Project: NISSAN SHOWROOM & OFFICE - BUILDING 2 THE PEARL

IFC Schedule As Built Schedule


S.No Ref
Qty
Capacity (TR) Total Capacity Chilled Water Flow (LPS) Total Chilled Water Flow Capacity (TR) Total Capacity Chilled Water Flow (LPS) Total Chilled Water Flow
(Each Unit) (TR) (Each Unit) (LPS) (Each Unit) (TR) (Each Unit) (LPS)

Chilled Waer Fan Coil Unit

BASEMENT

1 FCU-BF-1 1 1.00 1.00 0.09 0.09 1.25 1.25 0.12 0.12

2 FCU-BF-2 1 0.68 0.68 0.06 0.06 0.94 0.94 0.09 0.09

3 FCU-BF-3 1 0.83 0.83 0.08 0.08 0.93 0.93 0.11 0.11

4 FCU-BF-4 1 0.83 0.83 0.08 0.08 0.93 0.93 0.11 0.11

5 FCU-BF-5 1 2.02 2.02 0.19 0.19 2.27 2.27 0.22 0.22

6 FCU-BF-6 1 1.68 1.68 0.16 0.16 2.04 2.04 0.19 0.19

7 FCU-BF-7 1 0.71 0.71 0.07 0.07 0.94 0.94 0.09 0.09

8 FCU-BF-8 1 0.68 0.68 0.06 0.06 0.72 0.72 0.07 0.07

BASEMENT MEZZANINE FLOOR

9 FCU-BMF-1 1 1.68 1.68 0.16 0.16 2.04 2.04 0.19 0.19

FIRST FLOOR

10 FCU-FF-1 1 1.34 1.34 0.10 0.10 1.53 1.53 0.15 0.15

11 FCU-FF-2 1 2.33 2.33 0.20 0.20 2.55 2.55 0.24 0.24

12 FCU-FF-3 1 1.34 1.34 0.10 0.10 1.53 1.53 0.15 0.15

13 FCU-FF-4 1 3.36 3.36 0.30 0.30 3.66 3.66 0.35 0.35

14 FCU-FF-5 1 1.00 1.00 0.10 0.10 1.14 1.14 0.11 0.11

Chilled Waer Air Handling Unit

Ground Floor and Fround Floor Mezzaninr

1 AHU-GF-1,2,3,4,5,6 6 5.01 30.05 0.50 3.00 6.55 39.27 0.62 3.72

2 AHU-GF-7,8,9,10 4 5.01 20.03 0.50 2.00 6.60 26.41 0.63 2.52

3 AHU-GF-11 1 6.69 6.69 0.60 0.60 8.79 8.79 0.84 0.84

4 AHU-GF-12 1 6.69 6.69 0.60 0.60 8.79 8.79 0.84 0.84

5 AHU-GF-13 1 7.26 7.26 0.70 0.70 7.63 7.63 0.72 0.72

6 AHU-MF-01 1 11.04 11.04 1.00 1.00 14.43 14.43 1.37 1.37

7 AHU-MF-02 1 5.01 5.01 0.50 0.50 6.60 6.60 0.63 0.63

FIRST FLOOR

8 AHU-FF-01 1 5.35 5.35 0.50 0.50 6.94 6.94 0.66 0.66

9 AHU-FF-02 1 5.01 5.01 0.50 0.50 6.55 6.55 0.62 0.62

10 AHU-FF-03 1 6.69 6.69 0.60 0.60 8.79 8.79 0.84 0.84

11 AHU-FF-04 1 5.01 5.01 0.50 0.50 6.55 6.55 0.62 0.62

12 AHU-FF-05 1 10.05 10.05 1.00 1.00 13.03 13.03 1.24 1.24

13 AHU-FF-07 1 10.05 10.05 1.00 1.00 13.03 13.03 1.24 1.24

14 AHU-FF-06,08 2 6.69 13.38 0.60 1.20 8.79 17.59 0.84 1.68

15 AHU-FF-09 1 5.01 5.01 0.50 0.50 6.55 6.55 0.62 0.62

16 AHU-FF-10 1 5.69 5.69 0.50 0.50 7.51 7.51 0.72 0.72

Total Capacity As Per IFC Schedule Total Capacity As Per As Built


172.453045 16.45 220.9447923 21.065
- (TR) Schedule - (TR)