Schedule of Drawings:: Drawing Drawing Title NO
Schedule of Drawings:: Drawing Drawing Title NO
Schedule of Drawings:: Drawing Drawing Title NO
1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND 1. MATERIALS, WORKMANSHIP AND TESTING SHALL COMPLY WITH 1. WALL FRAMING HAS BEEN DESIGNED FOR THE ROOF TRUSS LAYOUT SHOWN. AN
SCHEDULE OF DRAWINGS: OTHER CONSULTANT'S DRAWINGS & SPECIFICATIONS AND OTHER WRITTEN AS 1379, AS 3600 & AS 3610. ALTERNATIVE TRUSS LAYOUT WILL REQUIRE REDESIGN AT THE BUILDERS EXPENSE.
INSTRUCTIONS ISSUED DURING THE COURSE OF THIS CONTRACT. ALL 2. LINTELS HAVE BEEN DESIGNED SUCH THAT THE LONG TERM DEFLECTION SHALL NOT
DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT AND AWAIT 2. WATER MUST NOT BE ADDED TO THE PREMIXED CONCRETE AT SITE AND NO ADDITIVES EXCEED THE LESSER OF SPAN / 360 OR 9mm.
CLARIFICATION BEFORE PROCEEDING WITH THE WORK. OR ADMIXTURES TO BE USED WITHOUT OBTAINING PRIORAPPROVAL IN WRITING FROM 3. ALL TIMBER TO BE MIN. JOINT GROUP JD4. & WALL FRAME MIN. F5 OR MP10.
DRAWING DRAWING TITLE 2. ALL LEVELS AND DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK SHALL THE ENGINEER. 4. TRIM OPENINGS IN CEILINGS AND ROOFS FOR SKYLIGHTS, EXHAUST DUCT, FLUES AND
NO. BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION AND FABRICATION IS SIMILAR. PROVIDE SUITABLE NOGGING AND UPSTANDS AS REQUIRED.
COMMENCED. THE ENGINEER'S DRAWINGS SHALL NOT BE SCALED A. THE FOLLOWING STRUCTURAL COMPONENTS SHALL HAVE THE FOLLOWING 5. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH AS 1684
S01 TITLE SHEET & STRUCTURAL NOTES 3. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONCRETE STRENGTH CHARATERISTICS: 6. ALSO REFER TRUSS NOTES
MAINTAINING THE STRUCTURE IN A STABLE CONDITION AND IF IN DOUBT CONSULT 7. FOR TERMITE RESISTANCE IN TIMBER FRAMING IT IS RECOMMENDED THE USE OF
S02 FOOTING LAYOUT THE ENGINEER. FOOTING 32 MPa 80 SLUMP 20mm MAX AGGREGATE CYPRESS OR ANY OTHER NATURAL TERMITE RESISTANT TIMBER LISTED IN
4. STABILITY OF ALL EXCAVATIONS INCLUDING EXCAVATIONS IN THE VICINITY OF SLAB ON GROUND 32 MPa 80 SLUMP 20mm MAX AGGREGATE AS 3660 PART 1, 1995, APPENDIX A5.
S03 DECK FRAMING PLAN NEIGHBOURING BUILDINGS IS THE RESPONSIBILITY OF THE BUILDER, APPROVAL OF SUSPENDED SLAB 40 MPa 80 SLUMP 20mm MAX AGGREGATE 8. BLOCKING AT MAX 1800c/c AND OVER SUPPORTS. FIXED AS PER MANUFACTURERS
ALL PROPOSALS MUST BE GRANTED IN WRITING PRIOR TO COMMENCEMENT OF SUCH B. LAP SPLICES FOR FABRIC (MESH) IN TENSION SHALL BE MADE SO THAT THE OUTER SPECIFICATIONS
S04 TYPICAL DETAILS WORK. MOST TRANSVERSE WIRES OF ONE SHEET OF FABRIC OVERLAP THE TWO OUTERMOST 9. HAZARD LEVELS AND TYPE OF TREATMENT TO ALL TIMBERS INCLUDING ANY
5. UNLESS OTHERWISE SPECIFIED MATERIALS AND WORKMANSHIP ARE TO BE IN TRANSVERSE WIRES OF THE SHEET BEING LAPPED, AS SHOWN IN THE FIGURE BELOW. SAPWOODS IN HARDWOODS:
ACCORDANCE WITH ALL RELEVANT CURRENT S.A.A. CODES INCLUDING CURRENT ALL FABRIC (MESH) SHALL BE FY = 500 MPA.
