COLUMNA SECCION AREA VOLUMEN ACERO POR SECCION (UD) LONGITUD DE ACERO (M) ESTRIBOS (5.

10 M)
S No. ANCHO ALTO LARGO (M2) (M3) 1/2" 3/4" 1" 1/2" 3/4" 1" No. LONG. LONG. ACERO 3/8"

C1 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28


C2 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C3 0.45 0.45 12.85 0.203 2.60 16.00 205.60 68 2.82 191.76
C4 0.45 0.45 12.85 0.203 2.60 8.00 102.80 49 1.72 84.28
C5 0.45 0.45 10.05 0.203 2.04 12.00 4.00 120.60 40.20 65 2.82 183.3
C6 0.45 0.45 10.05 0.203 2.04 12.00 4.00 120.60 40.20 65 2.82 183.3
C7 0.45 0.45 12.85 0.203 2.60 8.00 102.80 49 1.72 84.28
C8 0.45 0.45 12.85 0.203 2.60 16.00 205.60 68 2.82 191.76
C9 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C10 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C11 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C12 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C13 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C14 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C15 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C16 0.45 0.45 10.05 0.203 2.04 16.00 160.80 54 2.82 152.28
C17 0.45 0.45 12.85 0.203 2.60 16.00 205.60 83 2.82 234.06
C18 0.45 0.45 12.85 0.203 2.60 16.00 205.60 83 2.82 234.06
C19 0.45 0.45 12.85 0.203 2.60 16.00 205.60 54 2.82 152.28
C20 0.45 0.45 12.85 0.203 2.60 16.00 205.60 68 2.82 191.76
C21 0.45 0.45 12.85 0.203 2.60 16.00 205.60 68 2.82 191.76
C22 0.45 0.45 12.85 0.203 2.60 16.00 205.60 54 2.82 152.28
C23 0.45 0.45 10.05 0.203 2.04 8.00 80.40 65 1.72 111.8
C24 0.45 0.45 10.05 0.203 2.04 8.00 80.40 65 1.72 111.8

LONGITUD TOTALES ACERO (M) 3252.80 241.20 446.80 3821.28

NO. DE BARRAS DE ACERO 542.13 40.20 74.47 636.88

QUINTALES DE ACERO (QQ) 72.38 12.07 39.82 47.92

TOTAL GENERAL ( QQ) 172.20


SECCION AREA VOLUMEN ACERO POR SECCION (UD)
COLUMNAS No. ANCHO ALTO LARGO (M2) (M3) 1/2" 3/4"

C1 0.45 0.45 7.62 0.203 1.54 16.00


C2 0.45 0.45 7.62 0.203 1.54 16.00
C3 0.45 0.45 7.62 0.203 1.54 16.00
C4 0.45 0.45 7.62 0.203 1.54
C5 0.45 0.45 7.62 0.203 1.54 12.00
C6 0.45 0.45 7.62 0.203 1.54 12.00
C7 0.45 0.45 7.62 0.203 1.54
C8 0.45 0.45 7.62 0.203 1.54 16.00
C9 0.45 0.45 7.62 0.203 1.54 16.00
C10 0.45 0.45 7.62 0.203 1.54 16.00
C11 0.45 0.45 7.62 0.203 1.54 16.00
C12 0.45 0.45 7.62 0.203 1.54 16.00
C13 0.45 0.45 7.62 0.203 1.54 16.00
C14 0.45 0.45 7.62 0.203 1.54 16.00
C15 0.45 0.45 7.62 0.203 1.54 16.00
C16 0.45 0.45 7.62 0.203 1.54 16.00
C17 0.45 0.45 7.62 0.203 1.54 16.00
C18 0.45 0.45 7.62 0.203 1.54 16.00
C19 0.45 0.45 7.62 0.203 1.54 16.00
C20 0.45 0.45 7.62 0.203 1.54 16.00
C21 0.45 0.45 7.62 0.203 1.54 16.00
C22 0.45 0.45 7.62 0.203 1.54 16.00
C23 0.45 0.45 7.62 0.203 1.54
C24 0.45 0.45 7.62 0.203 1.54

