DRILLING LOG

CLIENT = CV. KIRAN JOYO ASTIKO BORE TYPE = ROTARY DRILLING Remarks.

PROJECT NAME = PERENCANAAN PEMBANGUNAN GUDANG STARTED = April 24, 2024 UD = Undisturb Sample
(WAREHOUSE)
FINISHED = April 26, 2024 CS = Core Sample

BORE HOLE = BH-1 BORE MASTER = PUTRA SPT = SPT Test

GWL = 0.6 METER


LOCATION = DESA JABALSARI KEC. SUMBERGEMPOL

UD / CS SPT TEST Standard Penetration Test


Elevation (LWS) in m

Relative Density or

General Remarks
Thickness in m

N-Value Blows/30 cm
Blows per each

Type of Soil

Consistency
N - Value
Depth in m
Scale in m

15 cm
Legend

Colour

Sample Code

Sample Code
Depth in m

Depth in m

15 cm

15 cm

15 cm
0 10 20 30 40 50
0.00 0.00 START OF BORING 0
COKLAT
LANAU BERPASIR
TERANG
1.00 -1.00 -1.00 1

2.00 -2.00 -2.00 -2.00 SPT 1 12 2 4 8


2
-2.50
LOOSE TO
3.00 -3.00 -3.00 SPT = 12
MEDIUM 3

4.00 -4.00 -4.00 -4.00 SPT 2 12 3 5 7


ABU-ABU 4
PASIR -4.50
TERANG
5.00 -5.00 -5.00 -5.00
5
-5.50 UD 01

6.00 -6.00 -6.00 -6.00 SPT 3 19 5 8 11


MEDIUM SPT = 19 6
-6.50

7.00 -7.00 -7.00 7

8.00 -8.00 -8.00 -8.00 SPT 4 22 5 8 14


8
-8.50

9.00 -9.00 -9.00 PASIR BERKULIT ABU-ABU SPT 9


MEDIUM
KERANG TERANG 18 TO 22

10.00 -10.00 -10.00 -10.00 -10.00 SPT 5 18 6 8 10


10
-10.50 UD 02 -10.50

11.00 -11.00 -11.00 11

12.00 -12.00 -12.00 MEDIUM SPT = 19 -12.00 SPT 6 19 5 7 12


12
-12.50

13.00 -13.00 -13.00 13

14.00 -14.00 -14.00 -14.00 SPT 7 35 8 14 21 14


-14.50

15.00 -15.00 -15.00 -15.00


15
ABU-ABU MEDIUM TO SPT
PASIR -15.50 UD 03
TERANG DENSE 29 TO 35
16.00 -16.00 -16.00 -16.00 SPT 8 29 7 11 18
16
-16.50

17.00 -17.00 -17.00 17

18.00 -18.00 -18.00 -18.00 SPT 9 23 6 10 13 18


-18.50
SPT
19.00 -19.00 -19.00 MEDIUM 19
23 TO 25

20.00 -20.00 -20.00 -20.00 -20.00 SPT 10 25 5 9 16 20


-20.50 UD 04 -20.50

21.00 -21.00 -21.00 21


VERY STIFF SPT = 21
# 22.00 -22.00 -22.00 -22.00 SPT 11 21 4 8 13 22
-22.50

23.00 -23.00 -23.00 23

ABU-ABU
24.00 -24.00 -24.00 LEMPUNG -24.00 SPT 12 13 3 5 8 24
TERANG
-24.50

25.00 -25.00 -25.00 -25.00 25


SPT
STIFF -25.50 UD 05
10 TO 13
26.00 -26.00 -26.00 -26.00 SPT 13 10 2 4 6 26
-26.50

27.00 -27.00 -27.00 27

28.00 -28.00 -28.00 -28.00 SPT 14 12 3 5 7 28


LEMPUNG ABU-ABU
STIFF SPT = 12 -28.50
BERPASIR TERANG
29.00 -29.00 -29.00 29
LEMPUNG ABU-ABU
STIFF SPT = 14
BERPASIR TERANG -30.00 -30.00 4 6 8
30.00 -30.00 -30.00 SPT 15 14 30
-30.50 UD 06 -30.50

31.00 -31.00 -31.00 31

SPT = 24
32.00 -32.00 -32.00 -32.00 SPT 16 24 6 10 14 32
DRILLING LOG
CLIENT = CV. KIRAN JOYO ASTIKO BORE TYPE = ROTARY DRILLING Remarks.

PROJECT NAME = PERENCANAAN PEMBANGUNAN GUDANG STARTED = April 24, 2024 UD = Undisturb Sample
(WAREHOUSE)
FINISHED = April 26, 2024 CS = Core Sample

