GENERAL NOTES: CONCRETE NOTES TIMBER NOTES:

1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND 1. MATERIALS, WORKMANSHIP AND TESTING SHALL COMPLY WITH 1. WALL FRAMING HAS BEEN DESIGNED FOR THE ROOF TRUSS LAYOUT SHOWN. AN
SCHEDULE OF DRAWINGS: OTHER CONSULTANT'S DRAWINGS & SPECIFICATIONS AND OTHER WRITTEN AS 1379, AS 3600 & AS 3610. ALTERNATIVE TRUSS LAYOUT WILL REQUIRE REDESIGN AT THE BUILDERS EXPENSE.
INSTRUCTIONS ISSUED DURING THE COURSE OF THIS CONTRACT. ALL 2. LINTELS HAVE BEEN DESIGNED SUCH THAT THE LONG TERM DEFLECTION SHALL NOT
DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT AND AWAIT 2. WATER MUST NOT BE ADDED TO THE PREMIXED CONCRETE AT SITE AND NO ADDITIVES EXCEED THE LESSER OF SPAN / 360 OR 9mm.
CLARIFICATION BEFORE PROCEEDING WITH THE WORK. OR ADMIXTURES TO BE USED WITHOUT OBTAINING PRIORAPPROVAL IN WRITING FROM 3. ALL TIMBER TO BE MIN. JOINT GROUP JD4. & WALL FRAME MIN. F5 OR MP10.
DRAWING DRAWING TITLE 2. ALL LEVELS AND DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK SHALL THE ENGINEER. 4. TRIM OPENINGS IN CEILINGS AND ROOFS FOR SKYLIGHTS, EXHAUST DUCT, FLUES AND
NO. BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION AND FABRICATION IS SIMILAR. PROVIDE SUITABLE NOGGING AND UPSTANDS AS REQUIRED.
COMMENCED. THE ENGINEER'S DRAWINGS SHALL NOT BE SCALED A. THE FOLLOWING STRUCTURAL COMPONENTS SHALL HAVE THE FOLLOWING 5. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH AS 1684
S01 TITLE SHEET & STRUCTURAL NOTES 3. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONCRETE STRENGTH CHARATERISTICS: 6. ALSO REFER TRUSS NOTES
MAINTAINING THE STRUCTURE IN A STABLE CONDITION AND IF IN DOUBT CONSULT 7. FOR TERMITE RESISTANCE IN TIMBER FRAMING IT IS RECOMMENDED THE USE OF
S02 FOOTING LAYOUT THE ENGINEER. FOOTING 32 MPa 80 SLUMP 20mm MAX AGGREGATE CYPRESS OR ANY OTHER NATURAL TERMITE RESISTANT TIMBER LISTED IN
4. STABILITY OF ALL EXCAVATIONS INCLUDING EXCAVATIONS IN THE VICINITY OF SLAB ON GROUND 32 MPa 80 SLUMP 20mm MAX AGGREGATE AS 3660 PART 1, 1995, APPENDIX A5.
S03 DECK FRAMING PLAN NEIGHBOURING BUILDINGS IS THE RESPONSIBILITY OF THE BUILDER, APPROVAL OF SUSPENDED SLAB 40 MPa 80 SLUMP 20mm MAX AGGREGATE 8. BLOCKING AT MAX 1800c/c AND OVER SUPPORTS. FIXED AS PER MANUFACTURERS
ALL PROPOSALS MUST BE GRANTED IN WRITING PRIOR TO COMMENCEMENT OF SUCH B. LAP SPLICES FOR FABRIC (MESH) IN TENSION SHALL BE MADE SO THAT THE OUTER SPECIFICATIONS
S04 TYPICAL DETAILS WORK. MOST TRANSVERSE WIRES OF ONE SHEET OF FABRIC OVERLAP THE TWO OUTERMOST 9. HAZARD LEVELS AND TYPE OF TREATMENT TO ALL TIMBERS INCLUDING ANY
5. UNLESS OTHERWISE SPECIFIED MATERIALS AND WORKMANSHIP ARE TO BE IN TRANSVERSE WIRES OF THE SHEET BEING LAPPED, AS SHOWN IN THE FIGURE BELOW. SAPWOODS IN HARDWOODS:
ACCORDANCE WITH ALL RELEVANT CURRENT S.A.A. CODES INCLUDING CURRENT ALL FABRIC (MESH) SHALL BE FY = 500 MPA.
AMENDMENTS, STATUTORY AUTHORITIES REGULATIONS AND BY-LAWS, AND THE H2 INSIDE, ABOVE GROUND
BUILDING ACT.
6. THE APPROVAL OF A SUBSTITUTION SHALL BE OBTAINED IN WRITING FROM THE H3 OUTSIDE, ABOVE GROUND
S1 S2 S1 S2
SUPERINTENDENT H4 OUTSIDE, IN-GROUND CONTACT
7. BUILDER TO COMPLY WITH HEALTH AND SAFETY REGULATIONS AT ALL TIMES A) S1 = S2 A) S1 < S2
DURING CONSTRUCTION AND INSPECTIONS. H5 OUTSIDE, IN-GROUND CONTACT, CONTACT WITH OR IN FRESH WATER

