MBTC is one of the pioneers in the pipeline construction & contracting in the Eastern Province of Saudi Arabia. The
company was established way back in 1976 as a 100% Saudi Owned Company.
MBTC is successfully achieving its goal of being always the best among the bests and known for its never‐fail‐attitude
irrespective of the nature of challenges. On innumerable occasions, we have successfully challenged the challenges
and have always exceeded the expectations of prestigious clients, like Saudi Aramco, Royal Commission, Sabic, SWCC,
Saudi Electricity Company & Marafiq etc. This has been made possible with hand picked managers who demonstrate only
the best in quality, efficiency, safety and known for their integrity when it comes to their promises.
Our management system, along with our safe, hardworking employees and excellent equipment and tools will ensure
that our goal will continue to be achieved. Our personnel are always with positive attitudes, due to our pro employee
policies along with our proven past records of always finishing projects ahead of schedule and our impec cable reputation as
the best pay masters in the market make our company second to none. It's our desire to serve you best and gives you the
good quality of work & services at all times.
The infinite wisdom we have learned through the years is to always respect, encourage and coach the employees. It has
proven to be the winning formula for thousands of years ago and will be for many, many years to come.
Our mission is to always fulfill the aspirations of our clients, employees, suppliers, subcontractors and professional
associates.
Mohammed Bargash
President
Corporate Profile
MBTC was established in the year 1976 in Eastern Province of Saudi Arabia as a 100% Saudi Owned
Company.
A leader in the truest sense in the pipeline industry. A company that has been sailing successfully on
all weather for more than 40 years with continuous operation.
We look to the future with great enthusiasm because we've learned so much from the past.
We employ a multi‐national, multi‐discipline work force of more than 1500 employees which
includes Managers, Engineers, Professionals, Supervisors, Foreman and various craftsmen. The
company is having a strong equipment base to execute awarded projects with ease, it contains resource
that ranges from small tools to heavy construction equipment. We have a right combination of manpower
resources that can take up any given challenges with ease.
“Our future corporate office is
We employ, train and develop Saudi Nationals. We are proud to say that we fulfill Saudization
under construction at Khobar” requirements as per decision 50 of Council of Ministers at all times.
It is our intent to maintain the highest level of professionalism, integrity, honesty and fairness in our
relationship with our clients, employees, suppliers, subcon tractor and professional associates.
Consistently improving the quality of our products and services, continuing to add value for our
clients and employees through innovation, foresight and integrity.
Design, supply, install, testing & commission of all kinds of water,
Fuel gas & oil pipes such as CS, SS, HDPE, GRP, GRV, RTR, RTP, etc. As
per ASTM , ANSI & API standard and suitable for different levels of
pressure & temperature with applying RT, UT, MT, PT and the required
testing and commissioning including hydro test .
Moreover in the last 5 years MBTC has completed more than 1000
kms of different size of pipes up to 60"without any failure and
successfully completed ahead oftime in almost all the executed
projects.
Appreciated & Congratulated by ROYAL COMMISION for securing first place among Top 10 Quality club &
Contractors Performance on 2nd, 3rd & 4th Quarter of 2013 from the total of 74 Construction contractors of
ROYAL COMMISSION.
PP 12 project was given to Barghash by SEC with the challenging schedule and we achieved the milestone
date. Based on the achievement SEC awarded PP 13 Gas Pipeline Power Plant Projects in Riyadh.
We successfully completed Saudi Aramco project for Shedgum Gas gathering manifold shutdown in a
limited time frame.
We successfully completed Saudi Aramco project at Shybah GOSP 2 & 3 trunk lines size of 20” & 16” and
rerouting / manifold replacement work in an emergency basis.
We successfully completed Saudi Aramco project at Nayyum Manifold # 4 with 17 Nozzles of size 20” to 8”
within 3 days.