BORE HOLE = BH-2 BORE MASTER = PUTRA SPT = SPT Test

GWL = 0.5 METER


LOCATION = DESA JABALSARI KEC. SUMBERGEMPOL

UD / CS SPT TEST Standard Penetration Test


Elevation (LWS) in m

Relative Density or

General Remarks
Thickness in m

N-Value Blows/30 cm
Blows per each

Type of Soil

Consistency
N - Value
Depth in m
Scale in m

15 cm
Legend

Colour

Sample Code

Sample Code
Depth in m

Depth in m

15 cm

15 cm

15 cm
0 10 20 30 40 50
0.00 0.00 START OF BORING 0
ABU-ABU
LANAU PASIR
TERANG
1.00 -1.00 -1.00 1

2.00 -2.00 -2.00 -2.00 SPT 1 10 2 4 6


LOOSE SPT = 10 2
-2.50

3.00 -3.00 -3.00


3

4.00 -4.00 -4.00 -4.00 SPT 2 18 5 8 10


4
-4.50

5.00 -5.00 -5.00 SPT -5.00


MEDIUM 5
16 TO 18 -5.50 UD 01

6.00 -6.00 -6.00 -6.00 SPT 3 16 4 7 9


6
-6.50

7.00 -7.00 -7.00 7

8.00 -8.00 -8.00 -8.00 SPT 4 23 6 9 14


8
-8.50

9.00 -9.00 -9.00 9


SPT
MEDIUM
20 TO 23
10.00 -10.00 -10.00 -10.00 -10.00 SPT 5 20 5 8 12
10
-10.50 UD 02 -10.50
ABU-ABU
11.00 -11.00 -11.00 PASIR
TERANG 11

12.00 -12.00 -12.00 -12.00 SPT 6 28 7 12 16


12
-12.50

13.00 -13.00 -13.00 13

14.00 -14.00 -14.00 SPT -14.00 SPT 7 21 6 9 12 14


MEDIUM
19 TO 28 -14.50

15.00 -15.00 -15.00 -15.00


15
-15.50 UD 03

16.00 -16.00 -16.00 -16.00 SPT 8 19 5 8 11


16
-16.50

17.00 -17.00 -17.00 17

18.00 -18.00 -18.00 -18.00 SPT 9 28 8 13 15 18


SPT -18.50
MEDIUM
24 TO 28
19.00 -19.00 -19.00 19

20.00 -20.00 -20.00 -20.00 -20.00 SPT 10 24 7 10 14 20


-20.50 UD 04 -20.50

21.00 -21.00 -21.00 21

# 22.00 -22.00 -22.00 -22.00 SPT 11 12 2 5 7 22


-22.50

23.00 -23.00 -23.00 23

24.00 -24.00 -24.00 -24.00 SPT 12 8 3 3 5 24


-24.50
ABU-ABU MEDIUM TO SPT
25.00 -25.00 -25.00 LEMPUNG -25.00 25
TERANG VERY STIFF 8 TO 22
-25.50 UD 05

26.00 -26.00 -26.00 -26.00 SPT 13 10 2 4 6 26


-26.50

27.00 -27.00 -27.00 27

28.00 -28.00 -28.00 -28.00 SPT 14 22 5 8 14 28


-28.50

29.00 -29.00 -29.00 29

30.00 -30.00 -30.00 -30.00 -30.00 SPT 15 24 5 8 16 30


-30.50 UD 06 -30.50

31.00 -31.00 -31.00 31


SPT
VERY STIFF
24 TO 26
32.00 -32.00 -32.00 -32.00 SPT 16 26 6 10 16 32
DRILLING LOG
CLIENT = CV. KIRAN JOYO ASTIKO BORE TYPE = ROTARY DRILLING Remarks.

PROJECT NAME = PERENCANAAN PEMBANGUNAN GUDANG STARTED = April 24, 2024 UD = Undisturb Sample
(WAREHOUSE)
FINISHED = April 26, 2024 CS = Core Sample

BORE HOLE = BH-2 BORE MASTER = PUTRA SPT = SPT Test

GWL = 0.5 METER


LOCATION = DESA JABALSARI KEC. SUMBERGEMPOL

UD / CS SPT TEST Standard Penetration Test


Elevation (LWS) in m

Relative Density or

General Remarks
Thickness in m

N-Value Blows/30 cm
Blows per each
Type of Soil

Consistency

N - Value
Depth in m
Scale in m

15 cm
Legend

Colour

Sample Code

Sample Code
Depth in m

Depth in m

15 cm

15 cm

15 cm
-32.50

33.00 -33.00 -33.00 33

34.00 -34.00 -34.00 -34.00 SPT 17 39 7 12 27 34


-34.50
ABU-ABU
35.00 -35.00 -35.00 LEMPUNG -35.00 35
TERANG
-35.50 UD 07

36.00 -36.00 -36.00 -36.00 SPT 18 42 8 14 28 36


-36.50

37.00 -37.00 -37.00 SPT 37


HARD
39 TO 45

38.00 -38.00 -38.00 -38.00 SPT 19 42 9 15 27 38


-38.50

39.00 -39.00 -39.00 39

40.00 -40.00 -40.00 -40.00 -40.00 SPT 20 45 7 16 29 40


-40.50 UD 08 -40.50

41.00 -41.00 -41.00 41


LEMPUNG LANAU ABU-ABU SPT
HARD
BERPASIR KECOKLATAN 45 TO >50
42.00 -42.00 -42.00 -42.00 SPT 21 >50 11 20 2/5 CM 42
-42.50

43.00 -43.00 -43.00 43

44.00 -44.00 -44.00 -44.00 SPT 22 >50 12 25/10 CM 44


-44.50

45.00 -45.00 -45.00 -45.00 45


-45.50 UD 09
46.00 -46.00 -46.00 -46.00 SPT 23 >50 15 26/5 CM 12 46
ABU-ABU
LEMPUNG LANAU HARD SPT >50 -46.50
TERANG
47.00 -47.00 -47.00 47

48.00 -48.00 -48.00 -48.00 SPT 24 >50 22/5 CM 48


-48.50

49.00 -49.00 -49.00 49

50.00 -50.00 -50.00 -50.00 -50.00 SPT 25 >50 30/10 CM 50


-50.50 UD 10 -50.50

END OF BORING