Professional Documents
Culture Documents
Mine Plan Reff
Mine Plan Reff
PTI
CONT
DATABASE Bucket Cap (m3) Vessel Cap (m3) Civil Factor Owner Cos
PC 200 1 35
PC 300 1.4
EXCAVATOR
PC 400 2 65.34
PC 800 4.3 80.83
PC 1200 6.5
PC1900 9.2 152.03
TRUCK 20 T 14 4% 25
TRUCK 30 T 21 4% 52.78
TRUCK
D7 4.99 66.44
D8 5.26 62.14
D10 18.5 86.61
CAT 12H 48
COMPACTOR GRADER
STRIPPING-TOP OB
Equipment
ROM density t/m3
Swell Factor
ROM loose density t/m3
Spotting Time (haul truck) Minutes
Waiting truck (load equipment)-LEFT, Deadload capacity-RIGHT
Dumping Time Minutes
Equipment specification m3
ROM fill factor
ROM Cycle Per Pass Minutes
ROM number of pass
ROM loading time
ROM loaded on truck WMT
ROM loading equipment productivity
MINING
Equipment
ROM density t/m3
Swell Factor
ROM loose density t/m3
Spotting Time (haul truck) Minutes
Waiting truck (load equipment)-LEFT, Deadload capacity-RIGHT
Dumping Time Minutes
Equipment specification m3
ROM fill factor
ROM Cycle Per Pass Minutes
ROM number of pass
ROM loading time
ROM loaded on truck WMT
ROM loading equipment productivity
CIVIL
Equipment
Quarry density t/m3
Swell Factor
Quarry loose density t/m3
Spotting Time (haul truck) Minutes
Waiting truck (load equipment)
Dumping Time Minutes
Equipment specification m3
Quarry fill factor
Quarry cycle per Pass Quarry Minutes
Quarry number of pass
Quarry loading time
Quarry loaded on truck WMT
Quarry loading equipment productivity
ROM HAULING TO PETEA STOCK PILE
Equipment
Quarry density t/m3
Swell Factor
Quarry loose density t/m3
Spotting Time (haul truck) Minutes
Waiting truck (load equipment)-LEFT, Deadload capacity-RIGHT
Dumping Time Minutes
Equipment specification m3
Quarry fill factor
Quarry cycle per Pass Quarry Minutes
Quarry number of pass
Quarry loading time
Quarry loaded on truck WMT
Quarry loading equipment productivity
Dozer
Type
Faktor blade
Faktor efisiensi alat
Kec maju km/jam
Kec mundur km/jam
Jarak gusur m
Kapasitas blade m3
Waktu siklus maju menit
Waktu siklus mundur menit
Waktu siklus lain-lain menit
Total waktu siklus menit
Density
Prod/jam ton/jam
Prod/day ton/day
Water Truck
Kapasitas tanki m3
Kebutuhan air/m2 m3/m2
Spread width m
Kec rata-rata penyiraman km/jam
Vol air per meter run m3/m run
Waktu penyirman per m run menit
Waktu siklus penyiraman menit
Jarak penyiraman km
Jarak menuju pengisian km
Jarak menuju lokasi penyiraman km
Kec rata-rata menuju pengisian km/jam
Kec rata-rata menuju penyiraman km/jam
Waktu siklus menuju pengisian menit
Waktu siklus menuju penyiraman menit
Waktu siklus pengisian air menit
Total waktu siklus menit
Prod penyiraman/day km
STRIPPING-TOP OB STRIPPING-BALAST
PC 800 TRUCK 100 T PC 800 TRUCK 100 T
