Professional Documents
Culture Documents
(REFERENCE) Professional Practice 3
(REFERENCE) Professional Practice 3
(REFERENCE) Professional Practice 3
SCHEMATIC SCHEMATIC
DESIGN 15% 10% 100,000 DESIGN 15% 15% -25,000 125,000
Preliminary Design Preliminary Design
DESIGN DESIGN
DEVELOPMENT 35% 20% 200,000 DEVELOPMENT 40% 25% 250,000
Working Drawings Working Drawings
CONTRACT CONTRACT
DOCUMENT
Specifications / Contract 85% 50% 500,000 DOCUMENT
Specifications / Contract 90% 50% 500,000
Documents Documents
COMPLETION
Part Time Supervision 100% 15% 150,000
COMPLETION
Part Time Supervision 100% 10% 100,000
● IMHOTEP©2018 ● Page 55 ●
PROFESSIONAL PRACTICE
ARCHITECT’S MINIMUM BASIC FEE (SPP 2010)
50M 50M 100M 300M 500M 500M
GROUP TYPE MBF BUILDINGS Php 50M Php 50M to Php 100M Php 200M Php 500M Over Php
100M to 200M to 500M to1B 1B
1 SIMPLE 6% Armories Packaging & Processing Plants 6% 5% 4% 3% 2% 1%
Bakeries Parking Structures
Habitable Agricultural Structures Printing Plants
Freight Facilities Public Markets
Hangars Service Garages
Industrial Buildings Simple Loft-Type Buildings
Manufacturing / Industrial Plants Warehouses
2 MODERATE 7% Art Galleries Office Buildings / Office Condominiums 7% 6% 5% 4% 3% 2%
Banks, Exchange Parks, Playgrounds and
Financial Institutions Open Air Recreational Facilities
Bowlodromes Residential Condominiums
Call Centers Police Stations
Churches & Religious Facilities Postal Facilities
City/Town Halls & Civic Centers Private Clubs
College Buildings Publishing Plants
Convents, Monasteries & Seminaries Race Tracks
Dormitories Restaurants / Fast Food Stores
Exhibition Halls & Display Structures Retail / Wholesale Stores
Fire Sations Schools
Laundries & Cleaning Facilities Serviced Apartments
Libraries Shopping Centers
Malls / Mall Complexes Showrooms / Service Centers
Motels & Apartels Supermarkets / Hyper-markets
Multi-Storey Apartments Welfare Buildings
Nursing Homes Mixed-Use Buildings
3 EXCEPTIONAL 8% Airports / Wet & Dry Ports & Terminals Mental Institutions 8% 7% 6% 5% 4% 3%
Aquariums Mortuaries
Auditoriums Nuclear Facilities
Breweries Observations
Cold Storage Facilities Public Health Centers
Convention Facilities Research Facilities
Gymnasiums Stadia
Hospitals & Medical Buildings Telecommunication Buildings
Hotels Theaters & Similar Facilities
Laboratories / Testing Facilities Transportation Facilities & Systems
Marinas & Resort Complexes Veterinary Hospitals
Medical Arts Offices & Clinics
4 RESIDENTIAL 10% Single-Detached Row-houses or Shop-houses
Single-Attached or Duplex Small Apartment Houses and
Townhouses JEREMIAH 29:11
Exposition & Fair Buildings Museums NEW KING JAMES VERSION (NKJV)
5 MONUMENTAL 12%
11 For I know the thoughts that I think toward you, says
Mausoleums, Memorials & Monuments Specialized Decorative Buildings
the LORD, thoughts of peace and not of evil, to give you a
6 REPETITIVE 100% (1st) Re-used Design & Contract Documents for the similar buildings without amending
the drawings and the specifications future and a hope.
80% (2nd)
60% (3rd)
40% (4th)
● IMHOTEP©2018 ● Page 56 ●
PROFESSIONAL PRACTICE
ARCHITECT’S MINIMUM BASIC FEE (SPP 2010)
GROUP TYPE MBF BUILDINGS 50M 50M 100M 300M 500M 500M
7 HOUSING 100% (1st) Several Residential Buildings on a single site with the use of one (1) set of plans /
60% (2nd-10th) designs, specifications and related documents
30% (11th + )
MATTHEW 7:7-8
8 EXTENSIVE DETAILING 15% Design for built-in components or elements, built-in equipment, special fittings, NEW KING JAMES VERSION (NKJV)
screens, counters, Architectural Interiors, and Development Planning and / or 7 “Ask, and it will be given to you; seek, and you will find;
design
Alterations, renovations, rehabilitations, retrofit and expansion / additions to
knock, and it will be opened to you. 8 For everyone who
9 ALTERATIONS / RENOVATIONS 150%
asks receives, and he who seeks finds, and to him who
existing buildings belonging to Groups 1 to 5
The Architect is engaged to render opinion or give advice, clarifications or knocks it will be opened.