3. CONCRETE COVER TO REINFORCEMENT (REFER TABLE 4.10.3.2. OF A.S. 3600). UNLESS H6 MARINE WATERS
DESIGN SPECIFICATIONS:
FOUNDATION NOTES: OTHERWISE SHOWN SHALL BE AS FOLLOWS:-
THE FOLLOWING DESIGN LOADS ARE CONSIDERED WHILE
1. ALL EXCAVATIONS FOR FOOTING INCLUDING PIERS AND SLAB SHOULD BE INSPECTED FLOOR FRAMING NOTES:
CARRYING OUT THE DESIGN BY AN ENGINEER PRIOR TO PLACEMENT OF REINFORCEMENT AND CONCRETE IN CASE BUILDING ELEMENT CONCRETE COVER (mm)
1. ALL FLOOR FRAMING USING ENGINEERED TIMBER MUST BE INSTALLED IN
OF MASS CONCRETE FOOTINGS. INTERNAL EXTERNAL COMPLIANCE WITH MANUFACTURER'S SPECIFICATION.
DEAD / SUPERIMPOSED LOADS: 2. ALL EXCAVATIONS SHALL BE KEPT CLEAR OF ALL LOOSE MATERIALS AND KEPT DRY AT FOOTINGS 50 GENERALLY 2. BLOCKING, NOTCHING AND PENETRATIONS INCLUDING TIMBER TREATMENT MUST
ALL TIMES UNTIL CONCRETE IS PLACED ALSO COMPLY WITH THE MANUFACTURER'S SPECIFICATION.
SLAB ON GROUND 30 TOP 40 TOP
3. ALL GROUND BEAMS SHOULD BE FOUNDED ON FIRM NATURAL GROUND AS
COMPONENTS LOADS RECOMMENDED IN THE GEOTECHNICAL REPORT OTHERWISE PROVIDE BACKHOE PITS
AT 2.5m OR PIERS AT 1.8m CENTRES MAXIMUM. BUILDER SHOULD CONSULT THE 4. NO CHEMICAL ADMIXTURES TO BE USED IN THE CONCRETE WITHOUT THE
SUPERINTENDENT'S PRIOR APPROVAL.
DECK DESIGN ENGINEER WHEN MAKING SUCH A CHANGE AND RECEIVE INSTRUCTIONS IN
5. SIZE OF ELEMENTS IS EXCLUSIVE OF APPLIED FINISHES. BEAM DEPTHS INCLUDE SLAB
(TILES + 19MM FC SHEET + WATER PROOFING + 1.20kPA WRITTING.
4. ALL PIERS SHOULD BE FOUNDED ON FIRM NATURAL GROUND AS RECOMMENDED IN THICKNESS & ARE THE FIRST DIMENSION SPECIFIED FOLLOWED BY WIDTH.
10MM PLASTERBOARD CEILING) THE GEOTECHNICAL REPORT. 6. SLABS TO BE CONTINUOUSLY MOIST CURED FOR 7 DAYS MAINTAINING DAMPNESS AT
5. SLAB SHOULD BE PLACED ON STIFF NATURAL GROUND WITH MIN 50kN/M2 ALLOWABLE ALL TIMES WITH CLEAR PLASTIC FILM AND WET SAND, OR CONTINUOUS IMMERSION.
BEARING CAPACITY OR CONTROLLED COMPACTED FILL OF ROAD BASE MATERIAL PVA & RESIN BASED CURING COMPOUNDS SHALL NOT BE USED.
COMPACTED IN 150 THICK LAYERS WITH MIN 2TON VIBRATOR ROLLER/PLATE TO MIN 7. MECHANICALLY VIBRATE ALL CONCRETE TO GIVE MAXIMUM COMPACTION WITHOUT
LIVE / IMPOSED LOADS: 98% MDD, OTHERWISE PROVIDE SLAB PIERS AS PER DETAIL @ 1.8M C/C REFER SEGREGATION OF THE CONCRETE.
DETAILS. THE BUILDER IS REQUIRED TO KEEP TEST RECORDS FOR THE COMPACTION 8. AT FOOTING INTERSECTIONS REINFORCEMENT SHALL EXTEND MIN 40XBAR DIAMETERS