1.74 1.74 2.00 2.00
20.00% 20.00% 20.00% 20.00%
1.45 1.45 1.67 1.67
0.40 0.40
1.00 8.19 1.00 -
0.50 0.50
4.30 52.01 4.30 60.20
95.00% 95% 85.00% 85%
0.55 0.65
13.00 13.00 14.00 14.00
7.15 9.10
77.00 85.28
566.89 506.63
ROM LGO
PC 800 TRUCK 100 T PC 800 TRUCK 100 T
1.60 1.60 1.60 1.60
20.00% 20.00% 20.00% 20.00%
1.33 1.33 1.33 1.33
0.40 0.40
1.00 4.58 1.00 4.58
0.50 0.50
4.30 55.62 4.30 55.62
90.00% 95% 90.00% 95%
0.60 0.60
14.00 14.00 14.00 14.00
8.40 8.40
72.24 72.24
461.11 461.11
CIVIL @ STRIPPING CIVIL @ MINING
PC 800 TRUCK 100 T PC 800 TRUCK 100 T
2.00 2.00 2.00 2.00
20.00% 20.00% 20.00% 20.00%
1.67 1.67 1.67 1.67
0.40 0.40
1.00 1.00
0.50 0.50
4.30 60.20 4.30 60.20
85.00% 85% 85.00% 85%
0.65 0.65
14.00 14.00 14.00 14.00
9.10 9.10
85.28 85.28
506.63 506.63
ROM HAULING HAUL ROAD MAINTENANCE ROM HAUL FR PETEA PILE TO SCR #10
PC 800 TRUCK 100 T PC 800 TRUCK 100 T LOADER 992 TRUCK 100 T
1.33 1.33 2.00 2.00 1.33 1.33
0.00% 0.00% 20.00% 20.00% 0.00% 0.00%
1.33 1.33 1.67 1.67 1.33 1.33
0.40 0.40 0.40
1.00 4.58 1.00 1.00 4.58
0.50 0.50 0.50
4.30 55.62 4.30 60.20 10.00 55.62
90.00% 90% 90.00% 80% 90.00% 90%
0.60 0.60 0.50
13.00 13.00 13.00 13.00 6.00 6.00
7.80 7.80 3.00
67.08 83.85 72.00
457.36 571.70 1,080.00
-
-
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
0.10
0.55
0.71
1.07
1.19
1.31
1.41
1.50
1.60
1.69
1.78
1.87
1.95
2.03
2.11
2.20
2.28
2.36
2.45
2.53
2.61
2.70
2.79
2.88
2.96
3.08
3.19
3.34
3.47
3.56
3.70
3.80
3.92
4.05
4.16
Average Speed(Km/h)
4.30
Average Speed(Km/h)
DISTANCE KM
4.49
DISTANCE KM
4.63
4.73
4.90
TRUCK SPEED vs DISTANCE
TRUCK SPEED vs DISTANCE
5.12
5.43
5.72
5.96
6.28
7.02
7.49
7.93
8.43
8.93
9.72
.90
E
.12
.43
.72
.96
.28
.02
.49
.93
.43
.93
.72
.65
.45
.56
.66
.65
.50
.64
.63
.19
.79
.89
.49
.39
.35
.34
.46
4.90
E
5.12
E
5.43
5.72
5.96
6.28
7.02
7.49
7.93
8.43
8.93
9.72
10.65
12.45
14.56
18.66
41.65
46.50
48.64
49.63
50.19
51.79
54.89
58.49
59.39
61.35
63.34
72.46
MINE SCHEDULING YEAR
XXXX XXXX XXXX
MATERIAL MOVEMENT Haul Truck
OB wmt TRUCK 100 T 6,038,604 6,128,173 5,433,481
WASTE wmt TRUCK 100 T
Low Grade wmt TRUCK 100 T 0 0 0
ROM wmt TRUCK 100 T 2,940,431 2,984,045 2,645,773
CIVIL @ Striping wmt 845,405 857,944 760,687
CIVIL @ Mining wmt 411,660 417,766 370,408
BALLAST wmt 475,889 482,948 428,200
SSP wmt 2,256,225 2,289,691 2,030,131
DKP dmt 1,461,052 1,482,724 1,314,642
DISTANCE
OB km 1.40 1.40 1.40
Low Grade km - - -
ROM Face to Rompile km 3.97 3.97 3.97
SSP to WOS 1 km 16.68 16.68 16.68
CIVIL km 4.22 4.22 4.22
SSP to WOS 2 km - - -
ROMPILE to SCR km 0 0 0
EXPOSE AREA Ha 50.00 50.00 50.00
CHEMISTRY
Ni % 1.76 1.76 1.76
Fe % 16.93 16.93 16.93
SiO2 % 33.86 33.86 33.86
MgO % 20.09 20.09 20.09