10 CONSULTATION / ARBITRATION PHP 200/hr
for technical explanation on technical matters pertaining to architectural works
matters
PHP 500
as expert witness
● IMHOTEP©2018 ● Page 57 ●
PROFESSIONAL PRACTICE
ARCHITECT’S RECOMMENDED PROFESSIONAL FEE (SPP 2016)
RPF 50M 50M 100M 300M 500M 500M
GROUP TYPE BUILDINGS Php 50M Php 50M to Php 100M Php 200M Php 500M Over Php
DAEDS DADS 100M to 200M to 500M to1B 1B
1 SIMPLE 5% 3% Armories Bakeries Packaging & Processing Plants 5% 4% 3% 2% 1% 0.5%
Habitable Agricultural Structures Parking Structures
Freight Facilities Printing Plants
Hangars Public Markets
Industrial Buildings Manufacturing / Service
Industrial Plants Garages
Simple Loft-Type Buildings
2 MODERATE 6% 3.6% Art Galleries Banks, Office Buildings / Office Condominiums 6% 5% 4% 3% 2% 1%
Exchange Parks, Playgrounds and
Financial Institutions Bowlodromes Open Air Recreational Facilities
Call Centers Residential Condominiums
Churches & Religious Facilities Police Stations
City/Town Halls & Civic Centers Postal Facilities
College Buildings Private Clubs
Convents, Monasteries & Seminaries Publishing
Dormitories Plants Race
Exhibition Halls & Display Structures Fire Tracks
Sations Restaurants / Fast Food Stores
Laundries & Cleaning Facilities Retail / Wholesale Stores
Libraries Schools
Malls / Mall Complexes Serviced Apartments
Motels & Apartels Shopping Centers
Multi-Storey Apartments Showrooms / Service Centers
Nursing Homes Supermarkets / Hyper-markets
Welfare Buildings
3 EXCEPTIONAL 7% 4.2% Airports / Wet & Dry Ports & Terminals Mental Institutions 7% 6% 5% 4% 3% 2%
Aquariums Mortuaries
Auditoriums Nuclear Facilities
Breweries Observations
Cold Storage Facilities Public Health Centers
Convention Facilities Research Facilities
Gymnasiums Stadia
Hospitals & Medical Buildings Hotels Telecommunication Buildings
Laboratories / Testing Facilities Theaters & Similar Facilities
Marinas & Resort Complexes Transportation Facilities & Systems
Medical Arts Offices & Clinics Veterinary Hospitals
● IMHOTEP©2018 ● Page 58 ●
PROFESSIONAL PRACTICE
ARCHITECT’S RECOMMENDED PROFESSIONAL FEE (SPP 2016)
RPF 50M 100M 300M 500M
50M 500M
GROUP TYPE BUILDINGS Php 50M Php 100M Php 200M Php 500M
DAEDS DADS Php 50M Over Php 1B
to 100M to 200M to 500M to1B
7 HOUSING 100% (1st) 100% (1st) Several Residential Buildings on a single site with the use of one (1) set of plans /
50% (2nd-10th) 30% (2nd-10th) designs, specifications and related documents
40% (11th-30th) 24% (11th-30th)
25% (31st-50th) 15% (31st-50th)
15% (51st-) 9% (51st-)
8 EXTENSIVE 15% Design for built-in components or elements, built-in equipment, special fittings, MATTHEW 7:7-8
screens, counters, Architectural Interiors, and Development Planning and / or NEW KING JAMES VERSION (NKJV)
DETAILING
design 7 “Ask, and it will be given to you; seek, and you will find;
9 ALTERATIONS / Alterations, renovations, rehabilitations, retrofit and expansion / additions to
existing buildings belonging to Groups 1 to 5 knock, and it will be opened to you. 8 For everyone who
RENOVATIONS 150%
asks receives, and he who seeks finds, and to him who
The Architect is engaged to render opinion or give advice, clarifications or
knocks it will be opened.
