List of Deliverables & Inputs Required For Barrackpore
List of Deliverables & Inputs Required For Barrackpore
Page 1 of 5
20.Enquiry specification for
instruments
21.Enquiry specification for control
panel
22.Electrical cable schedule
23.Earthing and Lightning Protection
BOQ
24.Illumination BOQ
25.Instrument cable schedule
8 KL ALUM TANK ELECTRO-MECHANICAL 1. General arrangement drawing for 1. General arrangement drawing of
INSTALLATION IN DRAWING REQUIRED alum tank existing chemical house
EXISTING CHEMICAL 2. Piping BOQ 2. Piping general arrangement
HOUSE 3. Valve BOQ drawing of existing chemical
4. Enquiry specification for agitator house
and drive motor
5. Enquiry specification for
instruments
6. Instrument list
10 KL WATER TANK ELECTRO-MECHANICAL 1. General arrangement drawing for Same as above
ABOVE ROOF OF EXISTING DRAWING REQUIRED water tank
CHEMICAL HOUSE 2. Piping BOQ
3. Valve BOQ
EXISTING DATA SHEET REQUIRED FOR Enquiry specifications for specified 1. General arrangement drawing of
CLARIFLOCCULATOR CHANGE OF EXISTING items clariflocculator and bridge
ELECTRO-MECHANICAL ITEM assembly
2. List of items and the respective
data sheets
EXISTING FILTER HOUSE FILTER MEDIA CHANGE, Enquiry specifications for specified List of items and the respective data
ORIFICE PIPE CHANGE , DATA items sheets
SHEET REQUIRED FOR
CHANGE OF EXISTING
ELECTRO-MECHANICAL ITEM
NEW CWR AND PUMP ELECTRO-MECHANICAL 1. P&I diagram for the system 3. General arrangement drawing
HOUSE DRAWING REQUIRED 2. General arrangement drawing for of existing plant
Page 2 of 5
CWR 4. Hydraulic diagram of existing
3. General arrangement drawing for plant
pump house 5. Location plan of CWR
4. Piping general arrangement
drawing
5. Piping BOQ
6. Valve BOQ
7. Operation & control philosophy
8. Instrument list
9. List of I/Os of local RTU / PLC
10.Electrical load list
11.Electrical single line diagram
12.Control schematics
13.General arrangement drawing for
electrical room
14.Enquiry specification for pumps and
drive motors
15.Enquiry specification for EOT Crane
16.Enquiry specification for motor
control center
17.Enquiry specification for cable
18.Enquiry specification for
instruments
19.Enquiry specification for control
panel
20.Electrical cable schedule
21.Earthing and Lightning Protection
BOQ
22.Illumination BOQ
23.Instrument cable schedule
NEW 35 KL GLR CUM ELECTRO-MECHANICAL 1. P&I diagram for the installation 1. Location plan of GLR
PUMP HOUSE DRAWING REQUIRED 2. General arrangement drawing for 2. Site plan of GLR
GLR 3. Incoming electrical power supply
Page 3 of 5
3. General arrangement drawing for details
pump house
4. Piping general arrangement
drawing
5. Piping BOQ
6. Valve BOQ
7. Operation & control philosophy
8. Instrument list
9. List of I/Os of local RTU / PLC
10.Electrical load list
11.Electrical single line diagram
12.Control schematics
13.General arrangement drawing for
transformer area
14.General arrangement drawing for
DG area
15.General arrangement drawing for
electrical room
16.Enquiry specification for pumps and
drive motors
17.Enquiry specification for electric
hoist
18.Enquiry specification for motor
control center
19.Enquiry specification for cable
20.Enquiry specification for diesel
generator
21.Enquiry specification for
instruments
22.Enquiry specification for control
panel
23.Electrical cable schedule
24.Earthing and Lightning Protection
BOQ
Page 4 of 5
25.Illumination BOQ
26.Instrument cable schedule
NOTE: It is envisaged that no
disinfection by means of chlorination
system will be carried out.
NEW 100 CUM GLR CUM ELECTRO-MECHANICAL Same as above Same as above
PUMP HOUSE AT CHAK DRAWING REQUIRED
KANTHALIA
NEW 150 CUM GLR CUM ELECTRO-MECHANICAL Same as above Same as above
PUMP HOUSE AT DRAWING REQUIRED
TAPANPUR
NEW 100 CUM GLR CUM ELECTRO-MECHANICAL Same as above Same as above
PUMP HOUSE AT DRAWING REQUIRED
RAUTARA
NEW 150 CUM GLR CUM ELECTRO-MECHANICAL Same as above Same as above
PUMP HOUSE AT RUIYA DRAWING REQUIRED
CHANGE OF PNEUMATIC DATA SHEET REQUIRED Enquiry specifications for specified 1. List of existing items and the
OPERATING SYSTEM TO items respective data sheets
SCADA SYSTEM 2. Revised philosophy of operation
Page 5 of 5