Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES AND REFERENCES

1). ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED.


2). LAND PLAN REFER XEN/ CW , HVPNL , KARNAL M.NO. CH-06, DT:-28.10.2022 (CH-3/BP-324)
3). FOR S.H.B,SEE DRG.NO.-1,JOB. NO.-1476 (C)

201160 4).
5).
GELO IS FINALISED AS PER COMMENTS OF SE/TS PKL, MEMO NO.
CE/PD&C R-1919/CH-17 DT:-18.10.22.(CH-1/BP-324)

00
50
Sr.No. REVISIONS
ZONING/EARTHMAT LINE LILO OF S/C KAUL- HABRI LINE FUTURE R-01 DRAWING REVISED BY SHIFTING THE BOUNDARY WALL/ZONING LINE TOWARDS MAIN ROAD BY 30 MTS AS PER

0
00
LETTER RECEIVED FROM SE/TS, HVPNL, KARNAL VIDE MEMO NO. CH-51/TCW-320,DATED 18.09.2023 (CP-27/BP-324).&

25/09/23
10
FURTHER DISCUSSION HELD IN OFFICE OF CE/PD&C ON 25.09.23.
C/L OF LA's NOTE: OTHER THAN THIS NO SCOPE OF WORK HAS BEEN CHANGED.

00 00 50 050
C/L OF CVT

BT-3

BT-3
BT-1
3
C/L OF TOWER C.H.D AE/R&I XEN/R&I SE/DESIGN

35 17 30

BB-1
C/L OF L & E
1
22
44

C/L OF CT

00
43
C/L OF SF-6 BREAKER

BT-6

BT-6

BT-6
00
27

BB-2

BB-2

BB-2
0
20
12

BT-1
BT-3

BT-3
3

8
UP
G.L.
52

29
±0
46

18
690 wide projection 690 wide projection
at lintel lvl. at lintel lvl.
P.L.+600

C5
C5

C5

W3/EF
C5

W3

C1
C1
D1/W2

D1/W6
C3
sun shade

C1
460 wide

250x300 MM TYPE-I
C1
250x300 MM TYPE-I
at roof slab lvl,

COMPUTER ROOM
150 Ø RWP

150 Ø RWP

150 Ø RWP
460 wide proj.

BATTERY ROOM

BT-4

BT-4

BT-4
BB-1

BB-1

BB-1

BB-1
450 wide sunshade
UP

T&P ROOM

5000x4000
5000x4000

5000x4000
5000x2500
r.c.c. shelves
PLANTER

SUB STN.
STORE
W1

r.c.c. shelves
slope 1:10
ramp up

C1
D2

D2
C1
C3

C1
C1

F.G.1

BT-1
ENTRANCE

P.L.+600

slope 1:10
C1

ramp up
PLAZA

BB-2

BB-2

BB-2
0
20
UP

DG

600x650 MM TYPE-III

12
C1

C3

C2
C1

C2
600x650 MM TYPE-III

600x650 MM TYPE-III
PASSAGE 2500 MM WIDE

"H" TYPE TRENCH


150 Ø RWP
slope 1:10

OPENING
ramp up

124050
STAFF ROOM
125177

PLANTER

F.G.1
W1

5000x4000

P.L. +600

W1
150 Ø RWP
UP

ELECTRIC ROOM

00
6
C1 D2

BT-6

BT-6

BT-6
C3
sun shade

C1
C1

C/L OF SF
20505x8230
460 wide

C1 C1

27
C1

C1
D2
EXECUTIVE ROOM
PLANTER

"H" TYPE TRENCH


0

OPENING
F.G.2

00
5000x4000
52

at roof slab lvl,


460 wide proj.