AMENDMENTS, STATUTORY AUTHORITIES REGULATIONS AND BY-LAWS, AND THE H2 INSIDE, ABOVE GROUND
BUILDING ACT.
6. THE APPROVAL OF A SUBSTITUTION SHALL BE OBTAINED IN WRITING FROM THE H3 OUTSIDE, ABOVE GROUND
S1 S2 S1 S2
SUPERINTENDENT H4 OUTSIDE, IN-GROUND CONTACT
7. BUILDER TO COMPLY WITH HEALTH AND SAFETY REGULATIONS AT ALL TIMES A) S1 = S2 A) S1 < S2
DURING CONSTRUCTION AND INSPECTIONS. H5 OUTSIDE, IN-GROUND CONTACT, CONTACT WITH OR IN FRESH WATER
3. CONCRETE COVER TO REINFORCEMENT (REFER TABLE 4.10.3.2. OF A.S. 3600). UNLESS H6 MARINE WATERS
DESIGN SPECIFICATIONS:
FOUNDATION NOTES: OTHERWISE SHOWN SHALL BE AS FOLLOWS:-
THE FOLLOWING DESIGN LOADS ARE CONSIDERED WHILE
1. ALL EXCAVATIONS FOR FOOTING INCLUDING PIERS AND SLAB SHOULD BE INSPECTED FLOOR FRAMING NOTES:
CARRYING OUT THE DESIGN BY AN ENGINEER PRIOR TO PLACEMENT OF REINFORCEMENT AND CONCRETE IN CASE BUILDING ELEMENT CONCRETE COVER (mm)
1. ALL FLOOR FRAMING USING ENGINEERED TIMBER MUST BE INSTALLED IN
OF MASS CONCRETE FOOTINGS. INTERNAL EXTERNAL COMPLIANCE WITH MANUFACTURER'S SPECIFICATION.
DEAD / SUPERIMPOSED LOADS: 2. ALL EXCAVATIONS SHALL BE KEPT CLEAR OF ALL LOOSE MATERIALS AND KEPT DRY AT FOOTINGS 50 GENERALLY 2. BLOCKING, NOTCHING AND PENETRATIONS INCLUDING TIMBER TREATMENT MUST
ALL TIMES UNTIL CONCRETE IS PLACED ALSO COMPLY WITH THE MANUFACTURER'S SPECIFICATION.
SLAB ON GROUND 30 TOP 40 TOP
3. ALL GROUND BEAMS SHOULD BE FOUNDED ON FIRM NATURAL GROUND AS
COMPONENTS LOADS RECOMMENDED IN THE GEOTECHNICAL REPORT OTHERWISE PROVIDE BACKHOE PITS
AT 2.5m OR PIERS AT 1.8m CENTRES MAXIMUM. BUILDER SHOULD CONSULT THE 4. NO CHEMICAL ADMIXTURES TO BE USED IN THE CONCRETE WITHOUT THE
SUPERINTENDENT'S PRIOR APPROVAL.
DECK DESIGN ENGINEER WHEN MAKING SUCH A CHANGE AND RECEIVE INSTRUCTIONS IN
5. SIZE OF ELEMENTS IS EXCLUSIVE OF APPLIED FINISHES. BEAM DEPTHS INCLUDE SLAB
(TILES + 19MM FC SHEET + WATER PROOFING + 1.20kPA WRITTING.
