Resourcing
Projects
Chapter 9
How many resources of each type & skill or knowledge level are needed?
Consider constraints placed upon how people are hired, scheduled, & released
1
4:18 PM
Plan Resource Management – the process of identifying resources and required skills
for a project, defining and assigning roles and responsibilities to all resources,
developing a reporting hierarchy, and communicating expectations.
Identify potential resources
Determine resource availability
Decide timing issues
10
11
2
4:18 PM
costs &
Organizational/administrative unit contractual issues
12
Resource Breakdown structure (RBS)– grouping all resources into main categories in
level one and populating each main category with resources based on either function
or skill level
13
3
4:18 PM
Diversity allows
for more
perspectives
14
15
4
4:18 PM
16
19
5
4:18 PM
RACI – a popular form of RAM that presents roles of key stakeholders and their
roles defined as responsible (R), accountable (A), consult (C), and inform (I) for
project activities in a matrix form
20
21
6
4:18 PM
23
24
7
4:18 PM
Project scheduling software pinpoints when overloads occur for each worker
25
26
8
4:18 PM
Reorder activities
Acquire or borrow additional resources
Reduce project scope or extend project schedule
Inform sponsor of severe overloads
Resource- level the overloaded person’s schedule (BEWARE)
Assign certain activities to other workers
Split an activity into two activities
Perform 1st part as scheduled
Delay 2nd part of activity
27
Resource Leveling
Delay activities so person doesn’t perform as many activities at the same time (most common)
Delay noncritical activities by an amount no more than their slack
Allow project to slip
If non-critical activities must be completed at rate of effort in original schedule, reassign activities to another
worker
Resource leveling is a combination of art & science
Resource Leveling – a project execution technique of adjusting the use of resources based
on availability and the amount of float on activities to accomplish work as soon as
possible, given the limited resource availability.
28
9
4:18 PM
© 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in
whole or in part, except for use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for classroom use.
29
30
10
4:18 PM
32
33
11
4:18 PM
Crashing – speeding up the critical path often by adding additional resources or employing
existing resources for longer hours and/or more days per week
Fast Tracking – a method to expedite a project by executing activities at the same time that
would ordinarily be done one after the other
In agile, crashing is called “swarming,” since team members swarm on a problem to help get back on track
34
Crashing
35
12
4:18 PM
Crashing
The enumeration
method was used to
identify each path and
its duration.
36
Crashing
37
13
4:18 PM
Crashing
After 2 rounds,
both critical paths
are 23 days.
38
Continuing to crash
activities until it is not
worthwhile
39
14
4:18 PM
40
Fast Tracking
42
15
4:18 PM
43
Critical chain method – an alternative scheduling technique that modifies project schedule by
taking resource constraints into account…allows the project team to place buffers on any
project schedule path to account for uncertainty and limited resources
44
16
4:18 PM
46
47
17
4:18 PM
48
Summary
PM needs to look at listed activities & estimate resources needed to perform each.
67
18
4:18 PM
Summary
68