10 CONSULTATION PHP 1000/hr for consultation
(as Technical Adviser) explanation on technical matters pertaining to architectural works
/ ARBITRATION
PHP 5000/appearance for
arbitration (as Expert Witness) witness
PHYSICAL PLANNING FOR BUILDING The Recommended Professional Fee (RPF) is Php 50,000.00 per hectare for the first five (5Has) hectares net to the Architect.
SITES such as INDUSTRIAL ESTATES,
COMMERCIAL, RELIGIOUS,
INSTITUTION & GOVERNMENT
AREA RECOMMENDED PROFESSIONAL FEE (RPF) AMOUNT
Basic rate for the first 5 hectares or less P5.00 per sq. meter P250,000.00
(1 hectare : 10,000 sq.meters)
Over 5 hectares up to 10 hectares P4.00 per sq. meter P250,000.00 + P40,000.00 per hectare in excess of 5 hectares
Over 10 hectares up to 50 hectares P3.00 per sq. meter P450,000.00 + P30,000.00 per hectare in excess of 10 hectares
Over 50 hectares and above P1.50 per sq. meter P1,650,000.00 + P15,000.00 per hectare in excess of 50 hectares
The rate stipulated above is based on the assumption that the land to be developed is moderately flat. However, if the land is rugged with steep terrain the fee shall increase by 20% to
30%.
● IMHOTEP©2018 ● Page 59 ●
PROFESSIONAL PRACTICE
DIFFERENCES BETWEEN
1979 UAP DOC – 2010 SPP – 2016 SPP
1979 UAP DOCUMENTS 2010 STANDARDS OF PROFESSIONAL PRACTICE 2016 STANDARDS OF PROFESSIONAL PRACTICE
DOC # DOCUMENT NAME DOC # DOCUMENT NAME DOC # DOCUMENT NAME
201 Pre‐Design Services 201 Annex “A” 201 Pre‐Design Services
202 Design Services 202 Pre‐Design Services 202 Regular Design Services
203 Specialized and Allied Services 203 Specialized and Allied Services 203 Specialized and Allied Services
204 Construction Services 204‐a Fulltime Supervision Services 204‐a Fulltime Supervision Services
204‐b Construction Management Services 204‐b Construction Management Services
205 Post‐Construction Services 205 Post‐Construction Services 205 Post‐Construction Services
206 Comprehensive Architectural Services 206 Comprehensive Architectural Services 206 Comprehensive Architectural Services
207 Design‐Build Services 207 Design‐Build Services 207 Design‐Build Services
208 Selection of the Architect and Method of Compensation 208 Architectural Design Competition 208 Architectural Design Competition
209 Professional Architectural Consulting Services 209 Professional Architectural Consulting Services
2. Schematic Design Phase 15% of MBF or (15‐5 = 10% of MBF) 15% of MBF or (15% of MBF – 25K) 20% of RPF or (20‐5 = 15% of RPF)
3. Design Development Phase 35% of MBF or (35‐15 = 20% of MBF) 40% of MBF or (40‐15 = 25% of MBF) 40% of RPF or (40‐20 = 20% of RPF)
4. Contract Document Phase 85% of MBF or (85‐35 = 50% of MBF) 90% of MBF or (90‐40 = 50% of MBF) 90% of RPF or (90‐40 = 50% of RPF)
Adjustment of 85% based on the winning bid Adjustment of 90% based on the winning bid Adjustment of 90% based on the winning bid
5. Bidding Phase (within 15 days after the award to the (within 15 days after the award to the (within 15 days after the award to the
winning contractor) winning contractor) winning contractor)
10% Civil Liability 5% Civil Liability 5% Civil Liability
6. Construction Phase
5% Periodic Construction Supervision (PCS) 5% Periodic Construction Supervision (PCS) 5% Periodic Construction Supervision (PCS)
● IMHOTEP©2018 ● Page 60 ●
PROFESSIONAL PRACTICE
2010 SPP DOCUMENTS IRR OF RA 9266 CODE OF ETHICS (UAP DOC 200)
NO. DESCRIPTION CONTENTS A S TITLE
200
The 2006 Code Of Ethical
Conduct (UAP) 1
Title, Policy Statement, Definition of
Terms and Scope of Practice
1-3 3 1 2 General Provisions
SECTIONS
Professional Regulatory Board The Architect’s Responsibility in
201 2 2 7
RULES
Pre-Design Services of Architecture (PRBOA) 4 - 11 8 Relation to the PEOPLE
Organization, Powers and Function
The Architect’s Responsibility in
202 Design Services 3
Examination, Registration and
Licensure
12 - 24 13 3 12
Relation to His / Her CLIENT
208
Architectural Design
Competition (ADC) Without first executing a written CONTRACT/SERVICE AGREEMENT 8 3 Miscellaneous Provisions
