 57,500 Subkon : GBU


Rp 37,050 Rp 37,050
Rp 25,000 Rp 6,250
Rp - Rp -
Rp 1,500 Rp 1,500
Rp 26,000 Rp 26,000
JUMLAH Rp 128,300 / m2
PEMBULATAN Rp 129,000 / m2

m2

Rp 75,000 Rp 75,000 Subkon : GBU


Rp 50,000 Rp 50,000
Rp 25,000 Rp 6,250
Rp - Rp -
Rp 1,500 Rp 1,500
Rp 26,000 Rp 26,000
JUMLAH Rp 158,750 / m2
PEMBULATAN Rp 159,000 / m2

Rp 40,000 Rp 17,600 Subkon : GBU


Rp 12,000 Rp 13,200
Rp 25,000 Rp 3,125
Rp - Rp -
Rp 1,500 Rp 1,500
Rp 25,000 Rp 25,000
JUMLAH Rp 60,425 / ml
PEMBULATAN Rp 61,000 / ml

Rp 40,000 Rp 13,200 Subkon : GBU


Rp 12,000 Rp 13,200
Rp 25,000 Rp 3,125
Rp - Rp -
Rp 1,500 Rp 1,500
Rp 25,000 Rp 25,000
JUMLAH Rp 56,025 / ml
PEMBULATAN Rp 57,000 / ml

Rp 40,000 Rp 60,000
Rp 12,000 Rp 144,000
Rp 500,000 Rp 37,500
Rp - Rp -
Rp 25,000 Rp 6,250
Rp 50,000 Rp 50,000
Rp 50,000 Rp 75,000
JUMLAH Rp 372,750 / Unit
PEMBULATAN Rp 373,000 / Unit

Rp 40,000 Rp 264,000
Rp 12,000 Rp 198,000
Rp 347,222 Rp 4,965,278
Rp 25,000 Rp 574,167
Rp 25,000 Rp 165,000
Rp 15,000 Rp 150,000
Rp 50,000 Rp 100,000
Rp 50,000 Rp 330,000
JUMLAH Rp 6,746,444 / Unit
PEMBULATAN Rp 6,800,000 / Unit

ml
Rp 15,000 Rp 15,000 Subkon : GBU
JUMLAH Rp 15,000 / ml
PEMBULATAN Rp 15,000 / ml
m2
Rp 58,000 Rp 58,000
Rp 20,000 Rp 20,000
JUMLAH Rp 78,000 / m2
PEMBULATAN Rp 78,000 / m2

m2

Rp 654,000 Rp 654,000 Subkon : Seni Jepara Glass

JUMLAH Rp 654,000 / m2
PEMBULATAN Rp 654,000 / m2

unit

Rp 6,850,000 Rp 6,850,000
Rp 15,000 Rp 15,000
Rp 215,000 Rp 215,000
JUMLAH Rp 7,080,000 / unit
PEMBULATAN Rp 7,080,000 / unit

unit

Rp 720,000 Rp 720,000
Rp 50,000 Rp 50,000
Rp 150,000 Rp 150,000
JUMLAH Rp 920,000 / unit
PEMBULATAN Rp 920,000 / unit

unit

Rp 550,000 Rp 550,000
Rp 5,000 Rp 5,000
Rp 25,000 Rp 25,000
JUMLAH Rp 580,000 / unit
PEMBULATAN Rp 580,000 / unit

unit

Rp 474,400 Rp 474,400
Rp 5,000 Rp 5,000
Rp 45,000 Rp 45,000
JUMLAH Rp 524,400 / unit
PEMBULATAN Rp 524,000 / unit

unit

Rp 3,200,400 Rp 3,200,400 Discount 30%, sebelum PPN


Rp 10,000 Rp 10,000
Rp 120,000 Rp 120,000
JUMLAH Rp 3,330,400 / unit
PEMBULATAN Rp 3,330,000 / unit

unit

Rp 3,000,000 Rp 3,000,000 Discount 30%, sebelum PPN

Rp 100,000 Rp 100,000
Rp 250,000 Rp 250,000
JUMLAH Rp 3,350,000 / unit
PEMBULATAN Rp 3,350,000 / unit

unit

Rp 4,872,000 Rp 4,872,000
Rp 30,000 Rp 30,000
JUMLAH Rp 4,902,000 / unit
PEMBULATAN Rp 4,902,000 / unit

unit

Rp 898,800 Rp 898,800
Rp 75,000 Rp 75,000
JUMLAH Rp 973,800 / unit
PEMBULATAN Rp 974,000 / unit

unit

Rp 1,503,600 Rp 1,503,600
Rp 3,000 Rp 3,000
Rp 72,000 Rp 72,000
JUMLAH Rp 1,578,600 / unit
PEMBULATAN Rp 1,579,000 / unit

unit

Rp 404,880 Rp 404,880
Rp 30,000 Rp 30,000
JUMLAH Rp 434,880 / unit
PEMBULATAN Rp 435,000 / unit

unit

Rp 350,000 Rp 350,000
Rp 2,500 Rp 2,500
Rp 35,000 Rp 35,000
JUMLAH Rp 387,500 / unit
PEMBULATAN Rp 388,000 / unit

unit

Rp 715,000 Rp 715,000
Rp 5,000 Rp 5,000
Rp 30,000 Rp 30,000
JUMLAH Rp 750,000 / unit
PEMBULATAN Rp 750,000 / unit

unit

Rp 500,000 Rp 500,000
Rp 5,000 Rp 5,000
Rp 30,000 Rp 30,000
JUMLAH Rp 535,000 / unit
PEMBULATAN Rp 535,000 / unit

unit

Rp 75,000 Rp 75,000
Rp 5,000 Rp 5,000
Rp 30,000 Rp 30,000
JUMLAH Rp 110,000 / unit
PEMBULATAN Rp 110,000 / unit

unit

Rp 180,000 Rp 342,000
Rp 2,873,000 Rp 5,559,255

JUMLAH Rp 5,901,255 / unit


PEMBULATAN Rp 5,901,000 / unit

unit

Rp 180,000 Rp 342,000
Rp 2,873,000 Rp 5,559,255

JUMLAH Rp 5,901,255 / unit


PEMBULATAN Rp 5,901,000 / unit

m2

Rp 1,750,000 Rp 2,187,500
Rp 58,000 Rp 7,946
Rp 155,000 Rp 7,905
Rp 19,500 Rp 5,070 1 kg dapat 3.85 m2
Rp 15,000 Rp 15,000
Rp 650,000 Rp 650,000

JUMLAH Rp 2,873,421 / m2
PEMBULATAN Rp 2,873,000 / m2 1 3275220
as Meja Wastafel #REF!
#REF! 963300
unit
Rp 250,000 Rp 600,000
Rp 6,000 Rp 38,400
Rp 9,000 Rp 57,600
Rp 5,000 Rp 40,000
Rp 66,000 Rp 158,400
Rp 75,000 Rp 150,000
Rp 894,400 Rp 22,360
Rp 1,066,760 Rp 53,338

JUMLAH Rp 1,120,098 / unit


PEMBULATAN Rp 1,130,000 / unit
Rp 380,000 /m2

Rp 195,000 Rp 390,000
Rp 20,000 Rp 168,000
Rp 50,000 Rp 10,000
Rp 35,000 Rp 35,000
Rp 27,500 Rp 158,400
JUMLAH Rp 761,400 / unit
PEMBULATAN Rp 770,000 / unit

unit
Rp 250,000 Rp 550,000
Rp 6,000 Rp 33,000
Rp 9,000 Rp 49,500
Rp 5,000 Rp 30,000
Rp 66,000 Rp 145,200
Rp 195,000 Rp 195,000
Rp 75,000 Rp 150,000
Rp 1,002,700 Rp 25,068
Rp 175,000 Rp 175,000
Rp 1,352,768 Rp 67,638