SM % 1.69 1.69 1.69
SSP Recovery % 76.73% 76.73% 76.73%
DKP Recovery % 49.69% 49.69% 49.69%
Plant Recovery % 89.32% 89.32% 89.32%
Nickel production M Lbs 50.75 51.51 45.67
6,193,639
0
3,015,923
867,109
422,229
488,107
2,314,151
1,498,563
1.40
-
3.97
16.68
4.22
-
0
50.00
1.76
16.93
33.86
20.09
1.69
76.73%
49.69%
89.32%
52.06
9,209,562
2.24
EQUIPMENT REQUIREMENT
XXXX XXXX XXXX
MINING EQUIPMENT
LOADING 352
OB+waste Production/day wmt/day 8,888 8,888 8,888
Eq-Running units 1.93 1.96 1.74
Eq-On site units 3 3 3
BALAST Production/day wmt/day 7,943 7,943 7,943
Eq-Running units 0.17 0.17 0.15
Eq-On site units 1 1 1
LGO Production/day wmt/day 7,229 7,229 7,229
Eq-Running units - - -
Eq-On site units 0 0 0
ROM Production/day wmt/day 7,229 7,229 7,229
Eq-Running units 1.16 1.17 1.04
Eq-On site units 2 2 2
CIVIL @ STRIPING Production/day wmt/day 7,943 7,943 7,943
Eq-Running units 0.30 0.31 0.27
Eq-On site units 1 1 1
CIVIL @MINING Production/day wmt/day 7,943 7,943 7,943
Eq-Running units 0.15 0.15 0.13
Eq-On site units 1 1 1
HAULING
OB+waste Truck speed km/hr 8.40 8.40 8.40
Travel time minutes 20.00 20.00 20.00
Cycle time minutes 28.05 28.05 28.05
Loaded on truck wmt 77.00 77.00 77.00
Production/day wmt/day 2,582.33 2,582.33 2,582.33
Eq-Running units 6.64 6.74 5.98
Eq-On site units 9 9 8
BALAST Truck speed km/hr 8.40 8.40 8.40
Travel time minutes 20.00 20.00 20.00
Cycle time minutes 30.00 30.00 30.00
Loaded on truck wmt 85.28 85.28 85.28
Production/day wmt/day 2,674.14 2,674.14 2,674.14
Eq-Running units 0.51 0.51 0.45
Eq-On site units 1 1 1
LGO Truck speed km/hr - - -
Travel time minutes - - -
Cycle time minutes 9.30 9.30 9.30
Loaded on truck wmt 72.24 72.24 72.24
Production/day wmt/day 7,306.96 7,306.96 7,306.96
Eq-Running units - - -
Eq-On site units 0 0 0
ROM Truck speed km/hr 20.95 20.95 20.95
Travel time minutes 22.74 22.74 22.74
Cycle time minutes 32.04 32.04 32.04
Loaded on truck wmt 72.24 72.24 72.24
Production/day wmt/day 2,120.74 2,120.74 2,120.74
Eq-Running units 3.94 4.00 3.54
Eq-On site units 6 6 5
CIVIL @ STRIPING Truck speed km/hr 22.13 22.13 22.13
Travel time minutes 22.89 22.89 22.89
Cycle time minutes 32.89 32.89 32.89
Loaded on truck wmt 85.28 85.28 85.28
Production/day wmt/day 2,439.54 2,439.54 2,439.54
Eq-Running units 0.98 1.00 0.89
Eq-On site units 2 2 2
CIVIL @ MINING Truck speed km/hr 22.13 22.13 22.13
Travel time minutes 22.89 22.89 22.89
Cycle time minutes 32.89 32.89 32.89
Loaded on truck wmt 85.28 85.28 85.28
Production/day wmt/day 2,439.54 2,439.54 2,439.54
Eq-Running units 0.48 0.49 0.43
Eq-On site units 1 1 1
DOZER
OB+waste Eq-Running units 0.91 0.92 0.82
Eq-On site units 2 2 2
BALAST Eq-Running units 0.21 0.21 0.19
