DAILY REPORT UNIT TANGGAL 11 September 2023

HM / KM RETASE DT BBM JAM KERJA


CATATAN
NO UNIT/TYPE UNIT NO OPERATOR START STOP TOTAL PIT JETTY AWAL TAMBAH (+) TOTAL PAKAI SISA FUEL/JAM PAGI SIANG TOTAL
1 PC 200 01 mekanik 20193.0 20203.0 10.00 95 305 400 185 215 18.5 0:00 0:00 13:00 21:50 8.83 GROUND TEST MEKANIK (SERVICE)
3 PC 200 06 Nirwan 12370.4 12377.9 7.50 235 165 400 150 250 20.00 8:00 11:45 13:00 16:45 7.50 MELAYANI MATERIAL DITUNNEL,LOADING SIRTU
4 PC 200 07 (EX-KNW) Ruly 4739.5 4747.0 7.50 235 165 400 125 275 16.67 8:00 11:45 13:00 16:45 7.50 LOADING LPA
5 PC 200 08 (EX-KNW) Ilham 12453.1 12458.5 5.40 270 270 170 100 31.48 10:05 11:45 13:00 16:44 5.40 BLENDING AGREGAT
6 PC 300 03 0.0 - 190 190 0 190 - 0.00 B/D
7 PC 300 05 0.0 - 555 555 0 555 - 0.00 B/D
8 PC 300 09 Hafidz 15977.1 15982.4 5.25 305 305 230 75 43.81 8:00 11:45 13:30 15:00 5.25 LOADING DITAMBANG
9 SANY 02 Hasanudin 9228.2 9236.0 7.80 210 140 350 155 195 19.87 8:00 11:48 13:00 17:00 7.80 MEMUAT PRODUK/LOADING LOKALAN
10 Hyundai 01 0.0 - 105 105 0 105 - 0.00 B/D
11 260 Ti 02 Hendrik 0.0 - 90 90 180 50 130 - 8:00 11:45 13:00 16:45 7.50 BUANG SIRTU/BLENDING AGGREGAT
12 260 Ti 03 0.0 - 100 100 0 100 - 0.00 B/D
13 260 Ti 07 Risman 0.0 - 170 170 50 120 - 8:00 11:45 13:00 16:45 7.50 HAULING DI TAMBANG/BUANG SIRTU
14 260 Ti 08 0.0 - 90 90 0 90 - 0.00 B/D
15 260 Ti 12 Doni 5420.0 5628.0 21 100 100 200 70 130 - 8:00 11:45 13:00 16:45 7.50 HAULING DITAMBANG/BUANG SIRTU
16 260 Ti 20 Tarmin 0.0 - 55 125 180 80 100 - 8:00 11:45 13:00 16:45 7.50 HAULING DI TAMBANG
17 260 Ti 21 - 90 90 0 90 - 0.00 B/D
18 260 Ti 27 0.0 0.0 - 60 60 0 60 - 0.00 B/D
19 261 Ti 28 Rifan 5939.0 5978.0 29 160 160 65 95 - 8:00 11:45 13:00 16:45 7.50 HAULING DI TAMBANG//BUANG SIRTU
20 CWB 01 8098.7 8098.7 - 140 140 0 140 - 0.00 B/D
21 CWB 02 0.0 0.0 - 130 130 0 130 - 0.00 B/D
22 CWB 03 0.0 0.0 - 150 150 0 150 - 0.00 B/D
23 QUON 06 Ahdan 0.0 0.0 - 10 270 270 70 200 - 8:00 11:45 13:00 16:45 7.50 HAULING DITAMBANG/BUANG SIRTU
24 PS 125 01 Rudi 228991.6 228991.6 - 0 20 20 20 8:00 11:45 13:00 16:45 7.50 PENYIRAMAN
25 GENSET 01 8736:07:00 8736:07:00 - 500 500 500 - 0.00 S/B
26 GENSET 02 1196:08:00 1196:08:00 - 400 400 400 - 0.00 S/B
MEK CRUSHER 0 0
MESIN LAS 0 0
LV-01 0 0
LV-02 Triton 0 0
LAIN-LAIN DT SEWA 0 215 215 215 -
TOTAL 1325 1635
Parameter
KOMATSU D85SS 25.00 ltr/hrs GENSET 440KVA 29.00 DI SETUJUI OLEH,
HINO FM260TI 12.00 ltr/hrs QUON 10.00 PLT HRGA PROJECT MANAGER
KOMATSU PC200 20.00 ltr/hrs
KOMATSU PC300 28.00 ltr/hrs
SANY 18.00 ltr/hrs
CWB 14.00 ltr/hrs
GENSET KTA38-GZ 80.00 ltr/hrs Erlina Salam PAULUS