JUMLAH Rp 1,420,406 / unit


PEMBULATAN Rp 1,420,000 / unit

unit

Rp 550,000 Rp 1,375,000
Rp 4,300 Rp 4,300
Rp 140,000 Rp 367,500

JUMLAH Rp 1,746,800 / unit


PEMBULATAN Rp 1,747,000 / unit

unit

Rp 2,486,400 Rp 2,486,400
Rp 20,000 Rp 20,000
Rp 210,000 Rp 210,000
JUMLAH Rp 2,716,400 / unit
PEMBULATAN Rp 2,716,000 / unit

unit

Rp 1,243,200 Rp 1,243,200
Rp 10,000 Rp 10,000
Rp 220,000 Rp 220,000
JUMLAH Rp 1,473,200 / unit
PEMBULATAN Rp 1,473,000 / unit

unit

Rp 585,000 Rp 585,000
Rp 350,000 Rp 350,000
Rp 5,000 Rp 5,000
Rp 145,000 Rp 145,000
JUMLAH Rp 1,085,000 / unit
PEMBULATAN Rp 1,085,000 / unit

Rp 165,480 Rp 165,480
Rp 5,000 Rp 5,000
Rp 15,000 Rp 15,000
JUMLAH Rp 185,480 / unit
PEMBULATAN Rp 185,000 / unit

ml

Rp 950,000 Rp 950,000 Aplikator : Agus Stainless Steel

JUMLAH Rp 950,000 / ml
PEMBULATAN Rp 950,000 / ml

m2
Rp 119,625 Rp 125,606 harga naik 10%
per minggu ke-3 Februar
Rp 32,500 Rp 34,125
Rp 8,500 Rp 8,500 9286
JUMLAH Rp 168,231 / m2
PEMBULATAN Rp 170,000 / m2

unit
Rp 480,000 Rp 220,800 per-ml = Rp.480.000,-, lebar = 1.15 m
Rp 17,500 Rp 8,050
JUMLAH Rp 228,850 / unit
PEMBULATAN Rp 228,900 / unit

Unit
Rp 900,000 Rp 7,187,400

Rp 413,450 Rp 1,800,988
Rp 14,000 Rp 178,640
Rp 20,000 Rp 255,200
Rp 33,500 Rp 201,000
Rp 12,500 Rp 50,000
Rp 550,000 Rp 1,100,000
Rp 3,650,000 Rp 7,300,000
Rp 168,750 Rp 337,500
Rp 236,250 Rp 472,500
Rp 315,000 Rp 630,000
Rp 23,800 Rp 47,600
Rp 12,373,428 Rp 309,336
Rp 634,138 Rp 1,268,276
Rp 13,951,040 Rp 697,552

JUMLAH Rp 21,835,992 / unit


PEMBULATAN Rp 21,836,000 / unit

Unit

Rp 413,450 Rp 2,947,072
Rp 14,000 Rp 278,880
Rp 20,000 Rp 398,400
Rp 33,500 Rp 201,000
Rp 12,500 Rp 50,000
Rp 550,000 Rp 1,100,000
Rp 3,650,000 Rp 7,300,000
Rp 168,750 Rp 337,500
Rp 168,750 Rp 337,500
Rp 225,000 Rp 450,000
Rp 17,000 Rp 34,000
Rp 13,434,352 Rp 335,859
Rp 688,511 Rp 1,377,021
Rp 15,147,231 Rp 757,362

JUMLAH Rp 15,904,593 / unit


PEMBULATAN Rp 15,905,000 / unit
Unit

Rp 131,750 Rp 750,975 Subkon : Seni Jepara Glass


Rp 125,163 Rp 796,033 Subkon : Seni Jepara Glass
Rp 120,000 Rp 259,200
Rp 14,000 Rp 89,040
Rp 20,000 Rp 127,200
Rp 95,000 Rp 102,600
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 267,500 Rp 267,500
Rp 17,000 Rp 17,000
Rp 3,283,299 Rp 164,165

JUMLAH Rp 3,447,463 / unit


PEMBULATAN Rp 3,447,000 / unit

Unit

Rp 413,450 Rp 893,052
Rp 14,000 Rp 92,400
Rp 20,000 Rp 132,000
Rp 33,500 Rp 100,500
Rp 12,500 Rp 25,000
Rp 450,000 Rp 450,000
Rp 3,650,000 Rp 3,650,000
Rp 168,750 Rp 168,750
Rp 168,750 Rp 168,750
Rp 225,000 Rp 225,000
Rp 17,000 Rp 17,000
Rp 5,922,452 Rp 148,061
Rp 303,526 Rp 607,051
Rp 6,677,565 Rp 333,878

JUMLAH Rp 7,011,443 / unit


PEMBULATAN Rp 7,011,000 / unit

Unit
Rp 131,750 Rp 830,025 Subkon : Seni Jepara Glass
Rp 125,163 Rp 871,131 Subkon : Seni Jepara Glass
Rp 120,000 Rp 291,600
Rp 14,000 Rp 97,440
Rp 20,000 Rp 139,200
Rp 95,000 Rp 230,850
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 267,500 Rp 267,500
Rp 17,000 Rp 17,000
Rp 3,618,496 Rp 180,925

JUMLAH Rp 3,799,421 / unit


PEMBULATAN Rp 3,799,000 / unit

Unit

Rp 160,000 Rp 960,000 Subkon : Karjo


Rp 265,000 Rp 530,000
Rp 335,000 Rp 670,000
Rp 350,000 Rp 105,000
Rp 47,000 Rp 54,050
Rp 17,500 Rp 182,000
Rp 45,000 Rp 45,000
Rp 9,500 Rp 64,600
Rp 20,000 Rp 64,000
Rp - Rp -
Rp 6,000 Rp 13,200
Rp 20,000 Rp 44,000
Rp - Rp -
Rp 350,000 Rp 350,000
Rp 285,000 Rp 285,000
Rp 290,000 Rp 290,000
Rp 450,000 Rp 450,000
Rp 90,000 Rp 135,000
Rp 35,000 Rp 35,000
Rp 4,276,850 Rp 213,843
JUMLAH Rp 4,490,693 / unit
PEMBULATAN Rp 4,500,000 / unit

Unit
Rp 240,000 Rp 2,196,000 Subkon : Karjo
Rp 265,000 Rp 530,000
Rp 275,000 Rp 550,000
Rp 47,000 Rp 54,050
Rp 45,000 Rp 45,000
Rp 9,500 Rp 60,800
Rp 20,000 Rp 64,000
Rp - Rp -
Rp 6,000 Rp 13,200
Rp 20,000 Rp 44,000
Rp 50,000 Rp 50,000
Rp 30,000 Rp 32,400
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 17,000 Rp 17,000
Rp 4,530,200 Rp 226,510
JUMLAH Rp 4,756,710 / unit
PEMBULATAN Rp 4,757,000 / unit

Rp 20,000 Rp 471,000
Rp 58,000 Rp 214,600
Rp 58,000 Rp 243,600
Rp 90,000 Rp 180,000
Rp 35,000 Rp 35,000
Rp 350,000 Rp 350,000
JUMLAH Rp 1,494,200 / unit
PEMBULATAN Rp 1,500,000 / unit

Unit

Rp 160,000 Rp 1,672,000 Subkon : Karjo


Rp 160,000 Rp 1,120,000
Rp 135,000 Rp 1,620,000
Rp 14,000 Rp 234,360
Rp 20,000 Rp 334,800
Rp 350,000 Rp 350,000
Rp 285,000 Rp 285,000
Rp 290,000 Rp 290,000
Rp 450,000 Rp 450,000
Rp 90,000 Rp 135,000
Rp 35,000 Rp 35,000
Rp 6,526,160 Rp 326,308
JUMLAH Rp 6,852,468 / unit
PEMBULATAN Rp 6,860,000 / unit

Unit

Rp 145,000 Rp 1,174,500 Subkon : Karjo


Rp 145,000 Rp 1,015,000
Rp 145,000 Rp 565,500
Rp 250,000 Rp 1,170,000
Rp 14,000 Rp 112,560
Rp 20,000 Rp 160,800
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 321,000 Rp 321,000
Rp 17,000 Rp 17,000
Rp 5,410,110 Rp 270,506