LONGITUD TOTALES ACERO (M)

NO. DE BARRAS DE ACERO

QUINTALES DE ACERO (QQ)


POR SECCION (UD) LONGITUD DE ACERO (M) ESTRIBOS (5.10 M)
1" 1/2" 3/4" 1" No. LONG. LONG. ACERO 3/8"

121.92 42 2.82 118.44


121.92 42 2.82 118.44
121.92 42 2.82 118.44
8.00 60.96 32 1.72 55.04
4.00 91.44 30.48 50 2.82 141
4.00 91.44 30.48 50 2.82 141
8.00 60.96 32 1.72 55.04
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 50 2.82 141
121.92 50 2.82 141
121.92 38 2.82 107.16
121.92 42 2.82 118.44
121.92 42 2.82 118.44
121.92 38 2.82 107.16
8.00 60.96 50 1.72 86
8.00 60.96 50 1.72 86

ES ACERO (M) 2194.56 182.88 304.80 2718.56

S DE ACERO 365.76 30.48 50.80 453.09

ACERO (QQ) 48.83 9.15 27.17 34.09

TOTAL GENERAL ( QQ) 119.24


SECCION AREA VOLUMEN ACERO POR SECCION (UD)
COLUMNAS No. ANCHO ALTO LARGO (M2) (M3) 1/2" 3/4"

C1 0.45 0.45 6.00 0.203 1.22 16.00


C2 0.45 0.45 6.00 0.203 1.22 16.00
C3 0.45 0.45 6.00 0.203 1.22 16.00
C4 0.45 0.45 6.00 0.203 1.22
C5 0.45 0.45 6.00 0.203 1.22 12.00
C6 0.45 0.45 6.00 0.203 1.22 12.00
C7 0.45 0.45 6.00 0.203 1.22
C8 0.45 0.45 6.00 0.203 1.22 16.00
C9 0.45 0.45 6.00 0.203 1.22 16.00
C10 0.45 0.45 6.00 0.203 1.22 16.00
C11 0.45 0.45 6.00 0.203 1.22 16.00
C12 0.45 0.45 6.00 0.203 1.22 16.00
C13 0.45 0.45 6.00 0.203 1.22 16.00
C14 0.45 0.45 6.00 0.203 1.22 16.00
C15 0.45 0.45 6.00 0.203 1.22 16.00
C16 0.45 0.45 6.00 0.203 1.22 16.00
C17 0.45 0.45 6.00 0.203 1.22 16.00
C18 0.45 0.45 6.00 0.203 1.22 16.00
C19 0.45 0.45 6.00 0.203 1.22 16.00
C20 0.45 0.45 6.00 0.203 1.22 16.00
C21 0.45 0.45 6.00 0.203 1.22 16.00
C22 0.45 0.45 6.00 0.203 1.22 16.00
C23 0.45 0.45 6.00 0.203 1.22
C24 0.45 0.45 6.00 0.203 1.22

LONGITUD TOTALES ACERO (M)

NO. DE BARRAS DE ACERO

QUINTALES DE ACERO (QQ)


POR SECCION (UD) LONGITUD DE ACERO (M) ESTRIBOS (5.10 M)
1" 1/2" 3/4" 1" No. LONG. LONG. ACERO 3/8"

96.00 44 2.82 124.08


96.00 44 2.82 124.08
96.00 44 2.82 124.08
8.00 48.00 27 1.72 46.44
4.00 72.00 24.00 41 2.82 r
4.00 72.00 24.00 41 2.82 115.62
8.00 48.00 27 1.72 46.44
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 41 2.82 115.62
96.00 41 2.82 115.62
96.00 35 2.82 98.7
96.00 44 2.82 124.08
96.00 44 2.82 124.08
96.00 35 2.82 98.7
8.00 48.00 41 1.72 70.52
8.00 48.00 41 1.72 70.52

