ZS Resort STP Project 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


2
3 -NO.8 MM IN1" 0 RSC
SERVICE ENTRANCE
OFFICE OF THE BUILDING OFFICIAL
DUMAGUETE CITY
M
KILOWATT HOUR METER

2
3 -NO.8 MM IN1" 0 RSC 1
2" x 2"

ELECTRICAL LEGEND Wood louvers


WALL
DEPARTMENT HEAD DATE

60 AT
PANEL BOARD PANEL BOARD
BUILDING OFFICIAL DATE
CONTROL ROOM
MAIN DISTRIBUTON PANEL BOARD SM

PB-OZONE
SERVICE ENTRANCE LAND USE AND ZONING
2" x 3" Wood UF SYSTEM
M KILOWATT HOUR METER AERATOR 1 30 AT 30 AT 2 AERATOR- SPARE Frame

SWITCH LINE S1
3
BOOSTER PUMP 15 AT 10 AT 4 AIR/DOSING PUMP
CONVENIENCE LINE
SUCTION PUMP 5 20 AT 10 AT 6 ULTRA V
CIRCUIT HOMERUN UF SYSTEM LAYOUT PLAN LIGHTING LAYOUT PLAN
DOOR 1-DETAIL DOOR 2-DETAIL BUILDING OFFICIAL DATE
CIRCUIT BREAKER OZONE GEN 8 15AT 10AT 7 LIGHTINGS

LED LAMP SPARE OUTLET 8 15AT LINE AND GRADE


LOUVER DOOR DETAL
CONVENIENCE OUTLET
GROUND

LINE WIRING DIAGRAM

C/FR-01
BUILDING OFFICIAL DATE

E
D
C/FR-01
ARCHITECTURAL

S C H E D U L E OF L O A D S

CKT. NO. DESCRIPTION WIRE CONDUIT


WATTS VOLTS AMPERES ACB
SIZE SIZE
2
1 AERATOR 1 3750 440 30 AT 3-5 mm 20mmØ

440 2
2 AERATOR 2-SPARE 3750 30 AT 3-5mm 20mmØ BUILDING OFFICIAL DATE
2
3 BOOSTER PUMP 560 220 20 AT 2-3.2mm 20mmØ
STRUCTURAL
SUCTION PUMP 2
4 746 220 20 AT 2-3.2mm 20mmØ
2
5 AIR/DOSING PUMP 200 220 15 AT 2-3.5mm 20mmØ

6 ULTRA V. / OZONE G 200 220 15 AT 2-2.5mm 20mmØ

7 LIGHTINGS 30 220 10 AT 2-2.5mm 20mmØ


CONTROL/FILTRATION RM FLOOR PLAN CONTROL/FILTRATION RM FLOOR PLAN
8 SPARE OUTLET 200 220 15 AT 2-2.5mm 20mmØ BUILDING OFFICIAL DATE

2 18mmØ
TOTAL 9622 220/440 AT 2#8mm
RSCPIPE
SANITARY

BUILDING OFFICIAL DATE

ELECTRICAL
1. All mechanical installation shal conform to the
rules and regulations of RA 8495 known as a
Mechanical Engineering Act of the Philippines and
the local safety ordinance.

2. All mechanical installation shall done under the BUILDING OFFICIAL DATE
direct and responsible supervision of duly licenced
Professional Mechanical Engineering.
1. All mechanical installation shal conform to the
rules and regulations of RA 8495 known as a
Mechanical Engineering Act of the Philippines and
the local safety ordinance.

2. All mechanical installation shall done under the


direct and responsible supervision of duly licenced
NGL NGL NGL
Professional Mechanical Engineering.

MECHANICAL

CONTROL/FILTRATION RM. DETAIL -D CONTROL/FILTRATION RM. DETAIL -E


SPECIFICATIONS
BUILDING OFFICIAL DATE
1. ALL MATERIALS TO BE USED IN THIS PARTICULAR PROJECT SHALL BE OF APPROVED TYPE.
2. ALL WIRINGS PASS THRU WOODEN STRUCTURES SHALL BE INSOLATED FIXED BY MEANS OF MOLDEFLEX
3. ALL WIRINGS PASS THRU CONCRETE STRUCTURES SHALL BE CONCEALED IN A RIGID CONDUIT PIPE. BUREAU OF FIRE
3. MINIMUM WIRE TO BE USED SHALL NOT BE SMALLER THAN 2.0 . AWG. FOR CONDUIT PIPE OUTLET AND 1.6 AWG. FOR LIGHTING OUTLET
5. ALL ELECTRICAL WIRINGS INSTALLATION SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED PROF. ELECTRICAL ENGINEER.
6. AND SHALL BE MADE TO THE LATEST EDITION ON THE ELECTRICAL CODE OF THE PHILIPPPINES AND THE LOCAL ELECTRIC COMPANY.

BUILDING OFFICIAL DATE

APPROVED: S E A L PRC NO: TITLE APPROVED AS PER PLAN DRAWN BY: SHEET CONTENT SHEET NO.

PTR NO:
PROJECT : SKECT PLAN/ VICINITY MAP OF THE STATION
PLACE OF ISSUE:
OWNER : Z'S RESORT SHEENA JOY I. SOBEJANA
AS INDICATED 1
SE / CHE / PME DATE OF ISSUE:

ADDRESS: TIN NO:


LOCATION : PUROK 1. BGRY POBLACION, ZAMBOANGUITA, NEGROS ORIENTAL Owrner/ Managing Head PAS Consultants and Allied Services
3