INTO TRANSVERSE FOOTING.
COMPONENTS LOADS 6. LOCATION OF ANY UNDERGROUND SERVICES SHOULD BE DETERMINED BY THE CLIENT
FOR THE ENGINEER PRIOR TO DESIGN OF THE FOOTINGS AND ANY NECESSARY 9. NO HOLES, CHASES OR EMBEDMENT OF PIPES OTHER THAN THOSE SHOWNON THE
MODIFICATION SHOULD BE OBTAINED PRIOR TO CONSTRUCTION OF THE FOOTINGS. STRUCTURAL DRAWINGS SHALL BE MADE IN CONCRETE ELEMENTS WITHOUT PRIOR
DECK 2.0kPA or 1.8KN THESE MODIFICATIONS MAY INCUR FEES PAYABLE TO THE ENGINEER. APPROVAL OF THE SUPERINTENDENT.
7. ALL REINFORCEMENTS SHOULD BE INSPECTED BY A SUITABLY QUALIFIED ENGINEER. 10. DIMENSIONAL TOLERENCES OF AS 3600 MODIFIED BY AS 3610 SHALL APPLY UNLESS
8. NOTE THIS DESIGN DOES NOT COVER ANY SLOPE STABILITY MATTERS. IF THE SITE HAS OTHERWISE NOTED.
ANY SLOPES THE CLIENT SHOULD GET A QUALIFIED GEOTECHNICAL ENGINEER TO 11. REINFORCEMENT IS REPRESENTED DIAGRAMATICALLY AND NOT NECESSARILY SHOWN
SITE SPECIFICATIONS: VERIFY IS STABILITY PRIOR TO CONSTRUCTION AND ANY RECOMMENDATIONS IN TRUE PROJECTION.
PERTAINING TO THE BUILDING SHOULD BE BROUGHT TO THE ENGINEERS NOTICE 12. SPLICES IN REINFORCEMENT SHALL BE MADE ONLY IN THE POSITIONS SHOWN OR AS
SOIL CLASSIFICATION & REACTIVITY P & H2 PRIOR TO CONSTRUCTION. ANY NECESSARY MODIFICATION SHOULD BE OBTAINED OTHERWISE APPROVED BY THE SUPERINTENDENT.
PRIOR TO CONSTRUCTION AND THESE MODIFICATIONS MAY INCUR FEES PAYABLE TO 13. WELDING OF REINFORCEMENT SHALL NOT BE PERMITTED WITHOUT THE APPROVAL OF
THE ENGINEER. THE SUPERINTENDENT.
9. NO PART OF THE FOOTING INCLUDING GROUND BEAMS, PIERS,BACKHOE PIERS SHOULD 14. ALL REINFORCEMENT SHALL BE WIRED TO AND SUPPORTED OF APPROVED CHAIRS AT
BE FOUNDED ON : A MAXIMUM SPACING OF 1m CENTRES BOTH WAYS TO PROVIDE THE CORRECT COVER.
a) LOOSE NATURAL MATERIALS WITH ALLOWABLE BEARING CAPACITY OF LESS THAN 15. REINFORCEMENT SYMBOLS:-
100kPa
b) LANDSLIP N- DEFORMED BARS TO A.S./NZS 4671
c) MINE SUBSIDENCE AND COLLAPSING SOILS GRADE 500 MPa
d) SOILS SUBJECT TO EROSION
R- STRUCTURAL GRADE PLAIN ROUND BAR TO A.S./NZS 4671
e) REACTIVE SITES WITH ABNORMAL MOISTURE CONTENTS CAUSED BY EVENTS ON
GRADE 250MPa
SITE AND INCLUDING THE SURROUNDINGS AREAS SUCH AS RECENT REMOVAL OF
BUILDING FROM SITE, CHANGE IN DRAINAGE OF THE SITE CAUSED BY REMOVAL/
SL/RL- HARD DRAWN STEEL WIRE REINFORCING FABRIC TO A.S./NZS 4671
ADDITION OF DRAINS, LEAKING DRAINS/PONDS POOLS ETC DUE TO POOR/LACK OF
GRAD 500 MPa