JUMLAH Rp 5,680,616 / unit


PEMBULATAN Rp 5,681,000 / unit

Rp 800,000 Rp 2,280,000
Rp 35,000 Rp 140,000
Rp 321,000 Rp 321,000
Rp 450,000 Rp 450,000

JUMLAH Rp 3,191,000 / unit


PEMBULATAN Rp 3,191,000 / unit

Rp 800,000 Rp 2,160,000
Rp 35,000 Rp 140,000
Rp 321,000 Rp 321,000
Rp 450,000 Rp 450,000

JUMLAH Rp 3,071,000 / unit


PEMBULATAN Rp 3,071,000 / unit

Rp 800,000 Rp 5,712,000
Rp 35,000 Rp 140,000
Rp 30,000 Rp 214,200
Rp 321,000 Rp 321,000
Rp 450,000 Rp 450,000
JUMLAH Rp 6,837,200 / unit
PEMBULATAN Rp 6,838,000 / unit

Rp 800,000 Rp 1,680,000
Rp 35,000 Rp 140,000
Rp 30,000 Rp 63,000
Rp 321,000 Rp 321,000
Rp 450,000 Rp 450,000

JUMLAH Rp 2,654,000 / unit


PEMBULATAN Rp 2,654,000 / unit

Rp 800,000 Rp 4,032,000
Rp 35,000 Rp 140,000
Rp 30,000 Rp 151,200
Rp 321,000 Rp 321,000
Rp 450,000 Rp 450,000

JUMLAH Rp 5,094,200 / unit


PEMBULATAN Rp 5,095,000 / unit

Rp 800,000 Rp 2,688,000
Rp 35,000 Rp 140,000
Rp 30,000 Rp 100,800
Rp 321,000 Rp 321,000
Rp 450,000 Rp 450,000

JUMLAH Rp 3,699,800 / unit


PEMBULATAN Rp 3,700,000 / unit

Unit

Rp 145,000 Rp 942,500 Subkon : Seni Jepara Glass


Rp 265,000 Rp 1,060,000
Rp 275,000 Rp 1,100,000
Rp 45,000 Rp 90,000
Rp 9,500 Rp 125,400
Rp 20,000 Rp 350,400
Rp 350,000 Rp 700,000
Rp 225,000 Rp 450,000
Rp 100,000 Rp 200,000
Rp 93,750 Rp 187,500
Rp 70,000 Rp 210,000
Rp 267,500 Rp 535,000
Rp 17,000 Rp 51,000
Rp 5,950,800 Rp 297,540
JUMLAH Rp 6,299,340 / unit
PEMBULATAN Rp 6,299,000 / unit

Unit

Rp 160,000 Rp 912,000 Subkon : Seni Jepara Glass


Rp 265,000 Rp 530,000
Rp 335,000 Rp 670,000
Rp 17,500 Rp 182,000
Rp 47,000 Rp 47,000
Rp 9,500 Rp 62,700
Rp 20,000 Rp 175,200
Rp 350,000 Rp 350,000
Rp 250,000 Rp 250,000
Rp 285,000 Rp 285,000
Rp 290,000 Rp 290,000
Rp 450,000 Rp 450,000
Rp 90,000 Rp 135,000
Rp 35,000 Rp 35,000
Rp 4,338,900 Rp 216,945
JUMLAH Rp 4,590,845 / unit
PEMBULATAN Rp 4,600,000 / unit

Unit

Rp 145,000 Rp 681,500 Subkon : Seni Jepara Glass


Rp 950,000 Rp 950,000
Rp 250,000 Rp 250,000
JUMLAH Rp 1,881,500 / unit
PEMBULATAN Rp 1,890,000 / unit

Rp 240,000 Rp 5,580,000
Rp 3,071,000 Rp 3,071,000
Rp 3,500,000 Rp 52,500
Rp 35,000 Rp 1,627,500
JUMLAH Rp 10,331,000 / unit
PEMBULATAN Rp 10,400,000 / unit
Rp 240,000 Rp 2,217,600
Rp 3,071,000 Rp 3,071,000
Rp 3,500,000 Rp 26,950
Rp 35,000 Rp 646,800
Rp 4,500,000 Rp 4,500,000
Rp 250,000 Rp 250,000
JUMLAH Rp 10,712,350 / unit
PEMBULATAN Rp 10,712,000 / unit

Rp 240,000 Rp 3,369,600
Rp 3,500,000 Rp 37,800
Rp 35,000 Rp 982,800
Rp 4,500,000 Rp 4,500,000

JUMLAH Rp 8,890,200 / unit


PEMBULATAN Rp 8,900,000 / unit

Rp 240,000 Rp 2,232,000
Rp 3,500,000 Rp 21,700
Rp 35,000 Rp 651,000
Rp 250,000 Rp 250,000

JUMLAH Rp 3,154,700 / unit


PEMBULATAN Rp 3,160,000 / unit

Rp 240,000 Rp 2,520,000
Rp 3,500,000 Rp 24,500
Rp 35,000 Rp 735,000

JUMLAH Rp 3,279,500 / unit


PEMBULATAN Rp 3,280,000 / unit

Rp 240,000 Rp 1,656,000
Rp 3,500,000 Rp 31,500
Rp 35,000 Rp 483,000
Rp 4,500,000 Rp 9,000,000

JUMLAH Rp 11,170,500 / unit


PEMBULATAN Rp 11,200,000 / unit

Rp 240,000 Rp 1,764,000
Rp 3,500,000 Rp 17,500
Rp 35,000 Rp 514,500

JUMLAH Rp 2,296,000 / unit


PEMBULATAN Rp 2,300,000 / unit

Rp 240,000 Rp 2,232,000
Rp 3,500,000 Rp 29,400
Rp 35,000 Rp 651,000
Rp 4,500,000 Rp 4,500,000

JUMLAH Rp 7,412,400 / unit


PEMBULATAN Rp 7,412,000 / unit

Rp 240,000 Rp 2,304,000
Rp 3,500,000 Rp 17,500
Rp 35,000 Rp 672,000

JUMLAH Rp 2,993,500 / unit


PEMBULATAN Rp 3,000,000 / unit

Unit R. Admin Part

Rp 145,000 Rp 2,291,000 Subkon : Karjo


Rp 160,000 Rp 1,072,000
Rp 160,000 Rp 416,000
Rp 250,000 Rp 1,080,000
Rp 14,000 Rp 234,360
Rp 6,000 Rp 13,200
Rp 20,000 Rp 44,000
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 17,000 Rp 17,000
Rp 6,041,310 Rp 302,066
JUMLAH Rp 6,343,376 / unit
PEMBULATAN Rp 6,400,000 / unit

Unit R. Admin Part

Rp 145,000 Rp 783,000 Subkon : Karjo


Rp 160,000 Rp 1,072,000
Rp 250,000 Rp 645,000
Rp 14,000 Rp 83,160
Rp 6,000 Rp 24,000
Rp 20,000 Rp 80,000
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000 ( 1100 x 2150 )mm - p 1
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 17,000 Rp 17,000
Rp 3,577,910 Rp 178,896
JUMLAH Rp 3,756,806 / unit
PEMBULATAN Rp 3,800,000 / unit

Rp 1,150,000 Rp 4,945,000
JUMLAH Rp 4,945,000 / unit
PEMBULATAN Rp 4,950,000 / unit

Rp 1,150,000 Rp 6,428,500

JUMLAH Rp 6,428,500 / unit


PEMBULATAN Rp 6,430,000 / unit

Rp 1,150,000 Rp 2,225,250
JUMLAH Rp 2,225,250 / unit
PEMBULATAN Rp 2,230,000 / unit

Rp 1,150,000 Rp 3,956,000
JUMLAH Rp 3,956,000 / unit
PEMBULATAN Rp 3,960,000 / unit
Rp 1,150,000 Rp 8,935,500