4. ALL PIERS SHOULD BE FOUNDED ON FIRM NATURAL GROUND AS RECOMMENDED IN THICKNESS & ARE THE FIRST DIMENSION SPECIFIED FOLLOWED BY WIDTH.
10MM PLASTERBOARD CEILING) THE GEOTECHNICAL REPORT. 6. SLABS TO BE CONTINUOUSLY MOIST CURED FOR 7 DAYS MAINTAINING DAMPNESS AT
5. SLAB SHOULD BE PLACED ON STIFF NATURAL GROUND WITH MIN 50kN/M2 ALLOWABLE ALL TIMES WITH CLEAR PLASTIC FILM AND WET SAND, OR CONTINUOUS IMMERSION.
BEARING CAPACITY OR CONTROLLED COMPACTED FILL OF ROAD BASE MATERIAL PVA & RESIN BASED CURING COMPOUNDS SHALL NOT BE USED.
COMPACTED IN 150 THICK LAYERS WITH MIN 2TON VIBRATOR ROLLER/PLATE TO MIN 7. MECHANICALLY VIBRATE ALL CONCRETE TO GIVE MAXIMUM COMPACTION WITHOUT
LIVE / IMPOSED LOADS: 98% MDD, OTHERWISE PROVIDE SLAB PIERS AS PER DETAIL @ 1.8M C/C REFER SEGREGATION OF THE CONCRETE.
DETAILS. THE BUILDER IS REQUIRED TO KEEP TEST RECORDS FOR THE COMPACTION 8. AT FOOTING INTERSECTIONS REINFORCEMENT SHALL EXTEND MIN 40XBAR DIAMETERS
INTO TRANSVERSE FOOTING.
COMPONENTS LOADS 6. LOCATION OF ANY UNDERGROUND SERVICES SHOULD BE DETERMINED BY THE CLIENT
FOR THE ENGINEER PRIOR TO DESIGN OF THE FOOTINGS AND ANY NECESSARY 9. NO HOLES, CHASES OR EMBEDMENT OF PIPES OTHER THAN THOSE SHOWNON THE
MODIFICATION SHOULD BE OBTAINED PRIOR TO CONSTRUCTION OF THE FOOTINGS. STRUCTURAL DRAWINGS SHALL BE MADE IN CONCRETE ELEMENTS WITHOUT PRIOR
DECK 2.0kPA or 1.8KN THESE MODIFICATIONS MAY INCUR FEES PAYABLE TO THE ENGINEER. APPROVAL OF THE SUPERINTENDENT.
7. ALL REINFORCEMENTS SHOULD BE INSPECTED BY A SUITABLY QUALIFIED ENGINEER. 10. DIMENSIONAL TOLERENCES OF AS 3600 MODIFIED BY AS 3610 SHALL APPLY UNLESS
8. NOTE THIS DESIGN DOES NOT COVER ANY SLOPE STABILITY MATTERS. IF THE SITE HAS OTHERWISE NOTED.
ANY SLOPES THE CLIENT SHOULD GET A QUALIFIED GEOTECHNICAL ENGINEER TO 11. REINFORCEMENT IS REPRESENTED DIAGRAMATICALLY AND NOT NECESSARILY SHOWN
SITE SPECIFICATIONS: VERIFY IS STABILITY PRIOR TO CONSTRUCTION AND ANY RECOMMENDATIONS IN TRUE PROJECTION.
PERTAINING TO THE BUILDING SHOULD BE BROUGHT TO THE ENGINEERS NOTICE 12. SPLICES IN REINFORCEMENT SHALL BE MADE ONLY IN THE POSITIONS SHOWN OR AS
SOIL CLASSIFICATION & REACTIVITY P & H2 PRIOR TO CONSTRUCTION. ANY NECESSARY MODIFICATION SHOULD BE OBTAINED OTHERWISE APPROVED BY THE SUPERINTENDENT.
