SC7062 11321 11321M Sc7062-Eh0d-Iso-10-11321m-018 00 SP-002

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

S P O O L D R A W I N G

FABRICATION MATERIALS
N
PT.NO SIZE SHORT CODE ITEM CODE DESCRIPTION QTY

1 2" P BAA03-103968 PIPE 2" A312 GR.TP304/304L SMLS BE SCH80S 1.1 M


CRYOGENIC
2 2" E BCB03-218990 90 ELBOW 2" A403 GR.WP304/304L SMLS BW SCH80S 2
CRYOGENIC

"NPD
2

76

76
2
90° 5

11321M-10-DR-60001-002

1088
2"N
PD

<1> 1
76 6

2
76 90°
EL +114230
CUTTING LIST WELDING LIST
CUT PIECE No. PIPE SIZE PIPE LENGTH (mm) WELD NO. SIZE TYPE SHOP/FIELD SCHEDULE

<1> 2" 1088 FW-4 2" BW FIELD SCH80S


5 2" BW SHOP SCH80S
6 2" BW SHOP SCH80S
FW-7 2" BW FIELD SCH80S

LINE No. 10-DR-60001


FLUID CODE DR
PIPING CLASS 1SA04
Contract No. : CW66327
P & ID No. SC7062-ES0D-PID-10-9081
OPER/DESN PRESS.(Kg/Cm^2) 1.62 5.3/-0.5 GENERAL NOTES: RAS LAFFAN PETROCHEMICALS
OPER/DESN TEMP.(deg.C) 30 85/-195 1. ALL DIMENSIONS AND COORDINATES ARE IN MM UNLESS OTHERWISE NOTED. Ras Laffan Petrochemicals Project
TEST PRESS.(Kg/Cm^2) 2. ALL CENTERLINE AND ELEVATION DIMENSIONS ARE TO BE VERIFIED ON SITE.
HYDR / 7.95 RLIC, Qatar
FLUID PHASE L MODULE NOTES:
COMPANY EPC CONTRACTOR
PAINT SPECIFICATION NI-NON 1. FABRICATION ALLOWANCE TO BE CONSIDERED AT PIPE END IN FOLLOWING CASES -
PAR TO PAR, PAR TO SHIP-LOOSE AND PAR TO STICK-BUILT. (SIMLARLY IN PAU CASES)
STRESS RELIEVING(PWHT) - - - ISSUED FOR
0 15-NOV-2023 S.S.OH J.T.HAN
CONSTRUCTION
STRESS ANALYSIS NO REFERENCES:

N D E (%) 100
1. 1050-PIDPS-000001_Piping Support Drawings (Standard) REV DATE PREPD CHKD DESCRIPTION
INSULATION FIELD Sh't
NI
WELD
SOCKET SCREWED TRACED INSULATED SUPPORT ISO. DWG No. SC7062-EH0D-ISO-10-11321M-018 No.
1/1 Rev. 0 LINE No.
WELD WELD JOINT PIPE PIPE MARK
SPOOL
DWG No. SC7062-EH0D-ISO-10-11321M-018__0__SP-002 Sh't
No.
1 /1 Rev. 0 10-DR-60001
BOOK No. 11321M AREA No. 11321 WBS No. ISO. DWG. RUN DATE : 2023-11-20 18:53:26 SPOOL. DWG. RUN DATE : 2023-11-20 18:53:26

You might also like