ES ACERO (M) 1728.00 144.00 240.00 2515.3

S DE ACERO 288.00 24.00 40.00 419.22

ACERO (QQ) 38.45 7.21 21.39 31.54

TOTAL GENERAL ( QQ) 98.59


MEDICIONES DE REFUERZO INFERIOR PLATEA MEDICIONES DE REFUERZO SUP
DIRECCION DIRECCION DIRECCION
ACERO 1/2" ACERO 1/2" ACERO 3/8" ACERO 3/8" ACERO 1/2"
EN X (qq) EN Y (qq) EN X (qq) EN Y (qq) EN X (qq)
403.5 218.4
177.98 121
177.98 121
17.15 42.25
17.15 42.25
5.86 25.74
6.36 25.74 5.68
6.86 10.42 6.46
7.86 10.1 7.52
11.46 9.86 8.02
9.1 9.52 8.62
8.06 9.22 12.58
7 8.98 9.06
5.94 19.03 8.46
2.89 19.03 7.04
35.28 97.92 6.94
35.28 38.88
26.76 60.6
26.76
54.84

1044.07 548.46 242 1834.53 179.86

174.01 91.41 40.33 29.98

23.23 12.20 3.03 4.00

PLATEA
ACERO R.I (qq) R.S (qq)
total acero 1/2" 35.44 5.60
total acero 3/8" 3.03 18.15
`
MEDICIONES DE REFUERZO SUPERIOR PLATEA
DIRECCION DIRECCION
ACERO 1/2" ACERO 3/8" ACERO 3/8"
EN Y (qq) EN X (qq) EN Y (qq)

326.16 205.44
125.37 115.08
125.37 115.08
19.67 78.12
19.67 78.12
27.93 24.31 11.16
8.06 24.31 10.76
8.36 10.36
8.76 9.96
9.16 9.84
9.46 9.7
38.16
26.76
64.03

71.73 664.86 782.57 1699.02

11.95 110.81 130.43

1.60 8.34 9.81


PORTICO MEDICIONES ACERO -3/8" ACERO - 1/2" ACERO - 3/4" LONGITUD - 3/8" LONGITUD - 1/2" LONGITUD - 3/4" NO. LONG. L. TOTAL L. TOTAL
VOLUMEN
No. LANGO ANCHO ALTO SUP. INF. SUP. INF. SUP. INF. SUP. INF. SUP. INF. SUP. INF. ESTRIBOS ESTRIBOS 3/8" 1/2" L. TOTAL 3/4"