PRIOR TO CONSTRUCTION AND THESE MODIFICATIONS MAY INCUR FEES PAYABLE TO 13. WELDING OF REINFORCEMENT SHALL NOT BE PERMITTED WITHOUT THE APPROVAL OF
THE ENGINEER. THE SUPERINTENDENT.
9. NO PART OF THE FOOTING INCLUDING GROUND BEAMS, PIERS,BACKHOE PIERS SHOULD 14. ALL REINFORCEMENT SHALL BE WIRED TO AND SUPPORTED OF APPROVED CHAIRS AT
BE FOUNDED ON : A MAXIMUM SPACING OF 1m CENTRES BOTH WAYS TO PROVIDE THE CORRECT COVER.
a) LOOSE NATURAL MATERIALS WITH ALLOWABLE BEARING CAPACITY OF LESS THAN 15. REINFORCEMENT SYMBOLS:-
100kPa
b) LANDSLIP N- DEFORMED BARS TO A.S./NZS 4671
c) MINE SUBSIDENCE AND COLLAPSING SOILS GRADE 500 MPa
d) SOILS SUBJECT TO EROSION
R- STRUCTURAL GRADE PLAIN ROUND BAR TO A.S./NZS 4671
e) REACTIVE SITES WITH ABNORMAL MOISTURE CONTENTS CAUSED BY EVENTS ON
GRADE 250MPa
SITE AND INCLUDING THE SURROUNDINGS AREAS SUCH AS RECENT REMOVAL OF
BUILDING FROM SITE, CHANGE IN DRAINAGE OF THE SITE CAUSED BY REMOVAL/
SL/RL- HARD DRAWN STEEL WIRE REINFORCING FABRIC TO A.S./NZS 4671
ADDITION OF DRAINS, LEAKING DRAINS/PONDS POOLS ETC DUE TO POOR/LACK OF
GRAD 500 MPa
MAINTENANCE, REMOVAL OF LARGE TREES, TREES NEAR THE FOUNDATION
10. MASORY ARTICULATIONS JOINTS SHOULD BE PROVIDED TO THE FULL HEIGHT OF THE
16. FORMWORK FOR FORMED CONCRETE SHALL BE STRIPPED AS REQUIRED BY THE
WALL AT A MAXIMUM OF 6.0m CENTRES FOR MASONRY VENEER, AND 5.0m FOR FULL
FORMWORK CODE AND SHALL BE BACKPROPPED UNTIL SUCH TIME AS THE CONCRETE
MASONRY REGARDLESS OF CORNERS, FOR DETAILS REFER TECHNICAL NOTE NO61
HAS GAINED ITS DESIGN STRENGTH. (A.S.3600 AND A.S.3610 ALSO APPLY)
FROM CEMENT AND CONCRETE ASSOCIATION AND IF IN ANY DOUBT CONTACT THE
17. WHERE CONSTRUCTION LOADS ARE IMPOSED, ADEQUATE BACKPROPPING SHALL BE
ENGINEER FOR CLARIFICATION.
MAINTAINED UNTIL SUCH LOADS ARE REMOVED AND AS APPROVED BY THE
11. FOOTINGS NEAR POOLS/RETAINING WALLS SHOULD BE TAKEN BELOW THE ZONE OF
SUPERINTENDENT.
INFLUNCE ON THESE STRUCTURE AND PIERS SHOULD BE USED IF NECESSARY. IF IN
16. FORMWORK DESIGN AND THE PROGRAMME OF CONCRETE POURS, STRIPPING AND
DOUBTS CONTACT THE ENGINEER FOR FURTHER ADVICE
SHORING SEQUENCES SHALL BE APPROVED BY THE SUPERINTENDENT.
