Hydraulic Calculation

1. Inflow to Filtration Train(s)

Parameter Unit Value


Flow per day m³/d 5,400.00
Flow per hour m³/hr 225.00
Flow, avg. L/s 62.50
Temperature min °C 20.0

2. Train Design / Product Selection

Parameter Unit Value


Trains pcs 1
Towers per train pcs 15
Total Towers pcs 15
Modules per Tower pcs 12
Total Modules pcs 180
Considered Module Design --- Module 6.0 S
Filter Area per Module m² 6
Total Filter Area m² 1080

3. Design Flux Rates

Parameter Unit Value


Design Flux LMH 208
Design Flux, normalized @20°C LMH 208

4. Project specific notes

CERAFILTEC recommend to use a balancing tank before entering to the UF in order to buffer the inflow during cleaning sequence.
CERAFILTEC recommend to design the tank height with the possibility to increase the number of module.
In case of CERAFILTEC membrane cleaning the other trains can cover the complete inflow/ load of WWTP.

Project Information Design Information


Name RAJO INCA Version Basic Projection 01-27
Application Mining Water Revision v0
Client/Partner AQUAVANT Date 18/05/2023
Client/Partner Contact d Page 2 / 4 Compiled by DOUGLAS ESPIN