1.00 0.95 0.65 0.30 0.19 3.00 3.00 1.21 1.05 16.00 17.76 6.78
2.00 1.25 0.65 0.30 0.24 3.00 3.00 1.51 1.51 12.00 26.64 9.06
1.25 2.00 0.95 1.90
3.00 0.65 0.30 0.24 2.00 3.00 0.95 1.51 12.00 26.64 6.43
3.00 4.00 1.51 0.95 8.33
4.00 1.25 0.65 0.30 0.24 5.00 7.00 1.51 1.51 10.00 22.20 18.12
5.00 1.25 0.65 0.30 0.24 5.00 3.00 2.00 1.51 1.51 2.01 12.00 26.64 12.08 4.02
6.00 1.25 0.65 0.30 0.24 5.00 3.00 2.00 1.51 1.51 2.01 12.00 26.64 12.08 4.02
7.00 1.25 0.65 0.30 0.24 5.00 7.00 1.51 1.51 11.00 24.42 18.12
8.00 1.25 0.65 0.30 0.24 3.00 3.00 1.51 1.51 12.00 26.64 9.06
2.00 4.00 0.95 0.95 5.70
9.00 1.25 0.65 0.30 0.24 5.00 7.00 1.51 1.51 11.00 24.42 18.12
10.00 1.25 0.65 0.30 0.24 3.00 3.00 1.49 1.33 10.00 22.20 8.46
2.00 1.20 2.40
11.00 0.85 0.65 0.30 0.17 4.00 4.00 1.11 0.95 8.00 22.64 8.24
12.00 0.85 0.65 0.30 0.17 4.00 4.00 1.11 0.95 16.00 22.64 8.24
13.00 1.235 0.65 0.30 0.24 3.00 3.00 1.49 1.33 10.00 22.20 8.46
2.00 1.20 2.40
14.00 1.235 0.65 0.30 0.24 3.00 3.00 1.49 1.33 10.00 22.20 8.46
2.00 1.20 2.40
15.00 1.218 0.65 0.30 0.24 3.00 3.00 1.48 1.32 10.00 22.20 8.40
2.00 2.00 1.32 1.97 2.64 3.94
16.00 1.218 0.65 0.30 0.24 3.00 3.00 1.48 1.32 10.00 22.20 8.40
2.00 2.00 1.32 1.97 2.64 3.94
17.00 0.95 0.65 0.30 0.19 6.00 4.00 1.00 1.21 1.05 1.70 16.00 22.64 11.46 1.70
18.00 1.52 0.65 0.30 0.30 5.00 3.00 1.78 2.48 14.00 31.08 8.90 7.44
19.00 1.52 0.65 0.30 0.30 3.00 3.00 2.00 1.78 1.78 2.28 13.00 28.86 10.68 4.56
2.00 2.00 1.00 1.35 2.00 2.70
20.00 0.95 0.65 0.30 0.19 6.00 4.00 1.00 1.21 1.05 1.70 8.00 22.64 11.46 1.70
21.00 1.20 0.65 0.30 0.23 3.00 3.00 2.00 1.46 1.30 1.95 10.00 28.30 8.28 3.90
2.00 2.00 1.25 1.10 4.70
22.00 1.20 0.65 0.30 0.23 5.00 3.00 1.45 1.45 10.00 28.30 11.60
4.00 1.25 5.00
23.00 0.85 0.65 0.30 0.17 3.00 3.00 1.11 1.61 16.00 22.20 3.33 4.83
24.00 0.95 0.65 0.30 0.19 4.00 4.00 1.21 1.05 16.00 22.64 9.04
25.00 0.95 0.65 0.30 0.19 3.00 3.00 1.21 1.05 16.00 17.76 6.78
26.00 1.074 0.65 0.30 0.21 3.00 3.00 1.33 1.42 16.00 22.20 3.99 4.26
27.00 0.95 0.65 0.30 0.19 3.00 3.00 1.21 1.05 16.00 17.76 6.78
28.00 1.074 0.65 0.30 0.21 3.00 3.00 1.34 1.43 16.00 22.20 4.02 4.29
29.00 0.85 0.65 0.30 0.17 3.00 2.00 1.12 1.12 16.00 22.20 5.60
3.00 0.96 2.88
30.00 0.95 0.65 0.30 0.19 4.00 4.00 1.21 1.05 16.00 22.64 9.04

TOTALES TOTALES LONGITUD 709.70 322.46 43.86 7.44

TOTALES NO. DE VARILLAS 118.28 53.74 7.31 1.24

TOTALES QUINTALES 8.90 4.04 0.98 0.37


12.94
TOTAL GENERAL QUINTALES

PORTICO
ACERO 3/8" ACERO 1/2" ACERO 3/4"
(qq) (qq) (qq)
12.94 0.98 0.37
OFICINA DE INGENIEROS SUPERVISORES DE OBRAS DEL ESTADO ADSCRITO AL PODER EJECUTIVO

PRESUPUESTO PROYECTOS DE CONSTRUCCION DE TEMPLOS, CASAS CURIALES Y OFICINAS PARROQUIALES ARQUIDIOCESIS DE SANTO
DOMINGO

Nonbre del Contratista: Fecha:18 de mayo del 2021


Ubicacion Localizacion : Prov.

