DETAIL OF WORK ACCOMPLISHMENT

E.B. MARZAN TRUCKING AND CONSTRUCTION, INC.

Project Title: CONSTRUCTION OF POTABLE WATER SYSTEM


Project Covered E. PIPELINES (PIPE LAYING SUPPLY AND INSTALLATION)

ORIGINAL CONTRACT QTY. OF WORK ACCOMPLISHED PERCENTANGE ACCOMPLISHED VALUE OF ACCOMPLISHMENT


ITEM NO. WORK ITEM QTY. UNIT U-AMOUNT TOTAL AMOUNT % PREVIOUS THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE

PIPELINES
1. INSTALLLATION OF TRANSMISSION LINES PIPE DISTRIBUTION LINES,
DISTRIBUTION LINES, END POINT FLUSHING, BLOWS-OFF, FIRE
1 l.s. ₱ 34,624,771.65 ₱ 34,624,771.65 100% 0.38 0.37 0.75 38.00% 37.00% 75.00% ₱ 13,157,413.23 ₱ 12,811,165.51 ₱ 25,968,578.74
HYDRANT, AIR RELEASE VALVE & PIPE CREEK CROSSINGS

TOTAL ₱ 34,624,771.65 100% 0.38 0.37 0.75 38.00% 37.00% 75.00% ₱ 13,157,413.23 ₱ 12,811,165.51 ₱ 25,968,578.74

Prepared & Submitted By: Approved By:

SubContractor: RAUL M. DIAZ EDWIN B. MARZAN


Project Engineer CEO / President