Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)

Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:- GWSP/HTC/C#04B/RH-I/358 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) REMARKS
No (m) (sqm)
Measurement for Installation of CE certified three dimensional erosion control mat
VO 2 - 1
Sqm 1 42.00 18.00 756.00

Total Three Dimensional Erosion Control Mat quantity as Per VO 2, BOQ Item No 1 in Ramsahill Main
756.00 Sqm
Reservoir =

Sign. Of Contractor Sign. of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:-Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:- GWSP/HTC/C#04B/RH-I/359 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) REMARKS
No (m) (sqm)
Measurement for Removal of Vegetation,bushes,shrubs…
VO 2 - 3
Sqm 1 48.00 4.00 192.00

Total Removal of Vegetation quantity as Per VO 2, BOQ Item No 3 in Ramsahill Main Reservoir = 192.00 Sqm

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:- GWSP/HTC/C#04B/RH-I/360 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) REMARKS
No (m) (sqm)
Measurement for Providing and laying one layer of Non-Woven geotextile
VO 2 - 4
Sqm 1 109.00 1.00 109.00

Total Non-Woven geotextile quantity as Per VO 2, BOQ Item No 4 in Ramsahill Main Reservoir = 109.00 Sqm

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:- GWSP/HTC/C#04B/RH-I/361 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) QUANTITY REMARKS
No
Measurement for Supply and fixing of self drilling bars 3.5 m long
VO 2 - 8
RM 1216 3.50 4256.00

Total self drilling bars 3.5 m long quantity as Per VO 2, BOQ Item No 8 in Ramsahill
4256.00 RM
Main Reservoir =

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:- GWSP/HTC/C#04B/RH-I/362 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) REMARKS
No (m) (sqm)
Measurement for Scrubbing loose boulders on the surface
VO 2 - 9
Sqm 1 42.00 18.00 756.00

Total Scrubbing loose boulders quantity as Per VO 2, BOQ Item No 9 in Ramsahill Main Reservoir = 756.00 Sqm

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:-GWSP/HTC/C#04B/RH-I/363 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) Height (m) REMARKS
No (m) (cum)
Measurement for Earthwork in excavation for foundation of structure
VO 2 - 10
Cum 1 90.00 1.00 1.00 90.00

Total Earthwork in excavation quantity as Per VO 2, BOQ Item No 10 in Ramsahill Main Reservoir = 90.00 Cum

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:-GWSP/HTC/C#04B/RH-I/363 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) Height (m) REMARKS
No (m) (cum)
Measurement for Providing & making Gabion structure
VO 2 - 11
Cum 1 109.00 1.00 1.00 109.00

Total Gabion structure quantity as Per VO 2, BOQ Item No 11 in Ramsahill Main Reservoir = 109.00 Cum

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:-Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:-GWSP/HTC/C#04B/RH-I/363 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) Height (m) REMARKS
No (m) (cum)
Measurement for Providing & Backfilling behind Gabion Units

VO 2 - 12 Front Side Cum 1 109.00 1.00 2.00 218.00

Below Wall Cum 1 109.00 1.00 2.00 218.00

Total Backfilling behind Gabion Units quantity as Per VO 2, BOQ Item No 12 in Ramsahill Main Reservoir = 436.00 Cum

Sign. Of Contractor Sign. Of PMC


Project name : JICA Assisted Guwahati Water Supply Project (GWSP) (PACKAGE C#04B)
Name of Structure:- Ramsa Hill Slope Stabilization and Erosion Control Measures
RFI No:-GWSP/HTC/C#04B/RH-I/363 dtd. 14/05/2024
Ref Drawing No- IND-NE-2023-0025357-MX-01
BOQ Item BREADTH QUANTITY
DESCRIPTION OF ITEM UNIT NOS LENGTH (m) Height (m) REMARKS
No (m) (cum)
Measurement for Supply and installation of boulders
VO 2 - 14
Cum 1 109.00 1.00 1.00 109.00

Total boulders quantity as Per VO 2, BOQ Item No 14 in Ramsahill Main Reservoir = 109.00 Cum

Sign. Of Contractor Sign. Of PMC