Electricity Reim/Rudra/23-24/01 Date: 15.05.

2024

Note to: Territory Manager, GAS UP-02

SUBJECT: APR GA: Approval for placing PO for Electricity Bill reimbursement to M/s Rudra Filling
Station (CNG Station) of Raebareli of APR GA for period from 02.12.2023 to 05.03.2024.

1. Background

 CNG sale commenced at M/s Rudra Filling Station in the month of March 22.
 For commissioning CNG Station, dealer of M/s Rudra Filling Station was asked to enhance
the electrical load required for running equipment’s like Compressor, dispenser etc.
 Electrical connection was taken by dealer
 For smooth operation of DBS – Station M/s Rudra Filling Station, the electricity bill will be
paid by the dealer and subsequently BPCL will reimburse the electricity bill to dealer.
 It is proposed to place a lumpsum PO of amount Rs. 51,000/- for reimbursing electricity bill
for period from 02.12.2023 to 05.03.2024 considering average electricity bill of Rs 17,000/-
per month.

Average Estimated
Estimated Electricity bill for
S.No Description Months Electricity bill per Month
FY 23-24 (Rs)
(Rs)
Estimated electricity
bill for a period from
1 3 17,000/- 51,000/-
December 02 to
March 05
Total 51,000/-

2. Approval Requested

View above, approval is requested for placing PO of estimated amount of Rs., 51,000/- to M/s Rudra
Filling Station for reimbursement of electricity bills during period from 02.12.2023 to 05.03.2024 for
smooth operation of M/s Rudra Filling Station, Raebareli.

Proposed by Approved By:

Mr. Sudeep Kumar Gupta Mr. Adhikari Jeetendra


Asst. Manager Sales (Gas), UP-02 Territory Manager (Gas), UP- 02