JUMLAH Rp 8,935,500 / unit


PEMBULATAN Rp 8,940,000 / unit

Area Bengkel Unit

Rp 145,000 Rp 812,000 Subkon : Seni Jepara Glass


Rp 101,500 Rp 1,136,800 Subkon : Seni Jepara Glass
Rp 250,000 Rp 450,000
Rp 14,000 Rp 78,400
Rp 20,000 Rp 112,000
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 267,500 Rp 267,500
Rp 3,431,700 Rp 171,585

JUMLAH Rp 3,603,285 / unit


PEMBULATAN Rp 3,603,000 / unit

Unit

Rp 160,000 Rp 912,000 Subkon : Seni Jepara Glass


Rp 250,000 Rp 250,000
Rp 135,000 Rp 186,300
Rp 20,000 Rp 116,000
Rp 6,000 Rp 34,800
Rp 250,000 Rp 345,000
Rp 285,000 Rp 285,000
Rp 90,000 Rp 135,000
Rp 267,500 Rp 267,500
Rp 2,531,600 Rp 126,580
JUMLAH Rp 2,658,180 / unit
PEMBULATAN Rp 2,658,000 / unit

Unit

Rp 160,000 Rp 416,000 Subkon : Seni Jepara Glass


Rp 135,000 Rp 47,250
Rp 20,000 Rp 116,000
Rp 6,000 Rp 34,800
Rp 250,000 Rp 87,500
Rp 285,000 Rp 285,000
Rp 90,000 Rp 135,000
Rp 285,000 Rp 285,000
Rp 1,406,550 Rp 70,328
JUMLAH Rp 1,476,878 / unit
PEMBULATAN Rp 1,477,000 / unit

Unit

Rp 160,000 Rp 1,200,000 Subkon : Seni Jepara Glass


Rp 135,000 Rp 418,500
Rp 20,000 Rp 116,000
Rp 6,000 Rp 34,800
Rp 250,000 Rp 775,000
Rp 285,000 Rp 285,000
Rp 90,000 Rp 135,000
Rp 285,000 Rp 285,000
Rp 3,249,300 Rp 162,465
JUMLAH Rp 3,411,765 / unit
PEMBULATAN Rp 3,412,000 / unit

Unit

Rp 145,000 Rp 1,348,500 Subkon : Seni Jepara Glass


Rp 265,000 Rp 530,000
Rp 335,000 Rp 670,000
Rp 47,000 Rp 47,000
Rp 9,500 Rp 62,700
Rp 250,000 Rp 540,000
Rp 20,000 Rp 175,200
Rp 30,000 Rp 25,350
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 17,000 Rp 17,000
Rp 4,272,500 Rp 213,625
Rp 240,000 Rp 264,000
Rp 36,000 Rp 79,200
JUMLAH Rp 4,846,325 / unit
PEMBULATAN Rp 4,847,000 / unit

Unit
Rp 145,000 Rp 1,348,500 Subkon : Seni Jepara Glass
Rp 190,000 Rp 380,000
Rp 275,000 Rp 550,000
Rp 47,000 Rp 47,000
Rp 9,500 Rp 62,700
Rp 250,000 Rp 840,000
Rp 20,000 Rp 175,200
Rp 30,000 Rp 25,350
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 17,000 Rp 17,000
Rp 4,319,500 Rp 215,975
Rp 240,000 Rp 384,000
Rp 31,000 Rp 99,200
JUMLAH Rp 5,018,675 / unit
PEMBULATAN Rp 5,019,000 / unit

Rp 240,000 Rp 1,809,600
Rp 31,000 Rp 467,480
Rp 31,000 Rp 233,740
JUMLAH Rp 2,510,820 / unit
PEMBULATAN Rp 2,511,000 / unit

Rp 240,000 Rp 2,644,800
Rp 31,000 Rp 683,240
Rp 31,000 Rp 341,620
JUMLAH Rp 3,669,660 / unit
PEMBULATAN Rp 3,670,000 / unit
Unit

Rp 145,000 Rp 1,450,000 Subkon : Seni Jepara Glass


Rp 250,000 Rp 540,000
Rp 30,000 Rp 25,350
Rp 350,000 Rp 350,000
Rp 2,365,350 Rp 118,268
Rp 240,000 Rp 5,181,600
Rp 31,000 Rp 1,338,580
JUMLAH Rp 9,003,798 / unit
PEMBULATAN Rp 9,004,000 / unit

Rp 6,299,000 Rp 6,299,000
Rp 4,847,000 Rp 4,847,000
Rp 240,000 Rp 5,961,600
Rp 31,000 Rp 1,540,080
Rp -
JUMLAH Rp 18,647,680 / unit
PEMBULATAN Rp 18,648,000 / unit

Rp 6,299,000 Rp 6,299,000
Rp 4,847,000 Rp 4,847,000
Rp 240,000 Rp 5,298,000
Rp 31,000 Rp 1,368,650
Rp -
JUMLAH Rp 17,812,650 / unit
PEMBULATAN Rp 17,813,000 / unit

Rp 4,847,000 Rp 4,847,000
Rp 240,000 Rp 1,555,200
Rp 31,000 Rp 401,760
Rp -
JUMLAH Rp 6,803,960 / unit
PEMBULATAN Rp 6,804,000 / unit

Unit

Rp 131,750 Rp 5,559,850 Subkon : Seni Jepara Glass


Rp 120,000 Rp 2,401,920
Rp 20,000 Rp 1,320,000
Rp 6,000 Rp 396,000
Rp 27,500 Rp 550,440

JUMLAH Rp 10,228,210 / unit


PEMBULATAN Rp 10,228,000 / unit

Unit

Rp 131,750 Rp 4,708,745 Subkon : Seni Jepara Glass


Rp 120,000 Rp 1,801,440
Rp 20,000 Rp 1,248,000
Rp 6,000 Rp 374,400
Rp 27,500 Rp 412,830

JUMLAH Rp 8,545,415 / unit


PEMBULATAN Rp 8,545,000 / unit

Unit

Rp 131,750 Rp 6,851,000 Subkon : Seni Jepara Glass


Rp 120,000 Rp 2,937,600
Rp 20,000 Rp 1,664,000
Rp 6,000 Rp 499,200
Rp 27,500 Rp 673,200

JUMLAH Rp 12,625,000 / unit


PEMBULATAN Rp 12,625,000 / unit ### per-m2

Unit

Rp 131,750 Rp 5,362,225 Subkon : Seni Jepara Glass


Rp 120,000 Rp 2,203,200
Rp 20,000 Rp 1,248,000
Rp 6,000 Rp 374,400
Rp 27,500 Rp 504,900

JUMLAH Rp 9,692,725 / unit


PEMBULATAN Rp 9,693,000 / unit ### per-m2

Unit

Rp 131,750 Rp 5,691,600 Subkon : Seni Jepara Glass


Rp 120,000 Rp 2,118,960
Rp 20,000 Rp 1,364,000
Rp 6,000 Rp 409,200
Rp 27,500 Rp 485,595

JUMLAH Rp 10,069,355 / unit


PEMBULATAN Rp 10,069,000 / unit
Unit

Rp 131,750 Rp 4,677,125 Subkon : Seni Jepara Glass


Rp 120,000 Rp 1,490,400
Rp 20,000 Rp 984,000
Rp 6,000 Rp 295,200
Rp 27,500 Rp 341,550

JUMLAH Rp 7,788,275 / unit


PEMBULATAN Rp 7,788,000 / unit

Unit

Rp 131,750 Rp 7,088,150 Subkon : Seni Jepara Glass


Rp 120,000 Rp 2,723,760
Rp 20,000 Rp 1,876,000
Rp 6,000 Rp 562,800
Rp 27,500 Rp 624,195

