Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:-
Ref Drawing No-
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) REMARKS
No (m) (sqm)
Measurement for Installation of CE certified three dimensional erosion control mat
VO 2 - 1
Sqm 1 42.00 18.00 756.00
Total Three Dimensional Erosion Control Mat quantity as Per VO 2, BOQ Item No 1 in Ramsahill Main
756.00 Sqm
Reservoir =
Total Removal of Vegetation quantity as Per VO 2, BOQ Item No 3 in Ramsahill Main Reservoir = 192.00 Sqm
Total Non-Woven geotextile quantity as Per VO 2, BOQ Item No 4 in Ramsahill Main Reservoir = 109.00 Sqm
Total self drilling bars 3.5 m long quantity as Per VO 2, BOQ Item No 8 in Ramsahill
4256.00 Rm
Main Reservoir =
Total Scrubbing loose boulders quantity as Per VO 2, BOQ Item No 9 in Ramsahill Main Reservoir = 756.00 Sqm
Total Earthwork in excavation quantity as Per VO 2, BOQ Item No 10 in Ramsahill Main Reservoir = 90.00 Cum
Total Gabion structure quantity as Per VO 2, BOQ Item No 11 in Ramsahill Main Reservoir = 109.00 Cum
Total Backfilling behind Gabion Units quantity as Per VO 2, BOQ Item No 12 in Ramsahill Main Reservoir = 436.00 Cum
Total boulders quantity as Per VO 2, BOQ Item No 14 in Ramsahill Main Reservoir = 109.00 Cum