Eq-On site units 1 1 1
Disposal Eq-Running units 2.21 2.25 1.99
Eq-On site units 3 3 3
LGO Eq-Running units - - -
Eq-On site units 0 0 0
ROM Eq-Running units 0.16 0.16 0.14
Eq-On site units 1 1 1
CIVIL @ STRIPING Eq-Running units 0.37 0.38 0.33
Eq-On site units 1 1 1
CIVIL @ MINING Eq-Running units 0.18 0.18 0.16
Eq-On site units 1 1 1
ROAD MAINT Eq-Running units 0.55 0.56 0.49
Eq-On site units 1 1 1
ROAD MAINT
Road Length to maintain km 6.50 6.50 6.50
GRADER Eq-Running units 0.37 0.37 0.37
Eq-On site units 1 1 1
COMPACTOR Eq-Running units 0.46 0.46 0.46
Eq-On site units 1 1 1
WATER TRUCK Eq-Running units 0.72 0.72 0.72
Eq-On site units 1 1 1
8,888
1.98
3
7,943
0.17
1
7,229
-
0
7,229
1.19
2
7,943
0.31
1
7,943
0.15
1
8.40
20.00
28.05
77.00
2,582.33
6.81
9
8.40
20.00
30.00
85.28
2,674.14
0.52
1
-
-
9.30
72.24
7,306.96
-
0
20.95
22.74
32.04
72.24
2,120.74
4.04
6
22.13
22.89
32.89
85.28
2,439.54
1.01
2
22.13
22.89
32.89
85.28
2,439.54
0.49
1
0.93
2
0.21
1
2.27
3
-
0
0.16
1
0.38
1
0.18
1
0.56
1
6.50
0.37
1
0.46
1
0.72
1
7,171
0.92
2
32.90
60.84
69.54
67.08
907.46
7.24
10
115,800
10
8,963
0.04
1
31.50
38.10
46.80
83.85
1,685.56
0.20
1
0.34
1
0.46
1
0.28
1
16,932
-
0
-
-
3.90
72.00
17,366.40
-
0
EQUIPMENT HOURS
Year XX
MINING EQUIPMENT HOURS
LOADING 352
OB+waste hours 11,835.78
BALAST hours 1,043.68
LGO hours -
ROM hours 7,085.45
CIVIL @ STRIPING hours 1,854.08
CIVIL @ MINING hours 902.82
HAULING
OB+waste hours 40,735.43
BALAST hours 3,100.05
LGO hours -
ROM hours 24,153.09
CIVIL @ STRIPING hours 6,036.78
CIVIL @ MINING hours 2,939.54
DOZER
OB+waste hours 5,582.11
BALAST hours 1,275.75
DISPOSAL hours 13,568.60
LGO hours -
ROM hours 985.33
CIVIL @ STRIPING hours 2,266.33
CIVIL @ MINING hours 1,103.57
ROAD MAINT hours 3,369.90
ROAD MAINTENANCE
GRADER hours 2,259.06
COMPACTOR hours 2,823.82
WATER TRUCK hours 4,422.11
EQUIPMENT PARAMETER
Parameter
Phisical Availability
Use Of Availability
Job Efficiency
QUARRY-CIVIL on face & disposal
Equipment
Quarry density
Equipment Parameter and Equipment Production parameter
Swell Factor
Quarry loose density
Spotting Time (haul truck)
Waiting truck (load equipment)
Dumping Time
Equipment specification
Quarry fill factor
Quarry cycle per Pass Quarry
Quarry number of pass
Quarry loading time
Quarry loaded on truck
Quarry loading equipment productivity
Crusher
CRUSHER
Cost/hrs
Producitivity/jam
Prod /day
Equip-running
Equip-hours
Wheel Loader
Jarak Load-Carry
Bucket fill factor
rameter
Kec Maju
Kec Mundur
Load time
Turning time
Dumping time
Waktu siklus
Loader capacity
Prod
Prod
8H
8H623
8H612
8H613
8H152
8H161
8H523
10H612
10H161
10H152
10H522
12H442
10H
12H
16H
24H
Alt. 1H
Alt. 2H
0