No. PARTIDAS CANT. UD PRECIO SUB-TOTAL TOTAL ( RD$ )

IGLESIA TIPO A

1.00 PREPARACION EN: 290,942.30


1.01 Limpieza solar 2800.00 M2 30.00 84,000.00
1.02 Charrancha 106.44 ML 144.27 15,356.10
1.03 Replanteo de ejes 644.00 M2 49.05 31,588.20
1.04 Estudio de suelo 600.00 P.A 208.33 124,998.00
1.05 Almacén para materiales 1.00 UD 35,000.00 35,000.00

2.00 MOVIMENTO DE TIERRAS EN: 1,417,860.00


2.01 Excavación Zapata Muros-Columnas (rocoso 554.90 M3 1,350.00 749,115.00
2.02 Excavación de registro 7.40 M3 1,350.00 9,990.00
20.30 Excavación caja séptica 14.80 M3 1,350.00 19,980.00
2.04 Movimiento de material inservible +30% esponjamiento 750.23 M3 350.00 262,580.50
2.05 Relleno de reposición 45.85 M3 450.00 20,632.50
2.06 Relleno compactado para piso (0.40 mts) 92.45 M3 600.00 55,470.00
2.07 Bote de material inservible +30% esponjamiento 750.23 M3 400.00 300,092.00

3.00 HORMIGON ARMADO EN: 8,857,936.24


3.01 Zapara de muros 116.00 M3 8,031.20 931,619.20
3.02 Columnas-muros hormigón de Cargas 236.00 M3 24,750.00 5,841,000.00
3.03 Viga de amarre 3.80 M3 19,902.09 75,627.94
3.04 Vigas de 9.70 M3 19,073.26 185,010.62
3.05 Losas de techos 81.40 M3 18,860.00 1,535,204.00
3.06 Hormigón Losa Messanini 9.20 M3 18,530.00 170,476.00
3.07 Hormigón simple en torta de piso 23.11 M3 5,149.22 118,998.47

4.00 ENCOFRADO 1,114,750.00


4.01 Encofrado de muros columnas (armadura) 867.00 M2 650.00 563,550.00
4.02 Encofrado de losas y vigas (armadura) 848.00 M2 650.00 551,200.00

5.00 MUROS DE BLOQUES EN : 66,476.96


5.01 Replanteo blocks de 6" 1era 85.60 ML 185.00 15,836.00
5.02 Muro de blocks de 6" contención y jardinera 51.36 M2 986.00 50,640.96

6.00 SUPERFICIES TERMINADAS EN: 3,152,336.60


6.01 Careteo en entrepiso (messanini) 46.00 M2 144.71 6,656.66
6.02 Careteo en techos 600.60 M2 144.71 86,912.83
6.03 Careteo en vicar de cargas 60.45 ML 144.71 8,747.72
6.04 Careteo en columnas 234.00 ML 144.71 33,862.14
6.05 Careteo en muros de hormigón dint. Y viga am 2470.00 M2 144.71 357,433.70
6.06 impermeabilizante en techo con vigas 794.00 M2 175.00 138,950.00
6.07 Fino en techo 600.60 M2 397.00 238,438.20
6.08 Pañete exterior 2876.00 M2 324.00 931,824.00
6.09 Pañete Interior 3186.00 M2 324.00 1,032,264.00
6.10 Pañete entrepisos (messanini) 76.00 M2 250.00 19,000.00
6.11 Pañete en vigas 62.00 ML 390.96 24,239.52
6.12 Cantos y mochetas 914.35 ML 109.48 100,103.04
6.13 Rosetas en yeso 24.00 UD 250.00 6,000.00
6.14 Esquineros en coralina 84.80 M2 1,213.50 102,904.80
6.15 Tenninacion en jardineras 1.00 P.A 65,000.00 65,000.00

7.00 REVESTIMIENTOS EN: 1,361,541.44


7.01 Piso en Baños cerámica importada 42.00 M2 1,048.52 44,037.84
7.02 Piso general coralina 716.00 M2 1,213.52 868,880.32
7.03 Zócalos coralina 168.00 ML 1,206.00 202,608.00
704.00 Cerarnica importada en paredes de 64.00 M2 1,863.52 119,265.28
7.05 Escalones de entrada principal 4.70 ML 2,500.00 11,750.00
7.06 Escalones de entrada 46.00 ML 2,500.00 115,000.00

OFICINA DE INGENIEROS SUPERVISORES DE OBRAS DEL ESTADO ADSCRITO AL PODER EJECUTIVO

PRESUPUESTO PROYECTOS DE CONSTRUCCION DE TEMPLOS, CASAS CURIALES Y OFICINAS PARROQUIALES ARQUIDIOCESIS DE SANTO
DOMINGO
Nonbre del Contratista: Fecha:18 de mayo del 2021
Ubicacion Localizacion : Prov.