JUMLAH Rp 12,874,905 / unit


PEMBULATAN Rp 12,875,000 / unit

Unit

Rp 131,750 Rp 5,812,810 Subkon : Seni Jepara Glass


Rp 120,000 Rp 1,969,920
Rp 20,000 Rp 1,212,000
Rp 6,000 Rp 363,600
Rp 27,500 Rp 451,440

JUMLAH Rp 9,809,770 / unit


PEMBULATAN Rp 9,810,000 / unit

Unit

Rp 131,750 Rp 2,430,788 Subkon : Seni Jepara Glass


Rp 120,000 Rp 972,000
Rp 20,000 Rp 504,000
Rp 6,000 Rp 151,200
Rp 27,500 Rp 222,750

JUMLAH Rp 4,280,738 / unit


PEMBULATAN Rp 4,281,000 / unit
Unit

Rp 131,750 Rp 1,897,200 Subkon : Seni Jepara Glass


Rp 120,000 Rp 729,000
Rp 20,000 Rp 378,000
Rp 6,000 Rp 113,400
Rp 27,500 Rp 167,063

JUMLAH Rp 3,284,663 / unit


PEMBULATAN Rp 3,285,000 / unit

Unit

Rp 131,750 Rp 6,495,275 Subkon : Seni Jepara Glass


Rp 120,000 Rp 2,646,000
Rp 20,000 Rp 1,556,000
Rp 6,000 Rp 466,800
Rp 27,500 Rp 606,375

JUMLAH Rp 11,770,450 / unit


PEMBULATAN Rp 11,770,000 / unit

Unit

Rp 131,750 Rp 4,787,795 Subkon : Seni Jepara Glass


Rp 120,000 Rp 1,850,040
Rp 20,000 Rp 1,118,400
Rp 6,000 Rp 335,520
Rp 27,500 Rp 423,968

JUMLAH Rp 8,515,723 / unit


PEMBULATAN Rp 8,516,000 / unit ### per-m2

Unit

Rp 131,750 Rp 6,529,530 Subkon : Seni Jepara Glass


Rp 120,000 Rp 6,343,680
Rp 20,000 Rp 2,336,000
Rp 6,000 Rp 700,800
Rp 27,500 Rp 1,453,760

JUMLAH Rp 17,363,770 / unit


PEMBULATAN Rp 17,364,000 / unit ### per-m2

Unit
Rp 131,750 Rp 1,212,100 Subkon : Seni Jepara Glass
Rp 75,000 Rp 150,000
Rp 9,350 Rp 78,540
Rp 250,000 Rp 500,000
Rp 40,000 Rp 40,000
Rp 7,500 Rp 49,500
Rp 20,000 Rp 175,200
Rp 350,000 Rp 350,000
Rp 120,000 Rp 165,600
Rp 20,000 Rp 116,000
Rp 6,000 Rp 34,800
Rp 27,500 Rp 37,950
Rp 95,000 Rp 62,700
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 267,500 Rp 267,500
Rp 17,000 Rp 17,000
Rp 3,763,640 Rp 188,182
JUMLAH Rp 3,968,822 / unit
PEMBULATAN Rp 3,969,000 / unit

Area Bengkel Unit

Rp 131,750 Rp 830,025 Subkon : Seni Jepara Glass


Rp 125,163 Rp 871,131 Subkon : Seni Jepara Glass
Rp 120,000 Rp 291,600
Rp 14,000 Rp 97,440
Rp 20,000 Rp 139,200
Rp 95,000 Rp 230,850
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 267,500 Rp 267,500
Rp 17,000 Rp 17,000
Rp 3,618,496 Rp 180,925

JUMLAH Rp 3,799,421 / unit


PEMBULATAN Rp 3,799,000 / unit
Area Bengkel Unit

Rp 131,750 Rp 951,235 Subkon : Seni Jepara Glass


Rp 75,000 Rp 150,000
Rp 9,350 Rp 84,524
Rp 250,000 Rp 500,000
Rp 40,000 Rp 40,000
Rp 7,500 Rp 54,150
Rp 20,000 Rp 73,600
Rp 95,000 Rp 23,655
Rp 95,000 Rp 23,655
Rp 6,000 Rp 14,520
Rp 20,000 Rp 48,400
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 267,500 Rp 267,500
Rp 17,000 Rp 17,000
Rp 3,104,989 Rp 155,249
JUMLAH Rp 3,277,238 / unit
PEMBULATAN Rp 3,277,000 / unit

Area Bengkel Unit

Rp 131,750 Rp 790,500 Subkon : Seni Jepara Glass


Rp 125,163 Rp 1,011,313 Subkon : Seni Jepara Glass
Rp 120,000 Rp 216,000
Rp 14,000 Rp 75,600
Rp 20,000 Rp 108,000
Rp 550,000 Rp 594,000
Rp 350,000 Rp 350,000
Rp 225,000 Rp 225,000
Rp 100,000 Rp 100,000
Rp 93,750 Rp 93,750
Rp 70,000 Rp 105,000
Rp 267,500 Rp 267,500
Rp 17,000 Rp 17,000
Rp 3,953,663 Rp 197,683
JUMLAH Rp 4,151,346 / unit
PEMBULATAN Rp 4,151,000 / unit

Area Bengkel Unit

Rp 1,000,000 Rp 4,560,000 Subkon : PT.delapan Baja

Include Include

JUMLAH Rp 4,560,000 / unit


PEMBULATAN Rp 4,560,000 / unit

Area Bengkel Unit

Rp 1,000,000 Rp 9,120,000 Subkon : PT.delapan Baja

Include Include

JUMLAH Rp 9,120,000 / unit


PEMBULATAN Rp 9,120,000 / unit

Area Bengkel Unit

Rp 1,000,000 Rp 5,760,000 Subkon : PT.delapan Baja

Include Include

JUMLAH Rp 5,760,000 / unit


PEMBULATAN Rp 5,760,000 / unit

Area Bengkel Unit


Rp 131,750 Rp 1,304,325 Subkon : Seni Jepara Glass
Rp 125,163 Rp 2,022,626 Subkon : Seni Jepara Glass
Rp 120,000 Rp 486,000
Rp 14,000 Rp 201,600
Rp 20,000 Rp 288,000
Rp 550,000 Rp 891,000
Rp 350,000 Rp 700,000
Rp 225,000 Rp 450,000
Rp 100,000 Rp 200,000
Rp 93,750 Rp 187,500
Rp 70,000 Rp 210,000
Rp 267,500 Rp 535,000
Rp 17,000 Rp 34,000
Rp 7,510,051 Rp 375,503

JUMLAH Rp 7,885,554 / unit


PEMBULATAN Rp 7,886,000 / unit

m2

Rp 1,132,875 Rp 1,132,875 Subkon : PT.Sarana Alumunium


Discount 10+5%
JUMLAH Rp 1,132,875 / m2
PEMBULATAN Rp 1,133,000 / m2

m2

Rp 450,000 Rp 450,000 Subkon : PT.Sarana Alumunium / Seni Jeapara


es, ex Asahimas Discount 10+5%
JUMLAH Rp 450,000 / m2
PEMBULATAN Rp 450,000 / m2

Gambar : IS-45 unit

Rp 77,000 Rp 1,416,800
Rp 7,800 Rp 124,800
Rp 68,000 Rp 680,000
Rp 52,000 Rp 436,800
Rp 232,000 Rp 371,200
Rp 462,000 Rp 369,600
Rp 535,000 Rp 2,889,000
Rp 50,000 Rp 1,000,000
Rp 50,000 Rp 1,000,000
Rp 32,000 Rp 224,000
JUMLAH 1 Rp 8,512,200

Rp 170,000 Rp 7,573,500
Rp 41,400 Rp 3,688,740
Rp 58,000 Rp 5,167,800
Rp 25,500 Rp 1,136,025
Rp 20,000 Rp 891,000
JUMLAH 2 Rp 18,457,065

Rp 7,800 Rp 124,800
Rp 232,000 Rp 371,200
Rp 899,000 Rp 719,200
Rp 170,700 Rp 2,731,200
JUMLAH 3 Rp 3,946,400