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Plan of Materiak Movement
Mining-Road Maintenance
Stripping Stripping
Mining Mining
Off spec ROM mining Off spec ROM mining
Truck 20t
Units Backhoe 1 m3 (Combination w/
1CuM B/hoe)
% 95.00 95
% 91.23 91
% 85.00 85
PC 200 TRUCK 20 T
t/m3 2.00 2.00
20.00% 20.00%
t/m3 1.67 1.67
Minutes 0.40
1.00
Minutes 0.50
m3 1.00 14.00
85.00% 85%
Minutes 0.85
14.00 14.00
11.90
WMT 19.83
92.25
$ 288.299
ton/jam 250
ton/day 1737
LOADER 988
m 50
90.00%
km/jam 11
km/jam 13
0.25
0.08
0.08
1.43
m3 5.5
ton/hrs 347.35
ton/day 2,413.42
9315314 465765.7
8716608 435830.4
297813 14890.65
Year
Unit of Measurement
XXXX
wmt 129,837
wmt 112,901
Km 5.00
Ha 4.5
Units 5.00
Units 3.96
Minutes 0.40
Minutes 0.50
Times 14.00
Km/h 24.00
Minutes 25.00
Minutes 11.90
Minutes 37.80
Ton 19.83
tpd 218.73
Units 2.00
Units 1.35
tph 640.94
Year
Measurement XXXX
- 5
- 3.96
Units 5
Units 3.96
- 2.00
- 1.35
Units 2
Units 1.35
1.00
0.14
1.00
Units 0.11
1.00
Units 0.14
1.00
Units 0.24
1.00
0.31
1.00
0.43
Year
Measurement XXXX
Hours 4,582.47
Hours 4,582.47
Hours 1,563.86
Hours 1,563.86
Hours 162.60
Hours 123.10
Hours 164.14
Hours 283.14
Hours 361.15
Hours 501.78
Year
Measurement XXXX
$ 114,562
$ 114,562
$ 54,735
$ 54,735
$ 10,803
$ 5,909
$ 5,745
$ 7,078
$ 43,338
$ -
$ 74,007
6,087
$ 322,263.24
$/ton 2.85
Dozer Quarry
Type D7
Faktor blade 0.90
Faktor efisiensi alat 0.83
Kec maju km/jam 3
Kec mundur km/jam 5
Jarak gusur m 20
Kapasitas blade m3 4.99
Waktu siklus maju menit 0.4
Waktu siklus mundurmenit 0.24
Waktu siklus lain-lai menit 0.15
Total waktu siklus menit 0.79
Density 1.67
Prod/jam ton/jam 393.20
Prod/day ton/day 6,164.58
29% 0.65
51% 1.13
6% 0.12
1% 0.03
13% 0.28
XXXX XXXX XXXX 0 0 0 0 0
67,630 67,630 67,630 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
0 0 0 0 0 0 0
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
FINAL OPERATING COST ESTIMATION Year
XXXX
EQUIPMENT RELATED COST US $ millions 17.39
NON-EQUIP RELATED COST US $ millions 9.83
COST ANALYSIS
TOTAL OPT COST $/DKP $/dmt DKP 18.63
TOTAL OPT COST $/DKP-exclude ore haul $/dmt DKP 14.82
TOTAL OPT COST $/Lbs Ni $/Lbs 0.54
TOTAL OPT COST $/Lbs Ni-exclude ore haul $/Lbs 0.43
TOTAL OPT COST $/wmt ROM $/wmt ROM 9.26
TOTAL OPT COST $/wmt ROM-exclude ore haul $/wmt ROM 7.36
TOTAL OPT COST $/wmt OB+LGO+ROM $/wmt 3.03
TOTAL OPT COST $/wmt OB+LGO+ROM-exclude $/wmt 2.41
TOTA
Cost $/Lbs Ni
TOTAL OPT COST $/DKP TOTAL OPT COST $/DKP-exclude ore haul
Cost $/DKP
0.60
20.00
18.00 0.50
16.00
14.00 0.40
12.00
10.00 0.30
8.00
0.20
6.00
4.00 0.10
2.00
- -
X
XX X
XX XX
Years
OPT COST $/Lbs Ni
TOTAL OPT COST $/Lbs Ni TOTAL OPT COST $/Lbs Ni-exclude ore haul
Cost $/Lbs Ni