MAINTENANCE, REMOVAL OF LARGE TREES, TREES NEAR THE FOUNDATION
10. MASORY ARTICULATIONS JOINTS SHOULD BE PROVIDED TO THE FULL HEIGHT OF THE
16. FORMWORK FOR FORMED CONCRETE SHALL BE STRIPPED AS REQUIRED BY THE
WALL AT A MAXIMUM OF 6.0m CENTRES FOR MASONRY VENEER, AND 5.0m FOR FULL
FORMWORK CODE AND SHALL BE BACKPROPPED UNTIL SUCH TIME AS THE CONCRETE
MASONRY REGARDLESS OF CORNERS, FOR DETAILS REFER TECHNICAL NOTE NO61
HAS GAINED ITS DESIGN STRENGTH. (A.S.3600 AND A.S.3610 ALSO APPLY)
FROM CEMENT AND CONCRETE ASSOCIATION AND IF IN ANY DOUBT CONTACT THE
17. WHERE CONSTRUCTION LOADS ARE IMPOSED, ADEQUATE BACKPROPPING SHALL BE
ENGINEER FOR CLARIFICATION.
MAINTAINED UNTIL SUCH LOADS ARE REMOVED AND AS APPROVED BY THE
11. FOOTINGS NEAR POOLS/RETAINING WALLS SHOULD BE TAKEN BELOW THE ZONE OF
SUPERINTENDENT.
INFLUNCE ON THESE STRUCTURE AND PIERS SHOULD BE USED IF NECESSARY. IF IN
16. FORMWORK DESIGN AND THE PROGRAMME OF CONCRETE POURS, STRIPPING AND
DOUBTS CONTACT THE ENGINEER FOR FURTHER ADVICE
SHORING SEQUENCES SHALL BE APPROVED BY THE SUPERINTENDENT.
12. IN AREAS WITH BRITTLE FINISH SUCH AS TILES, USE SL92 FABRIC MESH IN SLAB OR
17. PROVIDE DAMP PROOF MEMBRANE WHEN CONCRETE IS CAST AGAINST THE GROUND.
EQUIVALENT. ALSO ALLOW THE CONCRETE TO CURE FOR ATLEAST 3 MONTHS
18. FORMWORK SHALL REMAIN IN POSITION FOR A MINIMUM PERIOD OF 28 DAYS. WHERE
PRIORING TO PLACING SUCH FINISHES
SLABS AND BEAMS ARE TO SUPPORT BRICKWORK OR OTHER NON-FLEXIBLE/BRITTLE
13. BUILDERS AND HOME OWNER SHOULD MAINTAIN THE SITE IN ACCORDANCE WITH THE
FORMS OF CONSTRUCTION.
CSIRO'S 'FOUNDATION MAINTENANCE AND FOOTING PERFORMANCE: A HOME OWNERS
19. NO LOADS SHALL BE PLACED ON CANTILEVERED MEMBERS UNTIL REMOVAL OF
GUIDE' A COPY CAN BE PROVIDED ON REQUEST.
TEMPORARY SUPPORTS,
14. THE SOILS/GEOTECHNICAL REPORT FORM PART OF THE STRUCTURAL SPECIFICATIONS
20. DESIGN, ERECTION AND REMOVAL OF FORMWORK AND TEMPORARY SUPPORTS SHALL
AND SHOULD BE READ, UNDERSTOOD AND FOLLOWED STRICTLY DURING
BE THE RESPONSIBILITY OF THE BUILDER.
CONSTRUCTION AND MAINTENANCE OF THE BUILDING.
21. THE FACES OF ALL CONCRETE OF WHICH NEW CONCRETE IS TO BE POURED SHALL BE
THOROUGHLY SCABBLED AND CLEANED OF ANY DELETERIOUS MATERIAL.
22. PRIOR TO PLACEMENT OF SLAB ON GROUND ALL TOP SOIL AND ANY LOOSE OR
ORGANIC MATERIAL MUST BE REMOVED AND REPLACED BY AN APPROVED
CONSOLITATED FILLING MATERIAL COMPACTED TO A MINIMUM OF 98% MDD (MODIFIED
COMPACTION TEST).