Rp 1,333,000 Rp 2,132,800
Rp 12,700 Rp 3,556,000
Rp 12,700 Rp 355,600
Rp 292,000 Rp 4,672,000
Rp 232,500 Rp 6,733,200
Rp 1,333,000 Rp 959,760 kg/ m3
Rp 12,700 Rp 1,565,602 171 0.79
Rp 260,000 Rp 2,038,400
Rp 85,000 Rp 1,020,000
Rp 150,000 Rp 600,000

JUMLAH 4 Rp 23,633,362

Rp 131,750 Rp 671,925
Rp 120,000 Rp 708,000
Rp 119,000 Rp 179,095
Rp 6,000 Rp 34,200
Rp 20,000 Rp 114,000
Rp 27,500 Rp 41,388
Rp 200,000 Rp 200,000

Rp 119,000 Rp 434,350
Rp 6,000 Rp 69,000
Rp 20,000 Rp 230,000
Rp 27,500 Rp 100,375

JUMLAH 5 Rp 2,782,333
Rp 165,000 Rp 495,000
Rp 200,000 Rp 600,000

JUMLAH 6 Rp 1,095,000

Rp 126,933 Rp 441,728
Rp 99,400 Rp 691,824
Rp 90,000 Rp 50,400
Rp 100,000 Rp 140,000

JUMLAH 7 Rp 1,323,952

JUMLAH TOTAL 1~Rp 59,750,311 / Unit


PEMBULATAN Rp 59,750,000 / Unit

ml

Rp 77,000 Rp 8,855 ESPE Saluran uk. 26 x15 cm


Rp 7,800 Rp 3,588 ESPE 0.46
Rp 68,000 Rp 3,400 ESPE
Rp 52,000 Rp 3,380 ESPE
Rp 232,000 Rp 10,672 ESPE
Rp 3,800 Rp 988 ESPE
Rp 1,333,000 Rp 18,395 ESPE
Rp 90,000 Rp 41,400 ESPE

Rp 928,720 Rp 928,720 Net PT.Webforge Indonesia


Rp 40,000 Rp 40,000 ESPE Harga net = USD 36.8 (
1 USD = Rp.9.200,- ( up
JUMLAH Rp 1,059,398 / ml lebar = 25 cm
PEMBULATAN Rp 1,059,000 / ml

m2

Rp 85,000 Rp 89,250 Discount 20%


Rp 20,000 Rp 20,000 Upah : Nana Paving
JUMLAH Rp 109,250 / m2
PEMBULATAN Rp 110,000 / m2
Rp 95,000
m2

Rp 11,000 Rp 11,000
Rp 3,500 Rp 3,500 Upah : Nana Paving
JUMLAH Rp 14,500 / m2
PEMBULATAN Rp 14,500 / m2 ###

ml

Rp 90,000 Rp 90,000
Rp 32,500 Rp 9,425
Rp 15,000 Rp 15,000
JUMLAH Rp 114,425 / ml
PEMBULATAN Rp 120,000 / ml
Rp 105,000

ml

Rp 77,000 Rp 69,485
Rp 65,000 Rp 73,320
Rp 40,000 Rp 7,872
Rp 50,000 Rp 35,280
Rp 232,000 Rp 26,170
Rp 588,000 Rp 588,000 net, harga franco site proyek di atas truk
Rp 5,000 Rp 5,000
Rp 15,000 Rp 15,000
Rp 117,500 Rp 141,000

JUMLAH Rp 961,126 / 1.2 ml


JUMLAH Rp 800,939 / ml
PEMBULATAN Rp 1,051,000 / ml

Rp 196,000 Rp 392,000
Rp 5,000 Rp 5,000 net, harga franco site proyek di atas truk
Rp 15,000 Rp 15,000
Rp 90,000 Rp 90,000

JUMLAH Rp 502,000 / 1.2 ml


JUMLAH Rp 418,333 / ml
PEMBULATAN Rp 618,000 / ml

Rp 333,000 Rp 666,000
Rp 5,000 Rp 5,000 net, harga franco site proyek di atas truk
Rp 15,000 Rp 15,000
Rp 90,000 Rp 90,000
JUMLAH Rp 776,000 / 1.25 ml
JUMLAH Rp 647,000 / ml
PEMBULATAN Rp 797,000 / ml

ml

Rp 77,000 Rp 57,904
Rp 5,000 Rp 4,700
Rp 40,000 Rp 6,560
Rp 50,000 Rp 29,400
Rp 232,000 Rp 21,808
Rp 500,000 Rp 500,000 net, harga franco site proyek di atas truk
Rp 41,400 Rp 22,356
Rp 15,000 Rp 15,000
Rp 41,400 Rp 22,356
Rp 117,500 Rp 117,500

JUMLAH Rp 797,584 / 1.25 ml


JUMLAH Rp 797,584 / ml 2416
PEMBULATAN Rp 800,000 / ml
Rp 250,000

ml

Rp 77,000 Rp 57,904
Rp 5,000 Rp 4,700
Rp 40,000 Rp 6,560
Rp 50,000 Rp 29,400
Rp 232,000 Rp 21,808
Rp 550,000 Rp 550,000 net, harga franco site proyek di atas truk
Rp 99,400 Rp 53,676
Rp 15,000 Rp 15,000
Rp 41,400 Rp 22,356
Rp 117,500 Rp 117,500

JUMLAH Rp 878,904 / ml
JUMLAH Rp 878,904 / ml
PEMBULATAN Rp 880,000 / ml
Rp 300,000
ml

Rp 77,000 Rp 57,904
Rp 5,000 Rp 4,700
Rp 40,000 Rp 6,560
Rp 50,000 Rp 29,400
Rp 232,000 Rp 21,808
Rp 700,300 Rp 700,300 net, harga franco site proyek di atas truk
Rp 99,400 Rp 53,676
Rp 15,000 Rp 15,000
Rp 41,400 Rp 22,356
Rp 117,500 Rp 117,500

JUMLAH Rp 1,029,204 / ml
JUMLAH Rp 857,670 / ml
PEMBULATAN Rp 1,083,700 / ml

ml

Rp 77,000 Rp 53,900
Rp 65,000 Rp 45,500
Rp 40,000 Rp 10,800
Rp 50,000 Rp 21,500
Rp 232,000 Rp 16,240
Rp 3,800 Rp 2,280
Rp 1,333,000 Rp 359,910
Rp 90,000 Rp 324,000
Rp 41,200 Rp 111,240
Rp 357,000 Rp 357,000

JUMLAH Rp 1,302,370 / ml
PEMBULATAN Rp 1,302,000 / ml

ml

Rp 1,333,000 Rp 95,976
Rp 221,000 Rp 201,552
Rp 12,700 Rp 59,436 62 rasio tulangan / per-m3
besi tulangan Ø10 -200 m
JUMLAH Rp 356,964 / ml
PEMBULATAN Rp 357,000 / ml

ml

Rp 65,000 Rp 16,250
Rp 40,000 Rp 10,000
Rp 84,750 Rp 339,000
Rp 35,000 Rp 35,000 37000 0.0833615
Rp 2,000 Rp 2,000
Rp 10,400 Rp 41,600