0.60
0.50
0.40
0.30
0.20
0.10
X X
XX
Years
EQUIPMENT REPLACEMENT - CAPITAL
Loading BALAST 0 1 2
Equipment requirement - Onsite PC 800 - 1.00 1.00
Equipment requirement - Running PC 800 - 0.17 0.17
Equipment Hours Hours - 1,043.68 #REF!
Average operating hours per equipment 1,043.68 #REF!
Cummulative operating hours per equipment - 1,043.68 #REF!
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment 1 - -
Capitalize Initial/Additional equipment 1.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 1.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
LOADING LGO 0 1 2
Equipment requirement - Onsite PC 800 - - -
Equipment requirement - Running PC 800 - - -
Equipment Hours Hours - - #REF!
Average operating hours per equipment
Cummulative operating hours per equipment - - -
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment - - -
Capitalize Initial/Additional equipment - - -
Replacement - - -
Total Equipment requirement - - -
Capitalize Equipment plan - - -
Capital Requirement (US $) - - -
LOADING ROM 0 1 2
Equipment requirement - Onsite PC 800 - 2.00 2.00
Equipment requirement - Running PC 800 - 1.16 1.17
Equipment Hours Hours - 7,085.45 #REF!
Average operating hours per equipment 3,542.72 #REF!
Cummulative operating hours per equipment - 3,542.72 #REF!
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment 2 - -
Capitalize Initial/Additional equipment 2.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 2.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
HAULING OB 0 1 2
Equipment requirement - Onsite TRUCK 100 T - 9.00 9.00
Equipment requirement - Running TRUCK 100 T - 6.64 6.74
Equipment Hours Hours - 40,735.43 #REF!
Average operating hours per equipment 4,526.16 #REF!
Cummulative operating hours per equipment - 4,526.16 #REF!
Equipment Lifetime 25,000 25,000 25,000
Initial/Additional Equipment 9 - (1)
Capitalize Initial/Additional equipment 9.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 9.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
HAULING BALAST 0 1 2
Equipment requirement - Onsite TRUCK 100 T - 1.00 1.00
Equipment requirement - Running TRUCK 100 T - 0.51 0.51
Equipment Hours Hours - 3,100.05 #REF!
Average operating hours per equipment 3,100.05 #REF!
Cummulative operating hours per equipment - 3,100.05 #REF!
Equipment Lifetime 25,000 25,000 25,000
Initial/Additional Equipment 1 - -
Capitalize Initial/Additional equipment 1.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 1.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
HAULING LGO 0 1 2
Equipment requirement - Onsite TRUCK 100 T - - -
Equipment requirement - Running TRUCK 100 T - - -
Equipment Hours Hours - - #REF!
