Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

PORT INFO

PORT OF ( KFT ANCHORAGE ) - EAST


KALIMANTAN
GENERAL INFORMATION :
1 Berth Nama : Kalimantan Floating Terminal ( KFT-2 ) Loading Operations :
2 Type : Barge - Vessel shall all respects be ready to commance loading on completion of mooring
3 L.B.P : 192 M with hold clean and hatch cover open . A detailed loading plan , with hatch wise
4 Breadth : 50 M quantities ,loading sequence and quantity of coal with trim & draft to be discissed
5 Depth : 15 M and agreed with KFT-2 before commence of loading.
6 Draft : 10 M - Ballast operation to be accordance with the loading sequence and rate of coal by KFT2
7 GRT / NRT : 43530 M / 13059 M
8 Loader & : ( Two ) Shiploader & ( Four ) Unloader Crane - Vessel duty oficer to be in continues contact with loading master and KFT2 duty Officer during the

9 Loading Rate : 3000 MT/ Hrs / Shiploader


10 Trimming Method : Used Telecopic Banana Chute On shiploader - The stowage of coal is the sole responsibility of the vessel master or his nominee ,and any changes
to loading sequence must be immediately relayed to KFT2 duty officer.
11 Maximum High : 38 M
- In the event of stopping loading during normal operatopn , 50 - 100 tones o coal,will ,be required to
12 Maximum High : 48 M
Number and Type : @ 6 Pcs , Dia. 3.3 M x 6 Mtr at sea - The Vessel to provide sufficient light ob board for night loading and shall open & close hatch cover
13
Of Fender
@ 4 pcs , Dia. 2 M x 3 Mtr at Hull
14 Storage Capacity : 50,000 MT
15 Size Storage : Length upon : 151.5 M , length Under : 150 M ,

16 Max Loader : 19.5 M


17 Max Air Draft : 32.2 M
Comunication To
18 KFT2 : VHF CH. 15 & 16 ( For com with barge )
VHF CH. 06 ( for Com with Forman / MV )
VHF CH. 72 ( for Com with Forman / MV )
UHF CH 164,950 ( Com internal )
Loading Position ( KFT-2 )
19
Lat / Long : 001° - 21.45' S
117 ° - 00.27' E

20 Water Depth : 32 M
Density at Loading : 1,021 - 1,022
21
BERTHING / UNBERTHING ARRANGEMENT AT KFT2 :
A. MV BERTHING TO KFT2 B. MV UNBERTHING TO KFT2
MV shall move berthing to KFT2 , assist by Pilot & asist Tug . MV shall move Unberthing from KFT2 , assist by Pilot & asist Tug .
Before MV berthing to KFT2 , MV arrange mooring
Mooring Line : rope Release all line , waiting , Pilot Under commance
- 4 Head Line & 2 Spring line ( Forward )
- 4 Aft line & 2 srping line ( aft )
- Massenger line 50 Mtr .
Heavy Line : 50 M ( Arrange from Crew KFT-2 )
Weather Condition : Good Condition
Sea Condition < Moderate ( 2 Mtr )
Windh , 18 Knot
OTHER USEFULL INFORMATION :
Local Time : GMT + 8 Hours
Weather Condition : Relatif Humidity 99 % with Visibility 4 NM , Precipitation Rain 9 1/m2 Last 24 Hrs, temperature 24 C°/75 °F
Working Hours : 24 Hours / Day ,7 Day / week shich , Excl. National Major Holiday
Type of Terminal : Private Terminal
Master PIC : 081 390908073 KFT Phone : 081 15453288
C/O Pic : 085 332093109 External : 79975 / 79976
2/O Pic : 087 825531789
081 288288241

You might also like