Omni Antenna Installation
1 2 3 5 6
3 4
7 8
RRU Installation
1. Ensure standard installation for RRU on pole at right height with complete washers and nuts.
2. Ensure standard installation for RRU fiber and power cables connections to RRU.
3. Ensure installation of fiber cable between RRU and BBU as per standard
4. Make RRU power cable grounding point as per standard.
5. Connect RRU power cable as per standard black to + and Blue to -
6. Ensure connect RRU to earth bar by grounding cable to main ground bar of pole.
7. Take clear overview photo for RRU connectors isolation with good quality.
8. Take overview photos for RRU installation on pole.
1 2 3 4 5 6
7
Ensure Good Fixation For Grounding Bar To
Tower Main Grounding Tape
BBU Installation
1 2 3 4 5 6
2 3 4 5 6 7
Batteries Cabinet Installation
1
1 2
1 . Ensure standard installation for Batteries cabinets on pole at right height with complete washers and nuts.
2. Ensure connect Batteries cabinets by grounding cable to main ground bar of pole.
3. Ensure that all power cables are installed in good quality without losses – also to ensure using heat shrinkage tubes at cables ends.
4. Ensure good crimping for cables using crimping tools.
5. All fixation should be as standard : flat washers + 2 nuts : Ensure good tighten for all connections.
3 4 5 6 7
Ensure Quality Of
Grounding Layer
Ensure Quality Of
Grounding Layer
Overall Installation Tips
3