NOTE: TITLE: e: info@stranahpl.com.au t: (+61 07) 3378 5227


USING DOCUMENTS AND INFORMATION PROVIDED BY STRANA HOLDINGS PTY LTD Skype: stranahpl f: (+61 07) 3378 0176
(STRANA HPL) IMPLIES THE CLIENT/BUILDER HAS UNDERSTOOD THE FOLLOWING
CONDITIONS:
PROPOSED DECK ADDITION @ a: Suite 20, 1B/47 Park Rd, Milton, 4064 QLD Aust
1. COPY RIGHT BELONGS EXPLICITLY TO STRANAHPL UNLESS ARRANGEMENTS ARE 7 HAYES ST, WAKERLEY http://www.stranahpl.com.au
MADE OTHERWISE IN WRITING
Drawn: KSM Checked: SP Scale: N.T.S. Date: 25/10/22
2. ALL THE TERMS AND CONDITIONS OF ENGAGEMENT OF STRANA HPL AS CONSULTING
ENGINEERS AND IN PARTICULAR THEIR RESPONSIBILITIES AND LIABILITIES, NOTE A
COPY OF THESE TERMS IS AVAILABLE ON REQUEST ONLY
TITLE SHEET & STRUCTURAL NOTES 22146 - S01
MARK DATE BY REVISIONS
LEGEND:
350Øx1800 DEEP PIER FOUNDED ON
WEATHERED ROCK AS PER DETAIL
C1 C1 ON DWG F01
EXISTING RETAINING WALL TO REMAIN
C1 90SQ. HWD TIMBER POST FROM FOOTING
TO DECK BEARER
FB 450 DEEPX350 WIDE RC FOOTING WITH
C1 C1 3L12 TM TOP & BOTTOM, CONC GRADE 32
MIN 75 THICK HEBAL FIRE RATED WALL TO
CERTIFIERS REQUIREMENT INSTALLED IN
ACCORDANCE WITH MANUFACTURER'S
REQUIREMENTS
C1 C1
TIMBER WALL FRAME TO AS1684.2 MIN
REQUIREMENTS:
FB · COMMON STUDS- 70X45 MGP12 H3
TREATED @450C/C
C1 C1 · BOTTOM & TOP PLATE- 70X45 MGP12 H3
TREATED
C1 C1
· NOGGING - 70X45 MGP12 H3 TREATED @
MAX 1350C/C
EXISTNG DWELLING
C1 C1