THE APPRECIATION LETTER
FROM ARAMCO PROJECT
MANAGER SHOWS OUR
CAPABILITY TO EXECUTE
MAINTAIN POTENTIAL
PROJECTS ON FAST TRACK.
BARGHASH STRENGTH IN KINGDOM
Adobe Acrobat
Document
BARGHASH MAINTAIN POTENTIAL PROJECT STRENGTH
Maintain Potential Experience Reputed name in the Field of Maintain Potential Works
Track Record Carried over more than 300 well head projects from Aramco
The company places its first focus on Quality & Safety and has
Quality & Safety Records received lots of accreditation from Aramco
Average of 30 Wellhead works completed per year during past
Business Performance
10 years along with other pipeline projects.
The company has been continuously upgrading its fleet of
Asset Base
construction equipment.
Barghash has main Equipment maintenance, storage facilities
Centralized Fabrication Yard Facilities and Fabrication yards with Camp Accommodation at Abqaiq &
Salasil with total area of 300,000 sq. meters
BARGHASH MAINTAIN POTENTIAL PROJECTS
Well Head works & Tie in Flow line & Trunk Header & Pipeline
YEAR Remarks
Tie in works (No's) Line Replacement works
2014 38
Average of 180 KMS Completed
2015 40 Average of 60 KMS
completed per year
10 completed per year during
during past 3 Years In Progress
2016 past 3 Years
55 Target for 2016 to complete
Haradh
Hawiyah
Area ‐ 2 &
Harmaliyah.
Hawiyah A
Area ‐ 3 & Udhaliyah
Uthmaniyah.
Howtha
Area ‐ 4 & Howtha
Nayyum.
Shaybah Shaybah
Area ‐ 5
For our Upcoming Maintain Potential Projects, we will utilize the existing facilities for the
respective areas mentioned above.
BARGHASH PROJECTS ‐ CAMP FACILITIES
The below tabulation shows the
existing camp facilities for
BARGHASH projects in all over
KSA.
Camp Facilities Project
Location
Abqaiq Maintain Potential
Hawaiya Projects.
Utmaniya
Shaybah
Hawtah
• We are the only the maintain potential contractor who own internal
coating plant which give edge over other contractor to coat internal
girth weld coating for pipe spools without loss of time.
BARGHASH COATING PLANT
We are rated one of the best Maintenance
Contractor from Aramco & SWCC with over 40
Years of experience and we executed many of
the reconditioning works in all over KSA.
• Mechanical equipments
• Pipeline Maintenance
• Water & Fuel storage Tanks
• Cooling Towers
• Water/Oil /Gas Well Head Facilities Etc...
Civil & Earth Moving
2500
2000
1500
1000
500
0
2013-2014 2015-2016 2017-2018
OUR CLIENTS
BARGHASH PROJECTS APPRECIATION LETTER LIST SUMMARY
SUMMARY OF APPRECIATION LETTER AND BARGHASH ACHIEVEMENT IN THEIR TRACK RECORD
S. NO CLIENT WORK DESCRIPTION APPRECIATION / REMARKS
Achieving Top 10 Quality Club of Contractor’s
1 Royal Commission, K.S.A – (Jubail Division) Expansion of fuel & feedstock pipeline, stage 2, Jubail 2 performance 2nd, 3rd & 4th Quarter 2013
SEC (Northern Area Projects Department PP‐12 Sales Gas Fuel Delivery System 4Kms Gas Pipeline Appreciation for Completing 28" Fuel gas pipe
2 Third Party Projects Division) Project at Durma ‐ Riyadh line and Temporary Metering Skid By‐pass
facility for PP‐12 SEC Power Plant.