● IMHOTEP©2018 ● Page 61 ●
PROFESSIONAL PRACTICE
SPP DOCUMENTS (201 – 209) SPP DOCUMENTS (201 – 209)
DOC DESCRIPTION SCOPE DOC DESCRIPTION SCOPE
Consultation Coordination and Supervision
204B
PRE-DESIGN SERVICES (12) CONSTRUCTION
201 Pre-Feasibility Studies
Feasibility Studies
MANAGEMENT SERVICES (4) Cost and Time Control
Quality Control of Work
Methods of Compensation: Manner of Providing Services Construction Manager (CM)
Architect of Record (AoR) Site Selection Analysis Keeping of Records
MDPE (1.5 – 2.5) Site Utilization and Land-Use Studies
PFPE Consulting Architect for SDP Building & Facilities Administration
205
Architectural Research POST-CONSTRUCTION
LS/FF Architectural Programming SERVICES (2) Building Maintenance
PDHPRE Space Planning Grounds & Landscaping Supervision
MMC Space Management Studies Building Equipment Maintenance
Value Management Business Development and Management
Design Brief Preparation Post-Construction Evaluation
Promotional Services
Pre-Design Services
206
COMPREHENSIVE
REGULAR DESIGN SERVICES Project Definition Phase Regular Design Services (RDS)
202
ARCHITECTURAL SERVICES
(RDS) (6) Schematic Design Phase (5) Specialized Architectural Services
Design Development Phase Construction Services
Methods of Compensation: Contract Document Phase Post-Construction Services
PCC Manner of Providing Services
Bidding or Negotiation Phase
MDPE (1.5 – 2.5) Architect of Record (AoR) Design-Build Services by Administration
207
Construction Phase DESIGN-BUILD SERVICES
PFPE Consulting Architect for SDP Design-Build Services on Guaranteed Maximum Cost
(DBS) (2)
LS/FF
PDHPRE Single Contract / Sub-consultant
MMC Separate Contract Project ADCs for actual Projects proposed for
208
ARCHITECTURAL DESIGN
COMPETITION (ADC) implementation
Architectural Interiors (AI) Services
203
SPECIALIZED Ideas Competition of Competition of Ideas set as a design
ARCHITECTURAL SERVICES Acoustic Design Services planning exercise to elucidate the problem
(23) Architectural Lighting Layout & Design
Site Development Planning (SDP) Services PROFESSIONAL Program / Project Conceptualization & Development
209
Architect of Record (AoR)
Site & Physical Planning Services Technical Advice, Consultation and/or Counseling
Consulting Architect for SDP ARCHITECTURAL
Master Development Panning, Schematic Design
Subdivision Planning Methods of Compensation: CONSULTING SERVICES
Teaching, Lecturing, Coaching, Mentoring
Urban Design Per Diem / Hourly (PACS) Research & Development
Comprehensive Development Planning (CDP) Services Retainer Documentation
Historic & Heritage Conservation and Planning ( Salary Cost x Manner of Providing Services Pre-Investment/Pre-Feasibility and Feasibility Studies
Security Evaluation & Planning Multiplier) + Direct Professional Consulting Architect (PCA) Marketing & Promotional Studies
Building System Design Cost / Reimbursable Land Use and Multi-Sectoral Development Planning,
Facilities Maintenance Support Expenses Development & Management
Building Testing & Commissioning LS/FF Site Selection, Analyses, Evaluation, Ranking &
Building Environment Certification PCC Development
Forensic Architecture Construction
Building Appraisal Project / Construction Management and/or Administration
Structural Conceptualization Post-Construction Evaluation
Preliminary Services Monitoring & Evaluation
Contract Documentation and Review Services Training, Capability Building
Post-Design Services Continuing Professional Education (CPE)
(Including Construction Services) Capital Investment Programming
Dispute Avoidance and Resolution
Architectural Research Methods
Special Building/Facility Planning & Design
Building Components
Management of Architectural Practices
Quality Control
204A
FULL-TIME SUPERVISION
SERVICES Evaluation of Construction Work
Architect of Record (AoR) Preparation of Daily Inspection Reports
Consulting Architect Filing of Documents
Construction Supervision Group (CSG)
● IMHOTEP©2018 ● Page 62 ●
PROFESSIONAL PRACTICE