C1 C1

C1 C1

C1 C1

FB

C1 C1

C1 C1

FB
SEE DETAILS S04
EXISTNG GARAGE

C1 C1
EXISTNG POOL
FB

C1 C1

C1 C1 C1 C1 C1
EXISTING RETAINING WALL FOUNDING STRATA:
TO REMAIN BELOW DECK WHERE PIERS ARE SPECIFIED, PIERS MUST
BE FOUNDED ON WEATHERED ROCK
C1 C1 APPROXIMATELY 1.8M BELOW GROUND. ALSO
REFER TO RECOMMENDATIONS ON SOIL TEST
REPORT.
C1 C1 C1 C1 C1
LAYOUT: FOOTING
SOIL CLASS "P" & REACTIVITY H2

NOTE: TITLE: e: info@stranahpl.com.au t: (+61 07) 3378 5227


USING DOCUMENTS AND INFORMATION PROVIDED BY STRANA HOLDINGS PTY LTD Skype: stranahpl f: (+61 07) 3378 0176
(STRANA HPL) IMPLIES THE CLIENT/BUILDER HAS UNDERSTOOD THE FOLLOWING
CONDITIONS:
PROPOSED DECK ADDITION @ a: Suite 20, 1B/47 Park Rd, Milton, 4064 QLD Aust
1. COPY RIGHT BELONGS EXPLICITLY TO STRANAHPL UNLESS ARRANGEMENTS ARE 7 HAYES ST, WAKERLEY http://www.stranahpl.com.au
MADE OTHERWISE IN WRITING
Drawn: KSM Checked: SP Scale: 1:100 Date: 25/10/22
2. ALL THE TERMS AND CONDITIONS OF ENGAGEMENT OF STRANA HPL AS CONSULTING
ENGINEERS AND IN PARTICULAR THEIR RESPONSIBILITIES AND LIABILITIES, NOTE A
COPY OF THESE TERMS IS AVAILABLE ON REQUEST ONLY

FOOTING LAYOUT 22146 - S02


MARK DATE BY REVISIONS
LEGEND:
C1 90SQ. HWD TIMBER POST FROM FOOTING
C1 C1 TO DECK BEARER
SB C2 90SQ. HWD TIMBER POST FROM FOOTING
TO TOP OF PRIVACY SCREEN
DB1 120x45 MGP12 H3 CONTINUOUS DECK
BEARER
SB DB2 140x45 MGP12 H3 CONTINUOUS DECK
BEARER
C1 C1
DJ1 170x35 MGP12 H3 DECK JOISTS @ 450 C/C
SB INSTALL 25x0.8 THK GALV. STRAP
BRACING ABOVE THE FLOOR JOIST &
NAILED WITH MIN 2x2.8Øx25 LONG
NAILS TO EVERY JOIST & WRAP THE
C1 C1 ENDS OVER THE BEAM/PLATE &NAIL
DJ1 WITH 4x2.8Øx25 LONG GALV. NAILS