No. PARTIDAS CANT. UD PRECIO SUB-TOTAL TOTAL ( RD$ )


8.00 INSTALACIONES ELECTRICAS: 893,012.75
8.01 Salida de luces cenitales (lámparas) 24.00 UD 9,250.00 222,000.00
8.02 Salida de interruptor sencillo 6.00 UD 1,562.05 9,372.30
8.03 Salida de interruptor doble 4.00 UD 1,821.25 7,285.00
8.04 Salida para teléfono 1.00 UD 1,317.08 1,317.08
8.05 Salida para TV (monitor) 4.00 UD 1,317.08 5,268.32
8.06 Swich piloto 2.00 UD 1,821.25 3,642.50
8.07 Salida gara timbre (campana) 1.00 UD 2,081.80 2,081.80
8.08 Tomacorriente 110V 22.00 UD 1,757.87 38,673.14
8.09 Tomacorriente 220V 4.00 UD 2,876.32 11,505.28
8.10 Panel de control de 16 1.00 UD 5,208.96 5,208.96
8.11 Botón de timbre 1.00 UD 1,665.61 1,665.61
8.12 Switch de seguridad 1.00 UD 2,275.02 2,275.02
8.13 Salida para aire acondicionado 2.00 UD 1,950.00 3,900.00
8.14 Calentador eléctrico 1.00 UD 8,817.74 8,817.74
8.15 Materiales y tuberías eléctricas 1.00 UD 134,000.00 134,000.00
8.16 Otros materiales de arrastre a cometida 1.00 PA 112,000.00 112,000.00
8.17 Mano de Obra 1.00 RA 230,000.00 230,000.00
8.18 Instalaciones de seguridad (cámara) 1.00 P.A 94,000.00 94,000.00

9.00 INSTALACIONES SAINTTARIAS: 274,240.04


9.01 Inodoros completo 3.00 UD 7,538.05 22,614.15
9.02 Lavamanos completo con mueble 3.00 UD 18,500.00 55,500.00
9.03 Pila bautismal 1.00 P.A 47,000.00 47,000.00
9.04 Accesorio para baños 3.00 UD 2,500.00 7,500.00
9.05 Cámara de inspección 5.00 UD 3,952.29 19,761.45
9.06 Cámara séptica 1.00 UD 42,912.15 42,912.15
9.07 Trampa de grasa 1.00 ML 3,952.29 3,952.29
9.08 Tuberías y piezas 1.00 Uri 35,000.00 35,000.00
9.09 Mano de Obra 1.00 P.A 40,000.00 40,000.00

10.00 PORTAJE: 598,100.00


10.01 Puertas verjas perimetral (hierro) 2.00 UD 46,000.00 92,000.00
10.02 Puerta principales Madera roble e hierro personalizada 3.00 UD 95,000.00 285,000.00
10.03 Puertas de cristal corredera (Capilla y sacri) 2.00 UD 46,000.00 92,000.00
10.04 Puertas baño sacristía (Roble) 1.00 UD 18,500.00 18,500.00
10.05 Puertas baños comunes ( polimetal) 2.00 UD 5,800.00 11,600.00
10.06 Puertas laterales presbiterios (roble) 2.00 UD 18,500.00 37,000.00
10.07 Closet sacristía 1.00 UD 62,000.00 62,000.00

11.00 930,600.00
11.01 Ventanas alta Personalizada 12.00 UD 9,500.00 114,000.00
11.02 Ventana principales poliuretano en colores e hierro (personalizada) 12.00 UD 67,000.00 804,000.00
11.03 Ventanas Baños 3.00 UD 4,200.00 12,600.00