Average operating hours per equipment
Cummulative operating hours per equipment - - -
Equipment Lifetime 25,000 25,000 25,000
Initial/Additional Equipment - - -
Capitalize Initial/Additional equipment - - -
Replacement - - -
Total Equipment requirement - - -
Capitalize Equipment plan - - -
Capital Requirement (US $) - - -
HAULING ROM 0 1 2
Equipment requirement - Onsite TRUCK 100 T - 6.00 6.00
Equipment requirement - Running TRUCK 100 T - 3.94 4.00
Equipment Hours Hours - 24,153.09 #REF!
Average operating hours per equipment 4,025.51 #REF!
Cummulative operating hours per equipment - 4,025.51 #REF!
Equipment Lifetime 25,000 25,000 25,000
Initial/Additional Equipment 6 - (1)
Capitalize Initial/Additional equipment 6.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 6.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
DOZER OB 0 1 2
Equipment requirement - Onsite D8 - 2.00 2.00
Equipment requirement - Running D8 - 0.91 0.92
Equipment Hours Hours - 5,582.11 #REF!
Average operating hours per equipment 2,791.05 #REF!
Cummulative operating hours per equipment - 2,791.05 #REF!
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment 2 - -
Capitalize Initial/Additional equipment 2.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 2.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
DOZER BALAST 0 1 2
Equipment requirement - Onsite D8 - 1.00 1.00
Equipment requirement - Running D8 - 0.21 0.21
Equipment Hours Hours - 1,275.75 #REF!
Average operating hours per equipment 1,275.75 #REF!
Cummulative operating hours per equipment - 1,275.75 #REF!
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment 1 - -
Capitalize Initial/Additional equipment 1.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 1.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
DOZER DISPOSAL 0 1 2
Equipment requirement - Onsite D8 - 3.00 3.00
Equipment requirement - Running D8 - 2.21 2.25
Equipment Hours Hours - 13,568.60 #REF!
Average operating hours per equipment 4,522.87 #REF!
Cummulative operating hours per equipment - 4,522.87 #REF!
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment 3 - -
Capitalize Initial/Additional equipment 3.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 3.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
DOZER LGO 0 1 2
Equipment requirement - Onsite D8 - - -
Equipment requirement - Running D8 - - -
Equipment Hours Hours - - #REF!
Average operating hours per equipment - -
Cummulative operating hours per equipment - - -
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment - - -
Capitalize Initial/Additional equipment - - -
Replacement - - -
Total Equipment requirement - - -
Capitalize Equipment plan - - -
Capital Requirement (US $) - - -
DOZER ROM 0 1 2
Equipment requirement - Onsite D8 - 1.00 1.00
Equipment requirement - Running D8 - 0.16 0.16
Equipment Hours Hours - 985.33 #REF!
Average operating hours per equipment 985.33 #REF!
Cummulative operating hours per equipment - 985.33 #REF!
Equipment Lifetime 30,000 30,000 30,000
Initial/Additional Equipment 1 - -
Capitalize Initial/Additional equipment 1.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 1.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
HAULING 0 1 2
Equipment requirement - Onsite TRUCK 100 T - 10.00 10.00
Equipment requirement - Running TRUCK 100 T - 7.06 7.17
Equipment Hours Hours - 43,311.58 #REF!
Average operating hours per equipment 4,331.16 #REF!
Cummulative operating hours per equipment - 4,331.16 #REF!
Equipment Lifetime 25,000 25,000 25,000
Initial/Additional Equipment 10 - (1)
Capitalize Initial/Additional equipment 10.00 - -
Replacement - #REF! #REF!
Total Equipment requirement 10.00 #REF! #REF!
Capitalize Equipment plan #REF! #REF! #REF!
Capital Requirement (US $) #REF! #REF! #REF!