Saudi Aramco, (East west pipeline East west Pipeline Work, Area I Appreciation for completing overdue
3
department) worksheets in a record time
Saudi Aramco, (East west pipeline East west Pipeline Work, Area I, Area 2, Area 3 and Area 4 Appreciation for the work completion
4
department)
Saudi Aramco, (PPD / Oil & Gas Upstream Oil Well 551 flow line to Aosp‐3. Appreciation for the excellent work and ahead
5
Projects Division) of schedule
Saudi Aramco, (PPD / Oil & Gas Upstream Tie in 8” UTMN – 1625 Flow line to UTMN – Gosp 8. Appreciation for the excellent work and ahead
6
Projects Division) of schedule
Saudi Aramco, (PPD / Oil & Gas Upstream Oil Well Tie ins (ANDR‐551, SDGM‐494, UTMN‐1625, Appreciation for the Outstanding tie in
7
Projects Division) SDGM‐504, ANDR‐546 & SDGM‐514) Performance.
Saudi Aramco, (PPD / Oil & Gas Upstream Oil Well Tie ins (SDGM‐530, 525, 507 Flow line to SDGM‐ Appreciation for the excellent work.
8
Projects Division) Gosp ‐ 5)
Saudi Aramco, (PPD / Oil & Gas Upstream 107 Gas Well Tie ins and Manifold Expansion Appreciation for the excellent work.
9
Projects Division)
Saudi Aramco, (PPD / Oil & Gas Upstream Gas well works Outstanding safety achievements.
10
Projects Division)
Saudi Aramco, (PPD / Oil & Gas Upstream Gas well and tie in works Appreciation for the excellent work, record
11
Projects Division) time and ahead of schedule
Saudi Aramco, East West Pipeline 48” Pipeline works Appreciation for the excellent work.
12
department
Saudi Aramco, East West Pipeline East west Pipeline Work, Area I. Reconditioning of Pipeline Appreciation for completing job in minimum
13
department at 9 different location duration
Saudi Aramco, (PPD / Oil & Gas Upstream Construction of 16 NYYM Water Injection Wells for New Appreciation for the excellent work.
14 Projects Division) NYYM ‐ GOSP
BARGHASH PROJECTS APPRECIATION LETTER LIST SUMMARY
Saudi Aramco, (PPD / Oil & Gas Upstream Construction of 16 NYYM 12 Oil Wells Appreciation for the excellent work.
15 Projects Division) Flow Line, Manifold and Three T/L's to New
NYYM ‐ GOSP
Saudi Aramco & Manifa Project RTR Pipeline Projects Appreciation for the excellent work.
16 Department
QURAYYAH & GHAWAR Pipeline Unit Reconditioning Job at QUU‐3 60" Pipeline Appreciation for the excellent work.
17
Saline Water Conversion Corporation Appreciation for an Outstanding job RWTS‐60" Appreciation for the excellent work.
18 Water Line A and B
Saline Water Conversion Corporation Rehabilitation of 5345 Girth Welding joints Appreciation for the excellent work.
19 water line A and B
Saline Water Conversion Corporation Repair the feed cooling water line of Ph 2 (A) Appreciation for completing job in minimum duration
20
Saline Water Conversion Corporation Reconditioning of 12 KM 60" Water Line A and Appreciation for the excellent work
21 B
Saline Water Conversion Corporation In‐Plant Booster Line 56" Dia Appreciation for the excellent work
22
Saline Water Conversion Corporation Reconditioning of Sea water Line Header" Dia Appreciation for completing job in minimum duration
23 PCCP Pipes Inside SWCC Plant
Saudi Aramco, East West Pipeline East west Pipeline Work, PS‐1,PS‐2,PS‐3 & ASL Appreciation for completing job in minimum duration
24 department
Saudi Aramco, South Ghawar Producing Southern Area Flowlines Maintenance & Completion of all Flowl ines Modification
25 Department Fabrication Division
Saudi Aramco, South Ghawar Producing Southern Area Flowlines Maintenance & Appreciation for completing the modification works in
26 Department Fabrication Division safe, high quality & Efficiency Manner.
Certificates
Appreciation Letters
Appreciation Letters
ROYAL COMMISSION GAS PIPELINE PROJECT APPRECIATION LETTERS