12.00 HERRERIA EN ARTE : 196,000.00


12.01 Escalera 2.00 UD 52,000.00 104,000.00
12.02 Baranda de messanini 2.00 UD 46,000.00 92,000.00

13.00 CALLE ACERA Y CONTENES 1,718,400.00


13.01 Preparación corte de terreno 680.00 ML 260.00 176,800.00
13.02 Preparación relleno compactación Calle y parqueos sin asfalto. 680.00 ML 520.00 353,600.00
13.03 Contenes 1320.00 ML 480.00 633,600.00
13.04 Aceras 1320.00 ML 420.00 554,400.00

14.00 MOBILIARIOS 2,102,000.00


14.01 Mesa del Altar (mármol-madera) 1.00 P.A 130,000.00 130,000.00
14.02 Sede y dos sillas auxiliares 3.00 PA 40,000.00 120,000.00
14.03 Ambon 1.00 RA 32,000.00 32,000.00
14.04 Bancos de Roble 2 mts 130.00 isill- 14,000.00 1,820,000.00

15.00 PINTURA EN: 924,709.00

15.01 Entrepiso (acrílica) 46.00 M2 145.00 6,670.00


OFICINA DE INGENIEROS SUPERVISORES DE OBRAS DEL ESTADO ADSCRITO AL PODER EJECUTIVO

PRESUPUESTO PROYECTOS DE CONSTRUCCION DE TEMPLOS, CASAS CURIALES Y OFICINAS PARROQUIALES ARQUIDIOCESIS DE SANTO
DOMINGO

Nonbre del Contratista: Fecha:18 de mayo del 2021


Ubicacion Localizacion : Prov.

No. PARTIDAS CANT. UD PRECIO SUB-TOTAL TOTAL ( RD$ )


15.02 Techo (acrílica) 600.60 M2 145.00 87,087.00
15.03 Paredes exteriores-interiores (semigloss) 3847.00 M2 216.00 830,952.00
15.04
114,800.00
16.00 TRBAJOS FINALES 1.00 P.A 85,000.00 85,000.00
16.01 Áreas verdes y palmareñas posterior 2.00 UD 2,400.00 4,800.00
16.02 Zafacones para basura soterrados 1.00 P.A 25,000.00 25,000.00
16.03 Limpieza final

SUB-TOTAL 24,013,705.33

GASTOS GENERALES: 8,414,402.07


Dirección Técnica 0.08 1,921,096.43
Seguros y Fianzas (Sec6n Facturas) 1.00 P.A 840,479.41
Gastos Administrativos 0.04 960,548.21
Liquidación y Prestaciones Laborales 0.01 240,137.05
Transportes 0.01 240,137.05
Pianos 0.03 720,411.16
Supervisan e inspección de Obras 0.05 1,200,685.27
Estudio y Diseños 0.05 1,200,685.27
Publicidad 0.03 720,411.16
ITBIS Sobre la Dirección Técnica 0.18 345,797.36
Codia 0.00 24,013.71

TOTAL GENERAL 32,428,107.40

Nota 1:La partidas Seguros y Fianzas será pagada previa presentación de Facturas
Nota 2:El costo de Inspección Supervisión será cobrado por la Oficina de Ingenieros y Supervisores de Obras del Estado.
Nota 3:La Partida Estudios y Diseño será cobrada por Oficina de Ingenieros y Supervisores de Obras del Estado
Nota 4:La Partida Publicada será cobrada por Oficina de Ingenieros y Supervisores de Obras del Estado.
Nota 5:Las partidas presupuestadas serán medidas y evaluadas por la supervisión de campos.
Nota 6:Este presupuesto consta de tres (03) paginas incluyendo esta hoja de resumen.
Nota 7:Los volúmenes fueron tomado de la propuesta suministrada.

Volumetría Suministrada por Presupuesto Preparado Por

_____________________________________ ___________________________________________
Ing. EMIL MEDINA ARQ. SECUNDINO OZORIO ACOSTA
Sub-Dirección Regional

Aprobado Por Presupuesto Revisado Por

___________________________________________ ___________________________________________
ING. JUAN CARLOS CABRERA ING. JOSE RAFAEL NUÑEZ HERRAND
Director Técnica Encargado Sub-Dirección de Presupuesto

Aceptado conforme

_______________________________
Contratista