C1 C1
SB
C1 C1

SB EXISTNG DWELLING
C1 C1
DB1

DB1

DJ1
C1 C1
SB

C1 C1

SB

C1 C1

DB2

DB2
C1 C2

TIMBER
BEARER

C1 C2 2/M20 CHEMSET
PRIVACY SCREEN TO ANCHORS
CLIENT / ARCHITECT'D
DETAIL

EXISTNG GARAGE
FB
C1 C2
EXISTNG POOL
S
01 PIER

C1 C2
SB
C1
C1 C1 DB2 C1 C1

SECTION 01
SB

SB
SCALE 1:20
DJ1

C1 C2
NOTE:
SB

FOR JOIST SPANS >3m, PROVIDE


C1 C1 C1 DB2 C1 C1
LAYOUT: DECK FRAMING BLOCKING BETWEEN JOIST AT MID SPAN
TO MANUFACTURERS REQUIREMENTS

NOTE: TITLE: e: info@stranahpl.com.au t: (+61 07) 3378 5227


USING DOCUMENTS AND INFORMATION PROVIDED BY STRANA HOLDINGS PTY LTD Skype: stranahpl f: (+61 07) 3378 0176
(STRANA HPL) IMPLIES THE CLIENT/BUILDER HAS UNDERSTOOD THE FOLLOWING
CONDITIONS:
PROPOSED DECK ADDITION @ a: Suite 20, 1B/47 Park Rd, Milton, 4064 QLD Aust
1. COPY RIGHT BELONGS EXPLICITLY TO STRANAHPL UNLESS ARRANGEMENTS ARE 7 HAYES ST, WAKERLEY http://www.stranahpl.com.au
MADE OTHERWISE IN WRITING
Drawn: KSM Checked: SP Scale: 1:100 Date: 25/10/22
2. ALL THE TERMS AND CONDITIONS OF ENGAGEMENT OF STRANA HPL AS CONSULTING
ENGINEERS AND IN PARTICULAR THEIR RESPONSIBILITIES AND LIABILITIES, NOTE A
COPY OF THESE TERMS IS AVAILABLE ON REQUEST ONLY

DECK FRAMING PLAN 22146 - S03


MARK DATE BY REVISIONS
DJ1 DB2

TOP OF PRIVACY FENCE


EXTENT OF C2 POST
HEBAL WALL, SEE
DWG S02 FOR SPEC

TIMBER WALL FRAME,


SEE DWG S02
TIMBER SQ POST HW ON GI
STIRRUP MADE FROM 8THK 35
PLATE AND EMBEDED 300
INTO THE PIER 50

25
EXTEND OF
C1 POST
TIMBER BEAM

300

50
FB WITH FOOTING PIERS
UNDER (SHOW REINF AS 2/M16 GALV
DESCRIBED IN THE
LEGEND ON S02)

MIN. 1800, VERIFY ON SITE


4/N12 VERTICAL BARS
TIMBER POST

R6 LIGS @ 150C/C
TYPICAL TIMB POST TO TIMB
BEAM CONNECTION DETAIL
REINFORCEMENT NOT
REQUIRED FOR
PIER HEIGHTS LESS
THAN 1500

PIER 200 INTO


NOMINATED VERY
STIFF NATURAL GROUND
PIER Ø

TYP PIER TO TIMB POST DETAIL

NOTE: TITLE: e: info@stranahpl.com.au t: (+61 07) 3378 5227


USING DOCUMENTS AND INFORMATION PROVIDED BY STRANA HOLDINGS PTY LTD Skype: stranahpl f: (+61 07) 3378 0176
(STRANA HPL) IMPLIES THE CLIENT/BUILDER HAS UNDERSTOOD THE FOLLOWING
CONDITIONS:
PROPOSED DECK ADDITION @ a: Suite 20, 1B/47 Park Rd, Milton, 4064 QLD Aust
1. COPY RIGHT BELONGS EXPLICITLY TO STRANAHPL UNLESS ARRANGEMENTS ARE 7 HAYES ST, WAKERLEY http://www.stranahpl.com.au
MADE OTHERWISE IN WRITING
Drawn: KSM Checked: SP Scale: N.T.S. Date: 25/10/22
2. ALL THE TERMS AND CONDITIONS OF ENGAGEMENT OF STRANA HPL AS CONSULTING
ENGINEERS AND IN PARTICULAR THEIR RESPONSIBILITIES AND LIABILITIES, NOTE A
COPY OF THESE TERMS IS AVAILABLE ON REQUEST ONLY