JUMLAH Rp 443,850 / 4 ml
JUMLAH Rp 110,963 / ml
PEMBULATAN Rp 111,000 / ml

unit

Rp 77,000 Rp 120,120 Rp 1 74844 0.99


Rp 65,000 Rp 87,750 Rp 1 65000
Rp 50,000 Rp 78,000 Rp 1 27506
Rp 232,000 Rp 21,715 Rp 0 23200
Rp 3,800 Rp 5,130 Rp 1 3078
Rp 1,333,000 Rp 769,408 Rp 0 ###
Rp 90,000 Rp 236,160 Rp 3 ###
Rp 66,492 Rp 306,526 Rp 3 ###
Rp 250,000 Rp 250,000 Rp 1 ###
Rp 35,000 Rp 35,000 Rp 1 35000
Rp 250,000 Rp 250,000 Rp 1 ###
JUMLAH Rp 2,159,809 / unit ###
PEMBULATAN Rp 2,160,000 / unit

unit

Rp 77,000 Rp 29,279 1 0.99


Rp 65,000 Rp 2,421
Rp 50,000 Rp 19,013
Rp 232,000 Rp 22,272
Rp 3,800 Rp 38,000
Rp 1,333,000 Rp 363,909
Rp 90,000 Rp 289,440
Rp 66,492 Rp 127,664
Rp 250,000 Rp 500,000
Rp 35,000 Rp 35,000
Rp 250,000 Rp 250,000
JUMLAH Rp 1,676,998 / unit
PEMBULATAN Rp 1,680,000 / unit

Gmbr : IS-50 unit

Rp - Rp - 3 1.3
Rp - Rp -
Rp - Rp -
Rp 248,000 Rp 74,400
Rp 458,000 Rp 68,700
Rp 170,000 Rp 85,000 1
Rp 232,000 Rp 139,200
Rp 183,333 Rp 614,167
Rp 200,000 Rp 200,000
Rp 318,938 Rp 318,938
Rp 75,020 Rp 75,020

JUMLAH Rp 1,575,424 / Unit


PEMBULATAN Rp 1,575,000 / Unit

Rp 45,000 Rp 45,000
JUMLAH Rp 45,000 / m3
PEMBULATAN Rp 45,000 / m3

m2
Rp 350,000 Rp 437,500 1 gulung =1 kg = 0.8 m2
Rp 20,000 Rp 20,000

JUMLAH Rp 457,500 / m2
PEMBULATAN Rp 458,000 / m2

m3
Rp 171,000 Rp 188,100
Rp 60,000 Rp 60,000

JUMLAH Rp 248,100 / m3
PEMBULATAN Rp 248,000 / m3

Gmbr : IS-50 unit

Rp - Rp - 5 1.5
Rp - Rp -
Rp - Rp -
Rp 232,000 Rp 220,569
Rp 3,800 Rp 36,128
Rp 1,333,000 Rp 8,284,668
Rp 176,000 Rp 7,794,618
Rp 176,000 Rp 6,351,541
Rp 264,420 Rp 1,147,160
Rp 61,924 Rp 1,716,533
Rp 61,924 Rp 1,716,533

JUMLAH Rp 27,267,750 / Unit


PEMBULATAN Rp 27,268,000 / Unit ###

ml

Rp - Rp -
Rp 68,000 Rp 17,000
Rp 14,750 Rp 59,000
Rp 20,000 Rp 20,000 22000 0.1575931
Rp 2,000 Rp 2,000
Rp 10,400 Rp 41,600

JUMLAH Rp 139,600 / 4 ml
JUMLAH Rp 34,900 / ml
PEMBULATAN Rp 34,900 / ml

Gbr. IS-52 unit

Rp 77,000 Rp 84,192
Rp - Rp -
Rp - Rp -
Rp 232,000 Rp 53,592
Rp 899,000 Rp 69,223
Rp 1,333,000 Rp 746,480
Rp 176,000 Rp 492,800
Rp 12,700 Rp 889,000
Rp 154,000 Rp 308,000

Rp 1,780,000 Rp 3,560,000 ### 856000


Rp 720,000 Rp 720,000

JUMLAH Rp 6,923,287 / Unit ###


PEMBULATAN Rp 6,923,000 / Unit

Rp 750,000 Rp 750,000

JUMLAH Rp 750,000 / Unit

Gbr. IS-52 unit

Rp 67,000 Rp 4,924
Rp 7,800 Rp 1,560
Rp 52,000 Rp 19,578
Rp 197,000 Rp 45,507
Rp 699,000 Rp 53,823
Rp 706,000 Rp 317,700
Rp 172,000 Rp 120,400
Rp 11,000 Rp 371,250
Rp 141,700 Rp 283,400

Rp 175,000 Rp 1,137,500 ###

JUMLAH Rp 2,355,643 / Unit


PEMBULATAN Rp 2,356,000 / Unit

Ls

Rp 77,000 Rp 277,200 5 1.5


Rp - Rp -
Rp - Rp -
Rp 330,027 Rp 772,262

Rp 55,000 Rp 198,000
Rp 170,000 Rp 3,376,200
Rp 41,400 Rp 1,644,408
Rp 168,200 Rp 6,680,904

Rp 3,800 Rp 25,650
Rp 1,333,000 Rp 1,799,550
Rp 214,000 Rp 1,444,500
Rp 616,000 Rp 1,848,000

Rp 1,462,500 Rp 4,387,500

JUMLAH Rp 22,454,174 / Ls
PEMBULATAN Rp 22,454,000 / Ls

Ls

Rp 98,400 Rp 2,361,600
Rp 110,000 Rp 663,168
Rp 12,700 Rp 5,359,603
Rp 799,000 Rp 2,408,506
Rp 361,500 Rp 1,089,706

Rp 77,000 Rp 99,850
Rp - Rp -
Rp - Rp -
Rp 232,000 Rp 46,284
Rp 899,000 Rp 89,675
Rp 1,333,000 Rp 883,113
Rp 176,000 Rp 554,400
Rp 12,700 Rp 1,262,063
Rp 146,500 Rp 2,344,000

Rp 1,055,944 Rp 31,678,313
Rp 109,200 Rp 3,276,000
Rp 748,986 Rp 5,617,397
Rp 88,400 Rp 663,000
Rp 23,700 Rp 1,390,005
Rp 23,700 Rp 1,607,088
Rp 300,000 Rp 600,000

JUMLAH Rp 61,993,768 / Ls
PEMBULATAN Rp 61,994,000 / Ls

ml
Upah Farokhi
Rp 22,600 Rp 2,086,786 131 175000
Rp 61,924 Rp 848,359
JUMLAH Rp 2,935,144 / 6.5 ml
JUMLAH Rp 451,561 / ml
PEMBULATAN Rp 452,000 / ml

ml

Rp 77,000 Rp 9,240
Rp - Rp -
Rp - Rp -
Rp 232,000 Rp 6,960
Rp 1,333,000 Rp 119,970
Rp 117,333 Rp 140,800
Rp 12,700 Rp 85,725

JUMLAH Rp 362,695 / ml
PEMBULATAN Rp 363,000 / ml

Gambar : IS-51 Ls

Rp 170,000 Rp 5,928,750
Rp 41,400 Rp 2,887,650
Rp 58,000 Rp 4,045,500
Rp 16,000 Rp 846,000
Rp 29,500 Rp 497,813
Rp 240,000 Rp 480,000
Rp - Rp -
Rp 70,000 Rp 140,000

Rp 3,800 Rp 36,100
Rp 250,000 Rp 2,375,000
Rp 100,000 Rp 950,000
Rp 1,141,536 Rp 2,283,072
Rp 75,000 Rp 75,000
Rp 34,900 Rp 139,600
Rp 130,000 Rp 130,000
Rp 189,600 Rp 379,200

JUMLAH Rp 21,193,685 / Ls
PEMBULATAN Rp 21,194,000 / Ls

Gambar : IS-44 Ls

Rp 77,000 Rp 1,489,257
Rp - Rp -
Rp - Rp -
Rp 3,800 Rp 41,998
Rp 1,333,000 Rp 6,427,193
Rp 140,800 Rp 3,498,880
Rp 12,700 Rp 4,592,574

Rp 149,900 Rp 1,196,202
Rp 154,000 Rp 3,826,900
Rp 94,468 Rp 538,468
Rp 274,000 Rp 1,096,000
Rp 165,000 Rp 660,000

JUMLAH Rp 23,367,471 / Ls
PEMBULATAN Rp 23,367,000 / Ls

ml
Rp 77,000 Rp 404,250 panjang total = 100 ml, kemiringan 1%, total beda level ujung ke-ujung = 100
Rp 65,000 Rp 78,000
Rp 40,000 Rp 31,400
Rp 50,000 Rp 223,250
Rp 232,000 Rp 27,840
Rp 450,000 Rp 450,000
Rp 41,400 Rp 13,000
Rp 60,000 Rp 60,000