12. IN AREAS WITH BRITTLE FINISH SUCH AS TILES, USE SL92 FABRIC MESH IN SLAB OR
17. PROVIDE DAMP PROOF MEMBRANE WHEN CONCRETE IS CAST AGAINST THE GROUND.
EQUIVALENT. ALSO ALLOW THE CONCRETE TO CURE FOR ATLEAST 3 MONTHS
18. FORMWORK SHALL REMAIN IN POSITION FOR A MINIMUM PERIOD OF 28 DAYS. WHERE
PRIORING TO PLACING SUCH FINISHES
SLABS AND BEAMS ARE TO SUPPORT BRICKWORK OR OTHER NON-FLEXIBLE/BRITTLE
13. BUILDERS AND HOME OWNER SHOULD MAINTAIN THE SITE IN ACCORDANCE WITH THE
FORMS OF CONSTRUCTION.
CSIRO'S 'FOUNDATION MAINTENANCE AND FOOTING PERFORMANCE: A HOME OWNERS
19. NO LOADS SHALL BE PLACED ON CANTILEVERED MEMBERS UNTIL REMOVAL OF
GUIDE' A COPY CAN BE PROVIDED ON REQUEST.
TEMPORARY SUPPORTS,
14. THE SOILS/GEOTECHNICAL REPORT FORM PART OF THE STRUCTURAL SPECIFICATIONS
20. DESIGN, ERECTION AND REMOVAL OF FORMWORK AND TEMPORARY SUPPORTS SHALL
AND SHOULD BE READ, UNDERSTOOD AND FOLLOWED STRICTLY DURING
BE THE RESPONSIBILITY OF THE BUILDER.
CONSTRUCTION AND MAINTENANCE OF THE BUILDING.
21. THE FACES OF ALL CONCRETE OF WHICH NEW CONCRETE IS TO BE POURED SHALL BE
THOROUGHLY SCABBLED AND CLEANED OF ANY DELETERIOUS MATERIAL.
22. PRIOR TO PLACEMENT OF SLAB ON GROUND ALL TOP SOIL AND ANY LOOSE OR
ORGANIC MATERIAL MUST BE REMOVED AND REPLACED BY AN APPROVED
CONSOLITATED FILLING MATERIAL COMPACTED TO A MINIMUM OF 98% MDD (MODIFIED
COMPACTION TEST).
C1 C1
C1 C1
C1 C1
FB
C1 C1
C1 C1
FB
SEE DETAILS S04
EXISTNG GARAGE
C1 C1
EXISTNG POOL
FB
C1 C1
C1 C1 C1 C1 C1
EXISTING RETAINING WALL FOUNDING STRATA:
TO REMAIN BELOW DECK WHERE PIERS ARE SPECIFIED, PIERS MUST
BE FOUNDED ON WEATHERED ROCK
C1 C1 APPROXIMATELY 1.8M BELOW GROUND. ALSO
REFER TO RECOMMENDATIONS ON SOIL TEST
REPORT.
C1 C1 C1 C1 C1
LAYOUT: FOOTING
SOIL CLASS "P" & REACTIVITY H2
C1 C1
SB
C1 C1
SB EXISTNG DWELLING
C1 C1
DB1
DB1
DJ1
C1 C1
SB
C1 C1
SB
C1 C1
DB2
DB2
C1 C2
TIMBER
BEARER
C1 C2 2/M20 CHEMSET
PRIVACY SCREEN TO ANCHORS
CLIENT / ARCHITECT'D
DETAIL
EXISTNG GARAGE
FB
C1 C2
EXISTNG POOL
S
01 PIER
C1 C2
SB
C1
C1 C1 DB2 C1 C1
SECTION 01
SB
SB
SCALE 1:20
DJ1
C1 C2
NOTE:
SB
25
EXTEND OF
C1 POST
TIMBER BEAM
300
50
FB WITH FOOTING PIERS
UNDER (SHOW REINF AS 2/M16 GALV
DESCRIBED IN THE
LEGEND ON S02)
R6 LIGS @ 150C/C
TYPICAL TIMB POST TO TIMB
BEAM CONNECTION DETAIL
REINFORCEMENT NOT
REQUIRED FOR
PIER HEIGHTS LESS