W1
W1
36

600x650 MM TYPE-III

600x650 MM TYPE-III
F.G.1

43
450 wide sunshade

C/L OF CT's
C1
C3

C1
TOILET D3
1512x1685

2097X1510

C2

C2
W4C/EF

D2
PANTRY

BT-3

BT-3

BT-1
F.G.2
450 wide sun shade

1678x3310 1510x3310
W4B/EF

F.G.2

00
W1
LADIES
TOILET
w.c

D2
D3

52
D3

600x650 MM TYPE-III
D2
W4A/EF

w.c

C/L OF TWR./LA's
TOILET
GENTS

G1
cooler
water

BB-1

BB-1
W1
C1
C1

C1

C1
C1
V1

C2

BT-1
C/L OF T/F's
70

0
81

10

T-1 20/25 MVA 40/50 MVA T-2 T-3 FUTURE


10

132/33 KV T/F 132/33 KV T/F


C/L OF ROAD

3600
BILL OF MATERIALS
132 KV SIDE 33 KV SIDE
00
25

00
75
SR.NO. DESCRIPTION STR. DRG.NO. QTY. SR.NO. DESCRIPTION STR. DRG.NO. QTY.

DT-3
DT-2
DT-2

DT-3
3

DB-2
73
56

C/L OF TWR./L&E/LA's 1 TOWER TYPE BT- 1 HTD/ST - 5181 5 1 TOWER TYPE DT- 2 HW/ST - 5210 7

2 TOWER TYPE BT- 3 HTD/ST - 5183 6 2 TOWER TYPE DT- 3 HW/ST - 5211 8

25
22
C/L OF CT's 3 TOWER TYPE BT- 4 HTD/ST - 5184 3 3 BEAM TYPE DB- 2 HW/ST - 5201
PT PT ZONING/EARTHMAT LINE 8

25
22
C/L OF VCB's 4 TOWER TYPE BT- 6 HTD/ST - 5186 6 4 33 KV LA's HTD/ST - 89 R 21
DT-2

DT-3
DT-2

25
5 BEAM TYPE BB- 1 HTD/ST - 5189 11 5 33 KV BUS PT's HTD/ST - 88 6

22
C/L OF ISOL.
6 BEAM TYPE BB- 2 HTD/ST - 5190 6 6 33 KV CT's HTD/ST - 88 21
D-8 D-7 D-6 D-5 D-4 D-3 D-2 D-1 7 132 KV LA's HHW/ST - 63 R 12 7 33 KV L&E SW.'s HTD/ST - 110 5

EARTHMAT LINE 8 132 KV CVT's/PT's HHW/ST - 67 6 8 33 KV ISOLATOR's HTD/ST - 110 8


DT-3

DT-2

25
NEW ZONING C/L OF VCB's
5

22
SECTIONALIZER
02

DT-3

9 132 KV CT's HHW/ST - 67 9 33 KV VCB's HTD/ST - 110


39

15 7
LINE IN R-1 FUTURE

25
C/L OF CT's 33 KV NCT's 2

22
10 132 KV L&E SW.'s HTD/ST - 90 R 2 10 HTD/ST - 149

11 132 KV ISOLATOR's HTD/ST - 90 R 11 0.2 MVA 33/0.4 KV T/F ---------- 1

25
10
C/L OF TWR./L&E

22
12 132 KV SF-6 BRK's ---------- 5 12 CAP. BANK
DT-2

DB-2

DB-2

DB-2
DT-3

25
DT-3
DT-2
DT-3

ALONG WITH ALLIED EQPT. ---------- 2


C/L OF LA's

22
13 132 KV POST's HTD/ST - 144 10

14 132 KV NCT's HTD/ST - 145 2 13 BUS SECTIONALIZAR ISOL. HTD/ST - 110 1

15 40/50 MVA,132/33 KV T/F's ---------- 1 14


C.BANK
C.BANK

16 20/25MVA,132/33 KV T/F's ---------- 1 15


33 KV TEONTHA, PHARAL, SANGROLI 17

18

19

ZONING/EARTHMAT LINE
H.V.P.N.L
G.E.L.O.PLAN
184400 132 KV SUB / STATION SANGROLI (KTL)
MONTH -NOV. ,YEAR-2022 NOTE:- SCALE 1:300
DRAWN BY:- CHECKED BY:-

Rajan Jain Er. ROHIT PANT


C.H.D AE/AEE/R&I

Er. NEETU SAROHA Er. RAJESH KUMAR Er. SANJAY ARORA


XEN/R&I SE/DESIGN CE/PD&C
SUB-STN.DESIGN DIRECTORATE PANCHKULA

DRAWING NO. HGD-1 / 3302/R-1