JUMLAH Rp 1,287,740 / ml
PEMBULATAN Rp 1,288,000 / ml

ml

Rp 77,000 Rp 147,840 panjang total = 100 ml, kemiringan 1%, total beda level ujung ke-ujung = 100
Rp 65,000 Rp 78,000
Rp 40,000 Rp 31,400
Rp 50,000 Rp 56,750
Rp 232,000 Rp 27,840
Rp 250,000 Rp 250,000
Rp 41,400 Rp 13,000
Rp 60,000 Rp 60,000

JUMLAH Rp 664,830 / ml
PEMBULATAN Rp 665,000 / ml

Ls

Rp 77,000 Rp 191,268
Rp 65,000 Rp 140,400
Rp 40,000 Rp 48,960
Rp 50,000 Rp 63,000
Rp 232,000 Rp 50,112
Rp 899,000 Rp 97,092
Rp 1,102,000 Rp 1,388,520
Rp 12,700 Rp 1,760,220
Rp 85,000 Rp 918,000
Rp 126,000 Rp 3,024,000

Rp 155,262 Rp 12,889,541
Rp 109,893 Rp 2,351,700
Rp 68,648 Rp 1,015,983
Rp 709,923 Rp 3,322,437
Rp 2,835,622 Rp 1,531,236
Rp 3,166,634 Rp 3,166,634
Rp 175,000 Rp 1,050,000
JUMLAH Rp 33,009,103 / Ls
PEMBULATAN Rp 33,009,000 / Ls

m2

Rp 2,000,000 Rp 3,998,400
Rp 170,000 Rp 1,785,000
Rp 99,400 Rp 2,087,400
Rp 55,000 Rp 1,493,800
Rp 217,000 Rp 5,893,720
Rp 178,300 Rp 936,075
Rp 2,450,000 Rp 2,450,000
Rp 2,450,000 Rp 2,450,000

JUMLAH Rp 21,094,395 / 16.6 m2


JUMLAH Rp 1,266,170 / m2
PEMBULATAN Rp 1,266,000 / m2

m2
Rp 120,000 Rp 123,600 Net
Rp 58,000 Rp 7,946
Rp 186,000 Rp 9,486
Rp 6,660 Rp 1,730 1 kg dapat 3.85 m2
Rp 500 Rp 500
Rp 35,000 Rp 35,000
JUMLAH Rp 178,262 / m2
PEMBULATAN Rp 178,300 / m2

ml

Rp 77,000 Rp 70,840 5 1.5


Rp 65,000 Rp 52,000
Rp 40,000 Rp 21,200
Rp 50,000 Rp 19,500
Rp 232,000 Rp 18,560
Rp 462,000 Rp 18,480
Rp 535,000 Rp 144,450
Rp 32,000 Rp 10,667
JUMLAH Rp 355,697 / ml
PEMBULATAN Rp 356,000 / ml

ml
Rp 170,000 Rp 459,000
Rp 41,400 Rp 223,560
Rp 58,000 Rp 313,200
Rp 25,500 Rp 137,700
JUMLAH Rp 1,133,460 / ml
PEMBULATAN Rp 1,133,000 / ml

unit

Rp 19,900 Rp 6,036,148 Hollo 40x40x2.3 105


Rp 19,900 Rp 1,529,157 Hollo 20x40x2.3 30.4
Rp 2,700 Rp 1,026,448
Rp 100,000 Rp 200,000
Rp 35,000 Rp 1,400,000
Rp 280,000 Rp 14,963,200
Rp 125,000 Rp 4,000,000
Rp 45,000 Rp 1,350,000

JUMLAH Rp 30,504,953 / unit


PEMBULATAN Rp 30,500,000 / unit -4953 65000000

Rp 200,000 Rp 1,200,000
Rp 30,000 Rp 30,000
Rp 82,425 Rp 197,820
Rp 1,427,820 /2,4 m'
Rp 594,925 /m1
Rp 196

Rp 420,000 Rp 420,000
Rp 1,102,000 Rp 134,995
Rp 10,000 Rp 10,000
Rp 31,500 Rp 31,500
Rp 596,495 /2,4 m'
JUMLAH Rp 248,540 /m1
JUMLAH Rp 843,465
PEMBULATAN Rp 844,000
Rp 710,000

Rp 6,500 Rp 6,500
Rp 2,500 Rp 2,500
Rp 5,000 Rp 5,000
JUMLAH Rp 14,000 / ml
PEMBULATAN Rp 14,000 / ml
per ml per

Rp / ml

per ml per

BONGKAR DINDING 1/2 BATA 100 m2


Pekerja 2 OH > Bodem 10 kg Rp 190,000 2
rata-rata umur pekerja =35 th > Pahat Rp 81,818 2
1 hari = 7 jam =420 menit > Gerinda Poto Rp 70,000 2
Tinggi tembok 3 m
kemampuan, 1 m2 = 4 menit
25 m2, diselesaikan 0.83 Jam
100 m2, diselesaikan 3.33 Jam
160000
/ jam, 2 OH dibayar = 381 / menit
22,857 / jam
1/2 Bata 11500 / jam

Contoh Volume Pekerjaan 1 Bata 13000 / jam

10 m2

Mengupas plesteran 1 m2
Pekerja 1 OH
rata-rata umur pekerja =35 th
1 hari = 7 jam =420 menit
Tinggi tembok 3 m
kemampuan, 1 m2 = 10 menit
5 m2, diselesaikan 0.83 Jam
10 m2, diselesaikan 1.67 Jam
160000
/ jam, 2 OH dibayar = 381 / menit
22,857 / jam
22,900 / jam

10 m2

Mengupas plesteran 1 m2
Pekerja 1 OH
rata-rata umur pekerja =35 th
1 hari = 7 jam =420 menit
Tinggi tembok 3 m
kemampuan, 1 m2 = 10 menit
5 m2, diselesaikan 0.83 Jam
10 m2, diselesaikan 1.67 Jam
160000
/ jam, 2 OH dibayar = 381 / menit
22,857 / jam
22,900 / jam
###
1.5
.000.000,- / hari

.000.000,- / hari
.000.000,- / hari

.000.000,- / hari

.000.000,- / hari
WF 200x100x5.5x8 mm
sh + 1.5 ltr thinner 1 btng @ 12 m = 256 kg Luas = 9.605224 m2

1 ltr = 5 m2 0.03752 m2/ kg


1 m2 = 0.2 ltr 0.007504 ltr / kg 1 lapis
0.2
0.25
per-jarak 40 cm

0.71

per-jarak 40 cm

0.71

per-jarak 40 cm

0.71
ukses Mandiri

ukses Mandiri
0.05
.2.025.000,- / lmbr
m / PT. Seni jepara Glass

m / PT. Seni jepara Glass


tainless Steel

per minggu ke-3 Februari

, lebar = 1.15 m
DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%

( 1100 x 2150 )mm - p 1 dn sliding kcp 6mm, plat alumunium,


DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%

DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%
DISCOUNT 15%

a Alumunium

unium / Seni Jeapara


7.67
Saluran uk. 26 x15 cm
0.25

PT.Webforge Indonesia
Harga net = USD 36.8 ( per-ml )
1 USD = Rp.9.200,- ( up-date : 07 Maret 2012 )
lebar = 25 cm
royek di atas truk

royek di atas truk

royek di atas truk


royek di atas truk

royek di atas truk

royek di atas truk


rasio tulangan / per-m3
besi tulangan Ø10 -200 mm, 1 layer
1.6
1.6
Upah Farokhi
evel ujung ke-ujung = 100 cm, rata2 = 50 cm

evel ujung ke-ujung = 100 cm, rata2 = 50 cm


1.6
2.89 303.324
2.53 76.84208