Project: NISSAN SHOWROOM & OFFICE - BUILDING 2 THE PEARL
IFC Schedule As Built Schedule
S.No Ref Qty Capacity (TR) Total Capacity Chilled Water Flow (LPS) Total Chilled Water Flow Capacity (TR) Total Capacity Chilled Water Flow (LPS) Total Chilled Water Flow (Each Unit) (TR) (Each Unit) (LPS) (Each Unit) (TR) (Each Unit) (LPS)