SUBJECT: APR GA: Approval for placing PO for Electricity Bill reimbursement to M/s Nirmal Filling
Station (CNG Station) of Raebareli of APR GA for period from 05.03.2024 to 05.04.2024.
1. Background
CNG sale commenced at M/s Nirmal Filling Station in the month of Aug 22.
For commissioning CNG Station, dealer of M/s Nirmal Filling Station was asked to enhance
the electrical load required for running equipment’s like Compressor, dispenser etc.
Electrical connection was taken by dealer
For smooth operation of DBS – Station M/s Nirmal Filling Station, the electricity bill will be
paid by the dealer and subsequently BPCL will reimburse the electricity bill to dealer.
It is proposed to place a lumpsum PO of amount Rs. 65,000/-for reimbursing electricity bill
for period from 05.03.2024 to 05.04.2024 considering average electricity bill of Rs 65,000/-
per month.
Average Estimated
Estimated Electricity bill for
S.No Description Months Electricity bill per Month
FY 23-24 (Rs)
(Rs)
Estimated electricity
1 bill for a period from 1 65,000/- 65,000/-
March 05 to April 05
Total 65,000/-
2. Approval Requested
View above, approval is requested for placing PO of estimated amount of Rs. 65,000/- to M/s Nirmal
Filling Station for reimbursement of electricity bills during period from 05.03.2024 to 05.04.2024 for
smooth operation of M/s Nirmal Filling Station, Raebareli.