HAULING 0 1 2
Equipment requirement - Onsite TRUCK 100 T - - -
Equipment requirement - Running TRUCK 100 T - - -
Equipment Hours Hours - - #REF!
Average operating hours per equipment - -
Cummulative operating hours per equipment - - -
Equipment Lifetime 25,000 25,000 25,000
Initial/Additional Equipment - - -
Capitalize Initial/Additional equipment - - -
Replacement - - -
Total Equipment requirement - - -
Capitalize Equipment plan - - -
Capital Requirement (US $) - - -
3 4
1.00 1.00
0.15 0.17
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
- -
- -
#REF! #REF!
- -
30,000 30,000
- -
- -
- -
- -
- -
- -
3 4
2.00 2.00
1.04 1.19
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (2)
- (2.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.27 0.31
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.13 0.15
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
8.00 9.00
5.98 6.81
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
1 (9)
1.00 (9.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.45 0.52
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
- -
- -
#REF! #REF!
- -
25,000 25,000
- -
- -
- -
- -
- -
- -
3 4
5.00 6.00
3.54 4.04
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
1 (6)
1.00 (6.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
2.00 2.00
0.89 1.01
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
- (2)
- (2.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.43 0.49
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
2.00 2.00
0.82 0.93
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (2)
- (2.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.19 0.21
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
3.00 3.00
1.99 2.27
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (3)
- (3.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
- -
- -
#REF! #REF!
- -
- -
30,000 30,000
- -
- -
- -
- -
- -
- -
3 4
1.00 1.00
0.14 0.16
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.33 0.38
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.16 0.18
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.49 0.56
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.37 0.37
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.46 0.46
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.72 0.72
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
2.00 2.00
0.80 0.92
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (2)
- (2.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
9.00 10.00
6.36 7.24
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
1 (10)
1.00 (10.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.03 0.04
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.17 0.20
#REF! #REF!
#REF! #REF!
#REF! #REF!
25,000 25,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.30 0.34
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.40 0.46
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
1.00 1.00
0.24 0.28
#REF! #REF!
#REF! #REF!
#REF! #REF!
30,000 30,000
- (1)
- (1.00)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
- -
- -
#REF! #REF!
- -
- -
30,000 30,000
- -
- -
- -
- -
- -
- -
3 4
- -
- -
#REF! #REF!
- -
- -
25,000 25,000
- -
- -
- -
- -
- -
- -
3 4
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
3 4
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
CAPITAL COST
AREA XXXXX CAPITAL SUSTAIN 2011 2012
DESCRIPTION UNIT COST $ UNIT COST $
EPC BUILDING $ - $ - - -
IT $ - $ - - -
MINING EQUIPMENT #REF! #REF! #REF! #REF!
TUG AND BARGE $ - $ - -
ROM SCREENING $ - $ - - -
ENGINEERING TOOLS & EQUIP $ 774,128 $ - 0.77 -
CR+6 TREATMENT FACILITIES $ - $ - - -
POND $ 197,203 $ - 0.20 -
ROMPILE $ - $ - - -
DYKE $ - $ - - -
QUARRY PREPARATION $ - $ - - -
LGO PREPARATION $ 14,856 $ - 0.01 -
DISPOSAL PREPARATION $ 32,787 $ - 0.03 -
MINE ROAD ACCESS $ 469,763 $ 3,200,000 0.47 0.80
MHR CONSTRUCTION $ - $ - - -
PORT $ - $ - - -
EXPLORATION R & D $ 1,554,385 $ - 1.55 -
INDIRECT CAPITAL COST #REF! #REF! #REF! #REF! #REF!
TOTAL DIRECT+INDIRECT #REF!
CONTINGENCY 30% #REF! #REF! #REF! #REF!
TOTAL CAPITAL COST #REF! #REF! #REF! #REF!
2013 2014 2015
0 0
#REF! #REF! #REF!
- - -
- - -
#REF! #REF! #REF!